期刊文献+
共找到129篇文章
< 1 2 7 >
每页显示 20 50 100
Financial Calculation Problems and Countermeasure Analysis of Large-Scale Engineering Construction Projects
1
作者 Qiong Hou 《Proceedings of Business and Economic Studies》 2024年第2期15-21,共7页
The financial aspects of large-scale engineering construction projects profoundly influence their success.Strengthening cost control and establishing a scientific financial evaluation system can enhance the project’s... The financial aspects of large-scale engineering construction projects profoundly influence their success.Strengthening cost control and establishing a scientific financial evaluation system can enhance the project’s economic benefits,minimize unnecessary costs,and provide decision-makers with a robust financial foundation.Additionally,implementing an effective cash flow control mechanism and conducting a comprehensive assessment of potential project risks can ensure financial stability and mitigate the risk of fund shortages.Developing a practical and feasible fundraising plan,along with stringent fund management practices,can prevent fund wastage and optimize fund utilization efficiency.These measures not only facilitate smooth project progression and improve project management efficiency but also enhance the project’s economic and social outcomes. 展开更多
关键词 large-scale engineering construction projects Financial calculation Fund management
下载PDF
Construction of Risk Assessment Application Model of Epidemic Disease in Large-scale Pig Farms 被引量:1
2
作者 谭业平 刘强 +3 位作者 胡肄农 郁达威 何孔旺 陆昌华 《Agricultural Science & Technology》 CAS 2016年第9期2124-2126,共3页
The application model of epidemic disease assessment technology for Web-based large-scale pig farm was expounded from the identification of epidemic disease risk factors, construction of risk assessment model and deve... The application model of epidemic disease assessment technology for Web-based large-scale pig farm was expounded from the identification of epidemic disease risk factors, construction of risk assessment model and development of risk assessment system. The assessed pig farm uploaded the epidemic disease risk data information through on-line answering evaluating questionnaire to get the immediate evaluation report. The model could enhance the risk communication between pig farm veterinarian, manager and veterinary experts to help farm system understand and find disease risk factors, assess and report the potential high risk items of the pig farm in the three systems of engineering epidemic disease prevention technology, biological safety and immune monitoring, and promote the improvement and perfection of epidemic disease prevention and control measures. 展开更多
关键词 large-scale pig farm Risk assessment of epidemic disease Model construction
下载PDF
Localization of Mobile Robot Aided for Large-Scale Construction Based on Optimized Artificial Landmark Map in Ongoing Scene 被引量:2
3
作者 Zhen Xu Shuai Guo +2 位作者 Tao Song Yuwen Li Lingdong Zeng 《Computer Modeling in Engineering & Sciences》 SCIE EI 2022年第3期1853-1882,共30页
The effectiveness of mobile robot aided for architectural construction depends strongly on its accurate localization ability.Localization of mobile robot is increasingly important for the printing of buildings in the ... The effectiveness of mobile robot aided for architectural construction depends strongly on its accurate localization ability.Localization of mobile robot is increasingly important for the printing of buildings in the construction scene.Although many available studies on the localization have been conducted,only a few studies have addressed the more challenging problem of localization for mobile robot in large-scale ongoing and featureless scenes.To realize the accurate localization of mobile robot in designated stations,we build an artificial landmark map and propose a novel nonlinear optimization algorithm based on graphs to reduce the uncertainty of the whole map.Then,the performances of localization for mobile robot based on the original and optimized map are compared and evaluated.Finally,experimental results show that the average absolute localization errors that adopted the proposed algorithm is reduced by about 21%compared to that of the original map. 展开更多
关键词 large-scale construction artificial landmark map LOCALIZATION mobile robot non-linear optimization
下载PDF
Construction and Environmental Protection of Large-scale Livestock and Poultry Farms 被引量:1
4
作者 Mingquan LI 《Asian Agricultural Research》 2021年第9期28-29,48,共3页
Large-scale breeding of livestock and poultry is the main way of modern animal husbandry development.This breeding method is widely used by the majority of owners because of its easy technical promotion,low breeding c... Large-scale breeding of livestock and poultry is the main way of modern animal husbandry development.This breeding method is widely used by the majority of owners because of its easy technical promotion,low breeding cost and good economic benefits.But with the development of large-scale livestock and poultry breeding,the pollution and damage to the environment caused by fecal pollution from large-scale livestock and poultry breeding has been criticized by many environmentalists.In this paper,through visit and investigation of large-scale livestock and poultry farms,the methods and measures of environmental protection in the construction of large-scale livestock and poultry farms are proposed. 展开更多
关键词 LIVESTOCK large-scale farm construction Environmental protection
下载PDF
Reconstruction and Restoration of Main Facade and Wooden Ceilings of Hasan Basha Tahir Kuttab &Sabil, Cairo—Egypt
5
作者 Mahran F. Anwar 《World Journal of Engineering and Technology》 2019年第1期175-192,共18页
The architectural?complexes?of Hasan Basha Tahir?were suffering from many damages and deformation in different elements as load bearing walls, arches and wooden ceiling. Ground water, salt weathering, air pollution, b... The architectural?complexes?of Hasan Basha Tahir?were suffering from many damages and deformation in different elements as load bearing walls, arches and wooden ceiling. Ground water, salt weathering, air pollution, biological colonization and environmental aspects were the main degradation factors which caused a lot of damage and deterioration phenomena in the complexes. Horizontal and vertical cracks, salts, loss of decorations, and featured dark of the stone surface were noticed at the complexes elements. In addition, the celling of the complex was in a very bad condition;?it had lost a lot of decoration elements, cracking, soot deposition, insects’ holes, and fungi growth. This research will discuss the various deterioration phenomena that?have?effect on the main building materials and cause the damages and discuss the general scientific methodology of the architectural and structural conservation project which was?carried out. 展开更多
关键词 Architectural Complexes OTTOMAN Period Damages ceiling construction Bearing Wall Conservation Re-construction
下载PDF
One-Step-Installation of Offshore Wind Turbine on Large-Scale Bucket-Top-Bearing Bucket Foundation 被引量:18
6
作者 丁红岩 练继建 +1 位作者 李爱东 张浦阳 《Transactions of Tianjin University》 EI CAS 2013年第3期188-194,共7页
In 2010,the first offshore wind turbine with integrated installation was established in Qidong sea area of Jiangsu Province,China,which led to the implementation phase of one-step-installation technique based on the d... In 2010,the first offshore wind turbine with integrated installation was established in Qidong sea area of Jiangsu Province,China,which led to the implementation phase of one-step-installation technique based on the design and construction of large-scale bucket-top-bearing (LSBTB) bucket foundation.The critical technique of LSBTB bucket foundation included self-floating towing,penetration with adjustment of horizontal levelness,removability and one-step-installation.The process of one-step-installation included the prefabrication of LSBTB bucket foundation in onshore construction base,installation and debugging of wind power,overall water transportation of foundation and wind power system,and installation of foundation and offshore wind turbine on the appointed sea area.The cost of one-step-installation technique was about 5 000 Yuan/kW,which was 30%-50% lower than that of the existing technique.The prefabrication of LSBTB bucket foundation took about two months.During the one-step-installation process,the installation and debugging of wind power and overall water transportation need about one to two days in sea area within 35 m depth.After the proposed technique is industrialized,the cost will be further reduced,and the installation capacity is expected to be up to 500 wind turbines per year. 展开更多
关键词 one-step-installation TECHNIQUE large-scale bucket-top-bearing BUCKET foundation self-floating towing penetration TECHNIQUE with adjustment of horizontal levelness removability TECHNIQUE construction and INSTALLATION cost
下载PDF
Preliminary Discussion on the Construction and Development of Modern Refinery in China 被引量:1
7
作者 Jiang Rongxing Sun Lili Li Zhiqiang(SINOPEC Engineering Incorporation, Beijing 100101) 《China Petroleum Processing & Petrochemical Technology》 SCIE CAS 2004年第4期7-13,共7页
Sustainable development of refinery is an important problem that refining industry faces in the21st Century. The situation and challenges in front of refining industry are analyzed and illustrated byexamples in this p... Sustainable development of refinery is an important problem that refining industry faces in the21st Century. The situation and challenges in front of refining industry are analyzed and illustrated byexamples in this paper. It is also recognized that large-scale, clean, light-oriented and integrated refinery isthe mode of development in future, and also an important measure for the sustainable development ofpetroleum resource. 展开更多
关键词 SUSTAINABLE DEVELOPMENT REFINERY design construction CLEAN large-scale light product integration
下载PDF
Large-scale model test study on the water pressure resistance of construction joints of karst tunnel linings 被引量:1
8
作者 Meng HUANG Mingli HUANG +2 位作者 Ze YANG Yuan SONG Zhien ZHANG 《Frontiers of Structural and Civil Engineering》 SCIE EI CSCD 2023年第8期1249-1263,共15页
Model tests and numerical calculations were adopted based on the New Yuanliangshan tunnel project to investigate the water pressure resistance of lining construction joints in high-pressure and water-rich karst tunnel... Model tests and numerical calculations were adopted based on the New Yuanliangshan tunnel project to investigate the water pressure resistance of lining construction joints in high-pressure and water-rich karst tunnels.A large-scale model test was designed and conducted,innovatively transforming the external water pressure of the lining construction joint into internal water pressure.The effects of the embedded position and waterstop type on the water pressure resistance of the construction joint were analyzed,and the reliability of the model test was verified via numerical calculations.The results show that using waterstops can significantly improve the water pressure resistance of lining construction joints.The water pressure resistance of the lining construction joint is positively correlated with the lining thickness and embedded depth of the waterstop.In addition,the type of waterstop significantly influences the water pressure resistance of lining construction joints.The test results show that the water pressure resistance of the embedded transverse reinforced waterstop is similar to that of the steel plate waterstop,and both have more advantages than the rubber waterstop.The water pressure resistance of the construction joint determined via numerical calculations is similar to the model test results,indicating that the model test results have high accuracy and reliability.This study provides a reference for similar projects and has wide applications. 展开更多
关键词 karst tunnel lining construction joint water pressure resistance large-scale model test numerical calculations
原文传递
江南特色斗栱廊桥反拱坡屋面铝方通吊顶工程施工技术
9
作者 张玉建 余少乐 +4 位作者 梁丰韬 卫林强 何超 陈华 朱荣珅 《施工技术(中英文)》 CAS 2024年第14期56-62,共7页
宁波国际会议中心建筑造型新颖,考虑到建筑造型、可操作性、质量控制效果、经济性及施工进度等因素,提出江南特色斗栱廊桥反拱坡屋面铝方通吊顶施工技术。实践表明,该技术有效保证了室外异形仿木纹铝方通吊顶工程施工质量,解决了其安装... 宁波国际会议中心建筑造型新颖,考虑到建筑造型、可操作性、质量控制效果、经济性及施工进度等因素,提出江南特色斗栱廊桥反拱坡屋面铝方通吊顶施工技术。实践表明,该技术有效保证了室外异形仿木纹铝方通吊顶工程施工质量,解决了其安装难题,实现了江南特色建筑外观需求。同时,装配式施工工艺有效缩短了施工工期,降低了施工成本及能耗,具有良好的推广应用价值。 展开更多
关键词 屋面 铝方通 吊顶 装配式 安装 模拟 施工技术
下载PDF
工程车辆3-RPS座椅悬架半主动滑模控制
10
作者 樊书伟 燕碧娟 +1 位作者 叶伟 张文军 《噪声与振动控制》 CSCD 北大核心 2024年第3期158-164,共7页
工程车辆处于恶劣的工作环境中,垂向单维度的被动减振无法满足实际需求。为解决该问题,依据可实现三维减振的3-RPS并联机构座椅悬架,提出一种新型三维控制策略。基于“座椅-人体”三维振动数学模型,设计一种新的三维天棚控制模型,作为... 工程车辆处于恶劣的工作环境中,垂向单维度的被动减振无法满足实际需求。为解决该问题,依据可实现三维减振的3-RPS并联机构座椅悬架,提出一种新型三维控制策略。基于“座椅-人体”三维振动数学模型,设计一种新的三维天棚控制模型,作为滑模控制的参考对象。设计滑模控制器,并根据Lyapunov稳定判据,对控制系统的稳定性进行分析判断。利用Simulink软件建立座椅-人体受振模型,对处于E、F、G级3种路面环境中,分别采用滑模控制以及被动控制模式的座椅的减振效果进行仿真对比分析。结果表明,相较于被动控制的座椅悬架,采用三维滑模控制的座椅悬架在垂直方向上的加速度下降率在38.88%至57.06%之间;俯仰方向上的角加速度的下降率在36.00%至54.89%之间;侧倾方向上的角加速度的下降率在49.58%至59.97%之间。且可有效降低垂直方向上的加速度峰值,对于冲击载荷减振性能良好。研究成果可为半主动多维减振座椅悬架控制策略的研究提供一定参考。 展开更多
关键词 振动与波 工程车辆 3-RPS并联机构 三维天棚控制 滑模控制
下载PDF
基于变形协调控制的超高钢连廊整体提升施工技术研究
11
作者 王磊 蔡毅敏 《施工技术(中英文)》 CAS 2024年第19期127-131,共5页
结合工程实例,针对超高钢连廊的幕墙造型龙骨、底部铝板吊顶等附属结构,采用一体化同步提升技术。裙房屋顶拼装时,通过柱顶设置贝雷梁进行荷载转换,减少对混凝土结构的加固措施。通过堆载试验、有限元分析等技术措施,对各工况下的吊顶... 结合工程实例,针对超高钢连廊的幕墙造型龙骨、底部铝板吊顶等附属结构,采用一体化同步提升技术。裙房屋顶拼装时,通过柱顶设置贝雷梁进行荷载转换,减少对混凝土结构的加固措施。通过堆载试验、有限元分析等技术措施,对各工况下的吊顶铝板变形进行分析。优化附属结构与钢桁架连接方式,让更多幕墙附属结构能随钢连廊主体结构同步提升,减少后续高空作业。 展开更多
关键词 钢结构 钢连廊 吊顶 同步提升 变形协调 施工技术
下载PDF
洁净厂房双层金属壁板吊顶施工技术
12
作者 高博 郑新志 +2 位作者 姬建华 李欣儒 代杰 《施工技术(中英文)》 CAS 2024年第19期122-126,共5页
高科技电子厂房因洁净度需求,为保证洁净室内的密闭性,通常将吊顶设计为双层金属壁板吊顶。双层吊顶之间的区域为静压箱层,静压箱层设计有大量的机电管线,传统的施工工艺中固定机电管线的吊杆需要穿过上层吊顶,生根在结构梁板,导致上层... 高科技电子厂房因洁净度需求,为保证洁净室内的密闭性,通常将吊顶设计为双层金属壁板吊顶。双层吊顶之间的区域为静压箱层,静压箱层设计有大量的机电管线,传统的施工工艺中固定机电管线的吊杆需要穿过上层吊顶,生根在结构梁板,导致上层吊顶开孔洞数量大、施工工效低。采用新型酒杯梁铝合金龙骨+六角形螺栓+吊杆的体系,可以将小型机电管线生根于上层吊顶龙骨,减少上层吊顶板的开孔数量,施工工效高。 展开更多
关键词 洁净厂房 吊顶 金属壁板 机电管线 安装 施工技术
下载PDF
大型超5A商务办公楼精装修工程的装饰技术创新
13
作者 陈燕 《建筑施工》 2024年第2期262-265,共4页
基于国泰君安新建办公楼的精装修工程,分别对墙面材料施工技术及大规模天花板施工工艺开展技术研究,以达到提高工程整体质量及细节表现效果的目的,从而为后续类似的高端商务楼装饰工程提供技术储备。通过研发出精装修工程墙面材料的新... 基于国泰君安新建办公楼的精装修工程,分别对墙面材料施工技术及大规模天花板施工工艺开展技术研究,以达到提高工程整体质量及细节表现效果的目的,从而为后续类似的高端商务楼装饰工程提供技术储备。通过研发出精装修工程墙面材料的新型加工技术,形成金属-石材饰面墙干挂技术及防火涂料钢柱外包技术,有效提升了建筑墙面的观感效果,并降低了施工成本。此外,创新研发出商务楼精装修工程的大规模天花板施工工艺,采用超大规格软膜天花板施工技术及超大面积艺术发光天花板等新型施工技术,确保了整体效果的一致性。 展开更多
关键词 商务办公楼 装饰工程 墙面材料施工 大规模天花板施工
下载PDF
高空大跨度悬挑吊顶悬挂操作平台研制
14
作者 邹挺 赵庆国 +2 位作者 刘新乐 李宝泉 张泽宁 《铁路技术创新》 2024年第3期163-170,共8页
针对新建福厦铁路泉州南站的高空大跨度站房悬挑檐口吊顶的施工空间有限问题,提出一种用来安装檐口铝板等悬挑构件吊顶的悬挂操作平台及施工工艺。与脚手架平台、高空曲臂作业车等传统高空平台相比,该悬挂操作平台适用性广,安装、拆卸方... 针对新建福厦铁路泉州南站的高空大跨度站房悬挑檐口吊顶的施工空间有限问题,提出一种用来安装檐口铝板等悬挑构件吊顶的悬挂操作平台及施工工艺。与脚手架平台、高空曲臂作业车等传统高空平台相比,该悬挂操作平台适用性广,安装、拆卸方便,作业安全,平台安装轻便、工程量小,施工快捷;且整体性强,安全稳定,可提供良好的操作面,有利于施工质量控制,有效降低施工成本,尤其针对跨度大、结构高度高、传统施工平台受限的施工工况,经济及社会效用更高。 展开更多
关键词 高空大跨度悬挑吊顶 悬挂 操作平台 施工工艺
下载PDF
施工升降机基础布置在地下室顶板和天然地基上的应用
15
作者 杨品贤 《建筑技术开发》 2024年第9期29-31,共3页
研究主要介绍了住宅项目平面布置阶段,对于布置在地下室顶板上及地下室范围外天然基础上的施工升降机基础进行了分析。项目将施工升降机基础与地下室顶板结构相结合,在施工升降机基础内设置暗梁对顶板回顶架体进行设计,对天然基础上设... 研究主要介绍了住宅项目平面布置阶段,对于布置在地下室顶板上及地下室范围外天然基础上的施工升降机基础进行了分析。项目将施工升降机基础与地下室顶板结构相结合,在施工升降机基础内设置暗梁对顶板回顶架体进行设计,对天然基础上设置钢筋混凝土墩台及短柱等方面进行阐述,旨在设计施工方案、保证工程质量,减小施工升降机使用的安全风险。 展开更多
关键词 施工升降机 盘扣回顶架 天然地基 地下室顶板
下载PDF
地下车库顶板防水施工质量控制技术
16
作者 闫文海 王云飞 陈龙 《建设科技》 2024年第16期82-84,共3页
地下车库顶板渗漏,始终是建筑行业普遍性的顽疾。本文针对地下车库顶板防水施工质量控制技术开展探讨,旨在帮助我国建筑施工企业突破地下车库顶板渗漏问题带来的困境,并进一步推动我国建筑工程地下车库施工质量的提升,打造人民群众与政... 地下车库顶板渗漏,始终是建筑行业普遍性的顽疾。本文针对地下车库顶板防水施工质量控制技术开展探讨,旨在帮助我国建筑施工企业突破地下车库顶板渗漏问题带来的困境,并进一步推动我国建筑工程地下车库施工质量的提升,打造人民群众与政府满意的地下车库防水工程,并为我国建筑产业高质量发展提供技术参考。 展开更多
关键词 地下车库 顶板防水施工 基层处理 非固化施工 防水卷材施工
下载PDF
铁路站房大跨度多曲面GRG吊顶施工技术
17
作者 刘杰 王赓 +2 位作者 王肖冲 孙政 马水生 《铁路技术创新》 2024年第3期193-198,共6页
目前国内外大型公共建筑室内装饰造型越来越复杂,且文化特色愈加鲜明,建筑造型若按照常规理念和施工工艺往往很难实现。针对新建景德镇北站候车厅大跨度多曲面吊顶项目开展研究,结合GRG材料灵活柔韧的可塑性,采用BIM技术对整体吊顶进行... 目前国内外大型公共建筑室内装饰造型越来越复杂,且文化特色愈加鲜明,建筑造型若按照常规理念和施工工艺往往很难实现。针对新建景德镇北站候车厅大跨度多曲面吊顶项目开展研究,结合GRG材料灵活柔韧的可塑性,采用BIM技术对整体吊顶进行合理分割排版,并对理论设计与实际施工均提出优化改进措施,完美地将设计理念与地方文化特色融合展示。通过现场具体实施,最大限度实现了设计意图和设计理念,最终呈现的装饰效果美观大方、层次分明,简约而不简单,可为类似工程提供参考。 展开更多
关键词 铁路站房 大跨度多曲面 GRG吊顶 BIM 文化元素 施工工艺
下载PDF
Dynamic Coordinated Management Model of Programme in Large-Scale Construction Company 被引量:2
18
作者 Feng Guo Yi-qi Chen Yi-qing Cai 《Frontiers of Engineering Management》 2015年第3期287-292,共6页
Large-scale construction companies develop rapidly when facing more and more opportunities and challenges of programme contracting. However, project management technology, not meeting the requirements of firm growth, ... Large-scale construction companies develop rapidly when facing more and more opportunities and challenges of programme contracting. However, project management technology, not meeting the requirements of firm growth, still stands proud, while relevant programme management methods have not been well studied. Therefore, this paper commences innovative application of coordinated management theory to programme management according to the need of changing the existing management mode in large-scale construction companies,then puts forward the dynamic coordinated management model composed of the dynamic coordination of function module, interface module, support module and evaluation module. Besides, coordination degree was introduced to make auxiliary analysis, so that companies can utilize internal and external resources more effectively to realize the goals of programme management as well as enterprise strategy. 展开更多
关键词 large-scale construction company PROGRAMME dynamic coordinated management MODEL
原文传递
Strategic Guidance Effect of Large-Scale Construction Enterprise Growth to Programme Contracting 被引量:1
19
作者 Feng Guo Yi-qi Chen Yi-qing Cai 《Frontiers of Engineering Management》 2016年第3期246-251,共6页
In the case of single project management standing the major place, the management on the organizational level and project level is separated from each other in large-scale construction enterprises, and it is not long ... In the case of single project management standing the major place, the management on the organizational level and project level is separated from each other in large-scale construction enterprises, and it is not long before program management theories applied to construction industry. Under the new situation of construction project clustering, how to choose projects has been the strategic decision for construction enterprises. Therefore,with the theory of program management and strategic management, this paper analyzes the relationship between the strategic growth of large-scale construction enterprises and program contracting, and attempts to provide meaningful ideas for enterprises to choose program from the strategic level. 展开更多
关键词 large-scale construction enterprise enterprise growth programme contracting strategic interaction
原文传递
基于PDCA的地下室顶棚无机纤维喷涂施工质量研究
20
作者 陈金平 张雪松 +1 位作者 李欣 兰功峰 《建筑节能(中英文)》 CAS 2023年第8期139-142,共4页
地下室顶棚喷涂无机纤维矿物棉隔热层作为一种新型绿色施工技术,施工快捷方便,保温隔热性能优良,能减少热量损失,达到节能减排的目的。为进一步推动无机纤维喷涂施工技术的推广及应用,基于PDCA质量循环法,以青岛某公共建筑地下室顶棚喷... 地下室顶棚喷涂无机纤维矿物棉隔热层作为一种新型绿色施工技术,施工快捷方便,保温隔热性能优良,能减少热量损失,达到节能减排的目的。为进一步推动无机纤维喷涂施工技术的推广及应用,基于PDCA质量循环法,以青岛某公共建筑地下室顶棚喷涂无机纤维矿物棉隔热层为质量管理对象,根据现状调查分析设定目标,通过缺陷项目累计频率确定影响施工质量的主要问题,利用因果分析图法分析产生该问题的主要原因,再使用5W1H分析法制定质量管理对策并付诸实施,最后进行效果检查显示达到了提高施工合格率和缩短建设工期的目的,验证了PDCA在提高地下室顶棚喷涂无机纤维矿物棉隔热层施工质量的可行性和适用性,为相关研究和实践提供一定的借鉴与参考。 展开更多
关键词 PDCA 地下室顶棚 无机纤维喷涂 绿色施工
下载PDF
上一页 1 2 7 下一页 到第
使用帮助 返回顶部