It has been proved that the thermally insulated ocean pipeline has advantages over the conventional pipe-in-pipe pipeline. The risk of using the thermally insulated pipeline is that the exterior layers covering the st...It has been proved that the thermally insulated ocean pipeline has advantages over the conventional pipe-in-pipe pipeline. The risk of using the thermally insulated pipeline is that the exterior layers covering the steel pipe may be. pulled off if the shear stress on the interface induced by the pullout fore from the tensioner is greater than the binding fore between two neighboring layers during installation. This paper develops a procedure to calculate the shear stress on the interface. The binding force between two neighboring layers can be determined with full scale model tests. The safety of the thermally insulated pipe under installation can then be checked by comparison of the interface shear stress with the binding force.展开更多
The extensively built long-distance water transmission pipelines have become the main water sources for urban areas. To ensure the reliability and safety of the water supply, from the viewpoint of overall management, ...The extensively built long-distance water transmission pipelines have become the main water sources for urban areas. To ensure the reliability and safety of the water supply, from the viewpoint of overall management, it would be necessary to establish a system of information management for the pipeline. The monitoring, calculating and analyzing functions of the system serve to give controlling instructions and safe operating rules to the automatic equipment and technician, making sure the resistance coefficient distribution along the pipeline is reasonable; the hydraulic state transition is smooth when operating conditions change or water supply accidents occur, avoiding the damage of water hammer. This paper covered the composition structures of the information management system of long-distance water transmission pipelines and the functions of the subsystems, and finally elaborated on the approaches and steps of building a mathematics model for the analysis of dynamic hydraulic status.展开更多
According to the engineering investigation of long-distance oil and gas pipelines, the criterions and measures of route selection are drawn as follows: the flat landform is the first choice in route alignment. The fo...According to the engineering investigation of long-distance oil and gas pipelines, the criterions and measures of route selection are drawn as follows: the flat landform is the first choice in route alignment. The foot of mountain is the first choice when the route passes by the valley. The route should pass by but the shady and deposited slope and not in sunny and erosive slope as possible as it can. The pipeline should be vertical to contour climbing and descending the mountain except steep slope. Tunnel can be used in crossing foothill. Perpendicularly traversing the river is better than beveling; the worst choice is to put the pipeline along the river. Bypass is the best choice in karsts area. The order of route selection should be pre-choosing, investigation, optimization and adjustment.展开更多
The offshore pipeline network in the U.S. Gulf of Mexico is the largest and most transparent system in the world. A review of deepwater projects in the region provides insight into construction cost and installation m...The offshore pipeline network in the U.S. Gulf of Mexico is the largest and most transparent system in the world. A review of deepwater projects in the region provides insight into construction cost and installation methods and the evolution of contract strategies. Pipeline projects are identified as export systems, infield flowline systems, and combined export and infield systems, and three dozen deepwater pipeline installations from 1980–2014 are described based on Offshore Technology Conference(OTC) and Society of Petroleum Engineers(SPE) industry publications and press release data. Export lines and infield flowlines are equally represented and many projects used a combination of J-lay, S-lay and reel methods with rigid steel, flexible line, and pipe-in-pipe systems. The average 2014 inflation-adjusted cost for pipeline projects based on OTC/SPE publications was $2.76 million/mi and ranged from $520 000/mi to $12.94 million/mi. High cost pipelines tend to be short segments or specialized pipeline. Excluding the two cost endpoints, the majority of projects ranged from $1 to $6 million/mi. The average inflation-adjusted cost to install deepwater pipelines in the U.S. Gulf of Mexico based on available public data is estimated at $3.1 million/mi.展开更多
The oilfield construction and long-distance oil pipeline engineering has been developed extensively in China. The risk assessment of oil industry will, however, be an important objective to cope with the development o...The oilfield construction and long-distance oil pipeline engineering has been developed extensively in China. The risk assessment of oil industry will, however, be an important objective to cope with the development of oil industry , The risk assessment of oil industry has many subjects worthy to be studied.The major purpose of the paper is to research the risk cases of long-distance oil pipeline engineering in Ganshu and Shaanxi provinces.展开更多
For a water supply system with long-distance diversion pipelines, in addition to the water hammer problems that occur beyond pumps, the safety of the water diversion pipeline in front of pumps also deserves attention....For a water supply system with long-distance diversion pipelines, in addition to the water hammer problems that occur beyond pumps, the safety of the water diversion pipeline in front of pumps also deserves attention. In this study, a water hammer protection scheme combined with an overflow surge tank and a regulating valve was developed. A mathematical model of the overflow surge tank was developed, and an analytical formula for the height of the overflow surge tank was derived. Furthermore, a practical water supply project was used to evaluate the feasibility of the combined protection scheme and analyze the sensitivity of valve regulation rules. The results showed that the combined protection scheme effectively reduced the height of the surge tank, lessened the difficulties related to construction, and reduced the necessary financial investment for the project. The two-stage closing rule articulated as fast first and then slow could minimize the overflow volume of the surge tank when the power failure occurred, while the two-stage opening rule articulated as slow first and then fast could be more conducive to the safety of the water supply system when the pump started up.展开更多
The technology and methods involved in pipeline laying in shallow water have evolved to the level of routine and commonplace. However, regarding the unexpected deepwater complexity, the traditional pipeline laying tec...The technology and methods involved in pipeline laying in shallow water have evolved to the level of routine and commonplace. However, regarding the unexpected deepwater complexity, the traditional pipeline laying techniques have to confront many new challenges arisen from the increase of the water depth, diameter of the pipe and the welding difficuhy, all of which should be modified and/or innovated based on the existed mature experiences. The purpose of this investigation is to outline the existing and new engineering laying techniques and the associated facilities, which can provide some significant information to the related research. In the context, the latest deepwater pipeline laying technology and pipe laying barges of the renowned companies from Switzerland, Norway, Italy etc., are introduced and the corresponding comparison and discussion are presented as well.展开更多
A subsea flowline jumper (FJ) is a basic connected component for the wet oil tree, subsea pipeline and riser base, and it plays an irreplaceable role in the subsea production system. During the installation of FJ, c...A subsea flowline jumper (FJ) is a basic connected component for the wet oil tree, subsea pipeline and riser base, and it plays an irreplaceable role in the subsea production system. During the installation of FJ, collisions often happen between FJ and other equipment, which may cause serious damage. Besides, as the operating water depth increases, the demand for the installation equipments, such as the crane and winch, will increase. The research of deepwater FJ installation in China is still in the primary stage, thus an installation method for the deepwater FJ is proposed in this paper. Finite element models of a typical M-shaped FJ installation system are built to simulate the installation procedures. Analysis results show that the installation steps designed are feasible and valid for the deepwater FJ. In order to ensure the safety of the installation process, the collision-sensitive analysis for the FJ is conducted, and results show that it is necessary to set the pick up speed at a proper value, in order to avoid collision in the installation process. Besides, the mechanical characteristics of FJ during the installation are investigated under a range of environmental conditions and it is found that the maximum stress of the FJ always happens at its central position. The basic requirements for the installation equipment are also obtained through the analysis of the main installation steps.展开更多
A practical approach is discussed for sub-sea pipeline monitoring and leak detection based on the real time transient model . The characteristic method of transient simulation is coupled with the Extended Kalman Filt...A practical approach is discussed for sub-sea pipeline monitoring and leak detection based on the real time transient model . The characteristic method of transient simulation is coupled with the Extended Kalman Filter to estimate the system state where the only observed data are inlet and outlet flow rate and pressure. Because EKF has a time variant track under the non-stationary stochastic process with additive Gaussian noise, the high sensitivity of RTTM to non-stationary operating condition is reduced. A leak location recursion estimation formula is presented based on the real time observed data. The results of 27 groups of test data indicate that the procedure presented is sensitive to a wide range of detectable leak sizes and has a low average relative error of leak location .展开更多
Flowline bundle system consisting of carrier pipe,sleeve pipe and internal flowlines offers innovative solution for the infield transportation of oil and gas. Due to its features,flowline bundle offers a couple of adv...Flowline bundle system consisting of carrier pipe,sleeve pipe and internal flowlines offers innovative solution for the infield transportation of oil and gas. Due to its features,flowline bundle offers a couple of advantages over conventional flowline in particular for cases where multi-flowlines and high thermal performance is of great interest. The main benefits and advantages of such system include excellent thermal performance to prevent wax formation and hydrates,multiple bundled flowlines,mechanical and corrosion protection,potential reuse, etc. With the developments of offshore oil and gas industries,more and more hydrocarbon resources are being explored and discovered from shallow to deep water. Pipeline bundle system can be a smart solution for certain applications,which can be safe and cost effective solution. The objective of this paper is to overview pipeline bundle technology,outline detailed engineering design issue and procedure. Focus is given to its potential application in offshore for infield transportation. Engineering design principles and procedures for pipeline bundle system are highlighted. Construction methods of flowline bundle onshore are reviewed. Offshore towing and installation of pipeline bundle procedure is outlined.展开更多
基于南海陵水17-2深水油气田开发,针对J形首端海底管道终端(Pipeline End Termination,PLET)安装,采用OrcaFlex软件开展数值模拟,研究波流载荷对安装系统的影响,以得到其作业窗口,并分析J形首端PLET安装过程中作业窗口的影响因素。结果...基于南海陵水17-2深水油气田开发,针对J形首端海底管道终端(Pipeline End Termination,PLET)安装,采用OrcaFlex软件开展数值模拟,研究波流载荷对安装系统的影响,以得到其作业窗口,并分析J形首端PLET安装过程中作业窗口的影响因素。结果表明,PLET在飞溅区和预着陆阶段比较危险,波浪周期约10 s波流同向横浪是安装作业的控制工况。研究内容为南海陵水17-2海底管道J形首端PLET安装提供了重要的技术支持。展开更多
文摘It has been proved that the thermally insulated ocean pipeline has advantages over the conventional pipe-in-pipe pipeline. The risk of using the thermally insulated pipeline is that the exterior layers covering the steel pipe may be. pulled off if the shear stress on the interface induced by the pullout fore from the tensioner is greater than the binding fore between two neighboring layers during installation. This paper develops a procedure to calculate the shear stress on the interface. The binding force between two neighboring layers can be determined with full scale model tests. The safety of the thermally insulated pipe under installation can then be checked by comparison of the interface shear stress with the binding force.
基金Hi-Tech Research and Development Program of China (863 Program)(2002AA601140)
文摘The extensively built long-distance water transmission pipelines have become the main water sources for urban areas. To ensure the reliability and safety of the water supply, from the viewpoint of overall management, it would be necessary to establish a system of information management for the pipeline. The monitoring, calculating and analyzing functions of the system serve to give controlling instructions and safe operating rules to the automatic equipment and technician, making sure the resistance coefficient distribution along the pipeline is reasonable; the hydraulic state transition is smooth when operating conditions change or water supply accidents occur, avoiding the damage of water hammer. This paper covered the composition structures of the information management system of long-distance water transmission pipelines and the functions of the subsystems, and finally elaborated on the approaches and steps of building a mathematics model for the analysis of dynamic hydraulic status.
文摘According to the engineering investigation of long-distance oil and gas pipelines, the criterions and measures of route selection are drawn as follows: the flat landform is the first choice in route alignment. The foot of mountain is the first choice when the route passes by the valley. The route should pass by but the shady and deposited slope and not in sunny and erosive slope as possible as it can. The pipeline should be vertical to contour climbing and descending the mountain except steep slope. Tunnel can be used in crossing foothill. Perpendicularly traversing the river is better than beveling; the worst choice is to put the pipeline along the river. Bypass is the best choice in karsts area. The order of route selection should be pre-choosing, investigation, optimization and adjustment.
基金provided through the U.S. Department of the Interior, Bureau of Ocean Energy Management
文摘The offshore pipeline network in the U.S. Gulf of Mexico is the largest and most transparent system in the world. A review of deepwater projects in the region provides insight into construction cost and installation methods and the evolution of contract strategies. Pipeline projects are identified as export systems, infield flowline systems, and combined export and infield systems, and three dozen deepwater pipeline installations from 1980–2014 are described based on Offshore Technology Conference(OTC) and Society of Petroleum Engineers(SPE) industry publications and press release data. Export lines and infield flowlines are equally represented and many projects used a combination of J-lay, S-lay and reel methods with rigid steel, flexible line, and pipe-in-pipe systems. The average 2014 inflation-adjusted cost for pipeline projects based on OTC/SPE publications was $2.76 million/mi and ranged from $520 000/mi to $12.94 million/mi. High cost pipelines tend to be short segments or specialized pipeline. Excluding the two cost endpoints, the majority of projects ranged from $1 to $6 million/mi. The average inflation-adjusted cost to install deepwater pipelines in the U.S. Gulf of Mexico based on available public data is estimated at $3.1 million/mi.
文摘The oilfield construction and long-distance oil pipeline engineering has been developed extensively in China. The risk assessment of oil industry will, however, be an important objective to cope with the development of oil industry , The risk assessment of oil industry has many subjects worthy to be studied.The major purpose of the paper is to research the risk cases of long-distance oil pipeline engineering in Ganshu and Shaanxi provinces.
基金supported by the National Natural Science Foundation of China(Grants No.52179062 and 51879087).
文摘For a water supply system with long-distance diversion pipelines, in addition to the water hammer problems that occur beyond pumps, the safety of the water diversion pipeline in front of pumps also deserves attention. In this study, a water hammer protection scheme combined with an overflow surge tank and a regulating valve was developed. A mathematical model of the overflow surge tank was developed, and an analytical formula for the height of the overflow surge tank was derived. Furthermore, a practical water supply project was used to evaluate the feasibility of the combined protection scheme and analyze the sensitivity of valve regulation rules. The results showed that the combined protection scheme effectively reduced the height of the surge tank, lessened the difficulties related to construction, and reduced the necessary financial investment for the project. The two-stage closing rule articulated as fast first and then slow could minimize the overflow volume of the surge tank when the power failure occurred, while the two-stage opening rule articulated as slow first and then fast could be more conducive to the safety of the water supply system when the pump started up.
基金the National High Technology Research and Development Program of China (863 Program,Grant No.2006AA09A105)
文摘The technology and methods involved in pipeline laying in shallow water have evolved to the level of routine and commonplace. However, regarding the unexpected deepwater complexity, the traditional pipeline laying techniques have to confront many new challenges arisen from the increase of the water depth, diameter of the pipe and the welding difficuhy, all of which should be modified and/or innovated based on the existed mature experiences. The purpose of this investigation is to outline the existing and new engineering laying techniques and the associated facilities, which can provide some significant information to the related research. In the context, the latest deepwater pipeline laying technology and pipe laying barges of the renowned companies from Switzerland, Norway, Italy etc., are introduced and the corresponding comparison and discussion are presented as well.
基金Supported by the Numerical Simulation and Experimental Investigation of FPSO and Offloading System(2011ZX05030-006-002)
文摘A subsea flowline jumper (FJ) is a basic connected component for the wet oil tree, subsea pipeline and riser base, and it plays an irreplaceable role in the subsea production system. During the installation of FJ, collisions often happen between FJ and other equipment, which may cause serious damage. Besides, as the operating water depth increases, the demand for the installation equipments, such as the crane and winch, will increase. The research of deepwater FJ installation in China is still in the primary stage, thus an installation method for the deepwater FJ is proposed in this paper. Finite element models of a typical M-shaped FJ installation system are built to simulate the installation procedures. Analysis results show that the installation steps designed are feasible and valid for the deepwater FJ. In order to ensure the safety of the installation process, the collision-sensitive analysis for the FJ is conducted, and results show that it is necessary to set the pick up speed at a proper value, in order to avoid collision in the installation process. Besides, the mechanical characteristics of FJ during the installation are investigated under a range of environmental conditions and it is found that the maximum stress of the FJ always happens at its central position. The basic requirements for the installation equipment are also obtained through the analysis of the main installation steps.
文摘A practical approach is discussed for sub-sea pipeline monitoring and leak detection based on the real time transient model . The characteristic method of transient simulation is coupled with the Extended Kalman Filter to estimate the system state where the only observed data are inlet and outlet flow rate and pressure. Because EKF has a time variant track under the non-stationary stochastic process with additive Gaussian noise, the high sensitivity of RTTM to non-stationary operating condition is reduced. A leak location recursion estimation formula is presented based on the real time observed data. The results of 27 groups of test data indicate that the procedure presented is sensitive to a wide range of detectable leak sizes and has a low average relative error of leak location .
文摘Flowline bundle system consisting of carrier pipe,sleeve pipe and internal flowlines offers innovative solution for the infield transportation of oil and gas. Due to its features,flowline bundle offers a couple of advantages over conventional flowline in particular for cases where multi-flowlines and high thermal performance is of great interest. The main benefits and advantages of such system include excellent thermal performance to prevent wax formation and hydrates,multiple bundled flowlines,mechanical and corrosion protection,potential reuse, etc. With the developments of offshore oil and gas industries,more and more hydrocarbon resources are being explored and discovered from shallow to deep water. Pipeline bundle system can be a smart solution for certain applications,which can be safe and cost effective solution. The objective of this paper is to overview pipeline bundle technology,outline detailed engineering design issue and procedure. Focus is given to its potential application in offshore for infield transportation. Engineering design principles and procedures for pipeline bundle system are highlighted. Construction methods of flowline bundle onshore are reviewed. Offshore towing and installation of pipeline bundle procedure is outlined.
文摘基于南海陵水17-2深水油气田开发,针对J形首端海底管道终端(Pipeline End Termination,PLET)安装,采用OrcaFlex软件开展数值模拟,研究波流载荷对安装系统的影响,以得到其作业窗口,并分析J形首端PLET安装过程中作业窗口的影响因素。结果表明,PLET在飞溅区和预着陆阶段比较危险,波浪周期约10 s波流同向横浪是安装作业的控制工况。研究内容为南海陵水17-2海底管道J形首端PLET安装提供了重要的技术支持。