With the development of electronic equipment to high accuracy, high density, high frequency, and atrocious ser- vice environment, the functional surface in this type of equipment has increasingly serious problems,
In this paper, a method of intelligent fault tolerant management on electromechanical equipment is presented. It is based on condition monitoring of equipment and realized by condition prediction and condition contro...In this paper, a method of intelligent fault tolerant management on electromechanical equipment is presented. It is based on condition monitoring of equipment and realized by condition prediction and condition control. An example is introduced and analyzed in this paper.展开更多
The article introduces the main practices and achievements of the Environment and Plant Protection Institute of Chinese Academy of Tropical Agricultural Sciences in promoting the sharing of large-scale instruments and...The article introduces the main practices and achievements of the Environment and Plant Protection Institute of Chinese Academy of Tropical Agricultural Sciences in promoting the sharing of large-scale instruments and equipment in recent years,analyzes the existing problems in the management system,management team,assessment incentives and maintenance guarantee,and proposes improvement measures and suggestions from aspects of improving the sharing management system,strengthening management team building,strengthening sharing assessment and incentives,improving maintenance capabilities and expanding external publicity,to further improve the sharing management of large-scale instruments and equipment.展开更多
Time stress includes all kinds of environment and operating stress such as shock, vibration, temperature and electric current that the electromechanical system suffers in the manufacture, transport and operating proce...Time stress includes all kinds of environment and operating stress such as shock, vibration, temperature and electric current that the electromechanical system suffers in the manufacture, transport and operating process. In this paper, the conception of time stress and prognostics and health management ( PHM) system are introduced. Then, in order to improve the false alarm recognition and fault prediction capabilities of the electromechanical equipment, a novel PHM architecture for electromechanical equipment is put forward based on a built-in test (BIT) system design technology and time stress analysis method. Finally, the structure, the design and implementing method and the functions of each module of this PHM system are described in detail.展开更多
A coupled thermomechanical model is presented to investigate the thermoelastoplastic deformation mechanism of electromechanical equipments under the condition of electrocaloric shock. In the coupling model, differenti...A coupled thermomechanical model is presented to investigate the thermoelastoplastic deformation mechanism of electromechanical equipments under the condition of electrocaloric shock. In the coupling model, differentiating from the previous analyzing viewpoint that looked upon deformation work as additional heat source, temperature-field equation is established by considering the weakening role of deformation work on the intensity of internal heat source; in the process of setting up displacement-field equation, G-derivative of nonlinear functional is introduced into the traditional theory of elastoplastic finite deformation to simplify the expression of structural stiffness; stress-field equation is constructed by using the least square method to improve the stress solution obtained by constitutive equation. The presented model is converted into finite element program to simulate deforming process of 3-D structures with temperature-dependent material properties. As an example, thermal deformation analysis of Shanghai metro cars’ brake resistor is performed and compared with experimental results for illustrating the validity of the presented model.展开更多
The level of personnel operation ability determines the expected effectiveness of large-scale complex equipment. Firstly, this paper constructs the personnel operational ability evaluation index system and analyzes th...The level of personnel operation ability determines the expected effectiveness of large-scale complex equipment. Firstly, this paper constructs the personnel operational ability evaluation index system and analyzes the data source of index. Secondly, the weight of index is determined and the fuzzy comprehensive evaluation model is proposed. Finally, results of instance analysis show that the evaluation model is feasible and effective.展开更多
文摘With the development of electronic equipment to high accuracy, high density, high frequency, and atrocious ser- vice environment, the functional surface in this type of equipment has increasingly serious problems,
文摘In this paper, a method of intelligent fault tolerant management on electromechanical equipment is presented. It is based on condition monitoring of equipment and realized by condition prediction and condition control. An example is introduced and analyzed in this paper.
文摘The article introduces the main practices and achievements of the Environment and Plant Protection Institute of Chinese Academy of Tropical Agricultural Sciences in promoting the sharing of large-scale instruments and equipment in recent years,analyzes the existing problems in the management system,management team,assessment incentives and maintenance guarantee,and proposes improvement measures and suggestions from aspects of improving the sharing management system,strengthening management team building,strengthening sharing assessment and incentives,improving maintenance capabilities and expanding external publicity,to further improve the sharing management of large-scale instruments and equipment.
文摘Time stress includes all kinds of environment and operating stress such as shock, vibration, temperature and electric current that the electromechanical system suffers in the manufacture, transport and operating process. In this paper, the conception of time stress and prognostics and health management ( PHM) system are introduced. Then, in order to improve the false alarm recognition and fault prediction capabilities of the electromechanical equipment, a novel PHM architecture for electromechanical equipment is put forward based on a built-in test (BIT) system design technology and time stress analysis method. Finally, the structure, the design and implementing method and the functions of each module of this PHM system are described in detail.
文摘A coupled thermomechanical model is presented to investigate the thermoelastoplastic deformation mechanism of electromechanical equipments under the condition of electrocaloric shock. In the coupling model, differentiating from the previous analyzing viewpoint that looked upon deformation work as additional heat source, temperature-field equation is established by considering the weakening role of deformation work on the intensity of internal heat source; in the process of setting up displacement-field equation, G-derivative of nonlinear functional is introduced into the traditional theory of elastoplastic finite deformation to simplify the expression of structural stiffness; stress-field equation is constructed by using the least square method to improve the stress solution obtained by constitutive equation. The presented model is converted into finite element program to simulate deforming process of 3-D structures with temperature-dependent material properties. As an example, thermal deformation analysis of Shanghai metro cars’ brake resistor is performed and compared with experimental results for illustrating the validity of the presented model.
基金supported by the Natural Science Foundation of China(71704184)Projects of the of the National Social Science Foundation of China(15GJ003-245)Science Foundation of Equipment Research(JJ20172A05095)
文摘The level of personnel operation ability determines the expected effectiveness of large-scale complex equipment. Firstly, this paper constructs the personnel operational ability evaluation index system and analyzes the data source of index. Secondly, the weight of index is determined and the fuzzy comprehensive evaluation model is proposed. Finally, results of instance analysis show that the evaluation model is feasible and effective.