期刊文献+
共找到30篇文章
< 1 2 >
每页显示 20 50 100
Seasonal Characteristics of Forecasting Uncertainties in Surface PM_(2.5)Concentration Associated with Forecast Lead Time over the Beijing-Tianjin-Hebei Region
1
作者 Qiuyan DU Chun ZHAO +6 位作者 Jiawang FENG Zining YANG Jiamin XU Jun GU Mingshuai ZHANG Mingyue XU Shengfu LIN 《Advances in Atmospheric Sciences》 SCIE CAS CSCD 2024年第5期801-816,共16页
Forecasting uncertainties among meteorological fields have long been recognized as the main limitation on the accuracy and predictability of air quality forecasts.However,the particular impact of meteorological foreca... Forecasting uncertainties among meteorological fields have long been recognized as the main limitation on the accuracy and predictability of air quality forecasts.However,the particular impact of meteorological forecasting uncertainties on air quality forecasts specific to different seasons is still not well known.In this study,a series of forecasts with different forecast lead times for January,April,July,and October of 2018 are conducted over the Beijing-Tianjin-Hebei(BTH)region and the impacts of meteorological forecasting uncertainties on surface PM_(2.5)concentration forecasts with each lead time are investigated.With increased lead time,the forecasted PM_(2.5)concentrations significantly change and demonstrate obvious seasonal variations.In general,the forecasting uncertainties in monthly mean surface PM_(2.5)concentrations in the BTH region due to lead time are the largest(80%)in spring,followed by autumn(~50%),summer(~40%),and winter(20%).In winter,the forecasting uncertainties in total surface PM_(2.5)mass due to lead time are mainly due to the uncertainties in PBL heights and hence the PBL mixing of anthropogenic primary particles.In spring,the forecasting uncertainties are mainly from the impacts of lead time on lower-tropospheric northwesterly winds,thereby further enhancing the condensation production of anthropogenic secondary particles by the long-range transport of natural dust.In summer,the forecasting uncertainties result mainly from the decrease in dry and wet deposition rates,which are associated with the reduction of near-surface wind speed and precipitation rate.In autumn,the forecasting uncertainties arise mainly from the change in the transport of remote natural dust and anthropogenic particles,which is associated with changes in the large-scale circulation. 展开更多
关键词 PM_(2.5) forecasting uncertainties forecast lead time meteorological fields Beijing-Tianjin-Hebei region
下载PDF
Impacts of Increasing Model Resolutions and Shortening Forecast Lead Times on QPFs in South China During the Rainy Season
2
作者 张旭斌 李静珊 +4 位作者 罗亚丽 宝兴华 陈靖扬 肖辉 文秋实 《Journal of Tropical Meteorology》 SCIE 2023年第3期277-300,共24页
This study investigated the impacts of increasing model resolutions and shortening forecast lead times on the quantitative precipitation forecast(QPF)for heavy-rainfall events over south China during the rainy seasons... This study investigated the impacts of increasing model resolutions and shortening forecast lead times on the quantitative precipitation forecast(QPF)for heavy-rainfall events over south China during the rainy seasons in 2013-2020.The control experiment,where the analysis-forecast cycles run with model resolutions of about 3 km,was compared to a lower-resolution experiment with model resolutions of about 9 km,and a longer-term experiment activated 12 hours earlier.Rainfall forecasting in the presummer rainy season was significantly improved by improving model resolutions,with more improvements in cases with stronger synoptic-scale forcings.This is partially attributed to the improved initial conditions(ICs)and subsequent forecasts for low-level jets(LLJs).Forecasts of heavy rainfall induced by landfalling tropical cyclones(TCs)benefited from increasing model resolutions in the first 6 hours.Forecast improvements in rainfall due to shortening forecast lead times were more significant at earlier(1-6 h)and later(7-12 h)lead times for cases with stronger and weaker synoptic-scale forcings,respectively,due to the area-and case-dependent improvements in ICs for nonprecipitation variables.Specifically,significant improvements mainly presented over the northern South China Sea for low-level onshore wind of weak-forcing cases but over south China for LLJs of strong-forcing cases during the presummer rainy season,and over south China for all the nonprecipitation variables above the surface during the TC season.However,some disadvantages of higher-resolution and shorter-term forecasts in QPFs highlight the importance of developing ensemble forecasting with proper IC perturbations,which include the complementary advantages of lower-resolution and longer-term forecasts. 展开更多
关键词 south China QPF model resolution forecast lead time
下载PDF
Winter Wheat Yield Estimation Based on Sparrow Search Algorithm Combined with Random Forest:A Case Study in Henan Province,China
3
作者 SHI Xiaoliang CHEN Jiajun +2 位作者 DING Hao YANG Yuanqi ZHANG Yan 《Chinese Geographical Science》 SCIE CSCD 2024年第2期342-356,共15页
Precise and timely prediction of crop yields is crucial for food security and the development of agricultural policies.However,crop yield is influenced by multiple factors within complex growth environments.Previous r... Precise and timely prediction of crop yields is crucial for food security and the development of agricultural policies.However,crop yield is influenced by multiple factors within complex growth environments.Previous research has paid relatively little attention to the interference of environmental factors and drought on the growth of winter wheat.Therefore,there is an urgent need for more effective methods to explore the inherent relationship between these factors and crop yield,making precise yield prediction increasingly important.This study was based on four type of indicators including meteorological,crop growth status,environmental,and drought index,from October 2003 to June 2019 in Henan Province as the basic data for predicting winter wheat yield.Using the sparrow search al-gorithm combined with random forest(SSA-RF)under different input indicators,accuracy of winter wheat yield estimation was calcu-lated.The estimation accuracy of SSA-RF was compared with partial least squares regression(PLSR),extreme gradient boosting(XG-Boost),and random forest(RF)models.Finally,the determined optimal yield estimation method was used to predict winter wheat yield in three typical years.Following are the findings:1)the SSA-RF demonstrates superior performance in estimating winter wheat yield compared to other algorithms.The best yield estimation method is achieved by four types indicators’composition with SSA-RF)(R^(2)=0.805,RRMSE=9.9%.2)Crops growth status and environmental indicators play significant roles in wheat yield estimation,accounting for 46%and 22%of the yield importance among all indicators,respectively.3)Selecting indicators from October to April of the follow-ing year yielded the highest accuracy in winter wheat yield estimation,with an R^(2)of 0.826 and an RMSE of 9.0%.Yield estimates can be completed two months before the winter wheat harvest in June.4)The predicted performance will be slightly affected by severe drought.Compared with severe drought year(2011)(R^(2)=0.680)and normal year(2017)(R^(2)=0.790),the SSA-RF model has higher prediction accuracy for wet year(2018)(R^(2)=0.820).This study could provide an innovative approach for remote sensing estimation of winter wheat yield.yield. 展开更多
关键词 winter wheat yield estimation sparrow search algorithm combined with random forest(SSA-RF) machine learning multi-source indicator optimal lead time Henan Province China
下载PDF
Quantity-based shipment consolidation and stock replenishment policy with lead time in vendor-managed inventory system
4
作者 王正国 李文锋 王红卫 《Journal of Southeast University(English Edition)》 EI CAS 2007年第S1期40-45,共6页
In order to let the supplier make more reasonable supply decisions,an integrated continuous replenishment policy for the vendor-managed inventory system is presented,which considers the quantity-based shipment consoli... In order to let the supplier make more reasonable supply decisions,an integrated continuous replenishment policy for the vendor-managed inventory system is presented,which considers the quantity-based shipment consolidation and stock replenishment with lead time.Then the system cost is analyzed and a mathematical model is built.Since the model is rather complex,the bounds of the optimal policy are first attained,then the problem is solved by a heuristic algorithm.Through experiments the relationship between the order lead time and the corresponding integrated policy is discussed,and the influence on the system cost is also analyzed.The results reveal that the lead time's influence on the system is more serious with the increase of the order lead time,the integrated policy with the order lead time is more reasonable and the optimal policy can minimize the total system cost.Finally,the parameter sensitivity of the model is analyzed. 展开更多
关键词 vendor managed inventory lead time shipment consolidation stock replenishment
下载PDF
Two-echelon inventory model with service level constraint and controllable lead time sensitive to order quantity 被引量:3
5
作者 李果 关旭 +1 位作者 刘梦麒 单汩源 《Journal of Central South University》 SCIE EI CAS 2013年第11期3324-3333,共10页
The decision-making and optimization of two-echelon inventory coordination were analyzed with service level constraint and controllable lead time sensitive to order quantity.First,the basic model of this problem was e... The decision-making and optimization of two-echelon inventory coordination were analyzed with service level constraint and controllable lead time sensitive to order quantity.First,the basic model of this problem was established and based on relevant analysis,the original model could be transformed by minimax method.Then,the optimal order quantity and production quantity influenced by service level constraint were analyzed and the boundary of optimal order quantity and production quantity was given.According to this boundary,the effective method and tactics were put forward to solve the transformed model.In case analysis,the optimal expected total cost of two-echelon inventory can be obtained and it was analyzed how service level constraint and safety factor influence the optimal expected total cost of two-echelon inventory.The results show that the optimal expected total cost of two-echelon inventory is constrained by the higher constraint between service level constraint and safety factor. 展开更多
关键词 service level constraint safety factor controllable lead time sensitivity to order quantity two-echelon
下载PDF
Infinitesimal dividing modeling method for dual suppliers inventory model with random lead times 被引量:2
6
作者 Ji Pengcheng Song Shiji Wu Cheng 《Journal of Systems Engineering and Electronics》 SCIE EI CSCD 2009年第3期527-536,共10页
As one of the basic inventory cost models, the (Q, τ)inventory cost model of dual suppliers with random procurement lead time is mostly formulated by using the concepts of "effective lead time" and "lead time de... As one of the basic inventory cost models, the (Q, τ)inventory cost model of dual suppliers with random procurement lead time is mostly formulated by using the concepts of "effective lead time" and "lead time demand", which may lead to an imprecise inventory cost. Through the real-time statistic of the inventory quantities, this paper considers the precise (Q, τ) inventory cost model of dual supplier procurement by using an infinitesimal dividing method. The traditional modeling method of the inventory cost for dual supplier procurement includes complex procedures. To reduce the complexity effectively, the presented method investigates the statistics properties in real-time of the inventory quantities with the application of the infinitesimal dividing method. It is proved that the optimal holding and shortage costs of dual supplier procurement are less than those of single supplier procurement respectively. With the assumption that both suppliers have the same distribution of lead times, the convexity of the cost function per unit time is proved. So the optimal solution can be easily obtained by applying the classical convex optimization methods. The numerical examples are given to verify the main conclusions. 展开更多
关键词 INVENTORY precise model random lead times dual supplier infinitesimal dividing method optimiza- tion.
下载PDF
Probabilistic earthquake early warning times in Fujian Province 被引量:1
7
作者 Hongcai Zhang Xing Jin 《Earthquake Science》 2013年第1期33-41,共9页
Earthquake early warning (EEW) systems are a new and effective way to mitigate the damage associated with earthquakes. A prototype EEW system is currently being constructed in the Fujian Province, a region along the... Earthquake early warning (EEW) systems are a new and effective way to mitigate the damage associated with earthquakes. A prototype EEW system is currently being constructed in the Fujian Province, a region along the Southeast coast of China. It is anticipated that the system will be completed in time to be tested at the end of this year (2013). In order to evaluate how much advanced warning the EEW system will be able to provide different cities in Fujian, we established an EEW information release scheme based on the seismic monitoring stations distributed in the region. Based on this scheme, we selected 71 historical earthquakes. We then obtained the delineation of the region's potential seismic source data in order to estimate the highest potential seismic intensities for each city as well as the EEW system warning times. For most of the Fujian Province, EEW alarms would sound several seconds prior to the arrival of the destructive wave. This window of time gives city inhabitants the opportunity to take protective measures before the full intensity of the earthquake strikes. 展开更多
关键词 Earthquake early warning systems Lead time Fujian region
下载PDF
ANALYSIS AND IMPROVEMENT OF LEAD TIME FOR JOB SHOP UNDER MIXED PRODUCTION SYSTEM 被引量:1
8
作者 CHE Jianguo HE Zhen EDWARD M Knod 《Chinese Journal of Mechanical Engineering》 SCIE EI CAS CSCD 2006年第4期487-491,共5页
Firstly an overview of the potential impact on work-in-process (WIP) and lead time is provided when transfer lot sizes are undifferentiated from processing lot sizes. Simple performance examples are compared to thos... Firstly an overview of the potential impact on work-in-process (WIP) and lead time is provided when transfer lot sizes are undifferentiated from processing lot sizes. Simple performance examples are compared to those from a shop with one-piece transfer lots. Next, a mathematical programming model for minimizing lead time in the mixed-model job shop is presented, in which one-piece transfer lots are used. Key factors affecting lead time are found by analyzing the sum of the longest setup time of individual items among the shared processes (SLST) and the longest processing time of individual items among processes (LPT). And lead time can be minimized by cutting down the SLST and LPT. Reduction of the SLST is described as a traveling salesman problem (TSP), and the minimum of the SLST is solved through job shop scheduling. Removing the bottleneck and leveling the production line optimize the LPT. If the number of items produced is small, the routings are relatively short, and items and facilities are changed infrequently, the optimal schedule will remain valid. Finally a brief example serves to illustrate the method. 展开更多
关键词 Lead time Work-in-process(WIP) Mixed production system Job shop scheduling problem Traveling salesman problem(TSP)
下载PDF
Design of cost allocation rule for joint replenishment with controllable lead time
9
作者 Shi Xuefei Wang Haiyan 《Journal of Southeast University(English Edition)》 EI CAS 2020年第4期453-464,共12页
To encourage retailers to form cooperative alliances to jointly replenish inventory,considering that the supplier provides a flexible lead time and quantity discount to retailers,a model of average total cost per unit... To encourage retailers to form cooperative alliances to jointly replenish inventory,considering that the supplier provides a flexible lead time and quantity discount to retailers,a model of average total cost per unit time of periodic joint replenishment is constructed,and an approximate algorithm,which can satisfy the requirement of any given precision,is given.The cost allocation rule in the core of the joint replenishment game is designed based on the cooperative game theory.The numerical experiment results show that the proposed algorithm can quickly solve the joint replenishment problem when the item number is not greater than 640.The retailer's cost saving rate is always greater than 0,and it increases with the increase in quantity discount and fixed cost after adopting the given cost allocation rule.With the increase in the safety stock level,the retailer's cost saving rate increases first and then decreases;and the retailer's cost saving rate increases with the increase in the size of the alliance,but it decreases as the number of product category increases.The proposed cost allocation rule can reduce the retailer's cost up to 20%,which is conducive to forming a cooperative coalition. 展开更多
关键词 joint replenishment controllable lead time cost allocation cooperative game
下载PDF
Performance of the Seasonal Forecasting of the Asian Summer Monsoon by BCC_CSM1.1(m) 被引量:28
10
作者 LIU Xiangwen WU Tongwen +5 位作者 YANG Song JIE Weihua NIE Suping LI Qiaoping CHENG Yanjie LIANG Xiaoyun 《Advances in Atmospheric Sciences》 SCIE CAS CSCD 2015年第8期1156-1172,共17页
This paper provides a comprehensive assessment of Asian summer monsoon prediction skill as a function of lead time and its relationship to sea surface temperature prediction using the seasonal hindcasts of the Beijing... This paper provides a comprehensive assessment of Asian summer monsoon prediction skill as a function of lead time and its relationship to sea surface temperature prediction using the seasonal hindcasts of the Beijing Climate Center Climate System Model, BCC_CSM1. l(m). For the South and Southeast Asian summer monsoon, reasonable skill is found in the model's forecasting of certain aspects of monsoon climatology and spatiotemporal variability. Nevertheless, deficiencies such as significant forecast errors over the tropical western North Pacific and the eastern equatorial Indian Ocean are also found. In particular, overestimation of the connections of some dynamical monsoon indices with large-scale circulation and precipitation patterns exists in most ensemble mean forecasts, even for short lead-time forecasts. Variations of SST, measured by the first mode over the tropical Pacific and Indian oceans, as well as the spatiotemporal features over the Nifio3.4 region, are overall well predicted. However, this does not necessarily translate into successful forecasts of the Asian summer monsoon by the model. Diagnostics of the relationships between monsoon and SST show that difficulties in predicting the South Asian monsoon can be mainly attributed to the limited regional response of monsoon in observations but the extensive and exaggerated response in predictions due partially to the application of ensemble average forecasting methods. In contrast, in spite of a similar deficiency, the Southeast Asian monsoon can still be forecasted reasonably, probably because of its closer relationship with large-scale circulation patterns and E1 Nifio-Southern Oscillation. 展开更多
关键词 Asian summer monsoon forecast skill lead time sea surface temperature
下载PDF
Verification of an operational ocean circulation-surface wave coupled forecasting system for the China's seas 被引量:5
11
作者 WANG Guansuo ZHAO Chang +2 位作者 XU Jiangling QIAO Fangli XIA Changshui 《Acta Oceanologica Sinica》 SCIE CAS CSCD 2016年第2期19-28,共10页
An operational ocean circulation-surface wave coupled forecasting system for the seas off China and adjacent areas(OCFS-C) is developed based on parallelized circulation and wave models. It has been in operation sin... An operational ocean circulation-surface wave coupled forecasting system for the seas off China and adjacent areas(OCFS-C) is developed based on parallelized circulation and wave models. It has been in operation since November 1, 2007. In this paper we comprehensively present the simulation and verification of the system, whose distinguishing feature is that the wave-induced mixing is coupled in the circulation model. In particular, with nested technique the resolution in the China's seas has been updated to(1/24)° from the global model with(1/2)°resolution. Besides, daily remote sensing sea surface temperature(SST) data have been assimilated into the model to generate a hot restart field for OCFS-C. Moreover, inter-comparisons between forecasting and independent observational data are performed to evaluate the effectiveness of OCFS-C in upper-ocean quantities predictions, including SST, mixed layer depth(MLD) and subsurface temperature. Except in conventional statistical metrics, non-dimensional skill scores(SS) is also used to evaluate forecast skill. Observations from buoys and Argo profiles are used for lead time and real time validations, which give a large SS value(more than 0.90). Besides, prediction skill for the seasonal variation of SST is confirmed. Comparisons of subsurface temperatures with Argo profiles data indicate that OCFS-C has low skill in predicting subsurface temperatures between 100 m and 150 m. Nevertheless, inter-comparisons of MLD reveal that the MLD from model is shallower than that from Argo profiles by about 12 m, i.e., OCFS-C is successful and steady in MLD predictions. Validation of 1-d, 2-d and 3-d forecasting SST shows that our operational ocean circulation-surface wave coupled forecasting model has reasonable accuracy in the upper ocean. 展开更多
关键词 operational forecast sea surface temperature mixed layer depth lead time subsurface temperature ocean circulation-surface wave coupled forecast system China's seas
下载PDF
Quantitative Comparison of Predictabilities of Warm and Cold Events Using the Backward Nonlinear Local Lyapunov Exponent Method 被引量:1
12
作者 Xuan LI Ruiqiang DING Jianping LI 《Advances in Atmospheric Sciences》 SCIE CAS CSCD 2020年第9期951-958,共8页
The backward nonlinear local Lyapunov exponent method(BNLLE)is applied to quantify the predictability of warm and cold events in the Lorenz model.Results show that the maximum prediction lead times of warm and cold ev... The backward nonlinear local Lyapunov exponent method(BNLLE)is applied to quantify the predictability of warm and cold events in the Lorenz model.Results show that the maximum prediction lead times of warm and cold events present obvious layered structures in phase space.The maximum prediction lead times of each warm(cold)event on individual circles concentric with the distribution of warm(cold)regime events are roughly the same,whereas the maximum prediction lead time of events on other circles are different.Statistical results show that warm events are more predictable than cold events. 展开更多
关键词 backward nonlinear local Lyapunov exponent maximum prediction lead time layered structure statistical result
下载PDF
Inventory control model based on external and interior reverse logistics 被引量:1
13
作者 董景峰 王刚 +1 位作者 吕民 高国安 《Journal of Harbin Institute of Technology(New Series)》 EI CAS 2009年第5期717-722,共6页
To improve the inventory control strategy for enterprise and optimize inventory control parameters of existing external and interior reverse logistics, a multi-resource inventory control model is proposed to better si... To improve the inventory control strategy for enterprise and optimize inventory control parameters of existing external and interior reverse logistics, a multi-resource inventory control model is proposed to better simulate the logistics fact, which is aimed at periodic inventory checking and pull mode of inventory control strategy, based on the return product arrival time obeying Poisson distribution, the return product employing lotsize process and the nonzero lead time of manufaeturinge/remanufacturing. The rational cost function with multiple constraints is employed to describe the inventory model. The genetic algorithm is employed to solve the inventory cost function to obtain the optimal solution of inventory checking periods, safe inventory point, product lot-sizes and process lot-sizes of return product. An example is presented to prove the feasibility and validity of the proposed method. Moreover, the influence of manufacturing/remanufacturing lead time and reuse rate of return production on the inventory control strategy of enterprise is analyzed. 展开更多
关键词 reverse logistics inventory control periodic checking lead time
下载PDF
Ordering Cost Depletion in Inventory Policy with Imperfect Products and Backorder Rebate
14
作者 Sandeep Kumar Teekam Singh +1 位作者 Kamaleldin Abodayeh Wasfi Shatanawi 《Computers, Materials & Continua》 SCIE EI 2021年第3期2343-2357,共15页
This study presents an inventory model for imperfect products with depletion in ordering costs and constant lead time where the price discount in the backorder is permitted.The imperfect products are refused or modifi... This study presents an inventory model for imperfect products with depletion in ordering costs and constant lead time where the price discount in the backorder is permitted.The imperfect products are refused or modified or if they reached to the customer,returned and thus some extra costs are experienced.Lately some of the researchers explicitly present on the significant association between size of lot and quality imperfection.In practical situations,the unsatisfied demands increase the period of lead time and decrease the backorders.To control customers'problems and losses,the supplier provides a price discount in backorders during shortages.Also,an order’s policies may result in including some imperfect products in arrival lots.A discount on price may be offered by the supplier on the out-of-stock products to manage the backorder problems.The study aims to develop a model with imperfect products by permitting the price discount in backorders,and the cost of ordering is considered a decision variable.First,it is assumed that the demand for lead time is followed by a normal distribution and then stops it and assumed that the first two moments of demand for lead time are known.Further,the minimax distribution method is used to solve this model,and a separate algorithm is designed.In this study,two models are discussed with and without a normally distributed rate of demand.The current study verified with the help of some numerical examples over various model parameters. 展开更多
关键词 INVENTORY ordering cost imperfect product lead time BACKORDER
下载PDF
A Roadmap to Lean Production Implementation for Small Scale Nigerian Wire and Cable Companies
15
作者 Abioye Taiwo Bello Emmanuel Olabanji Olayinka 《Journal of Mechanics Engineering and Automation》 2011年第2期119-125,共7页
The increasing customers' demands in terms of speed of service and reduced cost at higher quality has generated a new platform on which manufacturing companies compete. This heightened challenge is virtually driving ... The increasing customers' demands in terms of speed of service and reduced cost at higher quality has generated a new platform on which manufacturing companies compete. This heightened challenge is virtually driving all manufacturing companies to introducing lean manufacturing principles into their production systems. This paper focuses on the analysis of the current state mapping of a case study and then proposes a future state mapping to the company. The extruder 60 production line of Denki wires and cables limited, Akure, Nigeria was carefully evaluated. Data were collected from actual operators on the shop floor and feedbacks from the customers at the Gemba. Denki's extruder 60 production line production lead time was massively reduced from 38.42 days to 5.16 days with a 12.86% waste reduction. At the end, a practical way of implementing this aspect of lean manufacturing was suggested. 展开更多
关键词 Value stream mapping production lead time gemba lean manufacturing waste.
下载PDF
Prediction of Wintertime Northern Hemisphere Blocking by the NCEP Climate Forecast System 被引量:4
16
作者 贾小龙 杨崧 +1 位作者 宋文玲 贺斌 《Journal of Meteorological Research》 SCIE 2014年第1期76-90,共15页
Daily output from the hindcasts by the NCEP Climate Forecast System version 2 (CFSv2) is analyzed to understand CFSv2's skill in forecasting wintertime atmospheric blocking in the Northern Hemisphere. Prediction sk... Daily output from the hindcasts by the NCEP Climate Forecast System version 2 (CFSv2) is analyzed to understand CFSv2's skill in forecasting wintertime atmospheric blocking in the Northern Hemisphere. Prediction skills of sector blocking, sector-blocking episodes, and blocking onset/decay are assessed with a focus on the Euro-Atlantic sector (20°W-45°E) and the Pacific sector (160°E 135°W). Features of associated circulation and climate patterns are also examined. The CFSv2 well captures the observed features of longitudinal distribution of blocking activity, but underestimates blocking frequency and intensity and shows a decreasing trend in blocking frequency with increasing forecast lead time. Within 14-day lead time, the Euro-Atlantic sector blocking receives a higher skill than the Pacific sector blocking. Skillful forecast (taking the hit rate of 50~ as a criterion) can be obtained up to 9 days in the Euro-Atlantic sector, which is slightly longer than that in the Pacific sector (7 days). The forecast skill of sector-blocking episodes is slightly lower than that of sector blocking in both sectors, and it is slightly higher in the Euro-Atlantic sector than in the Pacific sector. Compared to block onset, the skill for block decay is lower in the Euro-Atlantic sector, slightly higher in the Pacific sector during the early three days but lower after three days in lead time. In both the Euro-Atlantic and the Pacific sectors, a local dipole pattern in 500-hPa geopotential height associated with blocking is well presented in the CFSv2 prediction, but the wave-train like pattern that is far away from the blocking sector can only maintain in the forecast of relative short lead time. The CFSv2 well reproduces the observed characteristics of local temperature and precipitation anomalies associated with blocking. 展开更多
关键词 sector blocking prediction skill CFSv2 lead time
原文传递
A PERISHABLE INVENTORY SYSTEM WITH SERVICE FACILITIES, MAP ARRIVALS AND PH- SERVICE TIMES 被引量:3
17
作者 Paul MANUEL B. SIVAKUMAR G. ARIVARIGNAN 《Journal of Systems Science and Systems Engineering》 SCIE EI CSCD 2007年第1期62-73,共12页
We consider a continuous review perishable (s,S) inventory system with a service facility consisting of a waiting hall of finite capacity and a single server. We assume two types of customers, ordinary and negative,... We consider a continuous review perishable (s,S) inventory system with a service facility consisting of a waiting hall of finite capacity and a single server. We assume two types of customers, ordinary and negative, arrive according to a Markovian Arrival Process (MAP). An ordinary customer joins the queue and a negative customer instead of joining the queue removes one ordinary customer from the queue. The removal rule adopted in this paper is RCE (removal of a customer from the end). The individual customer's unit demand is satisfied after a random time of service which is assumed to have a phase-type distribution. The life time of each item and the lead time of the reorders have been assumed to be independent exponential distributions. The joint probability distribution of the number of customers in the system and the inventory level is obtained for the steady state case. Various stationary system performance measures are computed and the total expected cost rate is calculated. The results are illustrated numerically. 展开更多
关键词 Stochastic inventory Markovian demands service facility positive lead time negative customers
原文传递
A supply chain model for imperfect production system with stochastic lead time demand 被引量:3
18
作者 Rabin Kumar Mallick Amalesh Kumar Manna Shyamal Kumar Mondal 《Journal of Management Analytics》 EI 2018年第4期309-333,共25页
This study deals an integrated manufacturer-buyer supply chain system for imperfect production under stochastic lead time demand.Here,defective rate has been followed as a function of production rate.Also,the produced... This study deals an integrated manufacturer-buyer supply chain system for imperfect production under stochastic lead time demand.Here,defective rate has been followed as a function of production rate.Also,the produced units have been inspected in order to screen the defective units but screening rate is less than the production rate and greater than the demand rate.Buyer purchases the products from the manufacturer.Also,we assume that shortage during the lead time is permitted and demand during the shortage period is fully backordered.The objective is to derive the optimal production rate,ordering quantity and to maximize joint total profit.Basically,two different models for different probability distribution functions of stochastic lead time demand have been developed.Some numerical examples are provided to show the applicability of the proposed models comparing the optimum average profits.Finally,sensitive analysis,conclusion and future researches are presented. 展开更多
关键词 supply chain imperfect production stochastic lead time demand back order
原文传递
PLANNED LEAD TIME OPTIMIZATION IN MATERIAL REQUIREMENT PLANNING ENVIRONMENT FOR MULTILEVEL PRODUCTION SYSTEMS 被引量:1
19
作者 Faicel HNAIEN Alexandre DOLGUI Mohamed-Aly OULD LOULY 《Journal of Systems Science and Systems Engineering》 SCIE EI CSCD 2008年第2期132-155,共24页
This paper deals with the problem of planned lead time calculation in a Material Requirement Planning (MRP) environment under stochastic lead times. The objective is to minimize the sum of holding and backlogging co... This paper deals with the problem of planned lead time calculation in a Material Requirement Planning (MRP) environment under stochastic lead times. The objective is to minimize the sum of holding and backlogging costs. The proposed approach is based on discrete time inventory control where the decision variables are integer. Two types of systems are considered: multi-level serial-production and assembly systems. For the serial production systems (one type of component at each level), a mathematical model is suggested. Then, it is proven that this model is equivalent to the well known discrete Newsboy Model. This directly provides the optimal values for the planned lead times. For multilevel assembly systems, a dedicated model is proposed and some properties of the decision variables and objective function are proven. These properties are used to calculate lower and upper limits on the decision variables and lower and upper bounds on the objective function. The obtained limits and bounds open the possibility to develop an efficient optimization algorithm using, for example, a Branch and Bound approach. The paper presents the proposed models in detail with corresponding proofs and se'~eral numerical examples. Some advantages of the suggested models and perspectives of this research are discussed. 展开更多
关键词 Multilevel assembly and production control model planned lead time optimization systems MRP random lead times discrete inventory
原文传递
Optimal structure of joint inventory-pricing management with dual suppliers and different lead times 被引量:2
20
作者 Xiaoyi Feng Yangyang Xie +1 位作者 Shouyang Wang Houmin Yan 《Journal of Management Science and Engineering》 2021年第1期1-24,共24页
We consider a joint inventory-pricing control problem in a single-product,periodic-review,dual-supplier inventory system.The two suppliers have different lead times.One expedited supplier offers instantaneous replenis... We consider a joint inventory-pricing control problem in a single-product,periodic-review,dual-supplier inventory system.The two suppliers have different lead times.One expedited supplier offers instantaneous replenishment,and one regular supplier requires an L-period lead time for delivery.The supply quantity is stochastic and the demand is price-dependent.For the expedited inventory replenishment,we characterize the optimal policy as a state-dependent almost-threshold policy by extending the stochastically linear in mid-point to a multidimensional setting.To investigate the optimal regular inventory replenishment and pricing policy,we propose the notions of partially stochastic translation(PST)and increasing partially stochastic translation(IPST),which help in obtaining the antimultimodularity preservation in dynamic programming problems.We provide properties,sufficient conditions,and examples for PST and IPST functions.By applying PST and IPST,we obtain the antimultimodularity of the profit functions.The antimultimodular profit functions ensure that the optimal regular ordering quantity and the optimal price are monotone in the current inventory level and outstanding order quantities.Moreover,we reveal that as the time interval increases,the effects of previous outstanding orders on the optimal regular ordering and pricing decisions are decreasing and increasing,respectively.PST and IPST also enable us to further characterize the optimal expedited ordering quantity as decreasing in the inventory level.However,the optimal expedited ordering quantity can be non-monotone with respect to the outstanding order quantities,as shown in the example. 展开更多
关键词 Inventory-pricing control Dual supply Lead time Antimultimodularity
原文传递
上一页 1 2 下一页 到第
使用帮助 返回顶部