In China, regions with abundant wind energy resources are generally located at the end of power grids. The power grid architecture in these regions is typically not sufficiently strong, and the energy structure is rel...In China, regions with abundant wind energy resources are generally located at the end of power grids. The power grid architecture in these regions is typically not sufficiently strong, and the energy structure is relatively simple. Thus, connecting large-capacity wind power units complicates the peak load regulation and stable operation of the power grids in these regions. Most wind turbines use power electronic converter technology, which affects the safety and stability of the power grid differently compared with conventional synchronous generators. Furthermore, fluctuations in wind power cause fluctuations in the output of wind farms, making it difficult to create and implement suitable power generation plans for wind farms. The generation technology and grid connection scheme for wind power and conventional thermal power generation differ considerably. Moreover, the active and reactive power control abilities of wind turbines are weaker than those of thermal power units, necessitating additional equipment to control wind turbines. Hence, to address the aforementioned issues with large-scale wind power generation, this study analyzes the differences between the grid connection and collection strategies for wind power bases and thermal power plants. Based on this analysis, the differences in the power control modes of wind power and thermal power are further investigated. Finally, the stability of different control modes is analyzed through simulation. The findings can be beneficial for the planning and development of large-scale wind power generation farms.展开更多
Constructing an industrial system for a large-scale,non-grid-connected wind power industry is a key step towards the diverse utilization of wind power.However,wind power exploitation is not only a technical challenge ...Constructing an industrial system for a large-scale,non-grid-connected wind power industry is a key step towards the diverse utilization of wind power.However,wind power exploitation is not only a technical challenge but an industrial problem as well.The objective of this study is to introduce a concept of large-scale,non-grid-connected wind power(LSNGCWP) industrial zones and establish an evaluation model to assess their industrial arrangement.The data of wind energy,industry,nature resources and socio-economy were collected in this study.Using spatial overlay analysis of geographic information system,this study proposes a spatial arrangement of the LSNGCWP indus-trial zones in the coastal areas of China,which could be summarized as the 'one line and three circles' structure,which will contribute to the optimization of the industrial structure,advance the wind power technology,coordinate the multi-industrial cooperation,and upgrade the industrial transformation of China's coastal areas.展开更多
The key in the force transmission between the tower and the foundation for offshore wind turbines is to transfer the large moment and horizontal loads. The finite element model of a large-scale prestressing bucket fou...The key in the force transmission between the tower and the foundation for offshore wind turbines is to transfer the large moment and horizontal loads. The finite element model of a large-scale prestressing bucket founda- tion for offshore wind turbines is set up and the structural characteristics of the arc transition structure of the founda- tion are analyzed for 40-60 channels(20-30 rows) arranged with prestressing steel strand under the same ultimate load and boundary conditions. The mechanical characteristics of the key parts of the foundation structures are illus- trated by the peak of the principal tensile stress, the peak of the principal compressive stress and the distribution areas where the principal tensile stress is larger than 2.00 MPa. It can be concluded that the maximum principal tensile stress of the arc transition decreases with the increasing number of channels, and the amplitude does not change signifi- cantly; the maximum principal compressive stress increases with the increasing number of channels and the amplitude changes significantly; however, for the distribution areas where the principal tensile stress is larger than 2.00 MPa, with different channel numbers, the phenomenon is not obvious. Furthermore, the principal tensile stress at the top of the foundation beams fluctuantly increases with the increasing number of channels and for the top cover of the bucket, the principal tensile stress decreases with the increasing number of channels.展开更多
The combination of wind and pumped storage is a useful method to compensate the fluctuation of wind power generation, which would exploit the abundant wind potential and increase wind power penetration. Taiwan Power C...The combination of wind and pumped storage is a useful method to compensate the fluctuation of wind power generation, which would exploit the abundant wind potential and increase wind power penetration. Taiwan Power Company (TPC) develops renewable energy actively in recent years. Moreover, TPC has started planning a high penetration wind power system and building offshore wind farms around the coast of Zhangbin, Yunlin and Penghu. The target of the offshore wind power installed capacity is up to 3 GW by 2025. However, the integration of the large scale of wind power would give huge challenges to the system operator because wind is randomly characterized. In this study, after high penetration wind power is integrated, the impacts of system frequency and the dispatch of conventional units will be discussed. Additionally, the hybrid system combing wind power with pumped-storage will be planning to reduce the effect of system frequency.展开更多
With the advancement of clean heating projects and the integration of large-scale distributed heat pumps into rural distribution networks in northern China,power grid companies face tremendous pressure to invest in po...With the advancement of clean heating projects and the integration of large-scale distributed heat pumps into rural distribution networks in northern China,power grid companies face tremendous pressure to invest in power grid upgrades,which bring opportunities for renewable power generation integration.The combination of heating by distributed renewable energy with the flexible operation of heat pumps is a feasible alternative for dealing with grid reinforcement challenges resulting from heating electrification.In this paper,a mathematical model of the collaborative planning of distributed wind power generation(DWPG)and distribution network with large-scale heat pumps is developed.In this model,the operational flexibility of the heat pump load is fully considered and the requirements of a comfortable indoor temperature are met.By applying this model,the goals of not only increasing the profit of DWPG but also reducing the cost of the power grid upgrade can be achieved.展开更多
The increasing penetration of wind power brings great uncertainties into power systems,which poses challenges to system planning and operation.This paper proposes a novel probabilistic load flow(PLF)method based on cl...The increasing penetration of wind power brings great uncertainties into power systems,which poses challenges to system planning and operation.This paper proposes a novel probabilistic load flow(PLF)method based on clustering technique to handle large fluctuations from large-scale wind power integration.The traditional cumulant method(CM)for PLF is based on the linearization of load flow equations around the operation point,therefore resulting in significant errors when input random variables have large fluctuations.In the proposed method,the samples of wind power and loads are first generated by the inverse Nataf transformation and then clustered using an improved K-means algorithm to obtain input variable samples with small variances in each cluster.With such pre-processing,the cumulant method can be applied within each cluster to calculate cumulants of output random variables with improved accuracy.The results obtained in each cluster are combined according to the law of total probability to calculate the final cumulants of output random variables for the whole samples.The proposed method is validated on modified IEEE 9-bus and 118-bus test achieve a better performance with the consideration of both traditional CM,2 m+1 point estimate method(PEM),Monte Carlo simulation(MCS)and Latin hypercube sampling(LHS)based MCS,the proposed method can achieve a better performance with the consideration of bothcomputational efficiency and accuracy.展开更多
基金This work was supported by National Key Research and Development Program of China(2018YFB0904000).
文摘In China, regions with abundant wind energy resources are generally located at the end of power grids. The power grid architecture in these regions is typically not sufficiently strong, and the energy structure is relatively simple. Thus, connecting large-capacity wind power units complicates the peak load regulation and stable operation of the power grids in these regions. Most wind turbines use power electronic converter technology, which affects the safety and stability of the power grid differently compared with conventional synchronous generators. Furthermore, fluctuations in wind power cause fluctuations in the output of wind farms, making it difficult to create and implement suitable power generation plans for wind farms. The generation technology and grid connection scheme for wind power and conventional thermal power generation differ considerably. Moreover, the active and reactive power control abilities of wind turbines are weaker than those of thermal power units, necessitating additional equipment to control wind turbines. Hence, to address the aforementioned issues with large-scale wind power generation, this study analyzes the differences between the grid connection and collection strategies for wind power bases and thermal power plants. Based on this analysis, the differences in the power control modes of wind power and thermal power are further investigated. Finally, the stability of different control modes is analyzed through simulation. The findings can be beneficial for the planning and development of large-scale wind power generation farms.
基金Under the auspices of National Basic Research Program (No.2007CB210306)
文摘Constructing an industrial system for a large-scale,non-grid-connected wind power industry is a key step towards the diverse utilization of wind power.However,wind power exploitation is not only a technical challenge but an industrial problem as well.The objective of this study is to introduce a concept of large-scale,non-grid-connected wind power(LSNGCWP) industrial zones and establish an evaluation model to assess their industrial arrangement.The data of wind energy,industry,nature resources and socio-economy were collected in this study.Using spatial overlay analysis of geographic information system,this study proposes a spatial arrangement of the LSNGCWP indus-trial zones in the coastal areas of China,which could be summarized as the 'one line and three circles' structure,which will contribute to the optimization of the industrial structure,advance the wind power technology,coordinate the multi-industrial cooperation,and upgrade the industrial transformation of China's coastal areas.
基金Supported by Creative Research Groups of National Natural Science Foundation of China (No. 51021004)Program for Changjiang Scholars and Innovative Research Team in University (No. IRT0851)
文摘The key in the force transmission between the tower and the foundation for offshore wind turbines is to transfer the large moment and horizontal loads. The finite element model of a large-scale prestressing bucket founda- tion for offshore wind turbines is set up and the structural characteristics of the arc transition structure of the founda- tion are analyzed for 40-60 channels(20-30 rows) arranged with prestressing steel strand under the same ultimate load and boundary conditions. The mechanical characteristics of the key parts of the foundation structures are illus- trated by the peak of the principal tensile stress, the peak of the principal compressive stress and the distribution areas where the principal tensile stress is larger than 2.00 MPa. It can be concluded that the maximum principal tensile stress of the arc transition decreases with the increasing number of channels, and the amplitude does not change signifi- cantly; the maximum principal compressive stress increases with the increasing number of channels and the amplitude changes significantly; however, for the distribution areas where the principal tensile stress is larger than 2.00 MPa, with different channel numbers, the phenomenon is not obvious. Furthermore, the principal tensile stress at the top of the foundation beams fluctuantly increases with the increasing number of channels and for the top cover of the bucket, the principal tensile stress decreases with the increasing number of channels.
文摘The combination of wind and pumped storage is a useful method to compensate the fluctuation of wind power generation, which would exploit the abundant wind potential and increase wind power penetration. Taiwan Power Company (TPC) develops renewable energy actively in recent years. Moreover, TPC has started planning a high penetration wind power system and building offshore wind farms around the coast of Zhangbin, Yunlin and Penghu. The target of the offshore wind power installed capacity is up to 3 GW by 2025. However, the integration of the large scale of wind power would give huge challenges to the system operator because wind is randomly characterized. In this study, after high penetration wind power is integrated, the impacts of system frequency and the dispatch of conventional units will be discussed. Additionally, the hybrid system combing wind power with pumped-storage will be planning to reduce the effect of system frequency.
文摘With the advancement of clean heating projects and the integration of large-scale distributed heat pumps into rural distribution networks in northern China,power grid companies face tremendous pressure to invest in power grid upgrades,which bring opportunities for renewable power generation integration.The combination of heating by distributed renewable energy with the flexible operation of heat pumps is a feasible alternative for dealing with grid reinforcement challenges resulting from heating electrification.In this paper,a mathematical model of the collaborative planning of distributed wind power generation(DWPG)and distribution network with large-scale heat pumps is developed.In this model,the operational flexibility of the heat pump load is fully considered and the requirements of a comfortable indoor temperature are met.By applying this model,the goals of not only increasing the profit of DWPG but also reducing the cost of the power grid upgrade can be achieved.
基金supported by the National Key Research and Development Program of China(No.2017YFB0903400).
文摘The increasing penetration of wind power brings great uncertainties into power systems,which poses challenges to system planning and operation.This paper proposes a novel probabilistic load flow(PLF)method based on clustering technique to handle large fluctuations from large-scale wind power integration.The traditional cumulant method(CM)for PLF is based on the linearization of load flow equations around the operation point,therefore resulting in significant errors when input random variables have large fluctuations.In the proposed method,the samples of wind power and loads are first generated by the inverse Nataf transformation and then clustered using an improved K-means algorithm to obtain input variable samples with small variances in each cluster.With such pre-processing,the cumulant method can be applied within each cluster to calculate cumulants of output random variables with improved accuracy.The results obtained in each cluster are combined according to the law of total probability to calculate the final cumulants of output random variables for the whole samples.The proposed method is validated on modified IEEE 9-bus and 118-bus test achieve a better performance with the consideration of both traditional CM,2 m+1 point estimate method(PEM),Monte Carlo simulation(MCS)and Latin hypercube sampling(LHS)based MCS,the proposed method can achieve a better performance with the consideration of bothcomputational efficiency and accuracy.