期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
Researches on the key technology and equipment for rapid construction of long tunnels with large section 被引量:1
1
作者 Gao Juru Luo Jianchun Tu Wenxuan 《Engineering Sciences》 EI 2010年第1期40-43,共4页
Excavation and lining are two main important tasks in tunnel construction. Conventional sequential operations may not be appropriate due to time limit for a project and the high cost of construction. The authors devel... Excavation and lining are two main important tasks in tunnel construction. Conventional sequential operations may not be appropriate due to time limit for a project and the high cost of construction. The authors developed a new mode of tunnel construction that excavation and lining can be operated simultaneously. The new mode of tunnel construction has been successfully applied to Dahuofang Water Conveyance Project in Liaoning Province. This paper makes a comparison of Main Beam TBMs and Double Shield TBMs used in Dahuofang Water Conveyance Project, and the features of Full-ring Inner-through Lining Shutter Jumbo which solves the problem of interference between excavation and lining. 展开更多
关键词 TUNNELING TBM Full-ring Inner-through lining shutter Jumbo TEAMWORK
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部