期刊文献+
共找到302篇文章
< 1 2 16 >
每页显示 20 50 100
Failure mechanism of large-diameter shield tunnels and its effects on ground surface settlements 被引量:5
1
作者 杨宇友 李宏安 《Journal of Central South University》 SCIE EI CAS 2012年第10期2958-2965,共8页
A new technique for the analysis of the three-dimensional collapse failure mechanism and the ground surface settlements for the large-diameter shield tunnels were presented.The technique is based on a velocity field m... A new technique for the analysis of the three-dimensional collapse failure mechanism and the ground surface settlements for the large-diameter shield tunnels were presented.The technique is based on a velocity field model using more different truncated solid conical blocks to clarify the multiblock failure mechanism.Furthermore,the shape of blocks between the failure surface and the tunnel face was considered as an entire circle,and the supporting pressure was assumed as non-uniform distribution on the tunnel face and increased with the tunnel embedded depth.The ground surface settlements and failure mechanism above large-diameter shield tunnels were also investigated under different supporting pressures by the finite difference method. 展开更多
关键词 large-diameter shield tunnel failure mechanism ground surface settlements limit analysis theory supporting pressures
下载PDF
Modelling the performance of EPB shield tunnelling using machine and deep learning algorithms 被引量:21
2
作者 Song-Shun Lin Shui-Long Shen +1 位作者 Ning Zhang Annan Zhou 《Geoscience Frontiers》 SCIE CAS CSCD 2021年第5期81-92,共12页
This paper introduces an intelligent framework for predicting the advancing speed during earth pressure balance(EPB)shield tunnelling.Five artificial intelligence(AI)models based on machine and deep learning technique... This paper introduces an intelligent framework for predicting the advancing speed during earth pressure balance(EPB)shield tunnelling.Five artificial intelligence(AI)models based on machine and deep learning techniques-back-propagation neural network(BPNN),extreme learning machine(ELM),support vector machine(SVM),long-short term memory(LSTM),and gated recurrent unit(GRU)-are used.Five geological and nine operational parameters that influence the advancing speed are considered.A field case of shield tunnelling in Shenzhen City,China is analyzed using the developed models.A total of 1000 field datasets are adopted to establish intelligent models.The prediction performance of the five models is ranked as GRU>LSTM>SVM>ELM>BPNN.Moreover,the Pearson correlation coefficient(PCC)is adopted for sensitivity analysis.The results reveal that the main thrust(MT),penetration(P),foam volume(FV),and grouting volume(GV)have strong correlations with advancing speed(AS).An empirical formula is constructed based on the high-correlation influential factors and their corresponding field datasets.Finally,the prediction performances of the intelligent models and the empirical method are compared.The results reveal that all the intelligent models perform better than the empirical method. 展开更多
关键词 epb shield machine Advancing speed prediction Intelligent models Empirical analysis Tunnel excavation
下载PDF
双模(EPB/TBM)盾构模式转换技术工程实践
3
作者 张强 高志勇 吕晨熙 《江苏建筑》 2024年第1期82-85,共4页
双模盾构机为地质起伏变化较大的盾构隧道工程而设计,通过对平衡模式的切换来适应不同地质环境下盾构的高效施工掘进。深惠城际平湖站至凤岗站区间因具有前段、后段为上软下硬地质,中段为全断面岩层地质的特点而采用EPB/TBM双模盾构施工... 双模盾构机为地质起伏变化较大的盾构隧道工程而设计,通过对平衡模式的切换来适应不同地质环境下盾构的高效施工掘进。深惠城际平湖站至凤岗站区间因具有前段、后段为上软下硬地质,中段为全断面岩层地质的特点而采用EPB/TBM双模盾构施工,其间,需要切换模式4次。文章就盾构机模式切换的方法进行系统的阐述。 展开更多
关键词 双模盾构机 epb/TBM 模式转换施工技术
下载PDF
基于S7-400H的EPB盾构盾尾密封系统软件设计 被引量:5
4
作者 张合沛 陈馈 +2 位作者 李凤远 王助锋 王吉平 《隧道建设》 2013年第2期165-168,共4页
利用S7-400H PLC冗余系统平台开发、设计土压平衡(EPB)盾构控制系统软件,能够进一步提高系统的容错能力;对盾尾密封系统的控制及使能条件的关联进行分析、总结,给施工过程中盾构操作及维修人员以指导;对盾尾密封系统的控制流程进行分析... 利用S7-400H PLC冗余系统平台开发、设计土压平衡(EPB)盾构控制系统软件,能够进一步提高系统的容错能力;对盾尾密封系统的控制及使能条件的关联进行分析、总结,给施工过程中盾构操作及维修人员以指导;对盾尾密封系统的控制流程进行分析,给盾构控制系统软件设计人员以帮助。 展开更多
关键词 土压平衡盾构 盾尾密封 控制系统 PLC S7—400H
下载PDF
EPB盾构机推进系统振动响应分析 被引量:6
5
作者 刘杰 卿启湘 文桂林 《工程设计学报》 CSCD 北大核心 2013年第6期489-494,共6页
盾构机推进系统可以看作一个振动系统,为了研究土压平衡式(earth pressure balance,EPB)盾构机推进系统对初始条件的振动响应,用模态迭加法推导了无阻尼系统对初始条件的振动响应计算公式,在此基础上考虑地基弹簧的影响建立了五自由度... 盾构机推进系统可以看作一个振动系统,为了研究土压平衡式(earth pressure balance,EPB)盾构机推进系统对初始条件的振动响应,用模态迭加法推导了无阻尼系统对初始条件的振动响应计算公式,在此基础上考虑地基弹簧的影响建立了五自由度无阻尼EPB推进系统振动模型,并推导了该振动模型对初始条件的振动响应.分析算例振动响应得出了绕X轴和Y轴的初始角度对推进系统的姿态影响很大.当初始角度为1°时,盾构机推进系统就会发生高达27.53°的偏转,这样对盾构机姿态角的调整会产生很大的挑战,甚至会使盾构机偏离计划路线太多无法完成掘进工作.研究结果对工程上EPB盾构机掘进过程中姿态角调整具有一定理论指导意义. 展开更多
关键词 epb盾构机 推进系统 初始位移 振动响应 敏感系数
下载PDF
EPB盾构机土仓压力分布有限元数值模拟 被引量:9
6
作者 亢晨钢 李守巨 刘迎曦 《工程建设》 2009年第4期1-6,14,共7页
结合某地铁施工实例,采用有限元方法数值模拟了土压平衡盾构机的土仓压力。通过计算刀盘开口率不同的土仓压力分布,建立了盾构机土仓的承压隔板压力与开挖面压力的关系,研究了刀盘开口率对盾构机土仓压力分布的影响。通过回归分析,得到... 结合某地铁施工实例,采用有限元方法数值模拟了土压平衡盾构机的土仓压力。通过计算刀盘开口率不同的土仓压力分布,建立了盾构机土仓的承压隔板压力与开挖面压力的关系,研究了刀盘开口率对盾构机土仓压力分布的影响。通过回归分析,得到刀盘开口率与压力传递系数之间的映射关系。数值模拟结果表明,有限元模拟结果与现场观测值基本一致。 展开更多
关键词 epb盾构机 压力分布 开口率 压力传递系数
下载PDF
二次调节技术在盾构EPB模拟系统惯性能回收中的应用 被引量:1
7
作者 黎松辉 李笑 《机床与液压》 北大核心 2008年第3期89-91,共3页
提出一种基于二次调节技术的盾构土压平衡系统,系统制动过程中调节二次元件的排量作泵工况,在螺旋输送机的惯性带动下向系统回馈能量。模拟实验表明,这种基于二次调节技术的盾构土压平衡系统能取得明显的惯性能回收效果,系统能量回收效... 提出一种基于二次调节技术的盾构土压平衡系统,系统制动过程中调节二次元件的排量作泵工况,在螺旋输送机的惯性带动下向系统回馈能量。模拟实验表明,这种基于二次调节技术的盾构土压平衡系统能取得明显的惯性能回收效果,系统能量回收效率受二次元件的排量、系统油源压力及转速等参数的影响,在能量回收过程中实行恒转矩控制能使系统制动过程平缓,并能满足制动时间等要求。 展开更多
关键词 盾构 土压平衡(epb) 二次调节 能量回收
下载PDF
EPB盾构泡沫系统设计缺陷与改进 被引量:5
8
作者 张成 《铁道建筑技术》 2009年第1期54-56,68,共4页
通过对现有EPB盾构在掘进过程中泡沫系统存在的缺陷进行分析与研究,提出了详细的改进设计思路与措施,从而极大地降低了土压平衡盾构在掘进过程中发生堵塞的概率,提高了盾构的掘进速度,具有一定的实用和推广价值。
关键词 epb盾构 泡沫系统 设计改进
下载PDF
EPB/TBM双模盾构复合地层掘进参数及适应性研究
9
作者 何川 黄兴 +3 位作者 陈凡 宋天田 毋晨 王士民 《铁道工程学报》 EI CSCD 北大核心 2023年第3期96-103,共8页
研究目的:为探究EPB/TBM双模盾构在复合地层中的掘进适应性,本文基于深圳地铁12号线怀德站—福永站及13号线留仙洞站—中间风井区间的EPB/TBM双模盾构施工案例,对比分析不同掘进模式下的掘进参数和能源消耗情况的变化规律,以期为类似工... 研究目的:为探究EPB/TBM双模盾构在复合地层中的掘进适应性,本文基于深圳地铁12号线怀德站—福永站及13号线留仙洞站—中间风井区间的EPB/TBM双模盾构施工案例,对比分析不同掘进模式下的掘进参数和能源消耗情况的变化规律,以期为类似工程提供参考。研究结论:(1)双模盾构在软土地层采用EPB模式保证掌子面稳定,硬岩地层采用TBM模式规避掘进速度低及刀具磨损等风险;(2)掘进参数变化规律在软土段EPB模式下表现为“低转速、高扭矩、高推力”,硬岩段TBM模式表现为“高转速、低扭矩、低推力”;(3)微风化岩层TBM模式的推进速度较EPB模式在中风化岩层提升了38%,有效掘进时长占比提升约106.7%;(4)双模盾构能源消耗较软土地层EPB模式并未明显增加;(5)本文研究可为双模盾构在复合地层中的掘进适应性提供参考。 展开更多
关键词 epb/TBM双模盾构 统计分析 复合地层 掘进参数 盾构耗能
下载PDF
Influence of secondary lining thickness on mechanical behaviours of double-layer lining in large-diameter shield tunnels
10
作者 Shimin Wang Xuhu He +3 位作者 Xiaoyu Peng Ya Wang Zhengxin Li Zihan 《Underground Space》 SCIE EI CSCD 2024年第5期130-150,共21页
In large-diameter shield tunnels,applying the double-layer lining structure can improve the load-bearing properties and maintain the stability of segmental lining.The secondary lining thickness is a key parameter in t... In large-diameter shield tunnels,applying the double-layer lining structure can improve the load-bearing properties and maintain the stability of segmental lining.The secondary lining thickness is a key parameter in the design of a double lining structure,which is worth being explored.Based on an actual large-diameter shield tunnel,loading model tests are carried out to investigate the effect of the secondary lining thickness on the mechanical behaviours of the double lining structure.The test results show that within the range of secondary lining thicknesses discussed,the load-bearing limit of the double-layer lining increases with growing secondary lining thickness.As a passive support,the secondary lining acts as an auxiliary load-bearing structure by contacting the segment.And changes in secondary lining thickness have a significant effect on the contact state between the segment and secondary lining,with both the contact pressure level and the contact area between the two varying.For double-layer lining structures in large-diameter shield tunnels,it is proposed that the stiffness of the secondary lining needs to be matched to the stiffness of the segment,as this allows them to have a coordinated deformation and a good joint load-bearing effect. 展开更多
关键词 large-diameter shield tunnels Double-layer lining structure Secondary lining thickness Stiffness matching Similar model test
原文传递
双模盾构TBM转EPB模式转换位置的合理性研究 被引量:5
11
作者 朱向飞 罗伟庭 +4 位作者 陈泽 刘浩 李刚 李冉 于广明 《建筑结构》 CSCD 北大核心 2021年第S02期1734-1740,共7页
目前双模盾构在我国的地铁隧道建设中进行了初步尝试,已有的研究成果和施工案例不多,可借鉴的经验较少,诸多关键问题还需要深入研究并予以实践,其中双模盾构模式转换位置的合理选取尤为重要。为研究双模盾构TBM转EPB模式转换的合理位置... 目前双模盾构在我国的地铁隧道建设中进行了初步尝试,已有的研究成果和施工案例不多,可借鉴的经验较少,诸多关键问题还需要深入研究并予以实践,其中双模盾构模式转换位置的合理选取尤为重要。为研究双模盾构TBM转EPB模式转换的合理位置,首先对已有的工程经验进行总结,归纳模式转换适用范围及位置的选取原则;其次依托深圳地铁13号线留仙洞~白芒站双模盾构区间工程,利用FLAC^(3D)软件分析复合地层中TBM-EPB双模盾构施工时围岩应力与变形规律,并对双模盾构在软岩段及硬岩段施工时的影响范围进行研究,得出TBM转EPB时的安全转换位置;最后根据该工程特点对其双模盾构模式转换位置的合理性及施工的安全性进行了分析。研究结果表明,双模盾构应该在全断面硬岩段进行模式转换;该工程TBM转EPB较合理的位置是盾构机位于全断面硬岩段,且刀盘前方全断面硬岩段长10m;该工程模式转换的设计位置在理论上满足围岩稳定性要求,研究成果可为类似工程提供参考。 展开更多
关键词 epb-TBM 双模式盾构 复合地层 模式转换 TBM转epb
下载PDF
EPBS施工地下水压对气泡改良砂土渗透性影响
12
作者 冯亮 《山西建筑》 2011年第7期174-177,共4页
通过自制的压力舱模型对水压力对气泡改良砂土渗透性的影响进行了试验研究,分析了水头压力对气泡改良砂土渗透性的影响规律,并对不同砂样进行了比较,明确了砂土的级配对试验结果的影响,从而可以进一步清楚在这种富水砂层中应选用怎样的... 通过自制的压力舱模型对水压力对气泡改良砂土渗透性的影响进行了试验研究,分析了水头压力对气泡改良砂土渗透性的影响规律,并对不同砂样进行了比较,明确了砂土的级配对试验结果的影响,从而可以进一步清楚在这种富水砂层中应选用怎样的改良方案。 展开更多
关键词 土压平衡式盾构 气泡 水压力 渗透性
下载PDF
EPB盾构机工作面土压力和油缸推力合理优化 被引量:2
13
作者 占善新 亢晨刚 +2 位作者 曹丽娟 李守巨 孙伟 《科学技术与工程》 2008年第23期6278-6282,共5页
基于Rankine的主动和被动土压力理论,采用解析方法建立了合理确定EPB盾构机工作面压力方法,给出了EPB(Earth Pressure Blance)盾构机随埋深和土体力学参数的变化关系。根据力的平衡原理,推导了EPB盾构机推力与盾构机埋深、土体力学参数... 基于Rankine的主动和被动土压力理论,采用解析方法建立了合理确定EPB盾构机工作面压力方法,给出了EPB(Earth Pressure Blance)盾构机随埋深和土体力学参数的变化关系。根据力的平衡原理,推导了EPB盾构机推力与盾构机埋深、土体力学参数和盾构机几何尺寸的解析表达式。数值计算结果表明,所提出的推力计算方法与现场实际采用的数值基本一致。 展开更多
关键词 epb盾构机 主动和被动土压力 工作面压力 盾构机合理推力优化
下载PDF
EPB盾构螺旋输送机的参数多目标优化 被引量:1
14
作者 陈怀远 陈江义 +1 位作者 秦东晨 朱强 《重庆理工大学学报(自然科学)》 CAS 北大核心 2023年第2期158-165,共8页
为了提高EPB盾构螺旋输送机的输送效率,减小输送机螺旋体的磨损并降低运输过程中的功率损耗,结合离散元软件EDEM、NSGA-Ⅱ优化算法和熵权TOPSIS法,提出一种盾构用螺旋输送机结构参数优化方法。通过离散元软件EDEM按照设计好的正交试验... 为了提高EPB盾构螺旋输送机的输送效率,减小输送机螺旋体的磨损并降低运输过程中的功率损耗,结合离散元软件EDEM、NSGA-Ⅱ优化算法和熵权TOPSIS法,提出一种盾构用螺旋输送机结构参数优化方法。通过离散元软件EDEM按照设计好的正交试验进行仿真,得到输送机的质量流率、螺旋体平均磨损量和运行功率性能指标,并对仿真的可靠性进行验证。利用Matlab软件将仿真得出数据进行拟合,建立多个结构参数间的性能指标函数。采用NSGA-Ⅱ算法对螺旋输送机参数进行优化,得到Pareto前沿解集,并由熵权TOPSIS法确定最优解。结果表明:当螺旋输送机安装倾角为24.69°,螺距为613.25 mm,螺旋内径为696.34 mm,螺旋轴径为211.88 mm时,输送机整体性能最好,其他条件相同的情况下,质量流率提高了10.56%,螺旋轴磨损量减小了8.64%,功率损耗降低了6.41%。研究结果对EPB螺旋输送机的设计改进有一定的参考价值。 展开更多
关键词 epb盾构螺旋输送机 离散元 NSGA-Ⅱ算法 熵权TOPSIS法 参数优化
下载PDF
硬岩段双模盾构TBM-EPB施工优越性分析 被引量:3
15
作者 张永义 罗伟庭 +3 位作者 陈泽 刘浩 李刚 于广明 《山东理工大学学报(自然科学版)》 CAS 2022年第4期38-44,共7页
隧道采用盾构法施工时,不同盾构模式的适用地层往往不同,因此在保证隧道安全施工的同时,研究不同盾构开挖模式在同一类地层中的掘进效率,进而选择合适的盾构掘进模式来保证隧道高效掘进具有重要意义。依据深圳地铁13号线留仙洞站—中间... 隧道采用盾构法施工时,不同盾构模式的适用地层往往不同,因此在保证隧道安全施工的同时,研究不同盾构开挖模式在同一类地层中的掘进效率,进而选择合适的盾构掘进模式来保证隧道高效掘进具有重要意义。依据深圳地铁13号线留仙洞站—中间风井区间双模盾构(TBM-EPB)工程,通过分析TBM(tunnel boring machine)模式、EPB(earth press balance)模式在硬岩段的掘进参数,得出TBM模式相较于EPB模式于硬岩段掘进效率的提升程度。当隧道掘进地层为长距离软硬相间地层时,在硬岩段掘进时TBM模式的掘进性能要优于EPB模式,说明了硬岩段采用TBM模式掘进的必要性。该研究成果可为今后双模盾构类似工程的掘进效率分析提供参考。 展开更多
关键词 双模盾构 TBM模式 epb模式 掘进参数 硬岩地层
下载PDF
基于AMESIM的EPB盾构刀盘液压驱动系统的仿真研究 被引量:2
16
作者 张魏友 黄晓华 《机械制造与自动化》 2013年第4期112-115,共4页
结合某型盾构机,研究了6.4 m土压平衡盾构机刀盘驱动液压系统的结构组成和工作原理,采用变量泵变量马达闭环控制方式,设计了6.4 m EPB盾构刀盘液压驱动系统。在AMEsim环境中建立刀盘驱动系统的仿真模型,按实际情况设置子模型参数,对刀... 结合某型盾构机,研究了6.4 m土压平衡盾构机刀盘驱动液压系统的结构组成和工作原理,采用变量泵变量马达闭环控制方式,设计了6.4 m EPB盾构刀盘液压驱动系统。在AMEsim环境中建立刀盘驱动系统的仿真模型,按实际情况设置子模型参数,对刀盘速度负载特性和负载波动情况进行仿真,并对结果分析,为盾构机国产化研究提供参考依据。 展开更多
关键词 土压平衡盾构 刀盘液压驱动 闭环控制 AMESIM仿真
下载PDF
城市轨道交通双模式盾构(EPB/TBM)模式转换技术 被引量:16
17
作者 宋天田 娄永录 +3 位作者 吴蔚博 孙彰 姚超凡 阴书玉 《现代城市轨道交通》 2020年第12期59-64,共6页
结合深圳地铁12号、13号和14号线土压平衡(EPB)-单护盾硬岩掘进机(TBM)双模盾构施工,对中心皮带机出渣式和中心螺旋输送机出渣式2种EPB-TBM双模盾构机进行介绍和对比分析,详细阐述EPB和TBM双模式之间的相互转换流程,对拆螺机工装进行优... 结合深圳地铁12号、13号和14号线土压平衡(EPB)-单护盾硬岩掘进机(TBM)双模盾构施工,对中心皮带机出渣式和中心螺旋输送机出渣式2种EPB-TBM双模盾构机进行介绍和对比分析,详细阐述EPB和TBM双模式之间的相互转换流程,对拆螺机工装进行优化。通过对模式转换重难点的分析,提出提高模式转换施工安全和施工效率的建议。 展开更多
关键词 地铁隧道施工 盾构隧道 双模盾构 土压-单护盾双模盾构机 模式转换
下载PDF
Real-time analysis and prediction of shield cutterhead torque using optimized gated recurrent unit neural network 被引量:10
18
作者 Song-Shun Lin Shui-Long Shen Annan Zhou 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2022年第4期1232-1240,共9页
An accurate prediction of earth pressure balance(EPB)shield moving performance is important to ensure the safety tunnel excavation.A hybrid model is developed based on the particle swarm optimization(PSO)and gated rec... An accurate prediction of earth pressure balance(EPB)shield moving performance is important to ensure the safety tunnel excavation.A hybrid model is developed based on the particle swarm optimization(PSO)and gated recurrent unit(GRU)neural network.PSO is utilized to assign the optimal hyperparameters of GRU neural network.There are mainly four steps:data collection and processing,hybrid model establishment,model performance evaluation and correlation analysis.The developed model provides an alternative to tackle with time-series data of tunnel project.Apart from that,a novel framework about model application is performed to provide guidelines in practice.A tunnel project is utilized to evaluate the performance of proposed hybrid model.Results indicate that geological and construction variables are significant to the model performance.Correlation analysis shows that construction variables(main thrust and foam liquid volume)display the highest correlation with the cutterhead torque(CHT).This work provides a feasible and applicable alternative way to estimate the performance of shield tunneling. 展开更多
关键词 Earth pressure balance(epb)shield tunneling Cutterhead torque(CHT)prediction Particle swarm optimization(PSO) Gated recurrent unit(GRU)neural network
下载PDF
Tunnel face stability and ground settlement in pressurized shield tunnelling 被引量:4
19
作者 苏艺 汪国锋 周庆宏 《Journal of Central South University》 SCIE EI CAS 2014年第4期1600-1606,共7页
An analysis of the stability of large-diameter circular tunnels and ground settlement during tunnelling by a pressurized shield was presented. An innovative three-dimensional translational multi-block failure mechanis... An analysis of the stability of large-diameter circular tunnels and ground settlement during tunnelling by a pressurized shield was presented. An innovative three-dimensional translational multi-block failure mechanism was proposed to determine the face support pressure of large-shield tunnelling. Compared with the currently available mechanisms, the proposed mechanism has two unique features:(1) the supporting pressure applied to the tunnel face is assumed to have a non-uniform rather than uniform distribution, and(2) the method takes into account the entire circular excavation face instead of merely an inscribed ellipse. Based on the discrete element method, a numerical simulation of the Shanghai Yangtze River Tunnel was carried out using the Particle Flow Code in two dimensions. The immediate ground movement during excavation, as well as the behaviour of the excavation face, the shield movement, and the excavated area, was considered before modelling the excavation process. 展开更多
关键词 settlement large-diameter shield tunnel three-dimensional failure mechanism
下载PDF
EPB/TBM双模盾构机栽头原因与纠偏措施研究 被引量:1
20
作者 李春芳 靳兆阳 《施工技术(中英文)》 CAS 2022年第13期84-90,共7页
为探讨新研发的双模盾构机在福州软土地层推进中持续栽头机理及其纠偏措施,基于对双模盾构机重心理论计算和常规强制纠偏方法,并结合现场实际复推情况,对比分析了几种不同纠偏措施情况下,双模盾构机姿态调整效果。研究结果表明:常规强... 为探讨新研发的双模盾构机在福州软土地层推进中持续栽头机理及其纠偏措施,基于对双模盾构机重心理论计算和常规强制纠偏方法,并结合现场实际复推情况,对比分析了几种不同纠偏措施情况下,双模盾构机姿态调整效果。研究结果表明:常规强制纠偏方法(底部增加外置油缸、底部主推油缸压力设定值调高同时上部推进油缸实现全屏蔽)效果较好。 展开更多
关键词 地铁 盾构 epb TBM 双模盾构 栽头 纠偏 盾构姿态
下载PDF
上一页 1 2 16 下一页 到第
使用帮助 返回顶部