To determine the rational layout parameters of the lateral high drainage roadway(LHDR) serving for two adjacent working faces, a mechanical model of the LHDR under mining influence was established, and the overburden ...To determine the rational layout parameters of the lateral high drainage roadway(LHDR) serving for two adjacent working faces, a mechanical model of the LHDR under mining influence was established, and the overburden fissure, mining-induced stress distribution rules were analyzed. First, the development characteristics of mining-induced overburden fissure and the stress distribution law of the upper section of the working face were analyzed. Second, by analyzing the distribution law of vertical stress at different layers, the lateral distance of the LHDR was determined as 25 m. Third, by analyzing the surrounding rock deformation effect, stress distribution law, and overburden fissure distribution law of the LHDR at the heights of 20, 25, and 30 m away from the roof, the rational horizon of the LHDR was determined to be 25 m. Finally, an example of a LHDR located 25 m above the roof of the No. 2 coal seam and 25 m away from the No. 2-603 working face was presented. Results show that when the No. 2-603 coalface is being mined, the surrounding rocks lag 80 m or even further and the working face tends to be stable. The relative deformations of the roof and floor of the roadway and both of its walls were 583 and 450 mm,respectively. The reduction rate of the roadway section was 21.52%–25.32%. The section of the roadway was sufficient to extract the pressure relief gas in the overburden of the No. 2-605 working face. The average gas concentration and the pure volume at the branch pipeline were 24.8% and 22.3 m^3/min,respectively, showing that the position of high-level boreholes was reasonable.展开更多
In order to avoid the curing effects of paraffin on the transport process and reduce the transport difficulty,usually high temperature and high pressure are used in the transportation of oil and gas.The differences of...In order to avoid the curing effects of paraffin on the transport process and reduce the transport difficulty,usually high temperature and high pressure are used in the transportation of oil and gas.The differences of temperature and pressure cause additional stress along the pipeline,due to the constraint of the foundation soil,the additional stress can not release freely,when the additional stress is large enough to motivate the submarine pipelines buckle.In this work,the energy method is introduced to deduce the analytical solution which is suitable for the global buckling modes of idealized subsea pipeline and analyze the relationship between the critical buckling temperature,buckling length and amplitude under different high-order global lateral buckling modes.To obtain a consistent formulation of the problem,the principles of virtual displacements and the variation calculus for variable matching points are applied.The finite element method based on elasto-plastic theory is used to simulate the lateral global buckling of the pipelines under high temperature and pressure.The factors influencing the lateral buckling of pipelines are further studied.Based upon some actual engineering projects,the finite element results are compared with the analytical ones,and then the influence of thermal stress,the section rigidity of pipeline,the soil properties and the trigging force to the high order lateral buckling are discussed.The method of applying the small trigging force on pipeline is reliable in global buckling numerical analysis.In practice,increasing the section rigidity of a pipeline is an effective measure to improve the ability to resist the global buckling.展开更多
Pure nitrogen gas was heated with direct current arc, at input powers from several hundred Watt to over 5 kW, and then injected through a nozzle into a chamber at 1 or 10 Pa pressure, with the purpose of accelerating ...Pure nitrogen gas was heated with direct current arc, at input powers from several hundred Watt to over 5 kW, and then injected through a nozzle into a chamber at 1 or 10 Pa pressure, with the purpose of accelerating the gas to very high speed around 7 km/s. Various structures of the arc generator and gas expansion nozzle were examined. Results show that bypass exhausting of the boundary layer before it enters the nozzle divergent section can greatly increase flow speed of the jet, thus it might be possible to use nitrogen as a working gas in high speed gas dynamic test facilities.展开更多
A study to estimate land surface movement caused by large surface excavations in sedimentary strata is presented.In stratified or jointed strata the stress relief driven movement adjacent to large excavations can be s...A study to estimate land surface movement caused by large surface excavations in sedimentary strata is presented.In stratified or jointed strata the stress relief driven movement adjacent to large excavations can be significantly larger than expected.High lateral stresses measured in Australia and other places around the world indicate that the ratio of horizontal to vertical stress has been particularly high at shallow depths.The in situ strata is in compression and during excavation,stress is relieved towards the opening causing strata movement.Large excavations such as,open cut mines or highway cuttings,can initiate an extensive horizontal slide of surface layers towards the excavation.These ground movements can be damaging to surface structures such as water storage dams and large buildings.Based on stress measurements at shallow depths in Australian coal mines the study presented here calculates and models the extent of potential ground movement along the bedding surface adjacent to large excavations and provides a new prediction tool of land movement at the excavation boundary that can benefit the geotechnical practitioners in the mining industry.展开更多
基金National Key Basic Research Program of China (973 Program) (No. 2015CB251600)the National Natural Science Foundation of China (Nos. 51327007, 51174157, and 51104118) for their support of this project
文摘To determine the rational layout parameters of the lateral high drainage roadway(LHDR) serving for two adjacent working faces, a mechanical model of the LHDR under mining influence was established, and the overburden fissure, mining-induced stress distribution rules were analyzed. First, the development characteristics of mining-induced overburden fissure and the stress distribution law of the upper section of the working face were analyzed. Second, by analyzing the distribution law of vertical stress at different layers, the lateral distance of the LHDR was determined as 25 m. Third, by analyzing the surrounding rock deformation effect, stress distribution law, and overburden fissure distribution law of the LHDR at the heights of 20, 25, and 30 m away from the roof, the rational horizon of the LHDR was determined to be 25 m. Finally, an example of a LHDR located 25 m above the roof of the No. 2 coal seam and 25 m away from the No. 2-603 working face was presented. Results show that when the No. 2-603 coalface is being mined, the surrounding rocks lag 80 m or even further and the working face tends to be stable. The relative deformations of the roof and floor of the roadway and both of its walls were 583 and 450 mm,respectively. The reduction rate of the roadway section was 21.52%–25.32%. The section of the roadway was sufficient to extract the pressure relief gas in the overburden of the No. 2-605 working face. The average gas concentration and the pure volume at the branch pipeline were 24.8% and 22.3 m^3/min,respectively, showing that the position of high-level boreholes was reasonable.
基金Project(51021004)supported by Innovative Research Groups of the National Natural Science Foundation of ChinaProject(NCET-11-0370)supported by Program for New Century Excellent Talents in Universities of China+1 种基金Project(40776055)supported by the National Natural Science Foundation of ChinaProject(1002)supported by State Key Laboratory of Ocean Engineering Foundation,China
文摘In order to avoid the curing effects of paraffin on the transport process and reduce the transport difficulty,usually high temperature and high pressure are used in the transportation of oil and gas.The differences of temperature and pressure cause additional stress along the pipeline,due to the constraint of the foundation soil,the additional stress can not release freely,when the additional stress is large enough to motivate the submarine pipelines buckle.In this work,the energy method is introduced to deduce the analytical solution which is suitable for the global buckling modes of idealized subsea pipeline and analyze the relationship between the critical buckling temperature,buckling length and amplitude under different high-order global lateral buckling modes.To obtain a consistent formulation of the problem,the principles of virtual displacements and the variation calculus for variable matching points are applied.The finite element method based on elasto-plastic theory is used to simulate the lateral global buckling of the pipelines under high temperature and pressure.The factors influencing the lateral buckling of pipelines are further studied.Based upon some actual engineering projects,the finite element results are compared with the analytical ones,and then the influence of thermal stress,the section rigidity of pipeline,the soil properties and the trigging force to the high order lateral buckling are discussed.The method of applying the small trigging force on pipeline is reliable in global buckling numerical analysis.In practice,increasing the section rigidity of a pipeline is an effective measure to improve the ability to resist the global buckling.
基金supported by the National Natural Science Foundation of China(Nos.11575273 and 11475239)
文摘Pure nitrogen gas was heated with direct current arc, at input powers from several hundred Watt to over 5 kW, and then injected through a nozzle into a chamber at 1 or 10 Pa pressure, with the purpose of accelerating the gas to very high speed around 7 km/s. Various structures of the arc generator and gas expansion nozzle were examined. Results show that bypass exhausting of the boundary layer before it enters the nozzle divergent section can greatly increase flow speed of the jet, thus it might be possible to use nitrogen as a working gas in high speed gas dynamic test facilities.
文摘A study to estimate land surface movement caused by large surface excavations in sedimentary strata is presented.In stratified or jointed strata the stress relief driven movement adjacent to large excavations can be significantly larger than expected.High lateral stresses measured in Australia and other places around the world indicate that the ratio of horizontal to vertical stress has been particularly high at shallow depths.The in situ strata is in compression and during excavation,stress is relieved towards the opening causing strata movement.Large excavations such as,open cut mines or highway cuttings,can initiate an extensive horizontal slide of surface layers towards the excavation.These ground movements can be damaging to surface structures such as water storage dams and large buildings.Based on stress measurements at shallow depths in Australian coal mines the study presented here calculates and models the extent of potential ground movement along the bedding surface adjacent to large excavations and provides a new prediction tool of land movement at the excavation boundary that can benefit the geotechnical practitioners in the mining industry.