期刊文献+
共找到165篇文章
< 1 2 9 >
每页显示 20 50 100
Power generation expansion planning approach considering carbon emission constraints 被引量:3
1
作者 Hasan Mehedi Xiaobin Wang +3 位作者 Shilong Ye Guiting Xue Islam Md Shariful Fang Shi 《Global Energy Interconnection》 EI CAS CSCD 2023年第2期127-140,共14页
Decarbonization of the power sector in China is an essential aspect of the energy transition process to achieve carbon neutrality.The power sector accounts for approximately 40%of China’s total CO_(2) emissions.Accor... Decarbonization of the power sector in China is an essential aspect of the energy transition process to achieve carbon neutrality.The power sector accounts for approximately 40%of China’s total CO_(2) emissions.Accordingly,collaborative optimization in power generation expansion planning(GEP)simultaneously considering economic,environmental,and technological concerns as carbon emissions is necessary.This paper proposes a collaborative mixedinteger linear programming optimization approach for GEP.This minimizes the power system’s operating cost to resolve emission concerns considering energy development strategies,flexible generation,and resource limitations constraints.This research further analyzes the advantages and disadvantages of current GEP techniques.Results show that the main determinants of new investment decisions are carbon emissions,reserve margins,resource availability,fuel consumption,and fuel price.The proposed optimization method is simulated and validated based on China’s power system data.Finally,this study provides policy recommendations on the flexible management of traditional power sources,the market-oriented mechanism of new energy sources,and the integration of new technology to support the attainment of carbon-neutral targets in the current energy transition process. 展开更多
关键词 Low-carbon OPTIMIZATION Generation expansion planning long-term planning Renewable energy
下载PDF
Westinghouse Electric Corp.plans long-term investment in China
2
《Electricity》 1998年第1期50-50,共1页
WestinghouseElectricCorp.planslong-terminvestmentinChinaUS-basedWestinghouseElectricCorphasalong-termcommitm... WestinghouseElectricCorp.planslong-terminvestmentinChinaUS-basedWestinghouseElectricCorphasalong-termcommitmenttowardsitsinve... 展开更多
关键词 INVESTMENT long-term Corp.plans ELECTRIC China
下载PDF
THE NINTH FIVE-YEAR PLAN AND LONG-TERM TARGET BY 2010 FOR CHINA'S FOOD INDUSTRY
3
作者 Wang Wenzhe,President of the China Food Industry Association 《China's Foreign Trade》 1996年第6期16-16,共1页
The"Ninth Five-Year Plan for theNational Economy and SocialDevelopment and the Long-TermTarget by the Year 2010" adopted at theFourth Session of the Eighth National People’sCongress have opened up a vast ne... The"Ninth Five-Year Plan for theNational Economy and SocialDevelopment and the Long-TermTarget by the Year 2010" adopted at theFourth Session of the Eighth National People’sCongress have opened up a vast new worldfor the development of China’s food industry.The food industry should seize the opportunityto strengthen itself and speed up itsdevelopment for meeting the needs ofimproving the people’s living standards andperform well in modernized socialistconstruction. 展开更多
关键词 2010 US over THE NINTH FIVE-YEAR plan AND long-term TARGET BY 2010 FOR CHINA’S FOOD INDUSTRY
下载PDF
结合路径规划的虚拟夹具遥操作研究
4
作者 丁士旵 朱震 +1 位作者 钟永彦 陈娟 《现代电子技术》 北大核心 2024年第11期118-124,共7页
在传统的遥操作任务中,由于环境的不确定性和动态变化,传统虚拟夹具面临着实时适应环境变化的挑战,这限制了其在多变环境中的应用范围。为了解决这一问题,文中提出一种结合反向搜索可视图路径规划算法与虚拟夹具技术的创新策略,以实现... 在传统的遥操作任务中,由于环境的不确定性和动态变化,传统虚拟夹具面临着实时适应环境变化的挑战,这限制了其在多变环境中的应用范围。为了解决这一问题,文中提出一种结合反向搜索可视图路径规划算法与虚拟夹具技术的创新策略,以实现自适应虚拟夹具的构建和应用。搭建了基于触觉设备Geomagic Touch和ABB公司的IRB 1410型机械臂的遥操作系统,在该系统上进行了路径规划对比实验,并设计了具有突发情况的多组虚拟夹具对比实验。实验结果表明,这种自适应虚拟夹具有效地提高了遥操作系统在复杂环境中的适应能力,它不仅能够保护遥操作系统免受意外伤害,还显著提高了操作者的工作效率。研究结果证明了自适应虚拟夹具在提高遥操作系统灵活性和准确性方面的重要价值,为遥操作技术的进一步发展提供了有力的理论和实践支持。 展开更多
关键词 虚拟夹具 遥操作 机械臂 路径规划 触觉 共享控制 自适应 图像采集 运动控制
下载PDF
基于BIM技术的铁路建设项目设计与施工管理研究
5
作者 雷登峰 《科技创新与应用》 2024年第18期144-148,共5页
当前,建筑信息模型(BIM)技术往往仅限于工程操作层面的讨论,较少探究以数据驱动工程规划与控制工作的全流程。尤其是在铁路基础设施的背景下,以数据驱动管理和施工的模型概念尚未明晰。基于此,该文基于BIM技术,通过利用来自现场监控技... 当前,建筑信息模型(BIM)技术往往仅限于工程操作层面的讨论,较少探究以数据驱动工程规划与控制工作的全流程。尤其是在铁路基础设施的背景下,以数据驱动管理和施工的模型概念尚未明晰。基于此,该文基于BIM技术,通过利用来自现场监控技术以及自动化数据采集,构建数据-信息流生产与使用相融合的闭环设计与控制系统,以及时为铁路建设项目的设计和施工提供优化方案。该研究致力于搭建以数据为中心的全面施工管理模式,以改进过去被动式的工程设计与施工管理模式,为基于BIM技术的铁路建设项目设计与施工提供建议。 展开更多
关键词 建筑信息模型技术 数据驱动 施工规划 现场监控 自动化数据采集
下载PDF
抽水蓄能电站建设征地移民安置规划设计与实施管理
6
作者 潘秀庭 郑寿春 《红水河》 2024年第5期83-89,114,共8页
建设征地移民安置是抽水蓄能电站建设的一项重要内容。抽水蓄能电站能否高质量地建设好,建设征地移民安置工作是基础。由于抽水蓄能电站建设征地移民安置有其独有的特点,因此在建设征地移民安置规划设计和实施管理时需要有针对性的应对... 建设征地移民安置是抽水蓄能电站建设的一项重要内容。抽水蓄能电站能否高质量地建设好,建设征地移民安置工作是基础。由于抽水蓄能电站建设征地移民安置有其独有的特点,因此在建设征地移民安置规划设计和实施管理时需要有针对性的应对措施。笔者通过对抽水蓄能电站建设征地移民安置的特点进行分析,提出在建设征地移民安置规划设计与实施管理阶段应重点做好的工作以及需重点关注的问题,可为类似工程建设提供借鉴。 展开更多
关键词 建设征地移民安置 规划设计 实施管理 抽水蓄能电站
下载PDF
国土空间规划中无人机航测遥感的应用
7
作者 熊扬坤 《大众科学》 2024年第3期14-16,共3页
国土空间规划对城市化建设有着重要的意义,且是实现可持续发展的关键途径。国土空间规划主要涉及生态资产评估、规划实施监督等多个工作环节,要求科学划定生态保护红线,使城镇开发得到保证,确保基本农田得到保护。传统的测绘方式容易出... 国土空间规划对城市化建设有着重要的意义,且是实现可持续发展的关键途径。国土空间规划主要涉及生态资产评估、规划实施监督等多个工作环节,要求科学划定生态保护红线,使城镇开发得到保证,确保基本农田得到保护。传统的测绘方式容易出现数据误差,采用无人机航测遥感技术不仅能扩大测绘范围,还能保证数据信息准确性。分析了无人机航测遥感技术的主要应用优势和技术操作流程,明确了无人机航测遥感技术在国土空间规划中的应用要求及操作要点,并总结国土空间规划中此项技术的适用范围与注意事项,旨在提升国土空间规划水平,为社会可持续发展提供坚实基础。 展开更多
关键词 国土空间规划 无人机 航测遥感 立体采集
下载PDF
Development of ToSPACE for Pipe Wall Thinning Management in Nuclear Power Plants 被引量:2
8
作者 Kyeong Mo Hwang Hun Yun +2 位作者 Hyeok Ki Seo Geun Young Lee Kyung Woo Kim 《World Journal of Nuclear Science and Technology》 2019年第1期1-15,共15页
A number of piping components in the secondary system of nuclear power plants are exposed to aging mechanisms such as FAC (Flow-Accelerated Corrosion), cavitation, flashing, SPE (Solid Particle Erosion), LDIE (Liquid ... A number of piping components in the secondary system of nuclear power plants are exposed to aging mechanisms such as FAC (Flow-Accelerated Corrosion), cavitation, flashing, SPE (Solid Particle Erosion), LDIE (Liquid Droplet Impingement Erosion), etc. Those mechanisms may lead to thinning, leak, or rupture of the components. Due to the pipe ruptures caused by wall thinning in Surry unit 2 of USA in 1986 and in Mihama unit 3 of Japan in 1994, the pipe wall thinning management has emerged as one of the most important issues in nuclear power plants. To manage the pipe wall thinning in the secondary system, Korea has used a foreign program since 1996. As using the foreign country’s program for long term, it was necessary to improve from the perspective of the users. Accordingly, KEPCO-E & C has started to develop the 3D-based pipe wall thinning management program (ToSPACE, Total Solution for Piping And Component Engineering management) from eight years ago, and the development was successful. This paper describes the major functions included in ToSPACE program, such as 3D-based DB (Database) buildup, development of FAC and erosion evaluation theories, UT (Ultra-sonic Test) data reliability analysis, field connection with 3D, automatic establishment of long-term inspection plan, etc. ToSPACE program was developed to allow site engineers performing the selection of inspection quantity at each refueling outage, UT data reliability analysis, UT evaluation, determination of next inspection timing, identification of the inspecting and replacing components in 3D drawings, etc., to access easily. 展开更多
关键词 ToSPACE Pipe Wall THINNING Flow-Accelerated Corrosion (FAC) Liquid DROPLET IMPINGEMENT EROSION (LDIE) Reliability Analysis 3D MANAGEMENT long-term Inspection plan
下载PDF
Market-Based Transmission Expansion Planning
9
作者 Pavel Sergeyevich Drachev Victor Vasilyevich Trufanov 《Energy and Power Engineering》 2012年第6期387-391,共5页
The paper presents the main features of transmission expansion problem (TEP). In accord with review the aims and influencing factors are defined. The competitive behaviors of market participants, transmission losses, ... The paper presents the main features of transmission expansion problem (TEP). In accord with review the aims and influencing factors are defined. The competitive behaviors of market participants, transmission losses, discrete investment costs, various operating conditions are considered in the model. The model is a mixed-integer linear programming formulation for a static TEP in the competitive environment. The presented methodology is applied to six-node system. In order to point out efficiency of the model the results obtained are compared with traditional problem solution. 展开更多
关键词 ELECTRICITY MARKET Modeling long-term Transmission planNING SOCIAL WELFARE
下载PDF
从语言规划看国家意识形态安全——基于马克思主义语言社会学的分析
10
作者 邓伯军 张馨元 《江苏师范大学学报(哲学社会科学版)》 2023年第2期64-82,123,共20页
语言规划本质上是一个意识形态安全命题。语言规划通常是由国家授权的机构进行的一种有组织的语言活动,主要包括本体规划、地位规划、习得规划、生态规划等。语言本体规划是指对语言内容、形式以及功能等所进行的规范活动,在语言的规范... 语言规划本质上是一个意识形态安全命题。语言规划通常是由国家授权的机构进行的一种有组织的语言活动,主要包括本体规划、地位规划、习得规划、生态规划等。语言本体规划是指对语言内容、形式以及功能等所进行的规范活动,在语言的规范化和标准化培育过程中捍卫语言本体的纯洁与健康,并在语言逻辑层面佐证国家意识形态的合理性。语言地位规划是指对语言用途、功能以及地位等所进行的配置活动,在选择通用语言、维持民族语言、修正地方语言以及同化外来语言中法定主体的语码态度,从而将国家意识形态的合法性从权力界写入到主体思维域。语言习得规划是指对语言之控制语境、指导语境、人际语境、想象或创新语境等的建构,促使个体逐步褪去自然存在的外衣,逐渐成为自为的社会主体,并以其主体性功能强化对国家意识形态的价值认同。语言生态规划是指对语言生态体进行的认知、调控、变革的活动,探索语言生态系统发展的动力机制和制约机制,建构起平衡和谐的语言生态环境,并且以语言生态安全支撑起国家意识形态的安全。 展开更多
关键词 语言规划 本体规划 地位规划 习得规划 生态规划 国家意识形态安全
下载PDF
“信息获取与处理”领域2022年度国家自然科学基金项目申请与资助情况综述 被引量:1
11
作者 孙玲 刘军 余建刚 《电子与信息学报》 EI CSCD 北大核心 2023年第2期757-764,共8页
该文为国内科技工作者了解2022年度“信息获取与处理”领域基础研究队伍、主要研究方向及重大类项目立项资助等情况,对本年度国家自然科学基金委员会F01申请代码下信息获取与处理领域的面上项目、青年科学基金项目、地区科学基金项目、... 该文为国内科技工作者了解2022年度“信息获取与处理”领域基础研究队伍、主要研究方向及重大类项目立项资助等情况,对本年度国家自然科学基金委员会F01申请代码下信息获取与处理领域的面上项目、青年科学基金项目、地区科学基金项目、重点项目、优秀青年科学基金项目和国家杰出青年科学基金项目等项目类型进行了统计与分析,给出了自然科学基金各类项目申请中涉及面最广的面上项目和青年科学基金项目申请与资助的依托单位、申请代码分布,介绍了本领域按科学问题属性分类的评审试点和“负责任、讲信誉、计贡献”评审机制试点工作,展望了领域“十四五”期间重点发展方向。 展开更多
关键词 自然科学基金 信息获取与处理 “十四五”规划
下载PDF
面向主干输电网架空设备巡检的无人机路径规划方法 被引量:3
12
作者 张驯 杨启帆 +2 位作者 李志茹 陈佐虎 魏峰 《自动化技术与应用》 2023年第11期122-124,168,共4页
针对主干输电网架空设备巡检效率低、安全性差问题,提出基于遗传算法的巡检无人机路径规划方法。运用无人机定位与中心功能操作技术分析巡检路径信息,调节上位机和集中控制器的关系,创建巡检路径差异模型;充分发挥遗传算法优秀的全局搜... 针对主干输电网架空设备巡检效率低、安全性差问题,提出基于遗传算法的巡检无人机路径规划方法。运用无人机定位与中心功能操作技术分析巡检路径信息,调节上位机和集中控制器的关系,创建巡检路径差异模型;充分发挥遗传算法优秀的全局搜索能力,计算最高线程距离、最小步长及最高路径偏移角收敛条件,把选择、交叉与变异看作基础算子,以最优适应度值作为路径最优解输出,实现可靠的无人机路径规划任务。仿真结果表明,所提方法可根据任务要求灵活规划不同类型路径,相较其他方法巡检规划路径最短,有效节省机动能耗,全局收敛性强。 展开更多
关键词 无人机设备巡检 最高路径偏移角 路径规划 数据获取 遗传算法
下载PDF
房地产企业并购重组税收风险及应对策略研究 被引量:5
13
作者 施新荣 《市场周刊》 2023年第1期126-129,共4页
社会经济的不断发展使得房地产企业在国内市场环境的动态变化下迎来了相当大的市场竞争压力,这就使企业间的并购重组的现象越来越多。房地产企业在并购重组过程中一般会涉及较重的税收支出和税收负担,合适的税务筹划方案不仅能给企业减... 社会经济的不断发展使得房地产企业在国内市场环境的动态变化下迎来了相当大的市场竞争压力,这就使企业间的并购重组的现象越来越多。房地产企业在并购重组过程中一般会涉及较重的税收支出和税收负担,合适的税务筹划方案不仅能给企业减轻税负,也能有效规避企业的税收风险,反之则会导致企业增加税负并带来税收风险,因此房地产企业需要在并购重组过程中重视税务筹划工作的具体要求,针对性分析税收风险隐患,更科学合理地设计税收筹划方案。文章分析了房地产企业并购重组税收筹划的原因及并购重组的税收风险问题,并以此为基础探讨了有效规避企业并购重组税收风险的应对策略,以期为房地产企业在并购重组过程中所产生的税务问题的解决提供参考。 展开更多
关键词 房地产企业 并购重组 税收风险 税收筹划
下载PDF
基于大数据技术的智能电网规划分析 被引量:3
14
作者 贾钘楠 《集成电路应用》 2023年第3期150-151,共2页
阐述电网规划体系中的问题,新型电网规划体系的构架、数据获取方式、非结构化数据在电网规划体系中的应用,从而基于大数据技术不断完善电网规划体系。
关键词 大数据技术 数据获取 电网规划 非结构化数据
下载PDF
一种广域无线传感网络移动Sink节点路径规划方法
15
作者 何栋 桂志国 《传感技术学报》 CAS CSCD 北大核心 2023年第3期475-480,共6页
在广域无线传感网络中,大量Sink节点处在移动状态,路径规划过程易受其他节点特征的干扰,导致规划效果较差,提出一种针对广域无线传感网络的移动Sink节点路径规划方法。利用Sink数据采集协议确定节点的最佳位置,通过计算最大网络寿命成... 在广域无线传感网络中,大量Sink节点处在移动状态,路径规划过程易受其他节点特征的干扰,导致规划效果较差,提出一种针对广域无线传感网络的移动Sink节点路径规划方法。利用Sink数据采集协议确定节点的最佳位置,通过计算最大网络寿命成本比确定节点的最佳数量后,根据节点的最佳位置和数量规划出最大容量路径。依据最大容量路径计算出Sink节点在四个方向上的权值系数,并沿着最大权值系数的方向移动,完成广域无线传感网络移动Sink节点路径规划。仿真结果表明,所提方法的运行时间低于6 s、路径长度最长为53 cm、拐点数量少于9个、迭代次数高达69次。 展开更多
关键词 广域无线传感网络 数据采集协议 Sink节点路径规划 最大网络寿命 最佳节点个数 网络能耗模型 传输路径
下载PDF
大型河道治理工程征地移民安置规划设计工作探讨——以山东省小清河防洪综合治理工程为例 被引量:1
16
作者 李亚慧 李莉 李明 《中国水能及电气化》 2023年第12期30-34,共5页
文章以山东省小清河防洪综合治理工程为例,阐述了大型河道治理工程征地移民的特点:工程涉及行政区域多,社会经济发展水平不一、移民安置意愿多样;工程征收土地性质及权属复杂;工程影响专业项目种类多,与其他工程交叉影响,处理难度大等... 文章以山东省小清河防洪综合治理工程为例,阐述了大型河道治理工程征地移民的特点:工程涉及行政区域多,社会经济发展水平不一、移民安置意愿多样;工程征收土地性质及权属复杂;工程影响专业项目种类多,与其他工程交叉影响,处理难度大等。针对这些特点,提出了因地制宜,规划多元化的生产、生活安置方式供移民选择,多渠道查证、厘清土地权属,分门别类确定补偿标准,健全协调沟通机制,构建专业项目处理合作共赢模式等大型河道治理工程征地移民安置规划设计工作重点,为后续大型线性水利工程征地移民安置前期工作高质量发展提供借鉴和思考。 展开更多
关键词 大型河道治理工程 征地移民安置 规划设计
下载PDF
弥兴光伏项目征地及主变运输 被引量:1
17
作者 李文杰 《云南水力发电》 2023年第7期227-229,共3页
近年,我国新能源行业在国家能源局助力实现碳达峰碳中和目标任务方面取得了长足的进步。为贯彻落实党中央、国务院决策部署,保障能源安全,推动绿色低碳转型,以及可持续发展,爆发式推出新一轮的新能源光伏项目。弥兴光伏电站是省级重点... 近年,我国新能源行业在国家能源局助力实现碳达峰碳中和目标任务方面取得了长足的进步。为贯彻落实党中央、国务院决策部署,保障能源安全,推动绿色低碳转型,以及可持续发展,爆发式推出新一轮的新能源光伏项目。弥兴光伏电站是省级重点林光互补项目,征地流转及主变压器、大件运输考验着建设者的组织策划能力。文章对新能源光伏项目征地及主变运输进行了研究,指出了光伏项目征地及主变运输的重要作用,并给出了相应的对策。 展开更多
关键词 光伏项目 征地流转 设计规划 大件运输 主变运输 专项研究
下载PDF
基于数据中台的配电网规划业务数据自动采集系统设计
18
作者 赵雪 黄存强 +3 位作者 杨曦 刘兴文 田旭 刘嘉鎏 《微型电脑应用》 2023年第8期52-55,共4页
为了提高配电网规划业务数据采集精度,设计基于数据中台的配电网规划业务数据自动采集系统。系统以数据中台的模式,将采集与数据接口前置单元的采集前置程序与数据接口程序连接,采集其他企业业务应用系统、配电变压器设备、户表采集设... 为了提高配电网规划业务数据采集精度,设计基于数据中台的配电网规划业务数据自动采集系统。系统以数据中台的模式,将采集与数据接口前置单元的采集前置程序与数据接口程序连接,采集其他企业业务应用系统、配电变压器设备、户表采集设备的规划业务数据,并使用基于数据流概念漂移的自适应集成分类模型实施数据分类处理,然后传输到数据库服务器分类保存,实现数据中台式的数据集中管理。经测试,所设计系统采集精度较高且稳定,并具有较高的抗干扰性,对配电网规划业务数据分类效果较好。 展开更多
关键词 数据中台 配电网 规划业务数据 自动采集系统
下载PDF
Requirement-driven remote sensing metadata planning and online acquisition method for large-scale heterogeneous data
19
作者 Shuang Wang Guoqing Li +1 位作者 Wenyang Yu Yue Ma 《Geo-Spatial Information Science》 SCIE EI CSCD 2022年第2期169-181,共13页
Remote sensing data acquisition is one of the most essential processes in the field of Earth observation.However,traditional methods to acquire data do not satisfy the requirements of current applications because larg... Remote sensing data acquisition is one of the most essential processes in the field of Earth observation.However,traditional methods to acquire data do not satisfy the requirements of current applications because large-scale data processing is required.To address this issue,this paper proposes a data acquisition framework that carries out remote sensing metadata planning and then realizes the online acquisition of large amounts of data.Firstly,this paper establishes a unified metadata cataloging model and realizes the catalog of metadata in a local database.Secondly,a coverage calculation model is presented,which can show users the data coverage information in a selected geographical region under the data requirements of a specific application.Finally,according to the data retrieval results and the coverage calcula-tion,a machine-to-machine interface is provided to acquire target remote sensing data.Experiments were conducted to verify the availability and practicality of the proposed frame-work,and the results show the strengths and powerful capabilities of our framework by overcoming deficiencies in traditional methods.It also achieved the online automatic acquisi-tion of large-scale heterogeneous remote sensing data,which can provide guidance for remote sensing data acquisition strategies. 展开更多
关键词 Online data acquisition remote sensing metadata planning metadata cataloging model coverage calculation machine-to-machine interface
原文传递
倾斜摄影测量技术在规划竣工测量中的运用
20
作者 王玉磊 《价值工程》 2023年第36期106-108,共3页
近年来,倾斜摄影测量技术与传统测量方法如导线测量、大平板测量和RTK数字化采集相比,倾斜摄影测量在外业工作时效、劳动强度、视觉感官等方面具有优势,已经成为一种重要的测量方法,并在各个领域得到广泛应用。文中以某新建设工程项目为... 近年来,倾斜摄影测量技术与传统测量方法如导线测量、大平板测量和RTK数字化采集相比,倾斜摄影测量在外业工作时效、劳动强度、视觉感官等方面具有优势,已经成为一种重要的测量方法,并在各个领域得到广泛应用。文中以某新建设工程项目为例,详细阐述倾斜摄影测量技术的操作流程,针对规划竣工测量精度指标、现场踏勘、调试设备、像控点布设、倾斜航摄设计、获取倾斜影像、三维建模、规划竣工测量数据采集等进行了阐述,为增强规划竣工测量的精准性,更好地落实规划审批意图,确保城乡规划的有序实施。 展开更多
关键词 规划竣工测量 倾斜摄影测量技术 三维模型 数据采集
下载PDF
上一页 1 2 9 下一页 到第
使用帮助 返回顶部