The first topic discussed in this paper is to evaluate the present supporting theories,among which the typical two are collapse arch and elasto-plastic theories. The former is rather limited in practical application,a...The first topic discussed in this paper is to evaluate the present supporting theories,among which the typical two are collapse arch and elasto-plastic theories. The former is rather limited in practical application,and the latter is built up on some assumptions which is inconsis-tent with the reality,for it is of no need to support a roadway of which the surrounding rock is in elasto-plastic state. The second topic is to prove the objective existence of the broken zone in surrounding rock(BZSR) by a series of laboratory experiments and field measurements. The paper indicates that the object to be supported mainly is the bulking or expanding force resulted from the development of BZSR. This is remarkably different from the existing points of view which have been generally recognized nowadays. So far ,this theory has been tested in supporting more than ten thousand meters roadways located in various strata and has proved itself to have a great technoeconomical benefit.展开更多
In order to study the rules of distribution in a plastic zone of rocks, surrounding a roadway, affected by tectonic stress, we first analyzed the mechanics of a roadway affected by tectonic stress and derived a theore...In order to study the rules of distribution in a plastic zone of rocks, surrounding a roadway, affected by tectonic stress, we first analyzed the mechanics of a roadway affected by tectonic stress and derived a theoretical formula for the plastic zone of rocks surrounding a roadway. We also analyzed the distribution characteristics of the plastic zone under different levels of tectonic stress, vertical pressure, cohesion and friction angle of the surrounding rock. Secondly, we used numerical simulation to analyze the range and shape features of the plastic zone of rocks surrounding the roadway, given different tectonic stress levels. Finally we used a rock drilling detector to carry out field measurements on the broken state of rock surrounding the roadway at the –700 substation and channels in the Xinzhuang mine of the Shenhuo mining area. Given the measured ground stress, we analyzed the relationship between tectonic stress and the distribution of this plastic zone. Our results show that the range of the plastic zone at the top and bottom of the roadway increases with an increase in tectonic stress and this increase is especially obvious at the roadway corner.展开更多
Based on the characteristics of the deep circular tunnel, the surrounding rock was divided into three regions: the cracked region, the plastic region and the viscoelastic region. The process of rock stress deformatio...Based on the characteristics of the deep circular tunnel, the surrounding rock was divided into three regions: the cracked region, the plastic region and the viscoelastic region. The process of rock stress deformation and change was divided into three stages after the roadway excavation. By using the elastic-plastic mechanics theory, the analytical solutions of the surrounding stress and displacement at different stages and the radii of cracked and plastic regions were formulated. We additionally explained the surrounding rock stress and displacement which appeared in practical project. Simultaneously, based on the problem which emerged from a mine in Xuzhou during the excavating process of rock roadway's transport, we got the theoretical solutions for the stress and displacement in the process of rock roadway's excavation and considered that the broken area of rock roadway was largely loosing circle. The results indicate that according to the rheological characteristics of surrounding rock, in the primeval excavation of rock roadway, we should increase the length of anchor bolt and cooperate it with anchor nets cable-U steel supporting frame. In addition, when the deformation rate of the surrounding rock is descending after the 15 days' excavation, we should use the "three anchor" supporting method (anchor bolt spray, anchor note and anchor rove) and set aside about 20 cm as the reserved deformation laver.展开更多
文摘The first topic discussed in this paper is to evaluate the present supporting theories,among which the typical two are collapse arch and elasto-plastic theories. The former is rather limited in practical application,and the latter is built up on some assumptions which is inconsis-tent with the reality,for it is of no need to support a roadway of which the surrounding rock is in elasto-plastic state. The second topic is to prove the objective existence of the broken zone in surrounding rock(BZSR) by a series of laboratory experiments and field measurements. The paper indicates that the object to be supported mainly is the bulking or expanding force resulted from the development of BZSR. This is remarkably different from the existing points of view which have been generally recognized nowadays. So far ,this theory has been tested in supporting more than ten thousand meters roadways located in various strata and has proved itself to have a great technoeconomical benefit.
基金Financial support for this work, provided by the research fund of the State Key Laboratory of Coal Resources and Mine Safety of the China University of Mining & Technology (No.08kf11) is gratefully ac-knowledged
文摘In order to study the rules of distribution in a plastic zone of rocks, surrounding a roadway, affected by tectonic stress, we first analyzed the mechanics of a roadway affected by tectonic stress and derived a theoretical formula for the plastic zone of rocks surrounding a roadway. We also analyzed the distribution characteristics of the plastic zone under different levels of tectonic stress, vertical pressure, cohesion and friction angle of the surrounding rock. Secondly, we used numerical simulation to analyze the range and shape features of the plastic zone of rocks surrounding the roadway, given different tectonic stress levels. Finally we used a rock drilling detector to carry out field measurements on the broken state of rock surrounding the roadway at the –700 substation and channels in the Xinzhuang mine of the Shenhuo mining area. Given the measured ground stress, we analyzed the relationship between tectonic stress and the distribution of this plastic zone. Our results show that the range of the plastic zone at the top and bottom of the roadway increases with an increase in tectonic stress and this increase is especially obvious at the roadway corner.
基金provided by the National Basic Research Program of China (No. 2007CB209408)the National Natural Science Foundation of China (No. 51074166)the Research Innovation Program for College Graduates of Jiangsu (No.CX098B_108Z)
文摘Based on the characteristics of the deep circular tunnel, the surrounding rock was divided into three regions: the cracked region, the plastic region and the viscoelastic region. The process of rock stress deformation and change was divided into three stages after the roadway excavation. By using the elastic-plastic mechanics theory, the analytical solutions of the surrounding stress and displacement at different stages and the radii of cracked and plastic regions were formulated. We additionally explained the surrounding rock stress and displacement which appeared in practical project. Simultaneously, based on the problem which emerged from a mine in Xuzhou during the excavating process of rock roadway's transport, we got the theoretical solutions for the stress and displacement in the process of rock roadway's excavation and considered that the broken area of rock roadway was largely loosing circle. The results indicate that according to the rheological characteristics of surrounding rock, in the primeval excavation of rock roadway, we should increase the length of anchor bolt and cooperate it with anchor nets cable-U steel supporting frame. In addition, when the deformation rate of the surrounding rock is descending after the 15 days' excavation, we should use the "three anchor" supporting method (anchor bolt spray, anchor note and anchor rove) and set aside about 20 cm as the reserved deformation laver.