In China, regions with abundant wind energy resources are generally located at the end of power grids. The power grid architecture in these regions is typically not sufficiently strong, and the energy structure is rel...In China, regions with abundant wind energy resources are generally located at the end of power grids. The power grid architecture in these regions is typically not sufficiently strong, and the energy structure is relatively simple. Thus, connecting large-capacity wind power units complicates the peak load regulation and stable operation of the power grids in these regions. Most wind turbines use power electronic converter technology, which affects the safety and stability of the power grid differently compared with conventional synchronous generators. Furthermore, fluctuations in wind power cause fluctuations in the output of wind farms, making it difficult to create and implement suitable power generation plans for wind farms. The generation technology and grid connection scheme for wind power and conventional thermal power generation differ considerably. Moreover, the active and reactive power control abilities of wind turbines are weaker than those of thermal power units, necessitating additional equipment to control wind turbines. Hence, to address the aforementioned issues with large-scale wind power generation, this study analyzes the differences between the grid connection and collection strategies for wind power bases and thermal power plants. Based on this analysis, the differences in the power control modes of wind power and thermal power are further investigated. Finally, the stability of different control modes is analyzed through simulation. The findings can be beneficial for the planning and development of large-scale wind power generation farms.展开更多
The 10-GW-class Jiuquan Wind Power Base in Gansu Province is to get its Phase I Project completed soon, and will further expand and become the world largest wind power base in the future. Whether electricity from the ...The 10-GW-class Jiuquan Wind Power Base in Gansu Province is to get its Phase I Project completed soon, and will further expand and become the world largest wind power base in the future. Whether electricity from the wind power base can be delivered on such a large scale becomes the focus of attention of the world. This paper analyzes four challenges facing the wind power base, including transmission capability, peak regulation and frequency modulation, capacity balance and generation accommodation, as well as system stability.展开更多
In this paper the author describes the current development of the 10-GW wind power base in Jiuquan, Gansu Province. The future planning of the wind power base and the relevant power grid are also introduced based on t...In this paper the author describes the current development of the 10-GW wind power base in Jiuquan, Gansu Province. The future planning of the wind power base and the relevant power grid are also introduced based on the assessment on the wind resources and the wind power operation with the grid.展开更多
Jiangsu is a province with massive energy consumption. Although it is short of energy and mineral resources, it has abundant renewable energy resources, especially offshore wind energy. In this paper, the condition an...Jiangsu is a province with massive energy consumption. Although it is short of energy and mineral resources, it has abundant renewable energy resources, especially offshore wind energy. In this paper, the condition and spatial distribution of wind energy in Jiangsu are introduced, and also the recommendations to develop offshore wind power are put forward.展开更多
文章对海上风电各国总体发展现状及未来发展趋势进行分析,表明各国都在加强对海上风电开发利用,但随着海上风电高速发展,有限的近海风电资源开发趋于饱和,深远海域风电成为海上风电未来发展的方向。然而水深离岸远,深远海风能开发困难,...文章对海上风电各国总体发展现状及未来发展趋势进行分析,表明各国都在加强对海上风电开发利用,但随着海上风电高速发展,有限的近海风电资源开发趋于饱和,深远海域风电成为海上风电未来发展的方向。然而水深离岸远,深远海风能开发困难,难于实现商业化。文章介绍了一种将新能源电力转换为其他能源载体的Power to X模式。氢作为1种可再生能源载体,可基于Power to X模式,通过将新能源电力电解水制氢的方式,有效降低深远海风电的成本。展开更多
The combination of wind and pumped storage is a useful method to compensate the fluctuation of wind power generation, which would exploit the abundant wind potential and increase wind power penetration. Taiwan Power C...The combination of wind and pumped storage is a useful method to compensate the fluctuation of wind power generation, which would exploit the abundant wind potential and increase wind power penetration. Taiwan Power Company (TPC) develops renewable energy actively in recent years. Moreover, TPC has started planning a high penetration wind power system and building offshore wind farms around the coast of Zhangbin, Yunlin and Penghu. The target of the offshore wind power installed capacity is up to 3 GW by 2025. However, the integration of the large scale of wind power would give huge challenges to the system operator because wind is randomly characterized. In this study, after high penetration wind power is integrated, the impacts of system frequency and the dispatch of conventional units will be discussed. Additionally, the hybrid system combing wind power with pumped-storage will be planning to reduce the effect of system frequency.展开更多
With the advancement of clean heating projects and the integration of large-scale distributed heat pumps into rural distribution networks in northern China,power grid companies face tremendous pressure to invest in po...With the advancement of clean heating projects and the integration of large-scale distributed heat pumps into rural distribution networks in northern China,power grid companies face tremendous pressure to invest in power grid upgrades,which bring opportunities for renewable power generation integration.The combination of heating by distributed renewable energy with the flexible operation of heat pumps is a feasible alternative for dealing with grid reinforcement challenges resulting from heating electrification.In this paper,a mathematical model of the collaborative planning of distributed wind power generation(DWPG)and distribution network with large-scale heat pumps is developed.In this model,the operational flexibility of the heat pump load is fully considered and the requirements of a comfortable indoor temperature are met.By applying this model,the goals of not only increasing the profit of DWPG but also reducing the cost of the power grid upgrade can be achieved.展开更多
The increasing penetration of wind power brings great uncertainties into power systems,which poses challenges to system planning and operation.This paper proposes a novel probabilistic load flow(PLF)method based on cl...The increasing penetration of wind power brings great uncertainties into power systems,which poses challenges to system planning and operation.This paper proposes a novel probabilistic load flow(PLF)method based on clustering technique to handle large fluctuations from large-scale wind power integration.The traditional cumulant method(CM)for PLF is based on the linearization of load flow equations around the operation point,therefore resulting in significant errors when input random variables have large fluctuations.In the proposed method,the samples of wind power and loads are first generated by the inverse Nataf transformation and then clustered using an improved K-means algorithm to obtain input variable samples with small variances in each cluster.With such pre-processing,the cumulant method can be applied within each cluster to calculate cumulants of output random variables with improved accuracy.The results obtained in each cluster are combined according to the law of total probability to calculate the final cumulants of output random variables for the whole samples.The proposed method is validated on modified IEEE 9-bus and 118-bus test achieve a better performance with the consideration of both traditional CM,2 m+1 point estimate method(PEM),Monte Carlo simulation(MCS)and Latin hypercube sampling(LHS)based MCS,the proposed method can achieve a better performance with the consideration of bothcomputational efficiency and accuracy.展开更多
基金This work was supported by National Key Research and Development Program of China(2018YFB0904000).
文摘In China, regions with abundant wind energy resources are generally located at the end of power grids. The power grid architecture in these regions is typically not sufficiently strong, and the energy structure is relatively simple. Thus, connecting large-capacity wind power units complicates the peak load regulation and stable operation of the power grids in these regions. Most wind turbines use power electronic converter technology, which affects the safety and stability of the power grid differently compared with conventional synchronous generators. Furthermore, fluctuations in wind power cause fluctuations in the output of wind farms, making it difficult to create and implement suitable power generation plans for wind farms. The generation technology and grid connection scheme for wind power and conventional thermal power generation differ considerably. Moreover, the active and reactive power control abilities of wind turbines are weaker than those of thermal power units, necessitating additional equipment to control wind turbines. Hence, to address the aforementioned issues with large-scale wind power generation, this study analyzes the differences between the grid connection and collection strategies for wind power bases and thermal power plants. Based on this analysis, the differences in the power control modes of wind power and thermal power are further investigated. Finally, the stability of different control modes is analyzed through simulation. The findings can be beneficial for the planning and development of large-scale wind power generation farms.
文摘The 10-GW-class Jiuquan Wind Power Base in Gansu Province is to get its Phase I Project completed soon, and will further expand and become the world largest wind power base in the future. Whether electricity from the wind power base can be delivered on such a large scale becomes the focus of attention of the world. This paper analyzes four challenges facing the wind power base, including transmission capability, peak regulation and frequency modulation, capacity balance and generation accommodation, as well as system stability.
文摘In this paper the author describes the current development of the 10-GW wind power base in Jiuquan, Gansu Province. The future planning of the wind power base and the relevant power grid are also introduced based on the assessment on the wind resources and the wind power operation with the grid.
文摘Jiangsu is a province with massive energy consumption. Although it is short of energy and mineral resources, it has abundant renewable energy resources, especially offshore wind energy. In this paper, the condition and spatial distribution of wind energy in Jiangsu are introduced, and also the recommendations to develop offshore wind power are put forward.
文摘文章对海上风电各国总体发展现状及未来发展趋势进行分析,表明各国都在加强对海上风电开发利用,但随着海上风电高速发展,有限的近海风电资源开发趋于饱和,深远海域风电成为海上风电未来发展的方向。然而水深离岸远,深远海风能开发困难,难于实现商业化。文章介绍了一种将新能源电力转换为其他能源载体的Power to X模式。氢作为1种可再生能源载体,可基于Power to X模式,通过将新能源电力电解水制氢的方式,有效降低深远海风电的成本。
文摘The combination of wind and pumped storage is a useful method to compensate the fluctuation of wind power generation, which would exploit the abundant wind potential and increase wind power penetration. Taiwan Power Company (TPC) develops renewable energy actively in recent years. Moreover, TPC has started planning a high penetration wind power system and building offshore wind farms around the coast of Zhangbin, Yunlin and Penghu. The target of the offshore wind power installed capacity is up to 3 GW by 2025. However, the integration of the large scale of wind power would give huge challenges to the system operator because wind is randomly characterized. In this study, after high penetration wind power is integrated, the impacts of system frequency and the dispatch of conventional units will be discussed. Additionally, the hybrid system combing wind power with pumped-storage will be planning to reduce the effect of system frequency.
文摘With the advancement of clean heating projects and the integration of large-scale distributed heat pumps into rural distribution networks in northern China,power grid companies face tremendous pressure to invest in power grid upgrades,which bring opportunities for renewable power generation integration.The combination of heating by distributed renewable energy with the flexible operation of heat pumps is a feasible alternative for dealing with grid reinforcement challenges resulting from heating electrification.In this paper,a mathematical model of the collaborative planning of distributed wind power generation(DWPG)and distribution network with large-scale heat pumps is developed.In this model,the operational flexibility of the heat pump load is fully considered and the requirements of a comfortable indoor temperature are met.By applying this model,the goals of not only increasing the profit of DWPG but also reducing the cost of the power grid upgrade can be achieved.
基金supported by the National Key Research and Development Program of China(No.2017YFB0903400).
文摘The increasing penetration of wind power brings great uncertainties into power systems,which poses challenges to system planning and operation.This paper proposes a novel probabilistic load flow(PLF)method based on clustering technique to handle large fluctuations from large-scale wind power integration.The traditional cumulant method(CM)for PLF is based on the linearization of load flow equations around the operation point,therefore resulting in significant errors when input random variables have large fluctuations.In the proposed method,the samples of wind power and loads are first generated by the inverse Nataf transformation and then clustered using an improved K-means algorithm to obtain input variable samples with small variances in each cluster.With such pre-processing,the cumulant method can be applied within each cluster to calculate cumulants of output random variables with improved accuracy.The results obtained in each cluster are combined according to the law of total probability to calculate the final cumulants of output random variables for the whole samples.The proposed method is validated on modified IEEE 9-bus and 118-bus test achieve a better performance with the consideration of both traditional CM,2 m+1 point estimate method(PEM),Monte Carlo simulation(MCS)and Latin hypercube sampling(LHS)based MCS,the proposed method can achieve a better performance with the consideration of bothcomputational efficiency and accuracy.