Power generation is one of the most essential functions of any plant for continuous functioning without any interruption. A marine power plant (MPP) is the same section. In the present paper, the authors have tried ...Power generation is one of the most essential functions of any plant for continuous functioning without any interruption. A marine power plant (MPP) is the same section. In the present paper, the authors have tried to find the various reliability characteristics of an MPR A marine power plant which is a composition of two generators and in which one of them is located at the stern and another at the bow, both associated to the main switchboard (MSB). The distribution switchboards (DSB) receive power from the MSB through cables and their respective junctions. Given that arrangement, a working based transition state diagram has been generated. With the help of the Markov process, a number of intro-differential equations are formed and solved by Laplace transform. Various reliability characteristics are calculated and discussed with the help of graphs.展开更多
The rapid spreading of the Photovoltaic (PV) Systems as Distributed Generation (DG) in medium and low voltage networks created many effects and changes on the existing power system networks. In this work, two methods ...The rapid spreading of the Photovoltaic (PV) Systems as Distributed Generation (DG) in medium and low voltage networks created many effects and changes on the existing power system networks. In this work, two methods have been used and applied to determine the optimal allocation and sizing of the PV to be installed as DGs (ranging from 250 kW up to 3 MW). The first one is to determine the location according to the maximal power losses reduction over the feeder. The second one is by using the Harmony Search Algorithm which is claimed to be a powerful technique for optimal allocation of PV systems. The results of the two techniques were compared and found to be nearly closed. Furthermore, investigation on the effects on the feeder in terms of voltage levels, power factor readings, and short circuit current levels has been done. All calculations and simulations are conducted by using the MATLAB Simulation Program. Some field calculations and observations have been expended in order to substantiate the research findings and validation.展开更多
To investigate the imploding characteristics of cylindrical wire array, experiments with load current varying from 1.5MA to 1.7MA were carried out on the Qiangguang-1 facility. The complicated temporal-spatial distrib...To investigate the imploding characteristics of cylindrical wire array, experiments with load current varying from 1.5MA to 1.7MA were carried out on the Qiangguang-1 facility. The complicated temporal-spatial distribution of x-ray radiation was measured by the one-dimensional (1D) x-ray imaging system. Other diagnostic equipments including the x-ray power meter (XRPM) and the time-integrated pinhole camera were used to record time-resolved x-ray power pulse and pinhole x-ray images. Analysis shows that the fast leading edge of the local x-ray radiation pulse is of primary importance in sharpening x-ray power pulse rather than the temporal synchrony and the spatial uniformity of implosion. Experimental results indicated that the better axial imploding synchrony, the faster the increase of x-ray power for an array consisting of 32 tungsten wires of 5 μm diameter than for the others, and the higher the x-ray radiation power with maximal convergence ratio (r0/r1) of 10.5. A ‘zipper-like' effect of x-ray radiation extending from the anode to the cathode was also observed.展开更多
文摘Power generation is one of the most essential functions of any plant for continuous functioning without any interruption. A marine power plant (MPP) is the same section. In the present paper, the authors have tried to find the various reliability characteristics of an MPR A marine power plant which is a composition of two generators and in which one of them is located at the stern and another at the bow, both associated to the main switchboard (MSB). The distribution switchboards (DSB) receive power from the MSB through cables and their respective junctions. Given that arrangement, a working based transition state diagram has been generated. With the help of the Markov process, a number of intro-differential equations are formed and solved by Laplace transform. Various reliability characteristics are calculated and discussed with the help of graphs.
文摘The rapid spreading of the Photovoltaic (PV) Systems as Distributed Generation (DG) in medium and low voltage networks created many effects and changes on the existing power system networks. In this work, two methods have been used and applied to determine the optimal allocation and sizing of the PV to be installed as DGs (ranging from 250 kW up to 3 MW). The first one is to determine the location according to the maximal power losses reduction over the feeder. The second one is by using the Harmony Search Algorithm which is claimed to be a powerful technique for optimal allocation of PV systems. The results of the two techniques were compared and found to be nearly closed. Furthermore, investigation on the effects on the feeder in terms of voltage levels, power factor readings, and short circuit current levels has been done. All calculations and simulations are conducted by using the MATLAB Simulation Program. Some field calculations and observations have been expended in order to substantiate the research findings and validation.
基金Project supported by the National Natural Science Foundation of China (Grant No 10035030).Acknowledgments Thanks to the crew of Qiangguang-1 facility for help in experiments and thanks to Ding Ning for many constructive suggestions.
文摘To investigate the imploding characteristics of cylindrical wire array, experiments with load current varying from 1.5MA to 1.7MA were carried out on the Qiangguang-1 facility. The complicated temporal-spatial distribution of x-ray radiation was measured by the one-dimensional (1D) x-ray imaging system. Other diagnostic equipments including the x-ray power meter (XRPM) and the time-integrated pinhole camera were used to record time-resolved x-ray power pulse and pinhole x-ray images. Analysis shows that the fast leading edge of the local x-ray radiation pulse is of primary importance in sharpening x-ray power pulse rather than the temporal synchrony and the spatial uniformity of implosion. Experimental results indicated that the better axial imploding synchrony, the faster the increase of x-ray power for an array consisting of 32 tungsten wires of 5 μm diameter than for the others, and the higher the x-ray radiation power with maximal convergence ratio (r0/r1) of 10.5. A ‘zipper-like' effect of x-ray radiation extending from the anode to the cathode was also observed.