期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
Assistant pullback technique for main span closure of Sutong Bridge 被引量:2
1
作者 Chen Ming Luo Chengbin +2 位作者 Wu Qihe Zhang Yongtao You Xinpeng 《Engineering Sciences》 EI 2009年第1期69-75,共7页
Sutong Bridge is a cable-stayed steel box girder bridge with a main span of 1 088 m. The erection of upper structure adopts geometry control method and requires no change to the unit' s size and the structure' s non... Sutong Bridge is a cable-stayed steel box girder bridge with a main span of 1 088 m. The erection of upper structure adopts geometry control method and requires no change to the unit' s size and the structure' s none-stress geometry. Before main span closure, the cantilever of girder reaches 540.8 m, the structure state is noticeably influenced by extemal circumstances, the main span closure face great difficulty. By abstracting the advantage of the pullback method abroad and the domestic temperature-cutting method, a new assistant pullback method have put forward and bring into practice actually. In this paper, the analysis key point of practice conditions, key parameter of practice, main measures of the method and the performance is introduced. 展开更多
关键词 Sutong Bridge assistant pullback main span closure geometric control methord construction technology
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部