The financial aspects of large-scale engineering construction projects profoundly influence their success.Strengthening cost control and establishing a scientific financial evaluation system can enhance the project’s...The financial aspects of large-scale engineering construction projects profoundly influence their success.Strengthening cost control and establishing a scientific financial evaluation system can enhance the project’s economic benefits,minimize unnecessary costs,and provide decision-makers with a robust financial foundation.Additionally,implementing an effective cash flow control mechanism and conducting a comprehensive assessment of potential project risks can ensure financial stability and mitigate the risk of fund shortages.Developing a practical and feasible fundraising plan,along with stringent fund management practices,can prevent fund wastage and optimize fund utilization efficiency.These measures not only facilitate smooth project progression and improve project management efficiency but also enhance the project’s economic and social outcomes.展开更多
On the basis of a numerical model of tidal current using Delft3D , the distribution of the semi-exchange time of water was simulated in the Yueqing Bay here. The result showed that the semi-exchange time was about mor...On the basis of a numerical model of tidal current using Delft3D , the distribution of the semi-exchange time of water was simulated in the Yueqing Bay here. The result showed that the semi-exchange time was about more than 6 d in the bay end, and about 1~2 d in the bay mouth. Besides, based on the calculation of the semi-exchange time before and after the Xuanmen Dam project, a comparison between them was further carried out. And the same work was also done with the recent reclamation projects in the Yueqing Bay as well. The results showed that the change in semi-exchange time caused by the Xuanmen Dam project was about 6 d increase near the dam and 4.5 d increase at the bay end. And it was about 5 d increase at the bay end and 1 d increase at the mouth of the bay caused by the recent reclamation projects.展开更多
In coastal areas with complicated flow movement, deposition and scour readily occur in submarine excavation projects. In this study, a smallscale model, with a high resolution in the vertical direction, was used to si...In coastal areas with complicated flow movement, deposition and scour readily occur in submarine excavation projects. In this study, a smallscale model, with a high resolution in the vertical direction, was used to simulate the tidal current around a submarine excavation project. The finite volume method was used to solve Navier-Stokes equations and the Reynolds stress transport equation, and the entire process of the tidal current was simulated with unstructured meshes, generated in the irregular shape area, and structured meshes, generated in other water areas.The meshes near the bottom and free surface were densified with a minimum layer thickness of 0.05 m. The volume of fluid method was used to track the free surface, the volume fraction of cells on the upstream boundary was obtained from the volume fraction of adjacent cells, and that on the downstream boundary was determined by the water level process. The numerical results agree with the observed data, and some conclusions can be drawn: after the foundation trench excavation, the flow velocity decreases quite a bit through the foundation trench, with reverse flow occurring on the lee slope in the foundation trench; the swirling flow impedes inflow, leading to the occurrence of dammed water above the foundation trench; the turbulent motion is stronger during ebbing than in other tidal stages, the range with the maximum value of turbulent viscosity, occurring on the south side of the foundation trench at maximum ebbing, is greater than those in other tidal stages in a tidal cycle, and the maximum value of Reynolds shear stress occurs on the south side of the foundation trench at maximum ebbing in a tidal cycle. The numerical calculation method shows a strong performance in simulation of the hydrodynamic characteristics of tidal currents in the foundation trench, providing a basis for submarine engineering construction in coastal areas.展开更多
Constructing an industrial system for a large-scale,non-grid-connected wind power industry is a key step towards the diverse utilization of wind power.However,wind power exploitation is not only a technical challenge ...Constructing an industrial system for a large-scale,non-grid-connected wind power industry is a key step towards the diverse utilization of wind power.However,wind power exploitation is not only a technical challenge but an industrial problem as well.The objective of this study is to introduce a concept of large-scale,non-grid-connected wind power(LSNGCWP) industrial zones and establish an evaluation model to assess their industrial arrangement.The data of wind energy,industry,nature resources and socio-economy were collected in this study.Using spatial overlay analysis of geographic information system,this study proposes a spatial arrangement of the LSNGCWP indus-trial zones in the coastal areas of China,which could be summarized as the 'one line and three circles' structure,which will contribute to the optimization of the industrial structure,advance the wind power technology,coordinate the multi-industrial cooperation,and upgrade the industrial transformation of China's coastal areas.展开更多
Organized by Consiglio Nazional delle Ricerche (CNR), Gruppo Nedonale diIdraulice(GNI) with the support of the Ministry of Public Works and under the auspices of theCoastal Engineering Research Council(CERC) of the Am...Organized by Consiglio Nazional delle Ricerche (CNR), Gruppo Nedonale diIdraulice(GNI) with the support of the Ministry of Public Works and under the auspices of theCoastal Engineering Research Council(CERC) of the American Society of CivilEngineering(ASCE), and co-sponsored by the international Association for Hydraulic of Navi-gation Congress(PIANC) and by the Associazione di Ingegneria Offshore e Marina(AIOM).Aim展开更多
The 7th National Symposium on Coastal Engineering was held in Zhuhai, China, fromNovember 13th to 16th, 1993, co-sponsored by —Chinese Ocean Engineering Society —Harbour Engineering Committee, Chinese Society of Civ...The 7th National Symposium on Coastal Engineering was held in Zhuhai, China, fromNovember 13th to 16th, 1993, co-sponsored by —Chinese Ocean Engineering Society —Harbour Engineering Committee, Chinese Society of Civil Engineering —Harbour and Waterway Committee, Chinese Society of Hydraulic Engineering —Coast and Estuary Committee, Chinese Ocean and Limnology Society —Guangdong Ocean and Limnology Society —Guandong Society of Oceanograph展开更多
Sponsors Chinese Ocean Engineering Society (COES) Harbour Engineering Committee, Chinese Society of Civil Engineering Harbour and Waterway Committee, Chinese Society of Hydraulic Engineering Tianjin Society of Water T...Sponsors Chinese Ocean Engineering Society (COES) Harbour Engineering Committee, Chinese Society of Civil Engineering Harbour and Waterway Committee, Chinese Society of Hydraulic Engineering Tianjin Society of Water Transport Engineering Shanghai Ocean and Limnology Society The Authority of Comprehensive Improvement for Yangtze River Estuaty and Taihu Trainage Area.展开更多
The problems of environmental engineering geological in coastal zone mainly include earthquakes, collapse and landslide, etc. We selected eight major evaluation indexes from the influence factors of problems of enviro...The problems of environmental engineering geological in coastal zone mainly include earthquakes, collapse and landslide, etc. We selected eight major evaluation indexes from the influence factors of problems of environmental engineering geological in coastal zone, that is active fault, seismic activity and hydrological conditions, etc. Through the index of quantitative grading, constructing fuzzy comprehensive evaluation model,evaluation of environmental engineering geological stability in coastal zone, supplying a scientific method and gist for the more reasonable and effective development and utilization of coastal zone.展开更多
The intertidal flats are classified as 'attached bar', 'spit' and 'isolated bar' in relation to the land, and 'broad flat', 'sharp bank' and 'eroded cliff' according to ...The intertidal flats are classified as 'attached bar', 'spit' and 'isolated bar' in relation to the land, and 'broad flat', 'sharp bank' and 'eroded cliff' according to the shape of the cross-shore profile. Tidal currents on the flat are basically back and forth along the river channel banks but gyratory on the seaward side of the Chongming Island. The flow velocity on the intertidal flat is gradually reduced with increasing elevation. The river discharge strengthens ebb flows and modifies current asymmetry especially on the lower flat in neap tide, although hydrodynamics over the tidal flat is tide-dominated. The wave height on the tidal flat is normally limited to a few decimeters although it changes with water depth, slope and wind. Suspended sediment concentration over the tidal flat is typically hundreds to thousands of mg / 1. Although the delta has grown rapidly in history, the rate of growth is different in different periods. A maximum advancing rate of 330 m / a was recently found in the central part of the river month towards the sea. In view of the natural conditions, reclamation of higher intertidal flat (above the mean tidal level) in advancing coasts is suggested, which would leave broad wetlands for wild lives. In addition, some possible influences of coastal engineering projects and the future natural backgrounds of engineering under reduction in riverine sediment supply and sea level rise are addressed.展开更多
Chemical process optimization can be described as large-scale nonlinear constrained minimization. The modified augmented Lagrange multiplier methods (MALMM) for large-scale nonlinear constrained minimization are studi...Chemical process optimization can be described as large-scale nonlinear constrained minimization. The modified augmented Lagrange multiplier methods (MALMM) for large-scale nonlinear constrained minimization are studied in this paper. The Lagrange function contains the penalty terms on equality and inequality constraints and the methods can be applied to solve a series of bound constrained sub-problems instead of a series of unconstrained sub-problems. The steps of the methods are examined in full detail. Numerical experiments are made for a variety of problems, from small to very large-scale, which show the stability and effectiveness of the methods in large-scale problems.展开更多
With the significant development of computer hardware,many advanced numerical techniques have been proposed to investigate complex hydrodynamic problems.This article aims to provide a detailed review of moving particl...With the significant development of computer hardware,many advanced numerical techniques have been proposed to investigate complex hydrodynamic problems.This article aims to provide a detailed review of moving particle semi-implicit(MPS)techniques and their application in ocean and coastal engineering.The achievements of the MPS method in stability and accuracy,boundary conditions,and acceleration techniques are discussed.The applications of the MPS method,which are classified into two main categories,namely,multiphase flows and fluid-structure interactions,are introduced.Finally,the prospects and conclusions are highlighted.The MPS method has the potential to solve practical problems.展开更多
Free-interface dual-compatibility modal synthesis method(compatibility of both force and displacement on interfaces)is introduced to large-scale civil engineering structure to enhance computation efficiency. The basic...Free-interface dual-compatibility modal synthesis method(compatibility of both force and displacement on interfaces)is introduced to large-scale civil engineering structure to enhance computation efficiency. The basic equations of the method are first set up, and then the mode cut-off principle and the dividing principle are proposed. MATLAB is used for simulation in different frame structures. The simulation results demonstrate the applicability of this substructure method to civil engineering structures and the correctness of the proposed mode cut-off principle. Studies are also conducted on how to divide the whole structure for better computation efficiency while maintaining better precision. It is observed that the geometry and material properties should be considered, and the synthesis results would be more precise when the inflection points of the mode shapes are taken into consideration. Furthermore, the simulation performed on a large-scale high-rise connected structure further proves the feasibility and efficiency of this modal synthesis method compared with the traditional global method. It is also concluded from the simulation results that the fewer number of DOFs in each substructure will result in better computation efficiency, but too many substructures will be time-consuming due to the tedious synthesis procedures. Moreover, the substructures with free interface will introduce errors and reduce the precision dramatically, which should be avoided.展开更多
To keep up with the time,culture is integrated to large-scale construction project management in China,which will absolutely add more vitality into construction project management in our country.Engineering culture is...To keep up with the time,culture is integrated to large-scale construction project management in China,which will absolutely add more vitality into construction project management in our country.Engineering culture is an integration of project construction and engineering culture.However,engineering culture development enjoys its own particularity as a project is constructed once only within a limited period of time.This paper gives affirmative opinion that engineering culture development in large-scale projects backs project management on the basis of thorough investigation of engineering culture development in Sutong Bridge Project and after deepened analysis,proposes new thinking pattern of engineering culture development in large-scale projects in a systematic manner,including thorough understanding of the essence of engineering culture,principle and contents of engineering culture development as well as efficient method in respect of establishment and implementation of engineering culture,and therefore provides a standard reference and systematic thinking pattern for engineering culture development in future large-scale projects.展开更多
Tanghai County is one of the counties in Tangshan City with the highest saline-alkali degree, with 80% of its land being covered by saline-alkali soils. Through studying landscaping technologies for coastal saline-alk...Tanghai County is one of the counties in Tangshan City with the highest saline-alkali degree, with 80% of its land being covered by saline-alkali soils. Through studying landscaping technologies for coastal saline-alkali land in Tanghai County, 3 dominant modes for landscaping engineering in such land were summarized as shallow underground pipe desalination technology, banding soil replacement technology and hole membrane soil replacement technology, which are different in application scope and also in cost (respectively 260, 210 and 170 yuan). 3 landscaping measures were also proposed, including promotion of suitable plant cultivation technologies, application of saline-alkali tolerant plants and biological improvement of soils. To explore economic and practical planting patterns for saline-alkali land, low-cost landscaping tests were conducted from the perspectives of improving landscaping engineering mode and optimizing landscaping measures, and the results showed that it was practical to apply low-cost landscaping patterns, and comprehensive ecological measures should be adopted to realize the sustained utilization of soil.展开更多
The degradation of water source environment becomes serious problems accompanying with rapid urbanization in China. Ecological engineering provides ecologically sound and cost effective solution to solving this proble...The degradation of water source environment becomes serious problems accompanying with rapid urbanization in China. Ecological engineering provides ecologically sound and cost effective solution to solving this problem. As a case study, a 15 hm 2 ecological water storage basin for a water plant was designed and constructed on the TEDA area in Tianjin City. Located on saline, the construction of this project has to face serious difficulties, such as high salinity, scarce seed banks of macrophytes, and strong winds. Freshwater replacement, soil amendation and macrophytes planting at the basinshore, wooden water breaker and plastic membrane installation and other measures were conducted for the assistance of plant community establishment. The result showed that the chloride concentration in the basin water decreased from 11600 mg/L to less than 100 mg/L, and the chloride content in the basin sediment decreased from 2 1% to 0 35% after freshwater soaking. The introduced macrophytes of 8 species all survived and 11 other macrophytes species were occurred in the basin. A new ecosystem was created with increased biological diversity in the original saline, and the water quality was improved. This ecological water storage basin also provided a pleasing landscape for local people.展开更多
With the global warming and sea level rising, it is widely recognized that there is an increasing tendency of typhoon occurrence frequency and intensity. The defenses code against typhoon attacks for nuclear power pla...With the global warming and sea level rising, it is widely recognized that there is an increasing tendency of typhoon occurrence frequency and intensity. The defenses code against typhoon attacks for nuclear power plant should be calibrated because of the increasing threat of typhoon disaster and severe consequences. This paper discusses the probabilistic approach of definitions about "probable maximum typhoon" and "probable maximum storm surge" in nuclear safety regulations of China and has made some design code calibrations by use of a newly proposed Double Layer Nested Mtdti-objective Probability Model (DLNMPM).展开更多
A new coastal technique, named as assembly coastal building, was introduced. The main concept of the technique was the assembling components which could be combined and locked together to form a large caisson. The ass...A new coastal technique, named as assembly coastal building, was introduced. The main concept of the technique was the assembling components which could be combined and locked together to form a large caisson. The assembly coastal building technique was used in a sea access road in Zhuanghai 4X1 well, Dagang Oilfield. The design plans and in-situ tests in the sea access road project were introduced in detail. According to the Zhuanghai project, the numerical simulation method of assembly coastal building technique was proposed. 2D numerical simulations were performed in FLAC to analyze the displacement and stability of the technique in the construction process and post-construction period. The settlement calculated is close to the in-situ results, which proves that the proposed numerical method is reasonable. Results show that the assembly coastal building technique has large safety factor under the gravity loading and wave loadings.展开更多
In this study, the passage of waves through pile groups with different arrangements is investigated using a three-dimensional(3D)numerical model. For the simulations, waves of three different heights of 36, 58, and 81...In this study, the passage of waves through pile groups with different arrangements is investigated using a three-dimensional(3D)numerical model. For the simulations, waves of three different heights of 36, 58, and 81 mm, a fixed period of 0.88s, and a fixed wave length of 1.128 m were used. To simulate the waves and flow pattern through the piles, Reynolds-averaged Navier–Stokes(RANS) equations of fluid motion were solved based on the finite volume method(FVM). Piles were defined as obstacles in the rectangular domain using the fractional area/volume obstacle representation(FAVOR) method. The volume-of-fluid(VOF) and re-normalization group(RNG) methods were used to simulate the free surface and turbulence phenomenon, respectively. By performing different numerical simulations, the effect of coastal pile arrangements on wave pattern was studied and was compared with existing experimental data, and an acceptable agreement was achieved.展开更多
文摘The financial aspects of large-scale engineering construction projects profoundly influence their success.Strengthening cost control and establishing a scientific financial evaluation system can enhance the project’s economic benefits,minimize unnecessary costs,and provide decision-makers with a robust financial foundation.Additionally,implementing an effective cash flow control mechanism and conducting a comprehensive assessment of potential project risks can ensure financial stability and mitigate the risk of fund shortages.Developing a practical and feasible fundraising plan,along with stringent fund management practices,can prevent fund wastage and optimize fund utilization efficiency.These measures not only facilitate smooth project progression and improve project management efficiency but also enhance the project’s economic and social outcomes.
文摘On the basis of a numerical model of tidal current using Delft3D , the distribution of the semi-exchange time of water was simulated in the Yueqing Bay here. The result showed that the semi-exchange time was about more than 6 d in the bay end, and about 1~2 d in the bay mouth. Besides, based on the calculation of the semi-exchange time before and after the Xuanmen Dam project, a comparison between them was further carried out. And the same work was also done with the recent reclamation projects in the Yueqing Bay as well. The results showed that the change in semi-exchange time caused by the Xuanmen Dam project was about 6 d increase near the dam and 4.5 d increase at the bay end. And it was about 5 d increase at the bay end and 1 d increase at the mouth of the bay caused by the recent reclamation projects.
基金supported by the National Natural Science Foundation of China(Grant No.41406005)
文摘In coastal areas with complicated flow movement, deposition and scour readily occur in submarine excavation projects. In this study, a smallscale model, with a high resolution in the vertical direction, was used to simulate the tidal current around a submarine excavation project. The finite volume method was used to solve Navier-Stokes equations and the Reynolds stress transport equation, and the entire process of the tidal current was simulated with unstructured meshes, generated in the irregular shape area, and structured meshes, generated in other water areas.The meshes near the bottom and free surface were densified with a minimum layer thickness of 0.05 m. The volume of fluid method was used to track the free surface, the volume fraction of cells on the upstream boundary was obtained from the volume fraction of adjacent cells, and that on the downstream boundary was determined by the water level process. The numerical results agree with the observed data, and some conclusions can be drawn: after the foundation trench excavation, the flow velocity decreases quite a bit through the foundation trench, with reverse flow occurring on the lee slope in the foundation trench; the swirling flow impedes inflow, leading to the occurrence of dammed water above the foundation trench; the turbulent motion is stronger during ebbing than in other tidal stages, the range with the maximum value of turbulent viscosity, occurring on the south side of the foundation trench at maximum ebbing, is greater than those in other tidal stages in a tidal cycle, and the maximum value of Reynolds shear stress occurs on the south side of the foundation trench at maximum ebbing in a tidal cycle. The numerical calculation method shows a strong performance in simulation of the hydrodynamic characteristics of tidal currents in the foundation trench, providing a basis for submarine engineering construction in coastal areas.
基金Under the auspices of National Basic Research Program (No.2007CB210306)
文摘Constructing an industrial system for a large-scale,non-grid-connected wind power industry is a key step towards the diverse utilization of wind power.However,wind power exploitation is not only a technical challenge but an industrial problem as well.The objective of this study is to introduce a concept of large-scale,non-grid-connected wind power(LSNGCWP) industrial zones and establish an evaluation model to assess their industrial arrangement.The data of wind energy,industry,nature resources and socio-economy were collected in this study.Using spatial overlay analysis of geographic information system,this study proposes a spatial arrangement of the LSNGCWP indus-trial zones in the coastal areas of China,which could be summarized as the 'one line and three circles' structure,which will contribute to the optimization of the industrial structure,advance the wind power technology,coordinate the multi-industrial cooperation,and upgrade the industrial transformation of China's coastal areas.
文摘Organized by Consiglio Nazional delle Ricerche (CNR), Gruppo Nedonale diIdraulice(GNI) with the support of the Ministry of Public Works and under the auspices of theCoastal Engineering Research Council(CERC) of the American Society of CivilEngineering(ASCE), and co-sponsored by the international Association for Hydraulic of Navi-gation Congress(PIANC) and by the Associazione di Ingegneria Offshore e Marina(AIOM).Aim
文摘The 7th National Symposium on Coastal Engineering was held in Zhuhai, China, fromNovember 13th to 16th, 1993, co-sponsored by —Chinese Ocean Engineering Society —Harbour Engineering Committee, Chinese Society of Civil Engineering —Harbour and Waterway Committee, Chinese Society of Hydraulic Engineering —Coast and Estuary Committee, Chinese Ocean and Limnology Society —Guangdong Ocean and Limnology Society —Guandong Society of Oceanograph
文摘Sponsors Chinese Ocean Engineering Society (COES) Harbour Engineering Committee, Chinese Society of Civil Engineering Harbour and Waterway Committee, Chinese Society of Hydraulic Engineering Tianjin Society of Water Transport Engineering Shanghai Ocean and Limnology Society The Authority of Comprehensive Improvement for Yangtze River Estuaty and Taihu Trainage Area.
文摘The problems of environmental engineering geological in coastal zone mainly include earthquakes, collapse and landslide, etc. We selected eight major evaluation indexes from the influence factors of problems of environmental engineering geological in coastal zone, that is active fault, seismic activity and hydrological conditions, etc. Through the index of quantitative grading, constructing fuzzy comprehensive evaluation model,evaluation of environmental engineering geological stability in coastal zone, supplying a scientific method and gist for the more reasonable and effective development and utilization of coastal zone.
基金This work is financially supported by the National Natural Science Foundation of China(No.49676277)
文摘The intertidal flats are classified as 'attached bar', 'spit' and 'isolated bar' in relation to the land, and 'broad flat', 'sharp bank' and 'eroded cliff' according to the shape of the cross-shore profile. Tidal currents on the flat are basically back and forth along the river channel banks but gyratory on the seaward side of the Chongming Island. The flow velocity on the intertidal flat is gradually reduced with increasing elevation. The river discharge strengthens ebb flows and modifies current asymmetry especially on the lower flat in neap tide, although hydrodynamics over the tidal flat is tide-dominated. The wave height on the tidal flat is normally limited to a few decimeters although it changes with water depth, slope and wind. Suspended sediment concentration over the tidal flat is typically hundreds to thousands of mg / 1. Although the delta has grown rapidly in history, the rate of growth is different in different periods. A maximum advancing rate of 330 m / a was recently found in the central part of the river month towards the sea. In view of the natural conditions, reclamation of higher intertidal flat (above the mean tidal level) in advancing coasts is suggested, which would leave broad wetlands for wild lives. In addition, some possible influences of coastal engineering projects and the future natural backgrounds of engineering under reduction in riverine sediment supply and sea level rise are addressed.
文摘Chemical process optimization can be described as large-scale nonlinear constrained minimization. The modified augmented Lagrange multiplier methods (MALMM) for large-scale nonlinear constrained minimization are studied in this paper. The Lagrange function contains the penalty terms on equality and inequality constraints and the methods can be applied to solve a series of bound constrained sub-problems instead of a series of unconstrained sub-problems. The steps of the methods are examined in full detail. Numerical experiments are made for a variety of problems, from small to very large-scale, which show the stability and effectiveness of the methods in large-scale problems.
基金Supported by the National Key Research and Development Program of China(2019YFB1704200)the National Natural Science Foundation of China(51879159,52131102).
文摘With the significant development of computer hardware,many advanced numerical techniques have been proposed to investigate complex hydrodynamic problems.This article aims to provide a detailed review of moving particle semi-implicit(MPS)techniques and their application in ocean and coastal engineering.The achievements of the MPS method in stability and accuracy,boundary conditions,and acceleration techniques are discussed.The applications of the MPS method,which are classified into two main categories,namely,multiphase flows and fluid-structure interactions,are introduced.Finally,the prospects and conclusions are highlighted.The MPS method has the potential to solve practical problems.
基金Supported by the National Natural Science Foundation of China(No.51108089)Doctoral Programs Foundation of Ministry of Education of China(No.20113514120005)the Foundation of the Education Department of Fujian Province(No.JA14057)
文摘Free-interface dual-compatibility modal synthesis method(compatibility of both force and displacement on interfaces)is introduced to large-scale civil engineering structure to enhance computation efficiency. The basic equations of the method are first set up, and then the mode cut-off principle and the dividing principle are proposed. MATLAB is used for simulation in different frame structures. The simulation results demonstrate the applicability of this substructure method to civil engineering structures and the correctness of the proposed mode cut-off principle. Studies are also conducted on how to divide the whole structure for better computation efficiency while maintaining better precision. It is observed that the geometry and material properties should be considered, and the synthesis results would be more precise when the inflection points of the mode shapes are taken into consideration. Furthermore, the simulation performed on a large-scale high-rise connected structure further proves the feasibility and efficiency of this modal synthesis method compared with the traditional global method. It is also concluded from the simulation results that the fewer number of DOFs in each substructure will result in better computation efficiency, but too many substructures will be time-consuming due to the tedious synthesis procedures. Moreover, the substructures with free interface will introduce errors and reduce the precision dramatically, which should be avoided.
基金National Science and Technology Support Program(No.2006BAG04B06)
文摘To keep up with the time,culture is integrated to large-scale construction project management in China,which will absolutely add more vitality into construction project management in our country.Engineering culture is an integration of project construction and engineering culture.However,engineering culture development enjoys its own particularity as a project is constructed once only within a limited period of time.This paper gives affirmative opinion that engineering culture development in large-scale projects backs project management on the basis of thorough investigation of engineering culture development in Sutong Bridge Project and after deepened analysis,proposes new thinking pattern of engineering culture development in large-scale projects in a systematic manner,including thorough understanding of the essence of engineering culture,principle and contents of engineering culture development as well as efficient method in respect of establishment and implementation of engineering culture,and therefore provides a standard reference and systematic thinking pattern for engineering culture development in future large-scale projects.
文摘Tanghai County is one of the counties in Tangshan City with the highest saline-alkali degree, with 80% of its land being covered by saline-alkali soils. Through studying landscaping technologies for coastal saline-alkali land in Tanghai County, 3 dominant modes for landscaping engineering in such land were summarized as shallow underground pipe desalination technology, banding soil replacement technology and hole membrane soil replacement technology, which are different in application scope and also in cost (respectively 260, 210 and 170 yuan). 3 landscaping measures were also proposed, including promotion of suitable plant cultivation technologies, application of saline-alkali tolerant plants and biological improvement of soils. To explore economic and practical planting patterns for saline-alkali land, low-cost landscaping tests were conducted from the perspectives of improving landscaping engineering mode and optimizing landscaping measures, and the results showed that it was practical to apply low-cost landscaping patterns, and comprehensive ecological measures should be adopted to realize the sustained utilization of soil.
文摘The degradation of water source environment becomes serious problems accompanying with rapid urbanization in China. Ecological engineering provides ecologically sound and cost effective solution to solving this problem. As a case study, a 15 hm 2 ecological water storage basin for a water plant was designed and constructed on the TEDA area in Tianjin City. Located on saline, the construction of this project has to face serious difficulties, such as high salinity, scarce seed banks of macrophytes, and strong winds. Freshwater replacement, soil amendation and macrophytes planting at the basinshore, wooden water breaker and plastic membrane installation and other measures were conducted for the assistance of plant community establishment. The result showed that the chloride concentration in the basin water decreased from 11600 mg/L to less than 100 mg/L, and the chloride content in the basin sediment decreased from 2 1% to 0 35% after freshwater soaking. The introduced macrophytes of 8 species all survived and 11 other macrophytes species were occurred in the basin. A new ecosystem was created with increased biological diversity in the original saline, and the water quality was improved. This ecological water storage basin also provided a pleasing landscape for local people.
基金supported by the Nationam Natural Science Foundation of China(Grant No.50679076)Office of State Flood Control and Drought Relief Headquarters of China(Grant No.20060120)
文摘With the global warming and sea level rising, it is widely recognized that there is an increasing tendency of typhoon occurrence frequency and intensity. The defenses code against typhoon attacks for nuclear power plant should be calibrated because of the increasing threat of typhoon disaster and severe consequences. This paper discusses the probabilistic approach of definitions about "probable maximum typhoon" and "probable maximum storm surge" in nuclear safety regulations of China and has made some design code calibrations by use of a newly proposed Double Layer Nested Mtdti-objective Probability Model (DLNMPM).
基金Project (50639010) supported by the National Natural Science Foundation of China
文摘A new coastal technique, named as assembly coastal building, was introduced. The main concept of the technique was the assembling components which could be combined and locked together to form a large caisson. The assembly coastal building technique was used in a sea access road in Zhuanghai 4X1 well, Dagang Oilfield. The design plans and in-situ tests in the sea access road project were introduced in detail. According to the Zhuanghai project, the numerical simulation method of assembly coastal building technique was proposed. 2D numerical simulations were performed in FLAC to analyze the displacement and stability of the technique in the construction process and post-construction period. The settlement calculated is close to the in-situ results, which proves that the proposed numerical method is reasonable. Results show that the assembly coastal building technique has large safety factor under the gravity loading and wave loadings.
文摘In this study, the passage of waves through pile groups with different arrangements is investigated using a three-dimensional(3D)numerical model. For the simulations, waves of three different heights of 36, 58, and 81 mm, a fixed period of 0.88s, and a fixed wave length of 1.128 m were used. To simulate the waves and flow pattern through the piles, Reynolds-averaged Navier–Stokes(RANS) equations of fluid motion were solved based on the finite volume method(FVM). Piles were defined as obstacles in the rectangular domain using the fractional area/volume obstacle representation(FAVOR) method. The volume-of-fluid(VOF) and re-normalization group(RNG) methods were used to simulate the free surface and turbulence phenomenon, respectively. By performing different numerical simulations, the effect of coastal pile arrangements on wave pattern was studied and was compared with existing experimental data, and an acceptable agreement was achieved.