In this paper, an application of fault current limiter-thyristor controller series reactor (FCL-TCSR) in the distribution network is presented in order to minimize the peak value of current during the fault conditio...In this paper, an application of fault current limiter-thyristor controller series reactor (FCL-TCSR) in the distribution network is presented in order to minimize the peak value of current during the fault condition. This application considers a single fault current limiting action but can also be applied for a three phase system. The maximum contribution of FCL-TCSR quickly clears the abnormal current in the power distribution system when a fault condition occurs. Using a mathematical model of FCL-TCSR, the impact of series impedance used to adjust the amplitude of the fault current action is demonstrated. The performance of the load with the impedance and load in series is also analyzed.展开更多
文摘In this paper, an application of fault current limiter-thyristor controller series reactor (FCL-TCSR) in the distribution network is presented in order to minimize the peak value of current during the fault condition. This application considers a single fault current limiting action but can also be applied for a three phase system. The maximum contribution of FCL-TCSR quickly clears the abnormal current in the power distribution system when a fault condition occurs. Using a mathematical model of FCL-TCSR, the impact of series impedance used to adjust the amplitude of the fault current action is demonstrated. The performance of the load with the impedance and load in series is also analyzed.