期刊文献+
共找到846篇文章
< 1 2 43 >
每页显示 20 50 100
Analysis on Interface Shear Stress of Thermally InsulatedOcean Pipelines Under Installation 被引量:2
1
作者 闫澍旺 田英辉 +2 位作者 刘润 王章岭 王金英 《China Ocean Engineering》 SCIE EI 2006年第2期315-323,共9页
It has been proved that the thermally insulated ocean pipeline has advantages over the conventional pipe-in-pipe pipeline. The risk of using the thermally insulated pipeline is that the exterior layers covering the st... It has been proved that the thermally insulated ocean pipeline has advantages over the conventional pipe-in-pipe pipeline. The risk of using the thermally insulated pipeline is that the exterior layers covering the steel pipe may be. pulled off if the shear stress on the interface induced by the pullout fore from the tensioner is greater than the binding fore between two neighboring layers during installation. This paper develops a procedure to calculate the shear stress on the interface. The binding force between two neighboring layers can be determined with full scale model tests. The safety of the thermally insulated pipe under installation can then be checked by comparison of the interface shear stress with the binding force. 展开更多
关键词 thermally insulated pipelines shear stress installation binding force
下载PDF
Study on the Technology of Supplying Water Safely by Long-Distance Pipeline 被引量:3
2
作者 CHEN Yanbo YU Taipin +1 位作者 LIU Junhua ZHAO Hongbin 《Journal of Northeast Agricultural University(English Edition)》 CAS 2008年第3期80-85,共6页
The extensively built long-distance water transmission pipelines have become the main water sources for urban areas. To ensure the reliability and safety of the water supply, from the viewpoint of overall management, ... The extensively built long-distance water transmission pipelines have become the main water sources for urban areas. To ensure the reliability and safety of the water supply, from the viewpoint of overall management, it would be necessary to establish a system of information management for the pipeline. The monitoring, calculating and analyzing functions of the system serve to give controlling instructions and safe operating rules to the automatic equipment and technician, making sure the resistance coefficient distribution along the pipeline is reasonable; the hydraulic state transition is smooth when operating conditions change or water supply accidents occur, avoiding the damage of water hammer. This paper covered the composition structures of the information management system of long-distance water transmission pipelines and the functions of the subsystems, and finally elaborated on the approaches and steps of building a mathematics model for the analysis of dynamic hydraulic status. 展开更多
关键词 long-distance water transmission pipeline water supply security information management water hammer MODELING
下载PDF
Criterions and Measures of Route Selection of Shallowly Embedded Long-Distance Oil and Gas Pipeline in Mountain Areas 被引量:1
3
作者 WANG Chenghua MA Qingwen +2 位作者 KONG Jiming CHEN Zefu LI Xiuzhen 《Wuhan University Journal of Natural Sciences》 EI CAS 2006年第4期787-792,共6页
According to the engineering investigation of long-distance oil and gas pipelines, the criterions and measures of route selection are drawn as follows: the flat landform is the first choice in route alignment. The fo... According to the engineering investigation of long-distance oil and gas pipelines, the criterions and measures of route selection are drawn as follows: the flat landform is the first choice in route alignment. The foot of mountain is the first choice when the route passes by the valley. The route should pass by but the shady and deposited slope and not in sunny and erosive slope as possible as it can. The pipeline should be vertical to contour climbing and descending the mountain except steep slope. Tunnel can be used in crossing foothill. Perpendicularly traversing the river is better than beveling; the worst choice is to put the pipeline along the river. Bypass is the best choice in karsts area. The order of route selection should be pre-choosing, investigation, optimization and adjustment. 展开更多
关键词 shallowly embedded long-distance oil and gas pipeline criterions and measures of route selection avoiding geological hazards
下载PDF
A Review of Deepwater Pipeline Construction in the U.S. Gulf of Mexico-Contracts, Cost, and Installation Methods
4
作者 Mark J. Kaiser 《Journal of Marine Science and Application》 CSCD 2016年第3期288-306,共19页
The offshore pipeline network in the U.S. Gulf of Mexico is the largest and most transparent system in the world. A review of deepwater projects in the region provides insight into construction cost and installation m... The offshore pipeline network in the U.S. Gulf of Mexico is the largest and most transparent system in the world. A review of deepwater projects in the region provides insight into construction cost and installation methods and the evolution of contract strategies. Pipeline projects are identified as export systems, infield flowline systems, and combined export and infield systems, and three dozen deepwater pipeline installations from 1980–2014 are described based on Offshore Technology Conference(OTC) and Society of Petroleum Engineers(SPE) industry publications and press release data. Export lines and infield flowlines are equally represented and many projects used a combination of J-lay, S-lay and reel methods with rigid steel, flexible line, and pipe-in-pipe systems. The average 2014 inflation-adjusted cost for pipeline projects based on OTC/SPE publications was $2.76 million/mi and ranged from $520 000/mi to $12.94 million/mi. High cost pipelines tend to be short segments or specialized pipeline. Excluding the two cost endpoints, the majority of projects ranged from $1 to $6 million/mi. The average inflation-adjusted cost to install deepwater pipelines in the U.S. Gulf of Mexico based on available public data is estimated at $3.1 million/mi. 展开更多
关键词 construction cost contract type empirical statistics installation methods deepwater pipeline review
下载PDF
THE RISK ASSESSMENT OF THE LONG-DISTANCE OILPIPELINE ENGINEERING
5
作者 Wang Jinghua Mu Congru(Institute of Geography, CAS, Beijing 100101People’s Republic of China) 《Journal of Geographical Sciences》 SCIE CSCD 1996年第1期78-83,共6页
The oilfield construction and long-distance oil pipeline engineering has been developed extensively in China. The risk assessment of oil industry will, however, be an important objective to cope with the development o... The oilfield construction and long-distance oil pipeline engineering has been developed extensively in China. The risk assessment of oil industry will, however, be an important objective to cope with the development of oil industry , The risk assessment of oil industry has many subjects worthy to be studied.The major purpose of the paper is to research the risk cases of long-distance oil pipeline engineering in Ganshu and Shaanxi provinces. 展开更多
关键词 long-distance oil pipeline risk assessment ENGINEERING GANSU SHAANXI
下载PDF
Water hammer protection for diversion systems in front of pumps in long-distance water supply projects 被引量:4
6
作者 Lin Shi Jian Zhang +3 位作者 Xiao-dong Yu Sheng Chen Wen-long Zhao Xu-yun Chen 《Water Science and Engineering》 EI CAS CSCD 2023年第2期211-218,共8页
For a water supply system with long-distance diversion pipelines, in addition to the water hammer problems that occur beyond pumps, the safety of the water diversion pipeline in front of pumps also deserves attention.... For a water supply system with long-distance diversion pipelines, in addition to the water hammer problems that occur beyond pumps, the safety of the water diversion pipeline in front of pumps also deserves attention. In this study, a water hammer protection scheme combined with an overflow surge tank and a regulating valve was developed. A mathematical model of the overflow surge tank was developed, and an analytical formula for the height of the overflow surge tank was derived. Furthermore, a practical water supply project was used to evaluate the feasibility of the combined protection scheme and analyze the sensitivity of valve regulation rules. The results showed that the combined protection scheme effectively reduced the height of the surge tank, lessened the difficulties related to construction, and reduced the necessary financial investment for the project. The two-stage closing rule articulated as fast first and then slow could minimize the overflow volume of the surge tank when the power failure occurred, while the two-stage opening rule articulated as slow first and then fast could be more conducive to the safety of the water supply system when the pump started up. 展开更多
关键词 long-distance diversion pipeline Water supply Water hammer Overflow surge tank Regulating valve
下载PDF
An Overview of Deepwater Pipeline Laying Technology 被引量:18
7
作者 李志刚 王琮 +1 位作者 何宁 赵冬岩 《China Ocean Engineering》 SCIE EI 2008年第3期521-532,共12页
The technology and methods involved in pipeline laying in shallow water have evolved to the level of routine and commonplace. However, regarding the unexpected deepwater complexity, the traditional pipeline laying tec... The technology and methods involved in pipeline laying in shallow water have evolved to the level of routine and commonplace. However, regarding the unexpected deepwater complexity, the traditional pipeline laying techniques have to confront many new challenges arisen from the increase of the water depth, diameter of the pipe and the welding difficuhy, all of which should be modified and/or innovated based on the existed mature experiences. The purpose of this investigation is to outline the existing and new engineering laying techniques and the associated facilities, which can provide some significant information to the related research. In the context, the latest deepwater pipeline laying technology and pipe laying barges of the renowned companies from Switzerland, Norway, Italy etc., are introduced and the corresponding comparison and discussion are presented as well. 展开更多
关键词 DEEPWATER pipeline pipeline installation method pipe laying barge/vessel
下载PDF
Installation Strength Analysis of Subsea Flowline Jumpers
8
作者 Liping Sun Youwei Kang 《Journal of Marine Science and Application》 CSCD 2015年第3期316-326,共11页
A subsea flowline jumper (FJ) is a basic connected component for the wet oil tree, subsea pipeline and riser base, and it plays an irreplaceable role in the subsea production system. During the installation of FJ, c... A subsea flowline jumper (FJ) is a basic connected component for the wet oil tree, subsea pipeline and riser base, and it plays an irreplaceable role in the subsea production system. During the installation of FJ, collisions often happen between FJ and other equipment, which may cause serious damage. Besides, as the operating water depth increases, the demand for the installation equipments, such as the crane and winch, will increase. The research of deepwater FJ installation in China is still in the primary stage, thus an installation method for the deepwater FJ is proposed in this paper. Finite element models of a typical M-shaped FJ installation system are built to simulate the installation procedures. Analysis results show that the installation steps designed are feasible and valid for the deepwater FJ. In order to ensure the safety of the installation process, the collision-sensitive analysis for the FJ is conducted, and results show that it is necessary to set the pick up speed at a proper value, in order to avoid collision in the installation process. Besides, the mechanical characteristics of FJ during the installation are investigated under a range of environmental conditions and it is found that the maximum stress of the FJ always happens at its central position. The basic requirements for the installation equipment are also obtained through the analysis of the main installation steps. 展开更多
关键词 subsea flowline jumper installation analysis strength analysis subsea pipelines finite element model COLLISION
下载PDF
The CMEKF Method for Sub-Sea Pipeline Monitoring and Leak Detection
9
作者 白莉 岳前进 +3 位作者 崔莉 李洪升 金兆玉 王庆国 《海洋工程:英文版》 2004年第4期527-535,共9页
A practical approach is discussed for sub-sea pipeline monitoring and leak detection based on the real time transient model . The characteristic method of transient simulation is coupled with the Extended Kalman Filt... A practical approach is discussed for sub-sea pipeline monitoring and leak detection based on the real time transient model . The characteristic method of transient simulation is coupled with the Extended Kalman Filter to estimate the system state where the only observed data are inlet and outlet flow rate and pressure. Because EKF has a time variant track under the non-stationary stochastic process with additive Gaussian noise, the high sensitivity of RTTM to non-stationary operating condition is reduced. A leak location recursion estimation formula is presented based on the real time observed data. The results of 27 groups of test data indicate that the procedure presented is sensitive to a wide range of detectable leak sizes and has a low average relative error of leak location . 展开更多
关键词 long-distance pipeline real time transient model nonlinear dynamic system extended Kalman filter
下载PDF
Overview of flowline bundle technology from concept selection to offshore installation
10
作者 Song Ruxin Xia Qiuling 《Engineering Sciences》 EI 2013年第4期10-16,共7页
Flowline bundle system consisting of carrier pipe,sleeve pipe and internal flowlines offers innovative solution for the infield transportation of oil and gas. Due to its features,flowline bundle offers a couple of adv... Flowline bundle system consisting of carrier pipe,sleeve pipe and internal flowlines offers innovative solution for the infield transportation of oil and gas. Due to its features,flowline bundle offers a couple of advantages over conventional flowline in particular for cases where multi-flowlines and high thermal performance is of great interest. The main benefits and advantages of such system include excellent thermal performance to prevent wax formation and hydrates,multiple bundled flowlines,mechanical and corrosion protection,potential reuse, etc. With the developments of offshore oil and gas industries,more and more hydrocarbon resources are being explored and discovered from shallow to deep water. Pipeline bundle system can be a smart solution for certain applications,which can be safe and cost effective solution. The objective of this paper is to overview pipeline bundle technology,outline detailed engineering design issue and procedure. Focus is given to its potential application in offshore for infield transportation. Engineering design principles and procedures for pipeline bundle system are highlighted. Construction methods of flowline bundle onshore are reviewed. Offshore towing and installation of pipeline bundle procedure is outlined. 展开更多
关键词 OFFSHORE pipelines flowlines BUNDLES DEEPWATER design installation
下载PDF
利用已建隧道剩余空间安装管道方案探究
11
作者 朱海瑞 《化工管理》 2024年第8期165-168,共4页
某工程利用已建隧道剩余空间安装D1219 mm管道,已建隧道内已安装有一条D1016 mm管道,剩余空间有限、狭小、隧道内管道安装作业十分困难,考虑到已建隧道设计之初按照安装两条管道进行断面设计。本着节约投资、节省工期、充分利用已有管... 某工程利用已建隧道剩余空间安装D1219 mm管道,已建隧道内已安装有一条D1016 mm管道,剩余空间有限、狭小、隧道内管道安装作业十分困难,考虑到已建隧道设计之初按照安装两条管道进行断面设计。本着节约投资、节省工期、充分利用已有管道资源的原则,开展了受限剩余空间内安装已建管道方案设计。该方案在隧道进口外部完成管道运布管、对口、组焊、无损检测和防腐补口等工作,在隧道出口外部设置管道牵引系统将管道牵引就位,实现已建隧道内管道安装。该工程利用已建隧道剩余空间,在隧道外部完成管道焊接组装,通过管道发送系统完成管道就位安装,不仅节省了新建隧道的问题,而且缩短了工程工期,为今后在已建隧道内新增管道敷设提供了参考。 展开更多
关键词 已建隧道 剩余空间 管道安装 新建隧道
下载PDF
基于BIM的大型交通枢纽工程机电安装技术应用 被引量:1
12
作者 马健刚 张小龙 +1 位作者 刘占省 武乐佳 《建筑技术》 2024年第6期760-763,共4页
大型交通枢纽工程机电安装体量广,专业管线交叉多,功能设备复杂,传统机电安装工作模式无法保障施工质量和效率。因此,本研究将BIM技术与新型施工技术相结合,用高效、绿色的智慧施工技术来实现正向BIM协同设计和工厂化预制。根据新建长... 大型交通枢纽工程机电安装体量广,专业管线交叉多,功能设备复杂,传统机电安装工作模式无法保障施工质量和效率。因此,本研究将BIM技术与新型施工技术相结合,用高效、绿色的智慧施工技术来实现正向BIM协同设计和工厂化预制。根据新建长沙西站综合交通枢纽项目机电安装工程特点,系统阐述了BIM技术在管综深化、预制内保温风管、机电消声减振和工厂化支吊架等方面的应用,对今后类似项目的机电安装工程具有较高参考价值。 展开更多
关键词 BIM 机电安装 综合交通枢纽 管线综合 工厂化预制 绿色施工
下载PDF
海洋石油平台工艺管线安装技术及质量控制探析 被引量:1
13
作者 陈林 《化工管理》 2024年第12期59-61,共3页
石油化工产业的发展对我国经济的稳定增长具有重要影响,同时石油化工产业发展水平也成为衡量国家工业化发展程度的重要标尺。中国对于石油化工产业的发展给予了高度重视,其中石油运输过程中因受环境因素影响较大,对石油运输管线的质量... 石油化工产业的发展对我国经济的稳定增长具有重要影响,同时石油化工产业发展水平也成为衡量国家工业化发展程度的重要标尺。中国对于石油化工产业的发展给予了高度重视,其中石油运输过程中因受环境因素影响较大,对石油运输管线的质量提出了更高的要求,不断提升运输管线安装技术和质量是保障石油化工产业健康发展的关键。基于此,文章对海洋石油平台工艺管线安装进行了简要的概述,并分析了管线安装现状,进而具体探讨了管线安装技术及质量控制措施。 展开更多
关键词 海洋石油平台 工艺管线 石油运输
下载PDF
城市燃气管道安装关键技术及施工管理要点 被引量:2
14
作者 陈铭 《当代化工研究》 CAS 2024年第1期191-193,共3页
随着城市化进程不断加快,城市燃气管道的安装工程变得越来越重要,本研究旨在探讨燃气管道安装的特征和面临的挑战,并提出了防腐、吹扫处理等关键技术,还指明施工时要注意控制进度、科学管理现场安全工作等。研究结果表明,科学应用关键... 随着城市化进程不断加快,城市燃气管道的安装工程变得越来越重要,本研究旨在探讨燃气管道安装的特征和面临的挑战,并提出了防腐、吹扫处理等关键技术,还指明施工时要注意控制进度、科学管理现场安全工作等。研究结果表明,科学应用关键技术和有效施工管理将确保管道安装工程的顺利进行和质量可控,能全面保障城市居民的供气安全和城市发展的顺利推进。 展开更多
关键词 燃气管道 安装 关键技术 施工管理 要点
下载PDF
煤化工空分装置汽轮机组高压蒸汽管线应力分析 被引量:1
15
作者 李潇 乔舰 +1 位作者 刘岩 姜德强 《盐科学与化工》 CAS 2024年第5期43-46,共4页
高压蒸汽管线是煤化工空分装置管道应力分析的重难点,在满足相关标准中对管线一次、二次应力要求的同时,还需满足汽轮机生产厂家提出的较为苛刻的管口许用荷载。通过优化管线走向,合理设置管架类型,以满足不同工况下汽轮机管口荷载的要... 高压蒸汽管线是煤化工空分装置管道应力分析的重难点,在满足相关标准中对管线一次、二次应力要求的同时,还需满足汽轮机生产厂家提出的较为苛刻的管口许用荷载。通过优化管线走向,合理设置管架类型,以满足不同工况下汽轮机管口荷载的要求,对工程设计具有一定的指导意义。 展开更多
关键词 空分装置 高压蒸汽管线 应力分析 管架设置
下载PDF
化工工程与工艺管道的质量控制探究 被引量:1
16
作者 尚兆丰 马晓旭 +1 位作者 郑辉 曹守凯 《山东化工》 CAS 2024年第5期185-187,共3页
近几年,我国化学工业的发展步伐逐渐加快,对化学产品的各个环节都要严格按照规范的要求进行。化学工艺管线的安装是十分重要的,既要确保其施工的规范,又要确保其施工质量达到标准。通过与其他行业的比较,可以看出,该行业的特点是:消除... 近几年,我国化学工业的发展步伐逐渐加快,对化学产品的各个环节都要严格按照规范的要求进行。化学工艺管线的安装是十分重要的,既要确保其施工的规范,又要确保其施工质量达到标准。通过与其他行业的比较,可以看出,该行业的特点是:消除各种质量和安全隐患,必须制订出一套完整的质量管理计划,以提升企业经济效益,保全工人的生命健康。文章从化学工艺管线的安装质量入手,着重论述了如何加强化学工艺管线的安装质量管理,以减少安全、质量事故的发生。 展开更多
关键词 化工生产 工艺管道安装 质量控制 装置运行效率
下载PDF
深水J形首端PLET安装分析
17
作者 王晓飞 李斌 +1 位作者 李英 杨杰 《中国海洋平台》 2024年第2期82-88,共7页
基于南海陵水17-2深水油气田开发,针对J形首端海底管道终端(Pipeline End Termination,PLET)安装,采用OrcaFlex软件开展数值模拟,研究波流载荷对安装系统的影响,以得到其作业窗口,并分析J形首端PLET安装过程中作业窗口的影响因素。结果... 基于南海陵水17-2深水油气田开发,针对J形首端海底管道终端(Pipeline End Termination,PLET)安装,采用OrcaFlex软件开展数值模拟,研究波流载荷对安装系统的影响,以得到其作业窗口,并分析J形首端PLET安装过程中作业窗口的影响因素。结果表明,PLET在飞溅区和预着陆阶段比较危险,波浪周期约10 s波流同向横浪是安装作业的控制工况。研究内容为南海陵水17-2海底管道J形首端PLET安装提供了重要的技术支持。 展开更多
关键词 J形铺设 海底管道终端 作业窗口 数值模拟
下载PDF
大口径PCCP管安装拉紧与分离施工技术
18
作者 王飞 倪彬 王俊 《四川水力发电》 2024年第5期94-97,122,共5页
预应力钢筒混凝土管(简称PCCP管)是一种高强度、高抗渗性和高密封性的复合型材料,具有可承受内外高荷载的能力,通水能力强、耐腐蚀性好、使用寿命长、对地基适应性好以及社会综合效益好的优势。大口径PCCP管道不仅自重大、管节长、安装... 预应力钢筒混凝土管(简称PCCP管)是一种高强度、高抗渗性和高密封性的复合型材料,具有可承受内外高荷载的能力,通水能力强、耐腐蚀性好、使用寿命长、对地基适应性好以及社会综合效益好的优势。大口径PCCP管道不仅自重大、管节长、安装精度要求高,而且在进行管道安装时,对其承插口对接时的精度要求高,若承插口的对接不能满足设计与相关规范要求时,需要分离后再次安装,其费时费力。PCCP管常用于城市输水工程,具有有压、流量大的特点,在其运行过程中一旦发生管节脱落将会造成严重的后果。因此,为了保障管道施工的质量与运行安全,对管道安装精度的把控尤为重要。常规的PCCP管安装采用大吨位吊车吊装,但因吊车占用的时间较长、效率低、安装精度不高,通常存在返工的情况。阐述了结合具体工程研究出的PCCP管辅助安装设备,减少了对大吨位吊车的使用时间,同时还具有安装效率高、精度高、一次验收合格率高的特点。 展开更多
关键词 PCCP管 市政工程 管道安装 拉紧与分离
下载PDF
管线入廊与直埋敷设全寿命周期经济分析——以合肥市某道路综合管廊为例 被引量:1
19
作者 张智贤 《工程造价管理》 2024年第1期25-29,共5页
城市地下综合管廊工程在前期决策、实施和使用阶段存在一次性静态总投资大、经济效益不显著等难题,这也是制约决策部门投资管廊建设的重要原因之一。文章结合合肥市某道路综合管廊工程实例,基于静态现金流折现模型,计算并分析管线直埋... 城市地下综合管廊工程在前期决策、实施和使用阶段存在一次性静态总投资大、经济效益不显著等难题,这也是制约决策部门投资管廊建设的重要原因之一。文章结合合肥市某道路综合管廊工程实例,基于静态现金流折现模型,计算并分析管线直埋与入廊两种敷设方式在建设、运行、维护等方面的100年成本,深入探究两种敷设工艺的经济效益,得到了该综合管廊工程建设在社会经济效益层面的可行性依据。结果表明,在正常建设运营条件下,若将管线更换和破路恢复、给水管漏损、开挖对交通及道路寿命影响等间接成本统筹考虑在内,综合比较100年计算期内二者的总成本,该路综合管廊全生命周期内成本较管线直埋敷设方法下降约40.5%。 展开更多
关键词 综合管廊 管线直埋敷设 经济效益 全生命周期
下载PDF
人工剖面赛道制冷管道系统模块化施工技术
20
作者 马栋栋 俞华 +2 位作者 陈明 侯振峰 李宇 《施工技术(中英文)》 CAS 2024年第11期148-152,共5页
北京冬奥会雪车雪橇赛道依地形而建,分为54个制冷单元,须保证制冷单元内的制冷管道制作与安装精度。首先介绍雪车雪橇赛道制冷管道系统的组成,其次介绍了制冷管道系统中异形构件模块化制作成型质量,最后介绍制冷管道系统中异形构件的模... 北京冬奥会雪车雪橇赛道依地形而建,分为54个制冷单元,须保证制冷单元内的制冷管道制作与安装精度。首先介绍雪车雪橇赛道制冷管道系统的组成,其次介绍了制冷管道系统中异形构件模块化制作成型质量,最后介绍制冷管道系统中异形构件的模块化安装技术。 展开更多
关键词 体育建筑 雪车雪橇 制冷管道 模块化
下载PDF
上一页 1 2 43 下一页 到第
使用帮助 返回顶部