Numerical analysis of the optimal supporting time and long-term stability index of the surrounding rocks in the underground plant of Xiangjiaba hydro-power station was carried out based on the rheological theory. Firs...Numerical analysis of the optimal supporting time and long-term stability index of the surrounding rocks in the underground plant of Xiangjiaba hydro-power station was carried out based on the rheological theory. Firstly,the mechanical parameters of each rock group were identified from the experimental data; secondly,the rheological calculation and analysis for the cavern in stepped excavation without supporting were made; finally,the optimal time for supporting at the characteristic point in a typical section was obtained while the creep rate and displacement after each excavation step has satisfied the criterion of the optimal supporting time. Excavation was repeated when the optimal time for supporting was identified,and the long-term stability creep time and the maximum creep deformation of the characteristic point were determined in accordance with the criterion of long-term stability index. It is shown that the optimal supporting time of the characteristic point in the underground plant of Xiangjiaba hydro-power station is 5-8 d,the long-term stability time of the typical section is 126 d,and the corresponding largest creep deformation is 24.30 mm. While the cavern is supported,the cavern deformation is significantly reduced and the stress states of the surrounding rock masses are remarkably improved.展开更多
Large-scale pig-raising can discharge a great deal of wastewater,which contains high content of organic matter,ammonia nitrogen and suspended solids.The improper treatment of the piggery wastewater can lead to serious...Large-scale pig-raising can discharge a great deal of wastewater,which contains high content of organic matter,ammonia nitrogen and suspended solids.The improper treatment of the piggery wastewater can lead to serious environmental problems. As a liquid fertilizer,piggery wastewater is relatively low in fertilizer efficiency and high in transportation cost,so it is very necessary to treat it in situ. Energy plants have the advantages of rapid growth,large biomass,strong tillering ability and developed root system. Therefore,energy plants can be used to absorb and transform the pollutants( like nitrogen and phosphorus) in piggery wastewater into the components of plants,as well as form the rhizosphere environment which is conducive to microbial growth,so as to enhance the effects of nitrogen and phosphorus removal. The obtained energy plants can be recycled as the raw materials for biogas to increase the production of biogas,which brings economic benefits while solving the environmental problems caused by piggery wastewater.展开更多
For Finland, carbon dioxide mineralisation was identified as the only option for CCS (carbon capture and storage) application. Unfortunately it has not been embraced by the power sector. One interesting source-sink ...For Finland, carbon dioxide mineralisation was identified as the only option for CCS (carbon capture and storage) application. Unfortunately it has not been embraced by the power sector. One interesting source-sink combination, however, is formed by magnesium silicate resources at Vammala, located -85 km east of the 565 MWe coal-fired Meri-Pori Power Plant on the country's southwest coast. This paper assesses mineral sequestration of Meri-Pori power plant CO2, using Vammala mineral resources and the mineralisation process under development at Abo Akademi University. That process implies Mg(OH)E production from magnesium silicate-based rock, followed by gas/solid carbonation of the Mg(OH)2 in a pressurised fluidised bed. Reported are results on experimental work, i.e., Mg(OH)2 production, with rock from locations close to Meri-Pori. Results suggest a total CO2 fixation capacity -50 Mt CO2 for the Vammala site, although production of Mg(OH)2 from rock from the site is challenging. Finally, as mineralisation could be directly applied to flue gases without CO2 pre-capture, we report from experimental work on carbonation of Mg(OH)2 with CO2 and CO2-SO2-O2 gas mixtures. Results show that SO2 readily reacts with Mg(OH)2, providing an opportunity to simultaneously capture SO2 and CO2, which could make separate flue gas desulphurisation redundant.展开更多
To analyze the resonance mechanism of a photovoltaic(PV)power plant,a simplified impedance model of the PV power plant is first established.The structure of the PV power plant is then introduced,and the reason for the...To analyze the resonance mechanism of a photovoltaic(PV)power plant,a simplified impedance model of the PV power plant is first established.The structure of the PV power plant is then introduced,and the reason for the resonance is obtained by analyzing the on-site situation and measured data of the PV power plant.Finally,a simple and effective solution is proposed based on the structure of the PV power plant and its existing facilities.The results of the engineering experiments and the stable operation of the PV power plant verify the effectiveness of the proposed method.展开更多
基金Projects(50911130366, 50979030) supported by the National Natural Science Foundation of ChinaProject(2008BAB29B01) supported by the National Key Technology R&D Program of China
文摘Numerical analysis of the optimal supporting time and long-term stability index of the surrounding rocks in the underground plant of Xiangjiaba hydro-power station was carried out based on the rheological theory. Firstly,the mechanical parameters of each rock group were identified from the experimental data; secondly,the rheological calculation and analysis for the cavern in stepped excavation without supporting were made; finally,the optimal time for supporting at the characteristic point in a typical section was obtained while the creep rate and displacement after each excavation step has satisfied the criterion of the optimal supporting time. Excavation was repeated when the optimal time for supporting was identified,and the long-term stability creep time and the maximum creep deformation of the characteristic point were determined in accordance with the criterion of long-term stability index. It is shown that the optimal supporting time of the characteristic point in the underground plant of Xiangjiaba hydro-power station is 5-8 d,the long-term stability time of the typical section is 126 d,and the corresponding largest creep deformation is 24.30 mm. While the cavern is supported,the cavern deformation is significantly reduced and the stress states of the surrounding rock masses are remarkably improved.
基金Supported by the National Natural Science Foundation of China(41263006,2014BAC04B02)the Fund Project of Science and Technology Department of Jiangxi Province(20124ACB01200,20122BBG70086,20133ACF60005)the Fund Project of Jiangxi Academy of Sciences(gankeyuan(2013)No.19-06,2012-YYB-01,2013-XTPH1-14,2013H003)
文摘Large-scale pig-raising can discharge a great deal of wastewater,which contains high content of organic matter,ammonia nitrogen and suspended solids.The improper treatment of the piggery wastewater can lead to serious environmental problems. As a liquid fertilizer,piggery wastewater is relatively low in fertilizer efficiency and high in transportation cost,so it is very necessary to treat it in situ. Energy plants have the advantages of rapid growth,large biomass,strong tillering ability and developed root system. Therefore,energy plants can be used to absorb and transform the pollutants( like nitrogen and phosphorus) in piggery wastewater into the components of plants,as well as form the rhizosphere environment which is conducive to microbial growth,so as to enhance the effects of nitrogen and phosphorus removal. The obtained energy plants can be recycled as the raw materials for biogas to increase the production of biogas,which brings economic benefits while solving the environmental problems caused by piggery wastewater.
文摘For Finland, carbon dioxide mineralisation was identified as the only option for CCS (carbon capture and storage) application. Unfortunately it has not been embraced by the power sector. One interesting source-sink combination, however, is formed by magnesium silicate resources at Vammala, located -85 km east of the 565 MWe coal-fired Meri-Pori Power Plant on the country's southwest coast. This paper assesses mineral sequestration of Meri-Pori power plant CO2, using Vammala mineral resources and the mineralisation process under development at Abo Akademi University. That process implies Mg(OH)E production from magnesium silicate-based rock, followed by gas/solid carbonation of the Mg(OH)2 in a pressurised fluidised bed. Reported are results on experimental work, i.e., Mg(OH)2 production, with rock from locations close to Meri-Pori. Results suggest a total CO2 fixation capacity -50 Mt CO2 for the Vammala site, although production of Mg(OH)2 from rock from the site is challenging. Finally, as mineralisation could be directly applied to flue gases without CO2 pre-capture, we report from experimental work on carbonation of Mg(OH)2 with CO2 and CO2-SO2-O2 gas mixtures. Results show that SO2 readily reacts with Mg(OH)2, providing an opportunity to simultaneously capture SO2 and CO2, which could make separate flue gas desulphurisation redundant.
基金Supported by the International Science and Technology Cooperation Program of China(2018YFE0125300)the National Natural Science Foundation of China(52061130217)+2 种基金the Innovative Construction Program of Hunan Province of China(2019RS1016)the 111 Project of China(B17016)the Excellent Innovation Youth Program of Changsha of China(KQ2009037).
文摘To analyze the resonance mechanism of a photovoltaic(PV)power plant,a simplified impedance model of the PV power plant is first established.The structure of the PV power plant is then introduced,and the reason for the resonance is obtained by analyzing the on-site situation and measured data of the PV power plant.Finally,a simple and effective solution is proposed based on the structure of the PV power plant and its existing facilities.The results of the engineering experiments and the stable operation of the PV power plant verify the effectiveness of the proposed method.