期刊文献+
共找到22篇文章
< 1 2 >
每页显示 20 50 100
Comparative Study on Structural Redundancy of Cable-Stayed and Extradosed Bridges Through Safety Assessment of Their Stay Cables 被引量:5
1
作者 Khawaja Ali Hiroshi Katsuchi Hitoshi Yamada 《Engineering》 SCIE EI 2021年第1期111-123,共13页
This study provides new insights into the comparison of cable-stayed and extradosed bridges based on the safety assessment of their stay cables.These bridges are often regarded as identical structures owing to the use... This study provides new insights into the comparison of cable-stayed and extradosed bridges based on the safety assessment of their stay cables.These bridges are often regarded as identical structures owing to the use of inclined cables;however,the international standards for bridge design stipulate different safety factors for stay cables of both types of bridges.To address this misconception,a comparative study was carried out on the safety factors of stay cables under fatigue and ultimate limit states by considering the effects of various untoward and damaging factors,such as overloading,cable loss,and corrosion.The primary goal of this study is to describe the structural disparities between both types of bridges and evaluate their structural redundancies by employing deterministic and nondeterministic methods.To achieve this goal,three-dimensional finite-element models of both bridges were developed based on the current design guidelines for stay cables in Japan.After the balanced states of the bridge models were achieved,static analyses were performed for different safety factors of stay cables in a parametric manner.Finally,the first-order reliability method and Monte Carlo method were applied to determine the reliability index of stay cables.The analysis results show that cable-stayed and extradosed bridges exhibit different structural redundancies for different safety factors under the same loading conditions.Moreover,a significant increase in structural redundancy occurs with an incremental increase in the safety factors of stay cables. 展开更多
关键词 cable-stayed bridge Extradosed bridge REDUNDANCY stay cable Safety factor Reliability analysis
下载PDF
Parametrically excited oscillation of stay cable and its control in cable-stayed bridges" 被引量:2
2
作者 孙炳楠 汪至刚 +1 位作者 高赞明 倪一清 《Journal of Zhejiang University Science》 EI CSCD 2003年第1期13-20,共8页
This paper presents a nonlinear dynamic model for simulation and analysis of a kind of parametrically excited vibration of stay cable caused by support motion in cable-stayed bridges. The sag, inclination angle of the... This paper presents a nonlinear dynamic model for simulation and analysis of a kind of parametrically excited vibration of stay cable caused by support motion in cable-stayed bridges. The sag, inclination angle of the stay cable are considered in the model, based on which, the oscillation mechanism and dynamic response characteristics of this kind of vibration are analyzed through numerical calculation. It is noted that parametrically excited oscillation of a stay cable with certain sag, inclination angle and initial static tension force may occur in cable-stayed bridges due to deck vibration under the condition that the natural frequency of a cable approaches to about half of the first model frequency of the bridge deck system. A new vibration control system installed on the cable anchorage is proposed as a possible damping system to suppress the cable parametric oscillation. The numerical calculation results showed that with the use of this damping system, the cable oscillation due to the vibration of the deck and/or towers will be considerably reduced. 展开更多
关键词 stay cable cable stayed bridge Parametric vibration Vibration control Support excitation
下载PDF
Dynamic Characteristics Evaluation of Innovative UHPC Pedestrian Cable Stayed Bridge 被引量:5
3
作者 Won Jong Chin Young Jin Kim +1 位作者 Jeong-Rae Cho Jong Sup Park 《Engineering(科研)》 2012年第12期869-876,共8页
KICT (Korea Institute of Construction Technology) is conducting a project called “SUPER BRIDGE 200—Development of Low Cost and Long Life Hybrid Cable Stayed Bridge”. This project aims to reduce the construction and... KICT (Korea Institute of Construction Technology) is conducting a project called “SUPER BRIDGE 200—Development of Low Cost and Long Life Hybrid Cable Stayed Bridge”. This project aims to reduce the construction and main- tenance costs of long-span bridges by 20% and double their lifetime through the exploitation of ultra-high performance concrete (UHPC). This paper presents the design and construction of the first pedestrian cable stayed bridge using UHPC developed by KICT. UHPC, compared to conventional concrete, has not only high compressive and tensile strengths but also high ductility. The UHPC developed at KICT is a steel fiber-reinforced cement compound presenting design compressive strength larger than 180 MPa and design tensile strength exceeding 10 MPa with water-to-binder ratio below 0.24 and admixing of 2 volume percentage of steel fiber. To show the applicability of UHPC to structures, a pedestrian cable stayed bridge (Super Bridge I) exploiting the characteristics of the developed UHPC has been planned, designed and erected at KICT. The dimension of UHPC deck is 2.7 m × 7 m as a precast segment with a typical thickness of deck of only 7 cm. However, harmful crack was observed in the deck at the time of the fabrication of the deck segments. Accordingly, new fabrication method was conceived and applied to prevent cracking of the UHPC slender deck. Four UHPC deck segments were fabricated successfully without any crack. After construction, the dynamic characteristics (natural frequencies and mode shapes) were evaluated through vibration tests since several users felt excess vibration. A vertical tuned mass damper (TMD) was proposed and installed on the parapet of the bridge. The TMD reduces the acceleration by about 30% from 0.0316 g to 0.0244 g when two pedestrians are crossing the bridge. 展开更多
关键词 UHPC PEDESTRIAN cable stayed bridge Dynamic Characteristics Test TMD
下载PDF
Study on longitudinal wind load calculation method of cables for cable-stayed bridge 被引量:2
4
作者 Pei Minshan Zhang Xigang Zhu Bin Hou Bin Liu Changpeng 《Engineering Sciences》 EI 2009年第1期18-22,58,共6页
Along with the expanding of span of cable-stayed bridge,wind load becomes a more and more important controlling factor for bridge the design.A very large proportion of the wind load acting on cables has exceeded that ... Along with the expanding of span of cable-stayed bridge,wind load becomes a more and more important controlling factor for bridge the design.A very large proportion of the wind load acting on cables has exceeded that acting on deck.There was not any detailed prescript in Chinese code for calculation of longitudinal wind load on cables due to lack of theoretical research and experiment,and conservative simplified calculation was adopted during design,which leads to conservative and uneconomical design of structures.To resolve this problem,cable force experiment was carried out during the design of Sutong Bridge.By comparing with international research results,the calculation formula of longitudinal wind drag coefficient for cables was advanced to fill the blank of bridge wind resistant code of China,and has already been adopted in the Highway Bridge Wind Resistant Design Code(JTG/T D60-01-2004)with great significance for bridge engineering. 展开更多
关键词 cable-stayed bridge stayed cable longitudinal wind load
下载PDF
A simplified fragility analysis of fan type cable stayed bridges 被引量:1
5
作者 R. A. Khan T. K. Datta S. Ahmad 《Earthquake Engineering and Engineering Vibration》 SCIE EI CSCD 2005年第1期83-94,共12页
A simplified fragility analysis of fan type cable stayed bridges usingProbabilistic Risk Analysis (PRA) procedure is presented for determining their failure probabilityunder random ground motion. Seismic input to the ... A simplified fragility analysis of fan type cable stayed bridges usingProbabilistic Risk Analysis (PRA) procedure is presented for determining their failure probabilityunder random ground motion. Seismic input to the bridge support is considered to be a riskconsistent response spectrum which is obtained from a separate analysis. For the response analysis,the bridge deck is modeled as a beam supported on springs at different points. The stiffnesses ofthe springs are determined by a separate 2D static analysis of cable-tower-deck system. The analysisprovides a coupled stiffness matrix for the spring system. A continuum method of analysis usingdynamic stiffness is Used to determine the dynamic properties of the bridges .The response of thebridge deck is obtained by the response spectrum method of analysis as applied to multi-degree offreedom system which duly takes into account the quasi - static component of bridge deck vibration.The fragility analysis includes uncertainties arising due to the variation in ground motion,material property, modeling, method of analysis, ductility factor and damage concentration effect.Probability of failure of the bridge deck is determined by the First Order Second Moment (FOSM)method of reliability. A three span double plane symmetrical fan type cable stayed bridge of totalspan 689 m, is used as an illustrative example. The fragility curves for the bridge deck failure areobtained under a number of parametric variations. Some of the important conclusions of the studyindicate that (ⅰ) not only vertical component but also the horizontal component of ground motionhas considerable effect on the probability of failure; (ⅱ) ground motion with no time lag betweensupport excitations provides a smaller probability of failure as compared to ground motion with verylarge time lag between support excitation; and (ⅲ) probability of failure may considerablyincrease for soft soil condition. 展开更多
关键词 probabilistic risk analysis fan type cable stayed bridge fragilityanalysis first order second moment
下载PDF
Genetic Algorithms-based Optimization of Cable Stayed Bridges 被引量:2
6
作者 Venkat Lute Akhil Upadhyay Krishna Kumar Singh 《Journal of Software Engineering and Applications》 2011年第10期571-578,共8页
Optimum design of cable stayed bridges depends on number of parameters. Design of Cable stayed bridge satisfying all practical constraints is challenging to the designers. Considering the huge number of design variabl... Optimum design of cable stayed bridges depends on number of parameters. Design of Cable stayed bridge satisfying all practical constraints is challenging to the designers. Considering the huge number of design variables and practical constraints, Genetic Algorithms (GA) is most suitable for optimizing the cable stayed bridge. In the present work the optimum design is carried out by taking total material cost of bridge as objective function. During problem formulation most of the practical design variables and constraints are considered. Using genetic algorithms some parametric studies such as effect of geometric nonlinearity, effect of grouping of cables, effect of practical site constraints on tower height and side span, effect of bridge material, effect of cable layout, effect of extra-dosed bridges on optimum relative cost have been presented. Data base is prepared for new designers to estimate the relative cost of bridge. 展开更多
关键词 cable stayed bridge GENETIC ALGORITHMS STIFFNESS Analysis
下载PDF
Rolling Fatigue Test of Large-Sized UHPC Member for Cable Stayed Bridge 被引量:2
7
作者 Jeong-Rae Cho Young Jin Kim +2 位作者 Jong Sup Park Eun Suk Choi Won Jong Chin 《Engineering(科研)》 2012年第10期646-654,共9页
Recently, research strives to apply Ultra High Performance Concrete (UHPC) to large-sized structures owing to its remarkable mechanical performance and durability compared to normal concrete. The Korea Institute of Co... Recently, research strives to apply Ultra High Performance Concrete (UHPC) to large-sized structures owing to its remarkable mechanical performance and durability compared to normal concrete. The Korea Institute of Construction Technology proposed SuperBridge800, an edge girder type UHPC cable stayed bridge with central span of 800 m, through its detailed design. The bridge is designed to be erected through the connection of precast UHPC segments. The precast UHPC segment is monolithically composed of one ribbed deck slab and edge girders at each side. The connection between the precast segments is achieved by steel bars at the edge girders and by UHPC cast-in-place wet joint at the slab. Despite of the outstanding mechanical performance of UHPC, the fabrication of large-sized members is a difficult task since UHPC hardens faster than normal concrete and requires a special curing process. Therefore, the constructability of large-sized UHPC segment should be secured to achieve SuperBridge800. Besides, the performance of the connection between segments should also be guaranteed, especially in terms of the fatigue performance of the UHPC cast-in-place joint, which constitutes a weak point. To that goal, two half-scaled UHPC segments are manufactured and the constructability is examined by fabricating a large-sized UHPC member connected with respect to the design conditions. This study conducts rolling fatigue test on the so-fabricated large-sized UHPC member. Rolling fatigue test is carried out up to 2 million cycles considering actual vehicle load at each center and quarter points of the member. The test results confirm that the service limit state is satisfied. 展开更多
关键词 UHPC cable stayed bridge ROLLING FATIGUE Test Large-Sized UHPC MEMBER
下载PDF
Modeling of cable vibration effects of cable-stayed bridges
8
作者 S.H.Cheng David T.Lau 《Earthquake Engineering and Engineering Vibration》 SCIE EI CSCD 2002年第1期74-85,共12页
The analysis of dynamic responses of cable-stayed bridges subjected to wind and earthquake loads generally considers only the motions of the bridge deck and pylons.The influence of the stay cable vibration on the resp... The analysis of dynamic responses of cable-stayed bridges subjected to wind and earthquake loads generally considers only the motions of the bridge deck and pylons.The influence of the stay cable vibration on the responses of the bridge is either ignored or considered by approximate procedures.The transverse vibration of the stay cables,which can be significant in some cases,are usually neglected in previous research.In the present study,a new three-node cable element has been developed to model the transverse motions of the cables.The interactions between the cable behavior and the other parts of the bridge superstructure are considered by the concept of dynamic stiffness.The nonlinear effect of the cable caused by its self-weight is included in the formulation.Numerical examples are presented to demonstrate the accuracy and efficiency of the proposed model. The impact of cable vibration behavior on the dynamic characteristics of cable-stayed bridges is discussed. 展开更多
关键词 cable-stayed bridges cable vibration DYNAMICS finite elements long-span structures
下载PDF
Study on Fatigue Behavior of Anchorage of Cable and Girder of Long Span Cable-Stayed Bridge
9
作者 刘庆宽 强士中 张强 《Journal of Modern Transportation》 2001年第1期42-49,共8页
A full scale model test is done and a FEM model is established to investigate the fatigue behavior of the Nancha cable stayed bridge of the Nanjing Second Yangtz River Bridge, a long span steel bridge with a main sp... A full scale model test is done and a FEM model is established to investigate the fatigue behavior of the Nancha cable stayed bridge of the Nanjing Second Yangtz River Bridge, a long span steel bridge with a main span of 628 m. The results of test and FEM are analyzed and compared. It is shown that they are in good agreement. It is verified that the fatigue characteristic of the anchorage structure of cable and girder of the bridge satisfies the requirements specified by Chinese, British and American codes. 展开更多
关键词 cable stayed bridges anchorage of cable and girder FATIGUE
下载PDF
Closure technique for the hybrid girder cable stayed bridge of Edong Bridge
10
作者 Liu Minghu Tan Hao +1 位作者 Xu GuoPing Zhao Canhui 《Engineering Sciences》 EI 2012年第4期51-56,共6页
Based on Edong Yangtze River Bridge, which is the second longest hybrid girder cable stayed bridge with 926 m long main span, the influencing factors and crucial techniques of the main span closure method for long spa... Based on Edong Yangtze River Bridge, which is the second longest hybrid girder cable stayed bridge with 926 m long main span, the influencing factors and crucial techniques of the main span closure method for long span hybrid girder cable stayed bridge are studied. After theoretical analysis, numerical evaluation and practical test, the loading assistant closure method is employed in Edong Yangtze River Bridge. The loading assistant closure method, with better thermal adaptability and less influence on bridge line and the forced status, can meet the requirements of the unstressed state control method. Based on the mentioned advantages, the loading assistant closure method is applicable to long span hybrid girder cable stayed bridges. The conclusion can provide a reference for the further design of the similar brid^es. 展开更多
关键词 Edong bridge hybrid girder cable stayed bridge closure technique loading assistant closure method unstressed state control method
下载PDF
Nonlinear Dynamic Reliability of Coupled Stay Cables and Bridge Tower
11
作者 余建星 田佳 +3 位作者 董文斌 丁宁 杨晓蓉 谭振东 《Transactions of Tianjin University》 EI CAS 2007年第5期334-339,共6页
Nonlinear vibration can cause serious problems in long span cable-stayed bridges.When the internal resonance threshold is reached between the excitation frequency and natural frequency,large amplitudes occur in the ca... Nonlinear vibration can cause serious problems in long span cable-stayed bridges.When the internal resonance threshold is reached between the excitation frequency and natural frequency,large amplitudes occur in the cable.Based on the current situation of lacking corresponding constraint criteria,a model was presented for analyzing the dynamic reliability of coupling oscillation between the cable and tower in a cable-stayed bridge.First of all,in the case of cable sag,the d'Alembert principle is applied to studying the nonlinear dynamic behavior of the structure,and resonance failure interval of parametric oscillation is calculated accordingly.Then the dynamic reliability model is set up using the JC method.An application of this model has been developed for the preliminary design of one cable-stayed bridge located on Hai River in Tianjin,and time histories analysis as well as reliability indexes have been obtained.When frequency ratio between the cable and tower is approaching 1∶2,the reliability index is 0.98,indicating high failure probability.And this is consistent with theoretical derivation and experimental results in reference.This model,which is capable of computing the reliability index of resonance failure,provides theoretical basis for the establishment of corresponding rule. 展开更多
关键词 cable-stayed bridge stay cable nonlinear vibration internal resonance parametric vibration dynamic reliability
下载PDF
Cable flexural rigidity influence on suspension bridges static properties
12
作者 曾森 陈少峰 +1 位作者 王彩花 王焕定 《Journal of Harbin Institute of Technology(New Series)》 EI CAS 2011年第5期86-90,共5页
In order to figure out the cable flexural rigidity influence on suspension bridges,a contrast model experiment is made:a chain cable model with no flexural rigidity and a wire cable model with some flexural rigidity.A... In order to figure out the cable flexural rigidity influence on suspension bridges,a contrast model experiment is made:a chain cable model with no flexural rigidity and a wire cable model with some flexural rigidity.And then,four finite element models of a same long-span suspension bridge with different cable element are set up to be analyzed.Both experimental and numerical simulation results show that,with the increase of the span and the decrease of sag-span ratio,the influence of the cable flexural rigidity is significant.The difference of nodes displacement reaches more than 10 cm in construction analysis,which will bring some trouble to the construction.And the difference of the maximum section edge normal stress may reach 15%,which may have an adverse impact onto the bridge.Therefore,considering the cable flexural rigidity is necessary on some analysis of suspension bridges. 展开更多
关键词 long-span suspension bridges the cable flexural rigidity experimental compares numerical simulation of different cable elements geometric nonlinearity
下载PDF
Developments and Prospects of Long-Span High-Speed Railway Bridge Technologies in China 被引量:61
13
作者 Shunquan Qin Zongyu Gao 《Engineering》 SCIE EI 2017年第6期787-794,共8页
With the rapid developments of the high-speed railway in China, a great number of long-span bridges have been constructed in order to cross rivers and gorges. At present, the longest main span of a constructed high-sp... With the rapid developments of the high-speed railway in China, a great number of long-span bridges have been constructed in order to cross rivers and gorges. At present, the longest main span of a constructed high-speed railway bridge is only 630 m. The main span of Hutong Yangtze River Bridge and of Wufengshan Yangtze River Bridge, which are under construction, will be much longer, at 1092 m each. In order to overcome the technical issues that originate from the extremely large dead loading and the relatively small structural stiffness of long-span high-speed railway bridges, many new technologies in bridge construction, design, materials, and so forth have been developed. This paper carefully reviews progress in the construction technologies of multi-function combined bridges in China, including com- bined highway and railway bridges and multi-track railway bridges. Innovations and practices regarding new types of bridge and composite bridge structures, such as bridges with three cable planes and three main trusses, inclined main trusses, slab-truss composite sections, and steel-concrete composite sections, are introduced. In addition, investigations into high-performance materials and integral fabrication and erection techniques for long-span railway bridges are summarized. At the end of the paper, prospects for the future development of long-span high-speed railwav bridges are provided. 展开更多
关键词 High-speed railway long-span bridges Multi-function combined bridges High-performance materials Spatial structures with three cable planes Integral fabrication
下载PDF
Key Technologies for Design of Changqing Yellow River Super-long Bridge of Zhengzhou Ji'nan HSR
14
作者 ZUO Jiaqiang ZHANG Shang +3 位作者 MA Chenlong WANG Zongfeng ZHANG Hai ZHENG Mingda(Translated) 《Chinese Railways》 2023年第2期3-11,共9页
Changqing Yellow River Super-long Bridge of Zhengzhou-Ji'nan HSR is a partial cable-stayed bridge with concrete main girder and a unit length of 1,080 m.Studies are carried out on the key technologies of bridge de... Changqing Yellow River Super-long Bridge of Zhengzhou-Ji'nan HSR is a partial cable-stayed bridge with concrete main girder and a unit length of 1,080 m.Studies are carried out on the key technologies of bridge design,and the main conclusions are as follows:The whole unit adopts the supporting system of tower pier consolidation and tower-beam separation,and each pier is provided with seismic mitigation and isolation bearing;shaped-steel reinforced concrete bridge tower is adopted to bring into full play the tensile performance of steel and the compressive performance of concrete,and avoid the construction challenges of setting up multi-layer and multi-stirrup reinforcement while improving the bearing capacity of section;a new type of double-side and bi-directional anti-skid anchorage device is adopted for the cable saddle of wire divider pipe in order to withstand the unbalanced cable force,and verify the reliability of the anti-skid anchorage device by solid model test;and large-segment cantilever pouring design is adopted for the main girder with a maximum segment length of 8 m to effectively shorten the construction period of the bridge. 展开更多
关键词 Zhengzhou-Ji'nan HSR Changqing Yellow River Super-long bridge partial cable stayed bridge multi-tower cable-stayed bridge multiple span and long connection bridge design
下载PDF
Advanced aerostatic analysis of long-span suspension bridges
15
作者 张新军 《Journal of Zhejiang University-Science A(Applied Physics & Engineering)》 SCIE EI CAS CSCD 2006年第3期424-429,共6页
As the span length of suspension bridges increases, the diameter of cables and thus the wind load acting on them, the nonlinear wind-structure interaction and the wind speed spatial non-uniformity all increase consequ... As the span length of suspension bridges increases, the diameter of cables and thus the wind load acting on them, the nonlinear wind-structure interaction and the wind speed spatial non-uniformity all increase consequently, which may have unnegligible influence on the aerostatic behavior of long-span suspension bridges. In this work, a method of advanced aerostatic analysis is presented firstly by considering the geometric nonlinearity, the nonlinear wind-structures and wind speed spatial non-uniformity. By taking the Runyang Bridge over the Yangtze River as example, effects of the nonlinear wind-structttre interaction, wind speed spatial non-uniformity, and the cable's wind load on the aerostatic behavior of the bridge are investigated analytically. The results showed that these factors all have important influence on the aerostatic behavior, and should be considered in the aerostatic analysis of long and particularly super long-span suspension bridges. 展开更多
关键词 long-span suspension bridge Aerostatic analysis Nonlinear wind-structure interaction Wind speed spatial non-uniformity cable's wind load
下载PDF
General design of Sutong Bridge 被引量:4
16
作者 Zhang Xigang Yuan Hong +2 位作者 Pei Minshan Dai Jie Xu Lin 《Engineering Sciences》 EI 2009年第1期6-11,共6页
The main span of Sutong Bridge is a double-pylon,double-plane cable-stayed bridge with steel box girder,which has the world's longest central span of 1 088 m within cable-stayed bridges.To overcome problems caused... The main span of Sutong Bridge is a double-pylon,double-plane cable-stayed bridge with steel box girder,which has the world's longest central span of 1 088 m within cable-stayed bridges.To overcome problems caused by severe meteorological conditions,perplexing hydrological conditions,deep buried bedrock and higher navigation level,many new technics and methods were created.Keys including structural system,steel box girder,stayed cable,tower,pier,tower foundation,collision avoidance system,wind-resistance,seismic-resistance,structural nonlinear response and structural static stability were presented individually in this paper. 展开更多
关键词 cable-stayed bridge structural system steel box girder stayed cable TOWER tower foundation
下载PDF
Vehicle-bridge coupled vibrations in different types of cable stayed bridges 被引量:3
17
作者 Lingbo WANG Peiwen JIANG +3 位作者 Zhentao HUI Yinping MA Kai LIU Xin KANG 《Frontiers of Structural and Civil Engineering》 EI CSCD 2016年第1期81-92,共12页
Numerical analyses of the coupled vibrations of vehicle-bridge system and the effects of different types of cable stayed bridges on the coupled vibration responses have been presented in this paper using ANSYS. The br... Numerical analyses of the coupled vibrations of vehicle-bridge system and the effects of different types of cable stayed bridges on the coupled vibration responses have been presented in this paper using ANSYS. The bridge model and vehicle model were independently built which have no internal relationship in the ANSYS. The vehicle-bridge coupled vibration relationship was obtained by using the APDL program which subsequently imposed on the vehicle and bridge models during the numerical analysis. The proposed model was validated through a field measurements and literature data. The judging method, possibility, and criterion of the vehicle-bridge resonance (coupled vibrations) of cable stayed bridges (both the floating system and half floating system) under traffic flows were presented. The results indicated that the interval time between vehicles is the main influence factor on the resonance excitation frequency under the condition of equally spaced traffic flows. Compared to other types of cable stayed bridges, the floating bridge system has relatively high possibility to cause vehicle-bridge resonance. 展开更多
关键词 vehicle-bridge coupled vibration cable stayed bridge resonances of vehicle-bridge system
原文传递
Concrete-Filled Steel Tube Arch Bridges in China 被引量:69
18
作者 Jielian Zheng Jianjun wang 《Engineering》 2018年第1期143-155,共13页
In the past 20 years, great progress has been achieved in China in the construction of concrete-filled steel tube (CFST) arch bridges and concrete arch bridges with a CFST skeleton. The span of these bridges has bee... In the past 20 years, great progress has been achieved in China in the construction of concrete-filled steel tube (CFST) arch bridges and concrete arch bridges with a CFST skeleton. The span of these bridges has been increasing rapidly, which is rare in the history of bridge development. The large-scale construction of expressways and high-speed railways demands the development of long-span arch bridges, and advances in design and construction techniques have made it possible to construct such bridges. In the present study, the current status, development, and major innovative technologies of CFST arch bridges and concrete arch bridges with a CFST skeleton in China are elaborated. This paper covers the key con- struction technologies of CFST arch bridges, such as the design, manufacture, and installation of steel tube arch trusses, the preparation and pouring of in-tube concrete, and the construction of the world's longest CFST arch bridge-the First Hejiang Yangtze River Bridge. The main construction technologies of rein- forced concrete arch bridges are also presented, which include cable-stayed fastening-hanging cantilever assembly, adjusting the load by means of stay cables, surrounding the concrete for arch rib pouring, and so forth. In addition, the construction of two CFST skeleton concrete arch bridges-the Guangxi Yongning Yong River Bridge and the Yunnan-Guangxi Railway Nanpan River Bridge--is discussed. CFST arch bridges in China have already gained a world-leading position; with the continuous innovation of key technologies, China will become the new leader in promoting the development of arch bridges. 展开更多
关键词 Concrete-filled STEEL tube (CFST) ARCH bridge Steel-reinforced CONCRETE ARCH bridge cable-stayed fastening-hanging cantileverassembly VACUUM-ASSISTED pouring in-tube CONCRETE Adjusting load by stay cables
下载PDF
Key technology and innovation of Sutong Bridge
19
作者 Zhang Xiongwen 《Engineering Sciences》 EI 2010年第2期31-38,共8页
Sutong Bridge is a cable-stayed bridge across Yangtze River with the main span of 1 088 m. This article outlines technical challenges,key technology and innovation in the design and construction such as scour protecti... Sutong Bridge is a cable-stayed bridge across Yangtze River with the main span of 1 088 m. This article outlines technical challenges,key technology and innovation in the design and construction such as scour protection,lowering steel cofferdam,construction platform establishment,construction and control of pylons,fabrication and damping of long cables,erection and control of steel box girders. 展开更多
关键词 Sutong bridge key technology INNOVATION structure system FOUNDATION PYLON stay cables steel girder
下载PDF
Some important aspects of wind-resistant studies on long-span bridges
20
作者 GU Ming 《Science China(Technological Sciences)》 SCIE EI CAS 2012年第12期3334-3343,共10页
In recent years many long-span bridges have been or are being constructed in the world, especially in China. Wind loads and responses are the key factors for their structural design. This paper introduces some importa... In recent years many long-span bridges have been or are being constructed in the world, especially in China. Wind loads and responses are the key factors for their structural design. This paper introduces some important achievements of wind-resistant studies of the author's research team on long-span bridges. First, new concepts and identification methods of aerodynamic derivatives and aerodynamic admittances were proposed. Then mechanical and aerodynamic control strategies and methods of wind-induced vibrations of long-span bridges were the great concerned problems, and valuable achievements were presented. Especially, great efforts which have been theoretically and experimentally made on rain-wind induced vibration of cables of cable-stayed bridges were described. Finally, some new progresses in computation wind engineering were introduced, and a new method for simulating an equilibrium boundary layer was put forward as well. 展开更多
关键词 long-span bridge aerodynamic derivative and admittance flutter and buffeting control rain-wind induced vibration ofstay cable computation wind engineering equilibrium boundary layer
原文传递
上一页 1 2 下一页 到第
使用帮助 返回顶部