In view of the problems such as backward production mode,poor quality stability,high safety risk and incomplete control system during erection of the reinforcement framework of simply-supported box girders for high-sp...In view of the problems such as backward production mode,poor quality stability,high safety risk and incomplete control system during erection of the reinforcement framework of simply-supported box girders for high-speed railway(HSR),and in combination with the key points and main challenges in the reinforcement framework construction of Guangzhou-Zhanjiang HSR,the overall technical route for the intelligent manufacturing of reinforcement framework of simply-supported box girders is put forward.The component design of reinforcement framework of simply supported box girder is carried out based on BIM,and the feasibility of the scheme is verified through segment assembly test.The assembly techniques are studied in combination with the mesh design scheme to achieve rapid forming of the reinforcement framework.R&D of automatic processing equipment for components,material transshipment equipment,automatic hoisting equipment and technological equipment for assembly clamping fixture are carried out to realize the overall design of equipment production line.An intelligent control system is developed for the whole-process intelligent construction of reinforcement framework to realize the full life-cycle applications for the workshop production and visual management including intelligent layout and quality traceability.The research results systematically optimize and innovate the assembly and forming technologies of reinforcement framework in the prefabrication beam yard of high-speed railway,realize the component processing,automatic assembly and information technology management,improve the construction quality,efficiency and information technology level of intelligent manufacturing of reinforcement framework of railway prefabricated beam as a whole,and reduce the construction cost of the project.The research has realized a major breakthrough in the construction technology of railway prefabricated box girders,which has the extensive technical and market promotion values.展开更多
In this paper,a synthesized technique is explored through design of a virtual experiment system for main aero-engine based on VR,which attempts to integrate some VR techniques,such as 3D stereo simulation and modeling...In this paper,a synthesized technique is explored through design of a virtual experiment system for main aero-engine based on VR,which attempts to integrate some VR techniques,such as 3D stereo simulation and modeling,3D scene management and human-computer virtual assembly based on data glove and collision detection.The geometry modeling and instantiation technique,virtual hand modeling and data glove interaction technique are discussed chiefly.Finally,taking aim at assembling and dismantling experiment system of a certain aero-engine,interface technology is expounded also.展开更多
Modularized construction is a new type of prefabricated building system with green environmental protection and excellent performance. There are few studies on the seismic performance of its key connection joint. This...Modularized construction is a new type of prefabricated building system with green environmental protection and excellent performance. There are few studies on the seismic performance of its key connection joint. This paper presents a new type of assembled connection joint for the high-rise modularized construction. Cyclic shear tests of full-scale joints were carried out, and the key indexes of their seismic performances including the hysteretic performance, ductility, and energy dissipation capacity were analyzed and obtained. The results show that the hysteresis loops of longitudinal and lateral cyclic shear tests were both plump in shapes. The ductility coefficients were 4.54 and 4.98, and the energy dissipation coefficients were 1.83 and 1.43, respectively. The test joint had good ductility and energy dissipation capacity. The positions of yield failure of specimens were mainly concentrated in the connection areas between the column and short beam or end-plate. The research can provide the technical reference for the seismic design and engineering application of related modularized constructions.展开更多
The Hong Kong-Zhuhai-Macao Bridge(HZMB)project,which has just been opened to traffic in 2018.The special location,construction conditions,quality requirements and multiple functions of HZMB brought many challenges,suc...The Hong Kong-Zhuhai-Macao Bridge(HZMB)project,which has just been opened to traffic in 2018.The special location,construction conditions,quality requirements and multiple functions of HZMB brought many challenges,such as management,technology,safety and environmental protection.To meet these challenges and ensure the achievement of high quality and 120 years design service life,the HZMB project first introduced the completely new concept of"Large size,Factory production,Standardization and Assembly",which was fundamental to the design and construction.This was developed in consideration of the difficulties of the offshore environment.The core idea was Prefabrication and Assembly,which was to change this HZMB project into onshore work as much as possible by cutting this mega sea-crossing into large sized components,which could be prefabricated on land and then transported to the offshore site for assembly.The success of the HZMB undoubtedly has led the technology of prefabrication and assembly to a new height and recognized scale.This paper describes the implementation process of the concept;"Large size,Factory production,Standardization and Assembly"(LFSA)to the HZMB.展开更多
The problem of noise has always been highlighted in assembled steel structure houses.Therefore,it is necessary to use effective soundproof measures where steel beams intersect with the reserved line pipe openings,door...The problem of noise has always been highlighted in assembled steel structure houses.Therefore,it is necessary to use effective soundproof measures where steel beams intersect with the reserved line pipe openings,doors,windows,elevator shafts,and other locations.In this paper,we will investigate the areas with subpar soundproof performance in an assembled steel structure residential project and propose suitable noise control measures to address this issue.展开更多
文摘In view of the problems such as backward production mode,poor quality stability,high safety risk and incomplete control system during erection of the reinforcement framework of simply-supported box girders for high-speed railway(HSR),and in combination with the key points and main challenges in the reinforcement framework construction of Guangzhou-Zhanjiang HSR,the overall technical route for the intelligent manufacturing of reinforcement framework of simply-supported box girders is put forward.The component design of reinforcement framework of simply supported box girder is carried out based on BIM,and the feasibility of the scheme is verified through segment assembly test.The assembly techniques are studied in combination with the mesh design scheme to achieve rapid forming of the reinforcement framework.R&D of automatic processing equipment for components,material transshipment equipment,automatic hoisting equipment and technological equipment for assembly clamping fixture are carried out to realize the overall design of equipment production line.An intelligent control system is developed for the whole-process intelligent construction of reinforcement framework to realize the full life-cycle applications for the workshop production and visual management including intelligent layout and quality traceability.The research results systematically optimize and innovate the assembly and forming technologies of reinforcement framework in the prefabrication beam yard of high-speed railway,realize the component processing,automatic assembly and information technology management,improve the construction quality,efficiency and information technology level of intelligent manufacturing of reinforcement framework of railway prefabricated beam as a whole,and reduce the construction cost of the project.The research has realized a major breakthrough in the construction technology of railway prefabricated box girders,which has the extensive technical and market promotion values.
文摘In this paper,a synthesized technique is explored through design of a virtual experiment system for main aero-engine based on VR,which attempts to integrate some VR techniques,such as 3D stereo simulation and modeling,3D scene management and human-computer virtual assembly based on data glove and collision detection.The geometry modeling and instantiation technique,virtual hand modeling and data glove interaction technique are discussed chiefly.Finally,taking aim at assembling and dismantling experiment system of a certain aero-engine,interface technology is expounded also.
基金Sponsored by the Natural Science Foundation of Shandong Province of China (Grant No. ZR2019MEE047)the National Key Research and Development Project of China (Grant No. 2020YFB1901403)CSCEC Technical and Development Plan (Grant No. CSCEC-2020-Z-35)。
文摘Modularized construction is a new type of prefabricated building system with green environmental protection and excellent performance. There are few studies on the seismic performance of its key connection joint. This paper presents a new type of assembled connection joint for the high-rise modularized construction. Cyclic shear tests of full-scale joints were carried out, and the key indexes of their seismic performances including the hysteretic performance, ductility, and energy dissipation capacity were analyzed and obtained. The results show that the hysteresis loops of longitudinal and lateral cyclic shear tests were both plump in shapes. The ductility coefficients were 4.54 and 4.98, and the energy dissipation coefficients were 1.83 and 1.43, respectively. The test joint had good ductility and energy dissipation capacity. The positions of yield failure of specimens were mainly concentrated in the connection areas between the column and short beam or end-plate. The research can provide the technical reference for the seismic design and engineering application of related modularized constructions.
文摘The Hong Kong-Zhuhai-Macao Bridge(HZMB)project,which has just been opened to traffic in 2018.The special location,construction conditions,quality requirements and multiple functions of HZMB brought many challenges,such as management,technology,safety and environmental protection.To meet these challenges and ensure the achievement of high quality and 120 years design service life,the HZMB project first introduced the completely new concept of"Large size,Factory production,Standardization and Assembly",which was fundamental to the design and construction.This was developed in consideration of the difficulties of the offshore environment.The core idea was Prefabrication and Assembly,which was to change this HZMB project into onshore work as much as possible by cutting this mega sea-crossing into large sized components,which could be prefabricated on land and then transported to the offshore site for assembly.The success of the HZMB undoubtedly has led the technology of prefabrication and assembly to a new height and recognized scale.This paper describes the implementation process of the concept;"Large size,Factory production,Standardization and Assembly"(LFSA)to the HZMB.
文摘The problem of noise has always been highlighted in assembled steel structure houses.Therefore,it is necessary to use effective soundproof measures where steel beams intersect with the reserved line pipe openings,doors,windows,elevator shafts,and other locations.In this paper,we will investigate the areas with subpar soundproof performance in an assembled steel structure residential project and propose suitable noise control measures to address this issue.