The Device-to-Device(D2D)communication underlaying cellular networks is considered in this study.The D2D transmitter in the D2D mode can directly transmit messages to a receiver,but it may interfere with the transmiss...The Device-to-Device(D2D)communication underlaying cellular networks is considered in this study.The D2D transmitter in the D2D mode can directly transmit messages to a receiver,but it may interfere with the transmission of another cellular user who shares the same uplink channel.The transmitter can also operate in a cellular mode in which no interference to another cellular user occurs.We propose a mode selection scheme that aims to minimize the transmission power of the D2D transmitter subject to constraints on the minimum required data rate and maximum interference to other cellular users.The proposed scheme is based on bounds for transmission power and is less complex than the optimal scheme.Furthermore,it requires only a few statistics and does not need a fading channel distribution.The performance of the scheme is close to optimum when the number of Base Station(BS)antennas is large,and the mean absolute deviation of the fading terms is small.We verify this with numerical results of the Rician and Rayleigh fading channels by assuming that the BS antennas are independent.The simulation results for the two correlated BS antennas are presented herein.展开更多
Most of the hydropower projects in Southwest China and the adjacent foreign regions will be put into operation between 2015 and 2020, which will bring some difficulties for reasonable accommodation and delivery of ele...Most of the hydropower projects in Southwest China and the adjacent foreign regions will be put into operation between 2015 and 2020, which will bring some difficulties for reasonable accommodation and delivery of electric energy. In this paper the author studies the development scale, development schedule, accommodation and transmission schemes of the cascade hydropower stations along the Lancang River basin, one of the five large basins in China, based on the load characteristics of grids at both the sending end and the receiving end, the strategy of complementary utilization of thermal power and hydropower, the advanced transmission technologies, and the optimal economic performance. The study results show that, the cascade hydropower stations on the upper reaches of the Lancang River in Yunnan should mainly serve Guangdong Province, with proper planning of partly serving Yunnan Province during dry seasons. The transmission schemes should adopt UHVDC, UHVAC, and single-tower double-circuited HVDC transmission scheme according to the transmission capacity and distance.展开更多
An intelligent detecting system based on wireless transmission is designed. Its hardware includes the card reading module, the wireless digital transmission module, the LCD module, the random password keyboard module ...An intelligent detecting system based on wireless transmission is designed. Its hardware includes the card reading module, the wireless digital transmission module, the LCD module, the random password keyboard module and a 16×16 lattice word database based on e-Flash MM36SB020. Its software is a communication protocol between the central control computer and the entrance management base station. To resolve the conflicting problems occurred during the data transmission, a method of delaying time at random is proposed.展开更多
To transmit electric power from ThreeGorges to East China, ±500 kV HVDC willbe adopted. The first transmission Iine will beconstructed from the Longquan (Yichang)Converter Station to the Zhengping(Changzhou) Inve...To transmit electric power from ThreeGorges to East China, ±500 kV HVDC willbe adopted. The first transmission Iine will beconstructed from the Longquan (Yichang)Converter Station to the Zhengping(Changzhou) Inverter Station. This projectconnects the East China Power Network withthe Central China Power Network,coordinates the hydro and thermal electricpower, obtains the profit from timedifference and promotes the process of theinterconnection of the power networks of thewhole country.This paper gives the abstract of thesituation of the preliminary design, primaryresult and development tendency of the firstHVDC transmission project which transmitsthe electric power from Three Gorges to EastChina.展开更多
In view of its huge installed capacity and very complex transmission system,the design process of China's Three Gorges Hydropower Station had been repeatedly demonstrated for more than ten years.The smooth constru...In view of its huge installed capacity and very complex transmission system,the design process of China's Three Gorges Hydropower Station had been repeatedly demonstrated for more than ten years.The smooth construction,bringing into production and operation show that the planning scheme for Three Gorges power transmission project is successful.In this paper the design course of Three Gorges power transmission system is retrospected;the main planning schemes for Three Gorges power transmission system are reviewed;and the design results in different design stages are summarized.展开更多
A hybrid scheduling algorithm based on genetic algorithm is proposed in this paper for reconnaissance satellite data transmission.At first,based on description of satellite data transmission request,satellite data tra...A hybrid scheduling algorithm based on genetic algorithm is proposed in this paper for reconnaissance satellite data transmission.At first,based on description of satellite data transmission request,satellite data transmission task model and satellite data transmission scheduling problem model are established.Secondly,the conflicts in scheduling are discussed.According to the meaning of possible conflict,the method to divide possible conflict task set is given.Thirdly,a hybrid algorithm which consists of genetic algorithm and heuristic information is presented.The heuristic information comes from two concepts,conflict degree and conflict number.Finally,an example shows the algorithm's feasibility and performance better than other traditional展开更多
Simulation has proven to be an effective tool for analyzing pipeline network systems (PNS) in order to determine the design and operational variables which are essential for evaluating the performance of the system....Simulation has proven to be an effective tool for analyzing pipeline network systems (PNS) in order to determine the design and operational variables which are essential for evaluating the performance of the system. This paper discusses the use of simulation for performance analysis of transmission PNS. A simulation model was developed for determining flow and pressure variables for different configuration of PNS. The mathematical formulation for the simulation model was derived based on the principles of energy conservation, mass balance, and compressor characteristics. For the determination of the pressure and flow variables, solution procedure was developed based on iterative Newton Raphson scheme and implemented using visual C++6. Evaluations of the simulation model with the existing pipeline network system showed that the model enabled to determine the operational variables with less than ten iterations. The performances of the compressor working in the pipeline network system xvhich includes energy consumption, compression ratio and discharge pressure were evaluated to meet pressure requirements ranging from 4000-5000 kPa at various speed. Results of the analyses from the simulation indicated that the model could be used for performance analysis to assist decisions regarding the design and optimal operations of transmission PNS.展开更多
为了辨识油气智慧管道系统中存在的信息安全风险,通过基于系统论事故分析模型(systems-theoretic accident modeling and process,STAMP)的方法,对油气智慧管道系统的信息物理安全进行全面评估与分析。首先,系统综合分析了油气智慧管道...为了辨识油气智慧管道系统中存在的信息安全风险,通过基于系统论事故分析模型(systems-theoretic accident modeling and process,STAMP)的方法,对油气智慧管道系统的信息物理安全进行全面评估与分析。首先,系统综合分析了油气智慧管道涉及的设备、设施、工艺、元件,评估其安全性。其次,通过建立STAMP模型,深入分析了各层级、元件之间的反馈信息与控制动作,形成了明确的控制反馈回路,突显了元件之间的关联与控制关系。在此基础上,系统辨识出了潜在的信息风险因素,推导并构建了可能发生的系统失效场景。以天然气输气首站油气智慧管道系统为例,研究验证了基于STAMP模型的可行性和有效性。结果显示,该方法不仅直观地描述了元件之间的关联与控制关系,而且从物理层功能安全的角度全面考虑了信息风险,特别凸显了过程控制系统(process control systems,PCS)及易受攻击的操作员站。与传统方法相比,本研究所提出的方法将信息物理安全风险因素的识别率提升至80%以上,提高了40%以上,有助于避免不必要的安全措施冗余设计,提高了安全风险管控的准确性。展开更多
受光伏逆变器控制策略影响,光伏场站呈弱馈性和电流相位受控特性,导致送出线路光伏侧距离保护的测量阻抗无法正确反映故障所在位置,抗过渡电阻能力大大下降。根据送出线路系统的故障分量序网图推导出线路短路阻抗的求解方程组,同时基于...受光伏逆变器控制策略影响,光伏场站呈弱馈性和电流相位受控特性,导致送出线路光伏侧距离保护的测量阻抗无法正确反映故障所在位置,抗过渡电阻能力大大下降。根据送出线路系统的故障分量序网图推导出线路短路阻抗的求解方程组,同时基于光伏场站直流母线接入的超导磁储能(superconducting magnetic energy storage,SMES)改变传统的低电压穿越控制策略,通过控保协同消除方程组中的未知量,进而对线路短路阻抗进行求解,提出了基于超导磁储能的光伏场站送出线路距离保护方案。与现有推导线路短路阻抗的方法相比,该方法不存在近似计算,计算准确度得到很大提升;且相比于其他控保协同方案,该方案在保证距离保护可靠动作的同时也兼顾了故障期间光伏场站对于电网的无功支撑,其低电压穿越能力不仅没有被削弱,反而得到一定的提升。展开更多
基金This work was supported by Kasetsart University Research and Development Institute(KURDI)under the FY2016 Kasetsart University research grant,and the Royal Golden Jubilee Ph.D.program.
文摘The Device-to-Device(D2D)communication underlaying cellular networks is considered in this study.The D2D transmitter in the D2D mode can directly transmit messages to a receiver,but it may interfere with the transmission of another cellular user who shares the same uplink channel.The transmitter can also operate in a cellular mode in which no interference to another cellular user occurs.We propose a mode selection scheme that aims to minimize the transmission power of the D2D transmitter subject to constraints on the minimum required data rate and maximum interference to other cellular users.The proposed scheme is based on bounds for transmission power and is less complex than the optimal scheme.Furthermore,it requires only a few statistics and does not need a fading channel distribution.The performance of the scheme is close to optimum when the number of Base Station(BS)antennas is large,and the mean absolute deviation of the fading terms is small.We verify this with numerical results of the Rician and Rayleigh fading channels by assuming that the BS antennas are independent.The simulation results for the two correlated BS antennas are presented herein.
文摘Most of the hydropower projects in Southwest China and the adjacent foreign regions will be put into operation between 2015 and 2020, which will bring some difficulties for reasonable accommodation and delivery of electric energy. In this paper the author studies the development scale, development schedule, accommodation and transmission schemes of the cascade hydropower stations along the Lancang River basin, one of the five large basins in China, based on the load characteristics of grids at both the sending end and the receiving end, the strategy of complementary utilization of thermal power and hydropower, the advanced transmission technologies, and the optimal economic performance. The study results show that, the cascade hydropower stations on the upper reaches of the Lancang River in Yunnan should mainly serve Guangdong Province, with proper planning of partly serving Yunnan Province during dry seasons. The transmission schemes should adopt UHVDC, UHVAC, and single-tower double-circuited HVDC transmission scheme according to the transmission capacity and distance.
文摘An intelligent detecting system based on wireless transmission is designed. Its hardware includes the card reading module, the wireless digital transmission module, the LCD module, the random password keyboard module and a 16×16 lattice word database based on e-Flash MM36SB020. Its software is a communication protocol between the central control computer and the entrance management base station. To resolve the conflicting problems occurred during the data transmission, a method of delaying time at random is proposed.
文摘To transmit electric power from ThreeGorges to East China, ±500 kV HVDC willbe adopted. The first transmission Iine will beconstructed from the Longquan (Yichang)Converter Station to the Zhengping(Changzhou) Inverter Station. This projectconnects the East China Power Network withthe Central China Power Network,coordinates the hydro and thermal electricpower, obtains the profit from timedifference and promotes the process of theinterconnection of the power networks of thewhole country.This paper gives the abstract of thesituation of the preliminary design, primaryresult and development tendency of the firstHVDC transmission project which transmitsthe electric power from Three Gorges to EastChina.
文摘In view of its huge installed capacity and very complex transmission system,the design process of China's Three Gorges Hydropower Station had been repeatedly demonstrated for more than ten years.The smooth construction,bringing into production and operation show that the planning scheme for Three Gorges power transmission project is successful.In this paper the design course of Three Gorges power transmission system is retrospected;the main planning schemes for Three Gorges power transmission system are reviewed;and the design results in different design stages are summarized.
文摘A hybrid scheduling algorithm based on genetic algorithm is proposed in this paper for reconnaissance satellite data transmission.At first,based on description of satellite data transmission request,satellite data transmission task model and satellite data transmission scheduling problem model are established.Secondly,the conflicts in scheduling are discussed.According to the meaning of possible conflict,the method to divide possible conflict task set is given.Thirdly,a hybrid algorithm which consists of genetic algorithm and heuristic information is presented.The heuristic information comes from two concepts,conflict degree and conflict number.Finally,an example shows the algorithm's feasibility and performance better than other traditional
文摘Simulation has proven to be an effective tool for analyzing pipeline network systems (PNS) in order to determine the design and operational variables which are essential for evaluating the performance of the system. This paper discusses the use of simulation for performance analysis of transmission PNS. A simulation model was developed for determining flow and pressure variables for different configuration of PNS. The mathematical formulation for the simulation model was derived based on the principles of energy conservation, mass balance, and compressor characteristics. For the determination of the pressure and flow variables, solution procedure was developed based on iterative Newton Raphson scheme and implemented using visual C++6. Evaluations of the simulation model with the existing pipeline network system showed that the model enabled to determine the operational variables with less than ten iterations. The performances of the compressor working in the pipeline network system xvhich includes energy consumption, compression ratio and discharge pressure were evaluated to meet pressure requirements ranging from 4000-5000 kPa at various speed. Results of the analyses from the simulation indicated that the model could be used for performance analysis to assist decisions regarding the design and optimal operations of transmission PNS.
文摘为了辨识油气智慧管道系统中存在的信息安全风险,通过基于系统论事故分析模型(systems-theoretic accident modeling and process,STAMP)的方法,对油气智慧管道系统的信息物理安全进行全面评估与分析。首先,系统综合分析了油气智慧管道涉及的设备、设施、工艺、元件,评估其安全性。其次,通过建立STAMP模型,深入分析了各层级、元件之间的反馈信息与控制动作,形成了明确的控制反馈回路,突显了元件之间的关联与控制关系。在此基础上,系统辨识出了潜在的信息风险因素,推导并构建了可能发生的系统失效场景。以天然气输气首站油气智慧管道系统为例,研究验证了基于STAMP模型的可行性和有效性。结果显示,该方法不仅直观地描述了元件之间的关联与控制关系,而且从物理层功能安全的角度全面考虑了信息风险,特别凸显了过程控制系统(process control systems,PCS)及易受攻击的操作员站。与传统方法相比,本研究所提出的方法将信息物理安全风险因素的识别率提升至80%以上,提高了40%以上,有助于避免不必要的安全措施冗余设计,提高了安全风险管控的准确性。
文摘受光伏逆变器控制策略影响,光伏场站呈弱馈性和电流相位受控特性,导致送出线路光伏侧距离保护的测量阻抗无法正确反映故障所在位置,抗过渡电阻能力大大下降。根据送出线路系统的故障分量序网图推导出线路短路阻抗的求解方程组,同时基于光伏场站直流母线接入的超导磁储能(superconducting magnetic energy storage,SMES)改变传统的低电压穿越控制策略,通过控保协同消除方程组中的未知量,进而对线路短路阻抗进行求解,提出了基于超导磁储能的光伏场站送出线路距离保护方案。与现有推导线路短路阻抗的方法相比,该方法不存在近似计算,计算准确度得到很大提升;且相比于其他控保协同方案,该方案在保证距离保护可靠动作的同时也兼顾了故障期间光伏场站对于电网的无功支撑,其低电压穿越能力不仅没有被削弱,反而得到一定的提升。