期刊文献+
共找到247篇文章
< 1 2 13 >
每页显示 20 50 100
Financial Calculation Problems and Countermeasure Analysis of Large-Scale Engineering Construction Projects
1
作者 Qiong Hou 《Proceedings of Business and Economic Studies》 2024年第2期15-21,共7页
The financial aspects of large-scale engineering construction projects profoundly influence their success.Strengthening cost control and establishing a scientific financial evaluation system can enhance the project’s... The financial aspects of large-scale engineering construction projects profoundly influence their success.Strengthening cost control and establishing a scientific financial evaluation system can enhance the project’s economic benefits,minimize unnecessary costs,and provide decision-makers with a robust financial foundation.Additionally,implementing an effective cash flow control mechanism and conducting a comprehensive assessment of potential project risks can ensure financial stability and mitigate the risk of fund shortages.Developing a practical and feasible fundraising plan,along with stringent fund management practices,can prevent fund wastage and optimize fund utilization efficiency.These measures not only facilitate smooth project progression and improve project management efficiency but also enhance the project’s economic and social outcomes. 展开更多
关键词 large-scale engineering construction projects Financial calculation Fund management
下载PDF
Multi-level fuzzy comprehensive appraisal on social effects of projects 被引量:1
2
作者 孙立新 李良宝 +1 位作者 李晓东 王强 《Journal of Harbin Institute of Technology(New Series)》 EI CAS 2004年第5期524-527,共4页
The application of multi-level fuzzy comprehensive appraisal on social effects of projects has been studied. The principles for setting up an index system have been analyzed and the index system has been set up accord... The application of multi-level fuzzy comprehensive appraisal on social effects of projects has been studied. The principles for setting up an index system have been analyzed and the index system has been set up according to projects of construction. Models for multi-level fuzzy comprehensive appraisal have been offered and relative calculation steps have been given according to project instances. 展开更多
关键词 multi-level fuzzy comprehensive appraisal projects of construction multi-level index system
下载PDF
The research of breakdown structure and coding system for construction project
3
作者 丁大勇 金维兴 李培 《Journal of Harbin Institute of Technology(New Series)》 EI CAS 2004年第4期428-432,共5页
Whether the breakdown structure and coding system of construction projects are reasonable or not determines to a large degree the performance level of the entire project management. We analyze in detail the similariti... Whether the breakdown structure and coding system of construction projects are reasonable or not determines to a large degree the performance level of the entire project management. We analyze in detail the similarities and differences of two kinds of decomposing methods classified by type of work and construction elements based on the discussion of international typical coding standards system designing. We then deduce the differential coefficient relation between project breakdown structure (PBS) and work breakdown structure (WBS). At the same time we constitute a comprehensive construction project breakdown system including element code and type of work code and make a further schematic presentation of the implementation of the system’s functions. 展开更多
关键词 construction project breakdown structure comprehensive breakdown system
下载PDF
调水工程建设期安全-进度-投资系统风险分析——以引江济淮工程(河南段)为例
4
作者 何山 王辉 +4 位作者 程卫帅 刘渊 范嘉懿 王永强 桑连海 《南水北调与水利科技(中英文)》 CAS CSCD 北大核心 2024年第2期348-358,共11页
以引江济淮工程(河南段)为例,在确定安全-进度-投资系统风险评价指标体系的基础上,基于层次分析-模糊综合评价方法分析安全、进度、投资的单项风险;在考虑工程建设期安全、进度、投资的相互影响后,基于改进的综合风险评价方法分析安全-... 以引江济淮工程(河南段)为例,在确定安全-进度-投资系统风险评价指标体系的基础上,基于层次分析-模糊综合评价方法分析安全、进度、投资的单项风险;在考虑工程建设期安全、进度、投资的相互影响后,基于改进的综合风险评价方法分析安全-进度-投资系统风险。结果表明:当分析单项风险时,安全、进度和投资风险的评价结果均为一般风险;当分析系统风险时,得到安全风险>进度风险>投资风险;进一步分析指标体系中的准则层和指标层,安全风险的现场风险中施工技术方案风险排序第一,是后续风险管控的重点。本研究为提高工程建设期安全-进度-投资系统风险的可靠性、降低风险事件的发生提出了理论和技术参考。 展开更多
关键词 施工风险 改进综合风险评价法 安全-进度-投资系统风险 调水工程 引江济淮工程(河南段)
下载PDF
高海拔季节冻土区完全融化期土壤水分特征曲线适用性
5
作者 张海生 翁白莎 +3 位作者 严登华 栾清华 李文文 邓彬 《南水北调与水利科技(中英文)》 CAS CSCD 北大核心 2024年第2期247-257,358,共12页
以怒江源区那曲流域为例,基于4个试验场完全融化期(6—9月)的土壤体积含水量(0.15~0.51 cm^(3)/cm^(3))和土壤基质势数据(0~200 kPa)实测数据,选择Van Genuchten(VG)、Brooks-Corey(BC)和Campbell 3个模型进行拟合,以均方根误差ERMS和... 以怒江源区那曲流域为例,基于4个试验场完全融化期(6—9月)的土壤体积含水量(0.15~0.51 cm^(3)/cm^(3))和土壤基质势数据(0~200 kPa)实测数据,选择Van Genuchten(VG)、Brooks-Corey(BC)和Campbell 3个模型进行拟合,以均方根误差ERMS和决定系数R2为评价指标,分析3个模型对高海拔季节冻土区不同土层和不同土壤质地的适用性。结果表明:从整体上看,VG模型(平均R2为0.992,平均ERMS为0.006 cm^(3)/cm^(3))的拟合效果优于BC模型(平均R2为0.972,平均ERMS为0.019 cm^(3)/cm/3)和Campbell模型(平均R2为0.984,平均ERMS为0.014 cm^(3)/cm^(3));但是在不同土层和不同土壤质地情况下模型的适用性有所区别,VG模型更适用于壤土和壤质砂土(平均R2为0.987,平均ERMS为0.008 cm^(3)/cm^(3))以及土壤深层(10~35 cm土层,平均R2为0.990,平均ERMS为0.007 cm^(3)/cm^(3)),Campbell模型更适用于砂质壤土(平均R2为0.985,平均ERMS为0.009 cm^(3)/cm^(3))以及土壤表层(5 cm土层,平均R2为0.993,平均ERMS为0.006 cm^(3)/cm^(3)),BC模型在不同条件下都不是最优模型;参数θr取值大小会显著影响土壤水分特征曲线的形状。本研究可为深入研究高海拔季节冻土区的土壤水分运动特性以及中华水塔区的水源涵养作用提供支持。 展开更多
关键词 土壤水分特征曲线 模型优选 土壤质地 Van Genuchten模型 那曲流域
下载PDF
基于三维技术的变电站施工综合管理系统设计 被引量:1
6
作者 陈玄俊 蒋元元 +2 位作者 俞梦迪 任建炜 杨艳婷 《自动化技术与应用》 2024年第4期164-168,共5页
变电站施工常规的管理系统以二维图像为主,导致系统应用性差。提出基于三维技术的变电站施工综合管理系统设计。硬件设计在原有的硬件结构通讯管理机上,连接以AT89C55芯片为核心的微控制器;软件设计利用三维技术模拟变电站施工全景,确... 变电站施工常规的管理系统以二维图像为主,导致系统应用性差。提出基于三维技术的变电站施工综合管理系统设计。硬件设计在原有的硬件结构通讯管理机上,连接以AT89C55芯片为核心的微控制器;软件设计利用三维技术模拟变电站施工全景,确定需要管理的区域后,对多源施工信息进行同步处理,实现变电站施工实时管理。实验结果表明:设计的基于三维技术的综合管理系统在实际运行中故障率低,可靠度高,与常规的管理系统相比,使用寿命更长,在实际项目中应用更加可靠。 展开更多
关键词 三维技术 变电站 施工项目 综合管理 全景模拟
下载PDF
施工安全标准化与绿色施工相结合策略 被引量:1
7
作者 张涵清 《江苏建材》 2024年第1期142-144,共3页
施工安全标准化与绿色施工是新时代背景下对项目管理提出的基本要求,二者的有机结合有助于在提高项目施工安全性的同时,减少施工对周边环境的负面影响,并起到节约资源的作用。基于此,文章首先分析了项目施工安全标准化与绿色施工相结合... 施工安全标准化与绿色施工是新时代背景下对项目管理提出的基本要求,二者的有机结合有助于在提高项目施工安全性的同时,减少施工对周边环境的负面影响,并起到节约资源的作用。基于此,文章首先分析了项目施工安全标准化与绿色施工相结合的必要性,然后提出了促进施工安全标准化与绿色施工有效结合的两大实践路径,即构建施工安全标准化管理体系与强化绿色施工管理,旨在保证工程项目施工顺利进行,实现项目投资经济效益最大化。 展开更多
关键词 项目管理 安全标准化 绿色施工 综合效益
下载PDF
Detection of schedule delay risk of empirical construction projects 被引量:1
8
作者 Tsegay GEBREHIWET Hanbin LUO 《Frontiers of Engineering Management》 2018年第2期251-267,共17页
In Ethiopian construction projects, schedule delay risk is a predominant issue because it is not properly addressed. Although several studies have been focused on the various effects of risk in construction projects, ... In Ethiopian construction projects, schedule delay risk is a predominant issue because it is not properly addressed. Although several studies have been focused on the various effects of risk in construction projects, limited efforts have been made to investigate the typical and the overall schedule delay risk. In this study, our aim is to detect the typical and overall schedule delay risk throughout the construction project lifecycle, which consists of the pre-construction, construction, and post-construction stages, and compare the stages with each other. Common criteria, sub-criteria, and attributes were developed for all alternatives for the purpose of making a risk decision. The methodology that was followed integrated the multiplecriteria decision-making(MCDM) model of fuzzy analytic hierarchy process comprehensive evaluation(FAHPCE)and the relative important index(RII). Data were collected from 77 participants, who were selected through purposive sampling from different contracting organizations in Ethiopian construction projects by means of questionnaires that were distributed to experienced experts. The findings showed that there is a typical delay risk either in the type or in the level of the different construction activities.Consequently, the most influenced alternative is the construction stage because of the high-risk responsibility,resource, and contract condition related criteria. The postconstruction stage was the second most influenced stage because of the high-risk responsibility-related criteria. The pre-constructed stage was the least influenced stage that consist high-risk criteria of responsibility, resource, and contract condition related. These differences provided noteworthy information about risk mitigation in construction projects by identifying the exact risk level on specific activity to make appropriate decision. 展开更多
关键词 fuzzy analytic hierarchy process comprehensive evaluation construction project detection of delay risk relative important index
原文传递
业审融合模式下的高校基建项目绩效评价及提升策略
9
作者 阮晓 陈勇军 《北京城市学院学报》 2024年第2期79-85,共7页
业审融合模式下的高校基建项目旨在将审计监督完全融入业务流程,需要综合考虑资金、教学、施工和效益等方面的需求,且注重可持续性和长远发展。本文从财务指标、内部控制及可持续性三个维度建立评价指标体系,运用直觉模糊层次分析法和... 业审融合模式下的高校基建项目旨在将审计监督完全融入业务流程,需要综合考虑资金、教学、施工和效益等方面的需求,且注重可持续性和长远发展。本文从财务指标、内部控制及可持续性三个维度建立评价指标体系,运用直觉模糊层次分析法和模糊综合评价法对高校基建项目进行绩效评价,为规范高校基建项目管理提供策略,实现项目管理的提质增效。 展开更多
关键词 高校基建项目 业审融合 直觉模糊层次分析法 模糊综合评价法
下载PDF
市政综合管廊工程施工问题及对策研究
10
作者 包宛鑫 《现代工程科技》 2024年第18期33-36,共4页
随着城市化进程的加快,市政综合管廊作为地下空间利用的重要方式,在全国范围内得到了广泛应用。然而,施工过程中面临地下环境复杂、管线协调困难以及质量控制要求高等挑战。在此背景下,探讨了这些施工问题的成因,并提出有效的解决对策... 随着城市化进程的加快,市政综合管廊作为地下空间利用的重要方式,在全国范围内得到了广泛应用。然而,施工过程中面临地下环境复杂、管线协调困难以及质量控制要求高等挑战。在此背景下,探讨了这些施工问题的成因,并提出有效的解决对策。通过对地下空间复杂性、管线迁移和施工质量控制等主要问题进行分析,发现设计阶段的疏漏、施工技术和管理水平的不足是主要成因。针对这些问题,提出了优化设计方案、加强施工技术创新和管理优化、完善相关法规标准和监管措施等对策。研究表明,通过应用先进技术、优化施工管理和制定统一标准,能显著提高市政综合管廊工程的施工质量和效率。 展开更多
关键词 市政综合管廊工程 施工问题 对策
下载PDF
变电站工程建设项目全面质量管理探究
11
作者 唐定华 《建筑与装饰》 2024年第19期37-39,共3页
本文围绕变电站工程建设项目全面质量管理展开探究,着重探讨了变电站工程建设项目全面质量管理存在的问题,通过构建变电站工程建设项目全面质量管理指标体系,深入分析质量规划、质量控制、质量保证改进措施;构建健全的质量保证体系,明... 本文围绕变电站工程建设项目全面质量管理展开探究,着重探讨了变电站工程建设项目全面质量管理存在的问题,通过构建变电站工程建设项目全面质量管理指标体系,深入分析质量规划、质量控制、质量保证改进措施;构建健全的质量保证体系,明确质量责任制,制定切实可行的质量保证措施;加强全过程控制施工质量等,确保变电站建设工程项目质量稳定可靠。 展开更多
关键词 变电站工程 建设项目 全面质量管理
下载PDF
基于层次分析法和模糊综合评价法的建筑工程项目应急能力评价研究
12
作者 杨凯博 《城市建筑》 2024年第20期186-189,220,共5页
进入21世纪以来,随着经济全球化进程的加快,我国居民生活质量与水平大幅提升,各种基础设施、房屋及市政工程的需求量日渐增加。与此同时,建筑业由于其自身的特殊性,容易出现各类安全事故。为了提升建筑工程项目应对各类安全事故时的应... 进入21世纪以来,随着经济全球化进程的加快,我国居民生活质量与水平大幅提升,各种基础设施、房屋及市政工程的需求量日渐增加。与此同时,建筑业由于其自身的特殊性,容易出现各类安全事故。为了提升建筑工程项目应对各类安全事故时的应急能力,文章从应急管理的全过程出发并引入PPRR理论,构建了建筑工程项目应急能力评价指标体系。在此基础上结合应急能力评价指标体系的特点选用层次分析法及模糊综合评价法共同构建建筑工程项目应急能力评价模型,并将该模型运用在某商业综合体项目中进行实证评价研究,根据评价结果提出了建筑项目应急能力提升对策,为提高建筑工程项目应急能力提供了借鉴。 展开更多
关键词 建筑工程项目 应急能力 层次分析法 模糊综合评价法
下载PDF
市政综合管廊工程涉轨施工中常见的安全防护、质量管理要点
13
作者 陈刚 《建筑与装饰》 2024年第9期124-126,共3页
本文首先阐述了市政综合管廊工程涉轨施工中常见的安全防护、质量管理的必要性,接着分析了影响市政综合管廊工程涉轨施工安全防护、质量控制的相关因素,对市政综合管廊工程前期设计阶段、基坑支护、主体结构施工阶段进行了详细的探讨。... 本文首先阐述了市政综合管廊工程涉轨施工中常见的安全防护、质量管理的必要性,接着分析了影响市政综合管廊工程涉轨施工安全防护、质量控制的相关因素,对市政综合管廊工程前期设计阶段、基坑支护、主体结构施工阶段进行了详细的探讨。希望能够为市政综合管廊工程建设相关工作人员提供有益的参考和借鉴。 展开更多
关键词 市政综合管廊工程涉轨施工 安全防护管理 质量管理要点
下载PDF
综合性设计性实验项目建设的探索与实践 被引量:167
14
作者 田运生 刘维华 王景春 《实验技术与管理》 CAS 北大核心 2012年第2期126-129,共4页
综合性设计性实验是提高学生实践能力和创新能力、培养卓越工程师的重要环节。简要阐述了综合性设计性实验的教学模式,探讨了综合性设计性实验对学生及教师素质的基本要求,提出了综合性设计性实验的保障措施、认定程序及检查验收办法。
关键词 实验项目建设 综合性实验 设计性实验 培养模式
下载PDF
建设项目分解结构与编码体系的研究 被引量:40
15
作者 金维兴 丁大勇 李培 《土木工程学报》 EI CSCD 北大核心 2003年第9期7-11,18,共6页
建设项目分解结构和编码体系的合理与否在很大程度上决定了整个项目管理工作的绩效水平。作者在对国际典型标准编码体系进行讨论的基础上,详细分析了以工种工程为划分依据和以建筑元素为划分依据的两类分解方式的异同,提出项目分解结构... 建设项目分解结构和编码体系的合理与否在很大程度上决定了整个项目管理工作的绩效水平。作者在对国际典型标准编码体系进行讨论的基础上,详细分析了以工种工程为划分依据和以建筑元素为划分依据的两类分解方式的异同,提出项目分解结构与工作分解结构间的一阶导数关系,并据此建立了同时包含元素码和工种码的建设项目综合分解体系,进一步简要说明其功能实现过程。 展开更多
关键词 建设项目 分解结构 综合分解体系
下载PDF
城市中压配电网评估方法与实例研究 被引量:106
16
作者 肖峻 高海霞 +3 位作者 葛少云 王怡萍 邓华 张瀛 《电网技术》 EI CSCD 北大核心 2005年第20期81-85,共5页
通过层次分析法建立了较为全面的、适合城市配电网特点的综合评价体系,从技术合理性、安全性等多个方面评价电网;应用点面结合的量化分析方法从整体上反映出电网中的问题,并给出了存在问题最多的变电站和线路;针对所发现的问题提出近期... 通过层次分析法建立了较为全面的、适合城市配电网特点的综合评价体系,从技术合理性、安全性等多个方面评价电网;应用点面结合的量化分析方法从整体上反映出电网中的问题,并给出了存在问题最多的变电站和线路;针对所发现的问题提出近期电网的规划方案,并对规划电网进行评估,将评估结果与现状网对比以衡量规划效果;提出近期电网建设改造项目及其优先级排序。上述过程均已开发软件实现,并成功地在北京电力公司下属的多个供电公司得到应用。文中提出的综合评估方法弥补了传统的配电网评估方法中整体性差的不足,近期规划与评估紧密结合的方式为电网建设改造项目的提出与优化提供了新的途径。 展开更多
关键词 配电网 评估 层次分析法 综合评价体系 建设改造项目 近期规划
下载PDF
建设项目水土流失现状与综合治理对策 被引量:34
17
作者 郭索彦 姜德文 +1 位作者 赵永军 袁普金 《中国水土保持科学》 CSCD 2008年第1期51-56,共6页
根据"中国水土流失与生态安全综合科学考察项目"中"建设项目水土流失研究课题"所取得的相关成果,总结全国"十五"期间建设项目的概况、建设项目所造成水土流失的特点、水土流失量及其分布特点,从法制建设... 根据"中国水土流失与生态安全综合科学考察项目"中"建设项目水土流失研究课题"所取得的相关成果,总结全国"十五"期间建设项目的概况、建设项目所造成水土流失的特点、水土流失量及其分布特点,从法制建设与宣传教育、科研和技术支持体系建设等方面对建设项目水土流失综合治理工作提出了对策建议。 展开更多
关键词 建设项目 水土保持 水土流失 综合治理
下载PDF
工程项目管理沙盘综合性实训项目的设计与实践 被引量:14
18
作者 张朝勇 周静南 门小静 《实验室研究与探索》 CAS 北大核心 2011年第11期142-146,共5页
针对工程管理专业在管理类课程实践教学薄弱情况,提出了如何设计和实践综合性实训项目———"工程项目管理沙盘模拟"。其中,设计主要包括教学目的、内容设计、沙盘道具选择等;实践主要包括具体任务、实施方式、工作计划表、... 针对工程管理专业在管理类课程实践教学薄弱情况,提出了如何设计和实践综合性实训项目———"工程项目管理沙盘模拟"。其中,设计主要包括教学目的、内容设计、沙盘道具选择等;实践主要包括具体任务、实施方式、工作计划表、注意事项、项目总结报告撰写以及成绩评定方法等。通过校内比赛和参加全国性比赛的教学实践,发现工程项目管理沙盘模拟项目,不仅可以将工程项目管理全过程知识点串起来,形成有机整体,同时,学生的兴趣倍增,大大地提高和增强学生的专业素养、工程问题的解决能力和工程协作的团队意识。 展开更多
关键词 综合性实训项目 工程管理专业 沙盘模拟 工程项目管理
下载PDF
生产建设项目水土保持综合评价 被引量:16
19
作者 陈晓安 谢颂华 +2 位作者 张磊 杨洁 郑海金 《水土保持通报》 CSCD 北大核心 2012年第5期286-290,295,共6页
生产建设项目水土保持综合评价是不同项目分类治理的依据。采用层次分析法,以生产建设项目水土保持最主要的水土流失状况、水土保持防治效果、水土流失危害3个方面为基础,构建了水土保持评价模型,并对不同类型生产建设项目水土保持效益... 生产建设项目水土保持综合评价是不同项目分类治理的依据。采用层次分析法,以生产建设项目水土保持最主要的水土流失状况、水土保持防治效果、水土流失危害3个方面为基础,构建了水土保持评价模型,并对不同类型生产建设项目水土保持效益进行了分析。结果表明,点状生产建设项目水土保持效益要大于线状项目,点状项目水土保持效益波动性比线状项目要小;点状生产建设项目中房地产类项目水土保持效益最大,其次为电厂项目,最后为矿场项目,水土保持效益波动性从大到小顺序依次为电厂项目、矿场项目、房地产项目。 展开更多
关键词 生产建设项目 水土保持 综合评价 效益指数
下载PDF
国际工程项目风险评价研究 被引量:28
20
作者 邵军义 董坤涛 +1 位作者 郭晗 赵辉 《工程管理学报》 2011年第2期187-190,共4页
针对国际工程项目承包风险评价问题,构建了国际工程项目风险评价指标体系,提出了基于证据理论与模糊综合评价相集成的国际工程承包风险评价方法。首先利用证据理论对国际工程项目承包风险评价指标体系进行降维;然后把降维后的指标数据... 针对国际工程项目承包风险评价问题,构建了国际工程项目风险评价指标体系,提出了基于证据理论与模糊综合评价相集成的国际工程承包风险评价方法。首先利用证据理论对国际工程项目承包风险评价指标体系进行降维;然后把降维后的指标数据输入到模糊综合评价,根据最大隶属度原则做出判断;最后用该方法对某国际工程项目承包风险进行评价。实证研究表明,该方法应用到国际工程项目承包风险评价是可行和可靠的。 展开更多
关键词 国际工程项目 风险 证据理论 模糊综合评价
下载PDF
上一页 1 2 13 下一页 到第
使用帮助 返回顶部