Shale gas wells frequently suffer from liquid loading and insufficient formation pressure in the late stage of production.To address this issue,an intelligent production optimization method for low pressure and low pr...Shale gas wells frequently suffer from liquid loading and insufficient formation pressure in the late stage of production.To address this issue,an intelligent production optimization method for low pressure and low productivity shale gas well is proposed.Based on the artificial intelligence algorithms,this method realizes automatic production and monitoring of gas well.The method can forecast the production performance of a single well by using the long short-term memory neural network and then guide gas well production accordingly,to fulfill liquid loading warning and automatic intermittent production.Combined with adjustable nozzle,the method can keep production and pressure of gas wells stable automatically,extend normal production time of shale gas wells,enhance automatic level of well sites,and reach the goal of refined production management by making production regime for each well.Field tests show that wells with production regime optimized by this method increased 15%in estimated ultimate reserve(EUR).Compared with the development mode of drainage after depletion recovery,this method is more economical and can increase and stabilize production effectively,so it has a bright application prospect.展开更多
Purpose: To compare the success and complication rates of low target pressure trabeculectomy (LTT) and conventional trabeculectomy (CT). Methods: A retrospective study was conducted with consecutive patients undergoin...Purpose: To compare the success and complication rates of low target pressure trabeculectomy (LTT) and conventional trabeculectomy (CT). Methods: A retrospective study was conducted with consecutive patients undergoing trabeculectomy. Twelve eyes of 12 patients underwent LTT, and 17 eyes of 17 patients underwent CT. Surgical success was defined as meeting each target intraocular pressure (IOP) without additional medication or further glaucoma surgery. A Kaplan-Meier survival analysis was used to estimate survival rate. Incidences of surgical complications were also assessed. Results: The median postoperative IOP 2 years after surgery were 10.0 mmHg (interquartile range [IQR] 8.5 - 12.0 mmHg) in the LTT group and 16.0 mmHg (IQR, 14.0 - 18.5 mmHg) in the CT group (P = 0.000). Estimated survival rates for patients who underwent the two types of trabeculectomy were significantly different with all IOP criteria of 10, 12 and 14 mmHg (P Conclusion: LTT provided more chances to maintain low postoperative IOP and had no more vision-threatening complication than those of CT.展开更多
Low radioactive rare earth waste (containing 232 Th,specific activity 5 000 8 000 Bq·kg -1 ) were diluted 20 times by cement,sand and carbide ash and were made into special cement.The radioactivity of...Low radioactive rare earth waste (containing 232 Th,specific activity 5 000 8 000 Bq·kg -1 ) were diluted 20 times by cement,sand and carbide ash and were made into special cement.The radioactivity of this special cement complied with the healthy protect standard for radioactive materials (GB6566 86).Test results showed that this special cement could lower COD,the degradation rate increased as the time went on.In acidic medium,this special cement could remove E Coli effectively.Applying aeration and adding lumps of cement,the degradation of COD versus time complied with Logistic model through fitting by computer.The two “S” curves indicated that aeration and adding lumps of cement had synergistic action on sewage treatment.展开更多
基金Supported by the China National Science and Technology Major Project(2017ZX05037-004).
文摘Shale gas wells frequently suffer from liquid loading and insufficient formation pressure in the late stage of production.To address this issue,an intelligent production optimization method for low pressure and low productivity shale gas well is proposed.Based on the artificial intelligence algorithms,this method realizes automatic production and monitoring of gas well.The method can forecast the production performance of a single well by using the long short-term memory neural network and then guide gas well production accordingly,to fulfill liquid loading warning and automatic intermittent production.Combined with adjustable nozzle,the method can keep production and pressure of gas wells stable automatically,extend normal production time of shale gas wells,enhance automatic level of well sites,and reach the goal of refined production management by making production regime for each well.Field tests show that wells with production regime optimized by this method increased 15%in estimated ultimate reserve(EUR).Compared with the development mode of drainage after depletion recovery,this method is more economical and can increase and stabilize production effectively,so it has a bright application prospect.
文摘Purpose: To compare the success and complication rates of low target pressure trabeculectomy (LTT) and conventional trabeculectomy (CT). Methods: A retrospective study was conducted with consecutive patients undergoing trabeculectomy. Twelve eyes of 12 patients underwent LTT, and 17 eyes of 17 patients underwent CT. Surgical success was defined as meeting each target intraocular pressure (IOP) without additional medication or further glaucoma surgery. A Kaplan-Meier survival analysis was used to estimate survival rate. Incidences of surgical complications were also assessed. Results: The median postoperative IOP 2 years after surgery were 10.0 mmHg (interquartile range [IQR] 8.5 - 12.0 mmHg) in the LTT group and 16.0 mmHg (IQR, 14.0 - 18.5 mmHg) in the CT group (P = 0.000). Estimated survival rates for patients who underwent the two types of trabeculectomy were significantly different with all IOP criteria of 10, 12 and 14 mmHg (P Conclusion: LTT provided more chances to maintain low postoperative IOP and had no more vision-threatening complication than those of CT.
文摘Low radioactive rare earth waste (containing 232 Th,specific activity 5 000 8 000 Bq·kg -1 ) were diluted 20 times by cement,sand and carbide ash and were made into special cement.The radioactivity of this special cement complied with the healthy protect standard for radioactive materials (GB6566 86).Test results showed that this special cement could lower COD,the degradation rate increased as the time went on.In acidic medium,this special cement could remove E Coli effectively.Applying aeration and adding lumps of cement,the degradation of COD versus time complied with Logistic model through fitting by computer.The two “S” curves indicated that aeration and adding lumps of cement had synergistic action on sewage treatment.