At present time, there has been a demand for management systems that can survey and monitor a PC (personal computer) practice room, movement of people in an office, situation of utilization of facilities and so on i...At present time, there has been a demand for management systems that can survey and monitor a PC (personal computer) practice room, movement of people in an office, situation of utilization of facilities and so on in real time without causing psychological stress. For example, PC administrators in Japanese national educational institutions must report operation status of PC practice rooms once a year. But, there is currently no system for automatically recording PC operating situations. Therefore, the burden on the PC administrators is big. In this study, we aimed at systems for accurately managing the sitting and work time without psychologically stressing PC users. This time, we propose uniform management systems of sitting and work time using smart tap node and mat sensor node by IoT (Internet of Things) technology. The smart tap was connected to PCs to acquire the operating status of the PCs. In parallel with this smart tap, the mat sensor was used to acquire human presence state. By calculating binary data representing the PC operating status and human presence state from the two sensing data (smart tap and mat sensor) by the proposed technique, we can exactly calculate wasteful power consumption etc. The use of IoT technology makes it unnecessary to use large installation services when introducing our system. Therefore, this our proposal system can be easily installed even by unskilled workers.展开更多
Purpose–This study aims to analyze the development direction of track geometry inspection equipment for high-speed comprehensive inspection train in China.Design/methodology/approach–The development of track geometr...Purpose–This study aims to analyze the development direction of track geometry inspection equipment for high-speed comprehensive inspection train in China.Design/methodology/approach–The development of track geometry inspection equipment for highspeed comprehensive inspection train in China in the past 20 years can be divided into 3 stages.Track geometry inspection equipment 1.0 is the stage of analog signal.At the stage 1.0,the first priority is to meet the China’s railways basic needs of pre-operation joint debugging,safety assessment and daily dynamic inspection,maintenance and repair after operation.Track geometry inspection equipment 2.0 is the stage of digital signal.At the stage 2.0,it is important to improve stability and reliability of track geometry inspection equipment by upgrading the hardware sensors and improving software architecture.Track geometry inspection equipment 3.0 is the stage of lightweight.At the stage 3.0,miniaturization,low power consumption,self-running and green economy are co-developing on demand.Findings–The ability of track geometry inspection equipment for high-speed comprehensive inspection train will be expanded.The dynamic inspection of track stiffness changes will be studied under loaded and unloaded conditions in response to the track local settlement,track plate detachment and cushion plate failure.The dynamic measurement method of rail surface slope and vertical curve radius will be proposed,to reveal the changes in railway profile parameters of high-speed railways and the relationship between railway profile,track irregularity and subsidence of subgrade and bridges.The 200 m cut-off wavelength of track regularity will be researched to adapt to the operating speed of 400 km/h.Originality/value–The research can provide new connotations and requirements of track geometry inspection equipment for high-speed comprehensive inspection train in the new railway stage.展开更多
文摘At present time, there has been a demand for management systems that can survey and monitor a PC (personal computer) practice room, movement of people in an office, situation of utilization of facilities and so on in real time without causing psychological stress. For example, PC administrators in Japanese national educational institutions must report operation status of PC practice rooms once a year. But, there is currently no system for automatically recording PC operating situations. Therefore, the burden on the PC administrators is big. In this study, we aimed at systems for accurately managing the sitting and work time without psychologically stressing PC users. This time, we propose uniform management systems of sitting and work time using smart tap node and mat sensor node by IoT (Internet of Things) technology. The smart tap was connected to PCs to acquire the operating status of the PCs. In parallel with this smart tap, the mat sensor was used to acquire human presence state. By calculating binary data representing the PC operating status and human presence state from the two sensing data (smart tap and mat sensor) by the proposed technique, we can exactly calculate wasteful power consumption etc. The use of IoT technology makes it unnecessary to use large installation services when introducing our system. Therefore, this our proposal system can be easily installed even by unskilled workers.
基金supported by the National Natural Science Foundation of China(Grant No.52278465)Science and Technology Research and Development Plan of China Railway(Grant No.N2022G051)Key Project of China Academy of Railway Sciences(Grant No.2351JJ2401).
文摘Purpose–This study aims to analyze the development direction of track geometry inspection equipment for high-speed comprehensive inspection train in China.Design/methodology/approach–The development of track geometry inspection equipment for highspeed comprehensive inspection train in China in the past 20 years can be divided into 3 stages.Track geometry inspection equipment 1.0 is the stage of analog signal.At the stage 1.0,the first priority is to meet the China’s railways basic needs of pre-operation joint debugging,safety assessment and daily dynamic inspection,maintenance and repair after operation.Track geometry inspection equipment 2.0 is the stage of digital signal.At the stage 2.0,it is important to improve stability and reliability of track geometry inspection equipment by upgrading the hardware sensors and improving software architecture.Track geometry inspection equipment 3.0 is the stage of lightweight.At the stage 3.0,miniaturization,low power consumption,self-running and green economy are co-developing on demand.Findings–The ability of track geometry inspection equipment for high-speed comprehensive inspection train will be expanded.The dynamic inspection of track stiffness changes will be studied under loaded and unloaded conditions in response to the track local settlement,track plate detachment and cushion plate failure.The dynamic measurement method of rail surface slope and vertical curve radius will be proposed,to reveal the changes in railway profile parameters of high-speed railways and the relationship between railway profile,track irregularity and subsidence of subgrade and bridges.The 200 m cut-off wavelength of track regularity will be researched to adapt to the operating speed of 400 km/h.Originality/value–The research can provide new connotations and requirements of track geometry inspection equipment for high-speed comprehensive inspection train in the new railway stage.