期刊文献+
共找到96,660篇文章
< 1 2 250 >
每页显示 20 50 100
Reliability-based life-cycle cost seismic design optimization of coastal bridge piers with nonuniform corrosion using different materials
1
作者 Wu Xiangtong Yuan Wenting Guo Anxin 《Earthquake Engineering and Engineering Vibration》 SCIE EI CSCD 2024年第1期209-225,共17页
Reinforcement corrosion is the main cause of performance deterioration of reinforced concrete(RC)structures.Limited research has been performed to investigate the life-cycle cost(LCC)of coastal bridge piers with nonun... Reinforcement corrosion is the main cause of performance deterioration of reinforced concrete(RC)structures.Limited research has been performed to investigate the life-cycle cost(LCC)of coastal bridge piers with nonuniform corrosion using different materials.In this study,a reliability-based design optimization(RBDO)procedure is improved for the design of coastal bridge piers using six groups of commonly used materials,i.e.,normal performance concrete(NPC)with black steel(BS)rebar,high strength steel(HSS)rebar,epoxy coated(EC)rebar,and stainless steel(SS)rebar(named NPC-BS,NPC-HSS,NPC-EC,and NPC-SS,respectively),NPC with BS with silane soakage on the pier surface(named NPC-Silane),and high-performance concrete(HPC)with BS rebar(named HPC-BS).First,the RBDO procedure is improved for the design optimization of coastal bridge piers,and a bridge is selected to illustrate the procedure.Then,reliability analysis of the pier designed with each group of materials is carried out to obtain the time-dependent reliability in terms of the ultimate and serviceability performances.Next,the repair time of the pier is predicted based on the time-dependent reliability indices.Finally,the time-dependent LCCs for the pier are obtained for the selection of the optimal design. 展开更多
关键词 reliability-based design optimization(RBDO) life-cycle cost(LCC) nonuniform corrosion coastal bridge pier REPAIR
下载PDF
Life-cycle cost analysis of optimal timing of pavement preservation 被引量:1
2
作者 Zilong WANG Hao WANG 《Frontiers of Structural and Civil Engineering》 SCIE EI CSCD 2017年第1期17-26,共10页
Optimal application of pavement preservation or preventive maintenance is critical for highway agencies to allocate the limited budget for different treatments. This study developed an integrated life-cycle cost analy... Optimal application of pavement preservation or preventive maintenance is critical for highway agencies to allocate the limited budget for different treatments. This study developed an integrated life-cycle cost analysis (LCCA) model to quantify the impact of pavement preservation on agency cost and vehicle operation cost (VOC) and analyzed the optimal timing of preservation treatments. The international roughness index (IRI) data were extracted from the long-term pavement performance (LTPP) program specific pavement studies 3 (SPS-3) to determine the long-term effectiveness of preservation treatments on IRI deterioration. The traffic loading and the initial IRI value significantly affects life extension and the benefit of agency cost caused by pavement preservation. The benefit in VOC is one to two orders greater in magnitude as compared to the benefit in agency cost. The optimal timing calculated based on VOC is always earlier than the optimal timing calculated based on agency cost. There are considerable differences among the optimal timing of three preservation treatments. 展开更多
关键词 pavement preservation life-cycle cost analysis agency cost vehicle operation cost
原文传递
Design,simulation of different configurations and life-cycle cost analysis of solar photovoltaic-water-pumping system for agriculture applications:use cases and implementation issues
3
作者 L.Ashok Kumar C.N.Lakshmiprasad +1 位作者 G.Ramaraj G.Sivasurya 《Clean Energy》 EI 2022年第2期335-352,共18页
Water is an essential resource for agriculture and the majority of land is irrigated through borewells or wells.The power requirement for an irrigation pump motor is fed by the on-grid power supply but the availabilit... Water is an essential resource for agriculture and the majority of land is irrigated through borewells or wells.The power requirement for an irrigation pump motor is fed by the on-grid power supply but the availability of electricity in rural areas is still questionable.With rising concerns about global warming and the rise in carbon footprints,it is necessary to choose clean and green energy,thereby attaining self-sustainable life.India receives yearly a mean solar irradiation of 6.5 kWh/m^(2)day.Hence,a solar photovoltaic-water-pumping system(SPV-WPS)is a suitable alternative to grid energy;thereby,the farmers would generate electricity through the solar photovoltaic system and become self-sufficient in their energy needs.In this paper,two different agricultural fields in Tamil Nadu,India that deploy flood irrigation and drip irrigation are taken as a case study.The paper discusses the concerns on the use of grid power and their carbon footprint,design and simulation of 4-and 5.5-kW SPV-WPSs using PVsyst 7.1.1,and the advantages of using SPV-WPSs and life-cycle cost analysis on different use cases.The Government of India has introduced a special scheme to promote the installation of SPV-WPSs by offering attractive incentives through PM-Kisan Urja Suraksha evam Utthaan Mahabhiyan(KUSUM)yojana.The results of the case study show that with the use of SPV-WPSs,either with or without subsidy,the farmer could gain a minimum of 250%on the investment with a project lifetime of 25 years. 展开更多
关键词 solar water pump PVsyst PM-KUSUM subsidy life-cycle cost sustainable development goal
原文传递
Characterization and evaluation of brittleness of deep bedded sandstone from the perspective of the whole life-cycle evolution process 被引量:4
4
作者 Zhixiang Song Junwen Zhang +2 位作者 Yang Zhang Xukai Dong Shanyong Wang 《International Journal of Mining Science and Technology》 SCIE EI CAS CSCD 2023年第4期481-502,共22页
The quantitative determination and evaluation of rock brittleness are crucial for the estimation of excavation efficiency and the improvement of hydraulic fracturing efficiency.Therefore,a“three-stage”triaxial loadi... The quantitative determination and evaluation of rock brittleness are crucial for the estimation of excavation efficiency and the improvement of hydraulic fracturing efficiency.Therefore,a“three-stage”triaxial loading and unloading stress path is designed and proposed.Subsequently,six brittleness indices are selected.In addition,the evolution characteristics of the six brittleness indices selected are characterized based on the bedding effect and the effect of confining pressure.Then,the entropy weight method(EWM)is introduced to assign weight to the six brittleness indices,and the comprehensive brittleness index Bcis defined and evaluated.Next,the new brittleness classification standard is determined,and the brittleness differences between the two stress paths are quantified.Finally,compared with the previous evaluation methods,the rationality of the proposed comprehensive brittleness index Bcis also verified.These results indicate that the proposed brittleness index Bccan reflect the brittle characteristics of deep bedded sandstone from the perspective of the whole life-cycle evolution process.Accordingly,the method proposed seems to offer reliable evaluations of the brittleness of deep bedded sandstone in deep engineering practices,although further validation is necessary. 展开更多
关键词 BRITTLENESS Deep bedded sandstone Whole life-cycle evolution process Bedding effect Effect of confining pressure Entropy weight method
下载PDF
A Blockchain-Based Life-Cycle Environmental Management Framework for Hospitals in the COVID-19 Context 被引量:1
5
作者 Botao Zhong Han Gao +1 位作者 Lieyun Ding Yuhang Wang 《Engineering》 SCIE EI CAS CSCD 2023年第1期208-221,共14页
During the coronavirus disease 2019 (COVID-19) emergency, many hospitals were built or renovated around the world to meet the challenges posed by the rising number of infected cases. Environmental management in the ho... During the coronavirus disease 2019 (COVID-19) emergency, many hospitals were built or renovated around the world to meet the challenges posed by the rising number of infected cases. Environmental management in the hospital life cycle is vital in preventing nosocomial infection and includes many infection control procedures. In certain urgent situations, a hospital must be completed quickly, and work process approval and supervision must therefore be accelerated. Thus, many works cannot be checked in detail. This results in a lack of work liability control and increases the difficulty of ensuring the fulfillment of key infection prevention measures. This study investigates how blockchain technology can transform the work quality inspection workflow to assist in nosocomial infection control under a fast delivery requirement. A blockchain-based life-cycle environmental management framework is proposed to track the fulfillment of crucial infection control measures in the design, construction, and operation stages of hospitals. The proposed framework allows for work quality checking after the work is completed, when some work cannot be checked on time. Illustrative use cases are selected to demonstrate the capabilities of the developed solution. This study provides new insights into applying blockchain technology to address the challenge of environmental management brought by rapid delivery requirements. 展开更多
关键词 Blockchain Envir onmental management Nosocomial infection control Work quality management life-cycle traceability
下载PDF
Estimation of the Direct Cost of Management of Venous Thromboembolism in Three Reference Hospitals in the City of Yaoundé: A Retrospective Study over a Three-Year Period
6
作者 Hamadou Ba Nganou-Ngnindjio Chris Nadège +5 位作者 Tatchim Samuel Aimé Kamdem Félicité Tchoukoua Serge Honoré Ahmadou Jingi Danwe Dieudonne Kingue Samuel 《World Journal of Cardiovascular Diseases》 CAS 2024年第2期99-114,共16页
Background: Venous thromboembolism (VTE) is a major public health problem due to its increasing frequency, mortality and management cost. This cost may require major financial efforts from patients, especially in deve... Background: Venous thromboembolism (VTE) is a major public health problem due to its increasing frequency, mortality and management cost. This cost may require major financial efforts from patients, especially in developing countries like ours where less than 7% of the population has health insurance. This study aimed to estimate the direct cost of managing VTE in three reference hospitals in Yaoundé. Methods: This was a cross-sectional retrospective study over a three-year period (from January 1st 2018 to December 31 2020) carried out in the Cardiology departments of the Central and General Hospitals, and the Emergency Centre of the city of Yaoundé. All patients managed during the study period for deep vein thrombosis and pulmonary embolism confirmed by venous ultrasound coupled with Doppler and computed tomography pulmonary angiography respectively were included. For each patient, we collected sociodemographic and clinical data as well as data on the cost of consultation, hospital stay, workups and medications. These data were analysed using SPSS version 23.0. Results: A total of 92 patient’s records were analysed. The median age was 60 years [48 - 68] with a sex ratio of 0.53. The median direct cost of management of venous thromboembolism was 766,375 CFAF [536,455 - 1,029,745] or $1415 USD. Management of pulmonary embolism associated with deep vein thrombosis was more costly than isolated pulmonary embolism or deep vein thrombosis. Factors influencing the direct cost of management of venous thromboembolism were: hospital structure (p = 0.015), health insurance (p 0.001), type of pulmonary embolism (p = 0.021), and length of hospital stay (p = 0.001). Conclusion: Management of VTE is a major financial burden for our patients and this burden is influenced by the hospital structure, health insurance, type of pulmonary embolism and length of hospital stay. 展开更多
关键词 cost MANAGEMENT Venous Thromboembolism Yaoundé
下载PDF
A Hybrid Model for Improving Software Cost Estimation in Global Software Development
7
作者 Mehmood Ahmed Noraini B.Ibrahim +4 位作者 Wasif Nisar Adeel Ahmed Muhammad Junaid Emmanuel Soriano Flores Divya Anand 《Computers, Materials & Continua》 SCIE EI 2024年第1期1399-1422,共24页
Accurate software cost estimation in Global Software Development(GSD)remains challenging due to reliance on historical data and expert judgments.Traditional models,such as the Constructive Cost Model(COCOMO II),rely h... Accurate software cost estimation in Global Software Development(GSD)remains challenging due to reliance on historical data and expert judgments.Traditional models,such as the Constructive Cost Model(COCOMO II),rely heavily on historical and accurate data.In addition,expert judgment is required to set many input parameters,which can introduce subjectivity and variability in the estimation process.Consequently,there is a need to improve the current GSD models to mitigate reliance on historical data,subjectivity in expert judgment,inadequate consideration of GSD-based cost drivers and limited integration of modern technologies with cost overruns.This study introduces a novel hybrid model that synergizes the COCOMO II with Artificial Neural Networks(ANN)to address these challenges.The proposed hybrid model integrates additional GSD-based cost drivers identified through a systematic literature review and further vetted by industry experts.This article compares the effectiveness of the proposedmodelwith state-of-the-artmachine learning-basedmodels for software cost estimation.Evaluating the NASA 93 dataset by adopting twenty-six GSD-based cost drivers reveals that our hybrid model achieves superior accuracy,outperforming existing state-of-the-artmodels.The findings indicate the potential of combining COCOMO II,ANN,and additional GSD-based cost drivers to transform cost estimation in GSD. 展开更多
关键词 Artificial neural networks COCOMO II cost drivers global software development linear regression software cost estimation
下载PDF
Costs of Schizophrenia at Psychiatric Hospital of Bingerville (Ivory Coast)
8
作者 Madjara Anoumatacky Anna-Corinne Bissouma Drissa Kone 《Open Journal of Psychiatry》 2024年第1期1-10,共10页
Schizophrenia is classified as a priority mental disorder by the World Health Organization (WHO) and accounts for around 35% of diagnoses at the Bingerville Psychiatric Hospital (HPB). The aims of the study were to id... Schizophrenia is classified as a priority mental disorder by the World Health Organization (WHO) and accounts for around 35% of diagnoses at the Bingerville Psychiatric Hospital (HPB). The aims of the study were to identify the cost drivers for hospitalization and to calculate the costs of managing schizophrenia in hospital, with a view to planning household expenditure on care. This pilot cross-sectional study involved 31 patients with schizophrenia who had been hospitalized in the various third-category wards at the HPB between 1st January 2019 and 31st May 2020. Sampling was accidental. The methods used to estimate costs were based on the actual costs of drugs, hospitalization and additional examinations which prices were known, and on patients’ estimations for certain expenses such as food and transport. Results: The sex ratio was 3.42, the mean age was 29.52 years. The mean length of stay was 46.19 days, and the most frequent clinical forms were paranoid schizophrenia (41.9%) and schizoaffective disorder (29%). The combination of haloperidol and chlorpromazine was the most common medications for initial treatment (67.8%) and maintenance treatment (41.9%). The average cost of hospitalization at HPB for schizophrenia was XOF 164,412 (€249.90). The average direct medical cost was XOF 105,412 (€160.226) and the average direct non-medical cost was XOF 59,000 (€89.68). The average daily cost of antipsychotic treatment was XOF 795/day (€1.2084). The high cost of drugs as a proportion of hospitalization costs suggested the need of a reflection on the simplification of prescribing practices, assistance in psychiatric emergencies and the development of other alternatives to psychiatric hospitalization in Côte d’Ivoire. 展开更多
关键词 SCHIZOPHRENIA cost HOSPITALIZATION HPB Côte d’Ivoire
下载PDF
Cost of Medical Treatment for Primary Open-Angle Glaucoma in Relation to Patients’ Income and Its Impact on the Prognosis of the Disease, in Bouaké University Hospital
9
作者 Yves Ouattara Liliane Ella Godé +5 位作者 Zana Diabaté Franck Hermann Koffi Mamadou Korka Diallo Philippe Emile France Koffi Bilé Diomandé François Gossé Ibrahim Abib Diomandé 《Open Journal of Ophthalmology》 2024年第1期8-17,共10页
Introduction: Medical treatment for POAG is continuous and lifelong treatment. The aim of this study was to evaluate the relationship between the cost of this treatment and patients’ income and the impact of this rel... Introduction: Medical treatment for POAG is continuous and lifelong treatment. The aim of this study was to evaluate the relationship between the cost of this treatment and patients’ income and the impact of this relationship on treatment compliance. Materials and Methods: Prospective cross-sectional study with a descriptive aim covering sociodemographic data, average incomes, and direct and indirect costs of treatment of 57 patients followed for POAG during the period from January 1, 2012, to December 31, 2016 (5 years). Results: The patients were aged 25 to 77 years (mean = 54.4 years) with a male predominance (sex ratio = 1.5). Retirees were the most represented (26.32%), followed by workers in the informal sector (14.04%) and housewives (12.28%). Patients who had an annual income less than or equal to 900,000 CFA francs (€1370.83) per year represented 56.14% and those who did not have health coverage represented 57.89%. The treatment was monotherapy (64.91%), dual therapy (31.58%) or triple therapy (3.05%) and the average ratio of “annual cost of treatment to annual income” was 0.56 with for maximum 2.23 and 0.02 as minimum. Patients who considered the cost of treatment unbearable for their income represented 78.95%. Conclusion: Prevention of blindness due to glaucoma requires early detection but also the establishment of health coverage mechanisms to improve compliance with medical treatment. In addition, consideration should be given to the development of glaucoma surgery in our country, the indication of which could be the first intention in certain patients, considering for those patients, the geographical and financial accessibility of medical treatment. . 展开更多
关键词 Primary Open-Angle Glaucoma Treatment cost Medical Treatment INCOME BLINDNESS
下载PDF
A digital twin model-based approach to cost optimization of residential community microgrids
10
作者 Mariem Dellaly Sondes Skander-Mustapha Ilhem Slama-Belkhodja 《Global Energy Interconnection》 EI CSCD 2024年第1期82-93,共12页
This paper presents a peer-to-peer community cost optimization approach based on a single-prosumer energy management system.Its objective is to optimize energy costs for prosumers in the community by enhancing the con... This paper presents a peer-to-peer community cost optimization approach based on a single-prosumer energy management system.Its objective is to optimize energy costs for prosumers in the community by enhancing the consumption efficiency.This study was conducted along two main axes.The first axis focuses on designing a digital twin for a residential community microgrid platform.This phase involves data collection,cleaning,exploration,and interpretation.Moreover,it includes replicating the functionality of the real platform and validating the results.The second axis involves the development of a novel approach that incorporates two distinct prosumer behaviors within the same community microgrid,while maintaining the concept of peer-to-peer energy trading.Prosumers without storage utilize their individual PV systems to fulfill their energy requirements and inject excess energy into a local microgrid.Meanwhile,a single prosumer with a storage system actively engages in energy exchange to maximize the community’s profit.This is achieved by optimizing battery usage using a cost optimization solution.The proposed solution is validated using the developed digital twin. 展开更多
关键词 Energy management system(EMS) cost optimization Digital twin Photovoltaic systems MICROGRID
下载PDF
Impact of carbon disclosure on debt financing costs
11
作者 Yiming Hu Yunfeng Liang 《Chinese Journal of Population,Resources and Environment》 2024年第1期98-108,共11页
Creditors,such as banks,often use disclosed environmental information to assess a company’s environmental risk and ensure the safety of debt funds.Consequently,carbon disclosures have become an important consideratio... Creditors,such as banks,often use disclosed environmental information to assess a company’s environmental risk and ensure the safety of debt funds.Consequently,carbon disclosures have become an important consideration for creditors when making investments.This study explores the relationship between carbon disclosure and debt financing costs using data on listed companies from 2008 to 2019.The results show that carbon disclosure can reduce the debt financing costs of enterprises,and that this influence is more significant for private companies than for state-owned enterprises.Instrumental variables and Propensity Score Matching(PSM)were used to evaluate the robustness of negative relationships.Furthermore,carbon disclosure has a more significant impact on debt costs with less environmental supervision pressure,weak residents’environmental awareness,and weak product market competition.These findings provide guidance for companies’carbon information disclosure and support the establishment of official carbon disclosure standards. 展开更多
关键词 Carbon disclosure Debt financing cost State-owned enterprise Private enterprise
下载PDF
CO_(2)capture costs of chemical looping combustion of biomass:A comparison of natural and synthetic oxygen carrier
12
作者 Benjamin Fleiß Juraj Priscak +3 位作者 Martin Hammerschmid Josef Fuchs Stefan Müller Hermann Hofbauer 《Journal of Energy Chemistry》 SCIE EI CAS CSCD 2024年第5期296-310,共15页
Chemical looping combustion has the potential to be an efficient and low-cost technology capable of contributing to the reduction of the atmospheric concentration of CO_(2) in order to reach the 1.5/2°C goal and ... Chemical looping combustion has the potential to be an efficient and low-cost technology capable of contributing to the reduction of the atmospheric concentration of CO_(2) in order to reach the 1.5/2°C goal and mitigate climate change.In this process,a metal oxide is used as oxygen carrier in a dual fluidized bed to generate clean CO_(2) via combustion of biomass.Most commonly,natural ores or synthetic materials are used as oxygen carrier whereas both must meet special requirements for the conversion of solid fuels.Synthetic oxygen carriers are characterized by higher reactivity at the expense of higher costs versus the lower-cost natural ores.To determine the viability of both possibilities,a techno-economic comparison of a synthetic material based on manganese,iron,and copper to the natural ore ilmenite was conducted.The synthetic oxygen carrier was characterized and tested in a pilot plant,where high combustion efficiencies up to 98.4%and carbon capture rates up to 98.5%were reached.The techno-economic assessment resulted in CO_(2) capture costs of 75 and 40€/tCO_(2) for the synthetic and natural ore route respectively,whereas a sensitivity analysis showed the high impact of production costs and attrition rates of the synthetic material.The synthetic oxygen carrier could break even with the natural ore in case of lower production costs and attrition rates,which could be reached by adapting the production process and recycling material.By comparison to state-of-the-art technologies,it is demonstrated that both routes are viable and the capture cost of CO_(2) could be reduced by implementing the chemical looping combustion technology. 展开更多
关键词 Chemical looping combustion BECCS Techno-economic assessment CO_(2)capture costs Oxygen carrier development Synthetic materials ILMENITE
下载PDF
Gravitational Waves Background, as Well as Some UFO, FRB and Supernova Flares, Are Due to Compressibility of the Spacetime (CoST)
13
作者 Evgeny A. Novikov 《Journal of High Energy Physics, Gravitation and Cosmology》 CAS 2024年第1期67-70,共4页
The recently observed gravitational wave background is explained in terms of the quantum modification of the general relativity (Qmoger). Some UFO, FRB and supernova flares also can be explained in terms of Qmoger.
关键词 Gravitational Wave Background Quantum Modification of the General Relativity Compressibility of the Spacetime (cost)
下载PDF
TRADE DEPENDENCIES AND TRANSACTION COSTS: THE OC-CUPATION OF DECELEA HIGHLIGHTS BOTH THE BENEFITS AND THE DRAWBACKS OF A MARITIME ECONOMY
14
作者 Pascal Warnking 《Journal of Ancient Civilizations》 2024年第1期29-50,123,共23页
Thucydides asserts that the occupation of Decelea by the Spartans in 413 BC made the grain supply for Athens costly by forcing the transport from land onto the sea.This calls into question the well-established consens... Thucydides asserts that the occupation of Decelea by the Spartans in 413 BC made the grain supply for Athens costly by forcing the transport from land onto the sea.This calls into question the well-established consensus that sea transport was far cheaper than land transport.This paper contends that the cost of protecting supply lines-specifically the expenses associated with the warships which escorted the supply ships-rendered the grain transported on the new route exceptionally costly.In this paper,the benefits and drawbacks of a maritime economy,including transaction costs,trade dependencies,and the capabilities of warships and supply ships are discussed. 展开更多
关键词 convoy Decelea maritime dependencies maritime economy sea routes shipping costs transaction costs
下载PDF
Discussion on Construction Project Cost Budget Settlement Review
15
作者 Hongfeng Liu Yumin Yuan 《Journal of Architectural Research and Development》 2024年第1期43-48,共6页
Construction project cost control involves many complex contents,forming a large amount of data information.If the processing method is unreasonable,it will likely affect the cost control efficiency.Therefore,in the c... Construction project cost control involves many complex contents,forming a large amount of data information.If the processing method is unreasonable,it will likely affect the cost control efficiency.Therefore,in the current construction project management,the review of project cost budget settlement is the focus to solve the cost management problems of construction projects and promote the development of the construction industry.This article mainly analyzes the influencing factors and current situation of construction project cost budget settlement review,and based on this,it explores the project cost budget settlement review strategy to promote the healthy development of construction project cost work. 展开更多
关键词 Construction project cost Budget settlement Review strategy
下载PDF
Cost Control Strategies in the Pre-Construction Period of Highway Construction
16
作者 Chunbo Chen 《Journal of Architectural Research and Development》 2024年第3期104-109,共6页
Effective cost control in the investment and design phases of highway construction is crucial for managing project expenses.However,current management practices often overlook pre-construction cost management,leading ... Effective cost control in the investment and design phases of highway construction is crucial for managing project expenses.However,current management practices often overlook pre-construction cost management,leading to budget overruns and project delays during later stages.To ensure the smooth execution and cost control of highway construction projects,this paper examines the significance of cost control,evaluates the current state and challenges of highway construction,and proposes strategies for cost management.These strategies aim to establish a robust foundation for cost management in highway projects. 展开更多
关键词 Highway construction Preliminary management cost control Contract management Investment estimate
下载PDF
Costco超市为何大受欢迎
17
作者 陈智 《四川省情》 2024年第3期59-59,共1页
今年春节前夕,华南地区首家美国超市Costco在深圳开业,开市当日,顾客趋之如鹜,货物抢售一空,大有万人空巷、火爆春运之感觉。四年前首家Costco在上海开市,当时情景与今天的深圳大致相似。笔者很是纳闷,按理说,上海、深圳是我国一线城市... 今年春节前夕,华南地区首家美国超市Costco在深圳开业,开市当日,顾客趋之如鹜,货物抢售一空,大有万人空巷、火爆春运之感觉。四年前首家Costco在上海开市,当时情景与今天的深圳大致相似。笔者很是纳闷,按理说,上海、深圳是我国一线城市,其发达繁荣程度在国内无人能比,在国际上也不逊伦敦东京,上海人、深圳人啥子世面没见过,货物供应更是什么都不缺,为什么会有这样的场面呢?虽然Costco还未开到成都来,但也想探个究竟。 展开更多
关键词 一线城市 超市 春运 cost 万人空巷 华南地区 深圳
下载PDF
基于COST-DEA指数法对某三甲医院临床病区成本效率分析
18
作者 章俊龙 郭佳奕 +3 位作者 张红怡 何国斌 黄艳红 袁坚列 《中国医院统计》 2024年第2期129-133,共5页
目的测量某三甲医院各临床病区的成本效率、技术效率和配置效率,为实现医院高质量发展和精细化管理提供数据参考。方法利用数据包络法中的CCR、BCC和COST-DEA模型,测量该三甲医院各临床病区的相关效率值。结果2019年该三甲医院各临床病... 目的测量某三甲医院各临床病区的成本效率、技术效率和配置效率,为实现医院高质量发展和精细化管理提供数据参考。方法利用数据包络法中的CCR、BCC和COST-DEA模型,测量该三甲医院各临床病区的相关效率值。结果2019年该三甲医院各临床病区的成本效率均值为0.675,配置效率均值为0.782,技术效率均值为0.853,纯技术效率均值为0.902,规模效率均值为0.944。51个临床病区中,7个处于规模报酬递增状态,占比13.73%;23个处于规模报酬不变状态,占比45.10%;21个处于规模报酬递减状态,占比41.17%。结论该三甲医院各临床病区成本效率主要受到配置效率的影响,需要合理配置医疗资源;部分临床病区需要提高内部精细化管理水平实现产出增加。 展开更多
关键词 cost-DEA模型 成本效率 临床病区 规模报酬状态
下载PDF
Cyberattack Ramifications, The Hidden Cost of a Security Breach
19
作者 Meysam Tahmasebi 《Journal of Information Security》 2024年第2期87-105,共19页
In this in-depth exploration, I delve into the complex implications and costs of cybersecurity breaches. Venturing beyond just the immediate repercussions, the research unearths both the overt and concealed long-term ... In this in-depth exploration, I delve into the complex implications and costs of cybersecurity breaches. Venturing beyond just the immediate repercussions, the research unearths both the overt and concealed long-term consequences that businesses encounter. This study integrates findings from various research, including quantitative reports, drawing upon real-world incidents faced by both small and large enterprises. This investigation emphasizes the profound intangible costs, such as trade name devaluation and potential damage to brand reputation, which can persist long after the breach. By collating insights from industry experts and a myriad of research, the study provides a comprehensive perspective on the profound, multi-dimensional impacts of cybersecurity incidents. The overarching aim is to underscore the often-underestimated scope and depth of these breaches, emphasizing the entire timeline post-incident and the urgent need for fortified preventative and reactive measures in the digital domain. 展开更多
关键词 Artificial Intelligence (AI) Business Continuity Case Studies Copyright cost-Benefit Analysis Credit Rating Cyberwarfare Cybersecurity Breaches Data Breaches Denial Of Service (DOS) Devaluation Of Trade Name Disaster Recovery Distributed Denial of Service (DDOS) Identity Theft Increased cost to Raise Debt Insurance Premium Intellectual Property Operational Disruption Patent Post-Breach Customer Protection Recovery Point Objective (RPO) Recovery Time Objective (RTO) Regulatory Compliance Risk Assessment Service Level Agreement Stuxnet Trade Secret
下载PDF
Janus CoSTe单层膜在Li-S电池中的应用研究
20
作者 温新竹 曾凤生 彭玉颜 《北京化工大学学报(自然科学版)》 CAS CSCD 北大核心 2023年第2期8-16,共9页
开发新的亲硫催化材料是解决锂硫电池正极多硫化锂存在的严重的穿梭效应和缓慢的动力学转化等问题的有效方案。构建了一种潜在的锂硫电池正极锚定材料—Janus过渡金属二硫属化物CoSTe单层膜,采用第一性原理计算发现多硫化物Li_(2)S_(n)... 开发新的亲硫催化材料是解决锂硫电池正极多硫化锂存在的严重的穿梭效应和缓慢的动力学转化等问题的有效方案。构建了一种潜在的锂硫电池正极锚定材料—Janus过渡金属二硫属化物CoSTe单层膜,采用第一性原理计算发现多硫化物Li_(2)S_(n)团簇在CoSTe单层膜表面吸附能适中(0.88~2.85 eV),大于石墨烯表面和有机电解液中的吸附能,且高阶Li_(2)S_(n)团簇的表面吸附在一定范围内得到了优化;Li_(2)S_(n)团簇的分解不太容易自发地在CoSTe膜层上发生;Li_(2)S_(n)团簇在CoSTe单层膜表面的扩散有其微观上的“通道”;Li_(2)S的解离能优于石墨烯表面,CoSTe单层膜比石墨烯表面更利于硫还原反应的顺利进行;CoSTe单层膜的金属特性在吸附Li_(2)S_(n)团簇后得以保留。综上,理论上Janus CoSTe单层膜表面在锂硫电池电极中具备优异的电化学性能,具有开发应用的潜力和价值。 展开更多
关键词 第一性原理 Li_(2)S_(n)团簇 Janus coste单层膜 锚定材料 锂硫电池
下载PDF
上一页 1 2 250 下一页 到第
使用帮助 返回顶部