In this paper,the multi-body coupled dynamic characteristics of a semisubmersible platform and an HYSY 229 barge were investigated.First,coupled hydrodynamic analysis of the HYSY 229 barge and the semisubmersible plat...In this paper,the multi-body coupled dynamic characteristics of a semisubmersible platform and an HYSY 229 barge were investigated.First,coupled hydrodynamic analysis of the HYSY 229 barge and the semisubmersible platform was performed.Relevant hydrodynamic parameters were obtained using the retardation function method of three-dimensional frequency-domain potential flow theory.The results of the hydrodynamic analysis were highly consistent with the test findings,verifying the accuracy of the multifloating hydrodynamic coupling analysis,and key hydrodynamic parameters were solved for different water depths and the coupling effect.According to the obtained results,the hydrodynamic influence was the largest in shallow waters when the coupling effect was considered.Furthermore,the coupled motion equation combined with viscous damping,fender system,and mooring system was established,and the hydrodynamics,floating body motion,and dynamic response of the fender system were analyzed.Motion analysis revealed good agreement among the surge,sway,and yaw motions of the two floating bodies.However,when the wave period reached 10 s,the motion of the two floating bodies showed severe shock,and a relative motion was also observed.Therefore,excessive constraints should be added between the two floating bodies during construction to ensure construction safety.The numerical analysis and model test results of the semisubmersible platform and HYSY 229 barge at a water depth of 42 m and sea conditions of 0°,45°,and 90° were in good agreement,and the error was less than 5%.The maximum movement of the HYSY 229 barge reached 2.61 m in the sway direction,whereas that of the semisubmersible platform was 2.11 m.During construction,excessive constraints should be added between the two floating bodies to limit their relative movement and ensure construction safety.展开更多
In this study,the Jinzhou 9-3 CEPD float-over installation project was investigated.During the undocking condition,the water depth of the motion path of the working barge gradually changed from 10.31 m to 9.41 m.The u...In this study,the Jinzhou 9-3 CEPD float-over installation project was investigated.During the undocking condition,the water depth of the motion path of the working barge gradually changed from 10.31 m to 9.41 m.The undocking clearance of the HYSY 228 is smaller than 1 m;therefore,the barge shows highly nonlinear hydrodynamic characteristics,and it is difficult to be accurately simulated by numerical analysis.Thus,it is necessary to obtain the hydrodynamic characteristics and laws of the float-over barge at different water depths by using tank model test,to provide some reference and guidance for float-over operations in shallow water.展开更多
In this paper,a numerical investigation of a float-over installation for an offshore platform is presented to verify the feasibility of the actual installation.The hydrodynamic performance of a T-barge is investigated...In this paper,a numerical investigation of a float-over installation for an offshore platform is presented to verify the feasibility of the actual installation.The hydrodynamic performance of a T-barge is investigated in the frequency domain,and the coupled motions are analyzed in the time domain.We then compare with those of the model test and determine that the response amplitude operator and the time series agree quite well.The barge exhibits favorable hydrodynamic behavior in the considered sea state,and the equipment loads are allowable.Themooring systemand sway fender forces are within the permissible range.Based on these results,we can verify that the actual installation of the offshore platform is feasible.We accurately simulated many important factors and effectively reduced the risk associated with the offshore installation,which is of great importance.As such,we demonstrate that the numerical simulation of the float-over installation for offshore platforms has practical engineering significance.展开更多
In this paper, the seismic response of a newly designed steel jacket offshore platform with a float over deck (FOD) system in the Persian Gulf was investigated through incremental dynamic analysis. Comparison of inc...In this paper, the seismic response of a newly designed steel jacket offshore platform with a float over deck (FOD) system in the Persian Gulf was investigated through incremental dynamic analysis. Comparison of incremental dynamic analysis results for both directions of the platform shows that the lateral strength of the platform in the float over direction is less than its lateral strength in other direction. Dynamic characteristics measurement of a scale model of platform was also performed using forced vibration tests. From experimental measurement of the scaled model, it was observed that dynamic characteristic of the platform is different in the float over direction compared to the other direction. Therefore, a new offshore installed bracing system for the float over direction was proposed for improvement of seismic performance of this type of platform. Finally, the structure with the modified system was assessed using the probabilistic seismic assessment method as well as experimental measurement of its dynamic characteristics. It was observed that the proposed offshore installed bracing system improves the performance of platforms subjected to strong ground motion.展开更多
基金the National Natural Science Foundation of China(No.U20A20328).
文摘In this paper,the multi-body coupled dynamic characteristics of a semisubmersible platform and an HYSY 229 barge were investigated.First,coupled hydrodynamic analysis of the HYSY 229 barge and the semisubmersible platform was performed.Relevant hydrodynamic parameters were obtained using the retardation function method of three-dimensional frequency-domain potential flow theory.The results of the hydrodynamic analysis were highly consistent with the test findings,verifying the accuracy of the multifloating hydrodynamic coupling analysis,and key hydrodynamic parameters were solved for different water depths and the coupling effect.According to the obtained results,the hydrodynamic influence was the largest in shallow waters when the coupling effect was considered.Furthermore,the coupled motion equation combined with viscous damping,fender system,and mooring system was established,and the hydrodynamics,floating body motion,and dynamic response of the fender system were analyzed.Motion analysis revealed good agreement among the surge,sway,and yaw motions of the two floating bodies.However,when the wave period reached 10 s,the motion of the two floating bodies showed severe shock,and a relative motion was also observed.Therefore,excessive constraints should be added between the two floating bodies during construction to ensure construction safety.The numerical analysis and model test results of the semisubmersible platform and HYSY 229 barge at a water depth of 42 m and sea conditions of 0°,45°,and 90° were in good agreement,and the error was less than 5%.The maximum movement of the HYSY 229 barge reached 2.61 m in the sway direction,whereas that of the semisubmersible platform was 2.11 m.During construction,excessive constraints should be added between the two floating bodies to limit their relative movement and ensure construction safety.
文摘In this study,the Jinzhou 9-3 CEPD float-over installation project was investigated.During the undocking condition,the water depth of the motion path of the working barge gradually changed from 10.31 m to 9.41 m.The undocking clearance of the HYSY 228 is smaller than 1 m;therefore,the barge shows highly nonlinear hydrodynamic characteristics,and it is difficult to be accurately simulated by numerical analysis.Thus,it is necessary to obtain the hydrodynamic characteristics and laws of the float-over barge at different water depths by using tank model test,to provide some reference and guidance for float-over operations in shallow water.
基金supported by Marine Engineering Equipment Scientific Research Project of Ministry of Industry and Information Technology of PRC and the Application of float-over installation simulation in Wangchang Project of CNOOC Technology ProjectThe Fundamental Research Funds for the Central Universities(HEUCF170102)
文摘In this paper,a numerical investigation of a float-over installation for an offshore platform is presented to verify the feasibility of the actual installation.The hydrodynamic performance of a T-barge is investigated in the frequency domain,and the coupled motions are analyzed in the time domain.We then compare with those of the model test and determine that the response amplitude operator and the time series agree quite well.The barge exhibits favorable hydrodynamic behavior in the considered sea state,and the equipment loads are allowable.Themooring systemand sway fender forces are within the permissible range.Based on these results,we can verify that the actual installation of the offshore platform is feasible.We accurately simulated many important factors and effectively reduced the risk associated with the offshore installation,which is of great importance.As such,we demonstrate that the numerical simulation of the float-over installation for offshore platforms has practical engineering significance.
基金sponsored by POGC (Pars Oil and Gas Company,No.132 "Investigation of Structural Health Monitoring of Steel Jacket Offshore Platforms")The financial support of POGC is gratefully acknowledged
文摘In this paper, the seismic response of a newly designed steel jacket offshore platform with a float over deck (FOD) system in the Persian Gulf was investigated through incremental dynamic analysis. Comparison of incremental dynamic analysis results for both directions of the platform shows that the lateral strength of the platform in the float over direction is less than its lateral strength in other direction. Dynamic characteristics measurement of a scale model of platform was also performed using forced vibration tests. From experimental measurement of the scaled model, it was observed that dynamic characteristic of the platform is different in the float over direction compared to the other direction. Therefore, a new offshore installed bracing system for the float over direction was proposed for improvement of seismic performance of this type of platform. Finally, the structure with the modified system was assessed using the probabilistic seismic assessment method as well as experimental measurement of its dynamic characteristics. It was observed that the proposed offshore installed bracing system improves the performance of platforms subjected to strong ground motion.