In China, regions with abundant wind energy resources are generally located at the end of power grids. The power grid architecture in these regions is typically not sufficiently strong, and the energy structure is rel...In China, regions with abundant wind energy resources are generally located at the end of power grids. The power grid architecture in these regions is typically not sufficiently strong, and the energy structure is relatively simple. Thus, connecting large-capacity wind power units complicates the peak load regulation and stable operation of the power grids in these regions. Most wind turbines use power electronic converter technology, which affects the safety and stability of the power grid differently compared with conventional synchronous generators. Furthermore, fluctuations in wind power cause fluctuations in the output of wind farms, making it difficult to create and implement suitable power generation plans for wind farms. The generation technology and grid connection scheme for wind power and conventional thermal power generation differ considerably. Moreover, the active and reactive power control abilities of wind turbines are weaker than those of thermal power units, necessitating additional equipment to control wind turbines. Hence, to address the aforementioned issues with large-scale wind power generation, this study analyzes the differences between the grid connection and collection strategies for wind power bases and thermal power plants. Based on this analysis, the differences in the power control modes of wind power and thermal power are further investigated. Finally, the stability of different control modes is analyzed through simulation. The findings can be beneficial for the planning and development of large-scale wind power generation farms.展开更多
At the end of last year, the editors from Power and Electrical Engineers interviewed Zhou Xiaoxin on "Fundamental Research on Enhancing Operation Reliability for Large-Scale Interconnected Power Grids", a pr...At the end of last year, the editors from Power and Electrical Engineers interviewed Zhou Xiaoxin on "Fundamental Research on Enhancing Operation Reliability for Large-Scale Interconnected Power Grids", a project of "973 Program". Mr. Zhou, the chief engineer of China Electric Power Research Institute(CEPRI) and an academician of Chinese Academy of Sciences, is the chief scientist in charge of this research project.展开更多
This paper presents an approach for designing parameters of power system stabilizer(PSS)and FACTS damping controllers in a large scale practical power system.The objective is maximizing damping ratio of the target mod...This paper presents an approach for designing parameters of power system stabilizer(PSS)and FACTS damping controllers in a large scale practical power system.The objective is maximizing damping ratio of the target mode,and tracking technology(MTT)is used to avoid frequent alternations of target mode in optimization procedures.An improved planted growth simulation algorithm(IPGSA),which has high search efficiency and quick convergence speed,is proposed to optimize controller parameters coordinately.Based on case study of a large-scale power grid,and by using local and interregional low-frequency oscillation modes as target modes,simulation results verify proposed method in this paper.Furthermore,coordination optimization strategy adapted to multi-operating conditions demonstrates that the proposed approach is robust.展开更多
城市电网涵盖多个电压等级,调度操作复杂,为降低城市电网N-1后的运行风险,同时解决N-1-1发生时导致大面积停电的问题,提出一种转供区域识别方法,并结合研究场景对其进行分区处理,在保证求解准确度的前提下提高问题求解效率。提出降低城...城市电网涵盖多个电压等级,调度操作复杂,为降低城市电网N-1后的运行风险,同时解决N-1-1发生时导致大面积停电的问题,提出一种转供区域识别方法,并结合研究场景对其进行分区处理,在保证求解准确度的前提下提高问题求解效率。提出降低城市电网N-1-1运行风险拓扑重构双层优化模型,综合考虑了N-1-1时的负荷损失量和N-1后节点电压偏移量与设备负载率均衡度,使用二进制蝙蝠算法(Binary Bat Algorithm,BBA)对模型进行求解。最后通过某地区实际城市电网算例分析,验证了所提模型的有效性。展开更多
基金This work was supported by National Key Research and Development Program of China(2018YFB0904000).
文摘In China, regions with abundant wind energy resources are generally located at the end of power grids. The power grid architecture in these regions is typically not sufficiently strong, and the energy structure is relatively simple. Thus, connecting large-capacity wind power units complicates the peak load regulation and stable operation of the power grids in these regions. Most wind turbines use power electronic converter technology, which affects the safety and stability of the power grid differently compared with conventional synchronous generators. Furthermore, fluctuations in wind power cause fluctuations in the output of wind farms, making it difficult to create and implement suitable power generation plans for wind farms. The generation technology and grid connection scheme for wind power and conventional thermal power generation differ considerably. Moreover, the active and reactive power control abilities of wind turbines are weaker than those of thermal power units, necessitating additional equipment to control wind turbines. Hence, to address the aforementioned issues with large-scale wind power generation, this study analyzes the differences between the grid connection and collection strategies for wind power bases and thermal power plants. Based on this analysis, the differences in the power control modes of wind power and thermal power are further investigated. Finally, the stability of different control modes is analyzed through simulation. The findings can be beneficial for the planning and development of large-scale wind power generation farms.
文摘At the end of last year, the editors from Power and Electrical Engineers interviewed Zhou Xiaoxin on "Fundamental Research on Enhancing Operation Reliability for Large-Scale Interconnected Power Grids", a project of "973 Program". Mr. Zhou, the chief engineer of China Electric Power Research Institute(CEPRI) and an academician of Chinese Academy of Sciences, is the chief scientist in charge of this research project.
基金This work was supported by the Shanghai Science and Technology Commission Innovation Action Plan(Grant No.18DZ1203200).
文摘This paper presents an approach for designing parameters of power system stabilizer(PSS)and FACTS damping controllers in a large scale practical power system.The objective is maximizing damping ratio of the target mode,and tracking technology(MTT)is used to avoid frequent alternations of target mode in optimization procedures.An improved planted growth simulation algorithm(IPGSA),which has high search efficiency and quick convergence speed,is proposed to optimize controller parameters coordinately.Based on case study of a large-scale power grid,and by using local and interregional low-frequency oscillation modes as target modes,simulation results verify proposed method in this paper.Furthermore,coordination optimization strategy adapted to multi-operating conditions demonstrates that the proposed approach is robust.
文摘城市电网涵盖多个电压等级,调度操作复杂,为降低城市电网N-1后的运行风险,同时解决N-1-1发生时导致大面积停电的问题,提出一种转供区域识别方法,并结合研究场景对其进行分区处理,在保证求解准确度的前提下提高问题求解效率。提出降低城市电网N-1-1运行风险拓扑重构双层优化模型,综合考虑了N-1-1时的负荷损失量和N-1后节点电压偏移量与设备负载率均衡度,使用二进制蝙蝠算法(Binary Bat Algorithm,BBA)对模型进行求解。最后通过某地区实际城市电网算例分析,验证了所提模型的有效性。