Coal has been dominating the electricity supply in Indonesia,especially in long-term power generation from fossil energy.This dominance is due to lower production costs in coal-fired power plant generation.However,thi...Coal has been dominating the electricity supply in Indonesia,especially in long-term power generation from fossil energy.This dominance is due to lower production costs in coal-fired power plant generation.However,this low price is only based on monetary costs and ignores the social costs.Therefore,this study aims to quantify the social costs of coal-fired generation.Using QUERI-AirPacts modeling,the present study quantifies the social costs resulting from the Tenayan Raya coal-fired generation in Riau,Indonesia.It includes the levelized cost of electricity and health costs into the generation costs.After that,this study calculates the net present value,internal rate return,and project payback period.The study found that as much as$50.22/MWh was the levelized cost of electricity.While$15.978/MWh or$0.015978/kWh was the social cost that was not included in the generating cost.At the electricity production level of 1,380,171.69 MWh per year,there is an expected extra cost of$22,052,383.30 uncounted when externalities are included.For instance,the net present value(NPV)is lower and even negative when external costs are included(-$24,062,274.19)compared to$176,108,091.52 when externalities are not considered.The internal rate of return(IRR)is much higher when the social costs are not considered.The payback period is also shorter when the social costs are excluded than when the externalities are included.This global number indicates that the inclusion of external costs would impact NPV,IRR,and the payback period.This result implies that the government should internalize the external cost to stimulate the electricity producers to conduct cost-benefit analyses.The cost-benefit analysis mechanism would lead the producers to be more efficient.展开更多
In view of the high cost of solar thermal power generation in China,it is difficult to realize large-scale production in engineering and industrialization.Non-dominated sorting genetic algorithm II(NSGA-II)is applied ...In view of the high cost of solar thermal power generation in China,it is difficult to realize large-scale production in engineering and industrialization.Non-dominated sorting genetic algorithm II(NSGA-II)is applied to optimize the levelling cost of energy(LCOE)of the solar thermal power generation system in this paper.Firstly,the capacity and generation cost of the solar thermal power generation system are modeled according to the data of several sets of solar thermal power stations which have been put into production abroad.Secondly,the NSGA-II genetic algorithm and particle swarm algorithm are applied to the optimization of the solar thermal power station LCOE respectively.Finally,for the linear Fresnel solar thermal power system,the simulation experiments are conducted to analyze the effects of different solar energy generation capacities,different heat transfer mediums and loan interest rates on the generation price.The results show that due to the existence of scale effect,the greater the capacity of the power station,the lower the cost of leveling and electricity,and the influence of the types of heat storage medium and the loan on the cost of leveling electricity are relatively high.展开更多
North African countries generally have strategic demands for energy transformation and sustainable development.Renewable energy development is important to achieve this goal.Considering three typical types of renewabl...North African countries generally have strategic demands for energy transformation and sustainable development.Renewable energy development is important to achieve this goal.Considering three typical types of renewable energies—wind,photovoltaic(PV),and concentrating solar power(CSP)—an optimal planning model is established to minimize construction costs and power curtailment losses.The levelized cost of electricity is used as an index for assessing economic feasibility.In this study,wind and PV,wind/PV/CSP,and transnational interconnection modes are designed for Morocco,Egypt,and Tunisia.The installed capacities of renewable energy power generation are planned through the time sequence production simulation method for each country.The results show that renewable energy combined with power generation,including the CSP mode,can improve reliability of the power supply and reduce the power curtailment rate.The transnational interconnection mode can help realize mutual benefits of renewable energy power,while the apportionment of electricity prices and trading mechanisms are very important and are related to economic feasibility;thus,this mode is important for the future development of renewable energy in North Africa.展开更多
文摘Coal has been dominating the electricity supply in Indonesia,especially in long-term power generation from fossil energy.This dominance is due to lower production costs in coal-fired power plant generation.However,this low price is only based on monetary costs and ignores the social costs.Therefore,this study aims to quantify the social costs of coal-fired generation.Using QUERI-AirPacts modeling,the present study quantifies the social costs resulting from the Tenayan Raya coal-fired generation in Riau,Indonesia.It includes the levelized cost of electricity and health costs into the generation costs.After that,this study calculates the net present value,internal rate return,and project payback period.The study found that as much as$50.22/MWh was the levelized cost of electricity.While$15.978/MWh or$0.015978/kWh was the social cost that was not included in the generating cost.At the electricity production level of 1,380,171.69 MWh per year,there is an expected extra cost of$22,052,383.30 uncounted when externalities are included.For instance,the net present value(NPV)is lower and even negative when external costs are included(-$24,062,274.19)compared to$176,108,091.52 when externalities are not considered.The internal rate of return(IRR)is much higher when the social costs are not considered.The payback period is also shorter when the social costs are excluded than when the externalities are included.This global number indicates that the inclusion of external costs would impact NPV,IRR,and the payback period.This result implies that the government should internalize the external cost to stimulate the electricity producers to conduct cost-benefit analyses.The cost-benefit analysis mechanism would lead the producers to be more efficient.
基金National Natural Science Foundation of China(No.519667013)
文摘In view of the high cost of solar thermal power generation in China,it is difficult to realize large-scale production in engineering and industrialization.Non-dominated sorting genetic algorithm II(NSGA-II)is applied to optimize the levelling cost of energy(LCOE)of the solar thermal power generation system in this paper.Firstly,the capacity and generation cost of the solar thermal power generation system are modeled according to the data of several sets of solar thermal power stations which have been put into production abroad.Secondly,the NSGA-II genetic algorithm and particle swarm algorithm are applied to the optimization of the solar thermal power station LCOE respectively.Finally,for the linear Fresnel solar thermal power system,the simulation experiments are conducted to analyze the effects of different solar energy generation capacities,different heat transfer mediums and loan interest rates on the generation price.The results show that due to the existence of scale effect,the greater the capacity of the power station,the lower the cost of leveling and electricity,and the influence of the types of heat storage medium and the loan on the cost of leveling electricity are relatively high.
基金Supported by the Science and Technology Foundation of SGCC(Large-scale development and utilization mode of solar energy in North Africa under the condition of transcontinental grid interconnection:NY71-18-004)the Science and Technology Foundation of GEI(Research on Large-scale Solar Energy Development in West-Asia and North-Africa:NYN11201805034)
文摘North African countries generally have strategic demands for energy transformation and sustainable development.Renewable energy development is important to achieve this goal.Considering three typical types of renewable energies—wind,photovoltaic(PV),and concentrating solar power(CSP)—an optimal planning model is established to minimize construction costs and power curtailment losses.The levelized cost of electricity is used as an index for assessing economic feasibility.In this study,wind and PV,wind/PV/CSP,and transnational interconnection modes are designed for Morocco,Egypt,and Tunisia.The installed capacities of renewable energy power generation are planned through the time sequence production simulation method for each country.The results show that renewable energy combined with power generation,including the CSP mode,can improve reliability of the power supply and reduce the power curtailment rate.The transnational interconnection mode can help realize mutual benefits of renewable energy power,while the apportionment of electricity prices and trading mechanisms are very important and are related to economic feasibility;thus,this mode is important for the future development of renewable energy in North Africa.