Objective:The objective of this study was to analyze the current status of barriers to exercise participation(EP)among patients on maintenance hemodialysis(MHD).Materials and Methods:A cross-sectional study was conduc...Objective:The objective of this study was to analyze the current status of barriers to exercise participation(EP)among patients on maintenance hemodialysis(MHD).Materials and Methods:A cross-sectional study was conducted on 277 outpatients undergoing MHD in 2 tertiary first-class hospitals in Beijing from February 2023 to June 2023 who were selected using convenience sampling method.The data of patients on MHD were collected using the general information questionnaire,Physical Activity Rating Scale,Exercise Benefits/Barriers Scale(EBBS),and Exercise Self-Efficacy Scale(ESES).The relationship between EP and barriers to EP was analyzed through univariate and multivariate linear regression models.Results:Patients on MHD had a low exercise volume score of 13.71±0.68 points and a medium EBBS score of 63.36±0.40 points.Multivariate logistic analysis showed that exercise volume was significantly related to the following four aspects,including low monthly household income per capita(odds ratio[OR]=86.741,95%confidence interval[CI][1.164-6.465],P=0.042),primary underlying disease of diabetic nephropathy(OR=45.993,95%CI[1.353-1.564],P=0.033),the belief that“fatigue in lower extremities hinders exercise”(OR=4.697,95%CI[1.127-19.585],P=0.034),and the belief that“physical exercise bringing optimistic and positive life attitude”(OR=0.074,95%CI[0.007-0.830],P=0.035).Conclusions:Since patients on MHD had low physical exercise volume,the health-care provider should pay more attention on the controllable factors that affect the EP of patients on MHD.Therefore,feasible and effective intervention measures can be formulated based on ESES in clinical nursing.展开更多
This paper presents the theory,method,and application of performance-based pavement needs assessment at a state level,using the Pennsylvania Interstate System as an example.First,a general framework is presented for t...This paper presents the theory,method,and application of performance-based pavement needs assessment at a state level,using the Pennsylvania Interstate System as an example.First,a general framework is presented for the pavement asset management and a general optimization model is established for the pavement maintenance and rehabilitation needs assessment.Also,the bundling of pavement segments for the project implementation is discussed.Using the examples of Statewide Transportation Improvement Plan and Long Range Transportation Plan for Pennsylvania Interstate System,the application of performance-based pavement needs assessment is demonstrated.It is shown that unconstrained analysis can help decision-makers investigate the real maintenance and rehabilitation needs;financially-constrained analysis can help decision-makers select projects for implementation and examine the corresponding future pavement conditions.Trade-off analysis can help decision-makers investigate the outcomes of different investment levels on pavement maintenance and rehabilitation and make the final decision on the investment level.The proposed case study provides a good example of performance-based pavement needs assessment for developing countries.展开更多
The motivation for cost-effective management of highway pavements is evidenced not only by the massive expenditures associated with these activities at a national level but also by the consequences of poor pavement co...The motivation for cost-effective management of highway pavements is evidenced not only by the massive expenditures associated with these activities at a national level but also by the consequences of poor pavement condition on road users.This paper presents a state-of-the-art review of multi-objective optimization(MOO)problems that have been formulated and solution techniques that have been used in selecting and scheduling highway pavement rehabilitation and maintenance activities.First,the paper presents a taxonomy and hierarchy for these activities,the role of funding sources,and levels of jurisdiction.The paper then describes how three different decision mechanisms have been used in past research and practice for project selection and scheduling(historical practices,expert opinion,and explicit mathematical optimization)and identifies the pros and cons of each mechanism.The paper then focuses on the optimization mechanism and presents the types of optimization problems,formulations,and objectives that have been used in the literature.Next,the paper examines various solution algorithms and discusses issues related to their implementation.Finally,the paper identifies some barriers to implementing multi-objective optimization in selecting and scheduling highway pavement rehabilitation and maintenance activities,and makes recommendations to overcome some of these barriers.展开更多
Systematic approach to the maintenance of rural road network is a very important issue from the viewpoint of public costs. Most countries developed custom PMS (pavement management systems) based on deterministic or ...Systematic approach to the maintenance of rural road network is a very important issue from the viewpoint of public costs. Most countries developed custom PMS (pavement management systems) based on deterministic or probabilistic approach. The main goal is to ensure safety and continuity of road traffic on road network with low intensity and lower technical requirements. Article presents PMS used for Slovakia rural road network based on road construction diagnostics, traffic volume, climate factors and evaluation of maintenance works economics effectives by using of software tools like HDM-4 developed by World Bank. Local road administrators of rural road networks often lack the software equipment, most PMS, however effective, are often cumbersome, demanding in regard to energy, know-how and software equipment. The majority of local road administrators of rural road networks thus resort to non-effective reactive maintenance strategies. This article describes an easy to use method, based on predetermined maintenance repair and rehabilitation standards. A simple method, based on road user cost, is introduced that administrator can use to prepare a list of road section eligible for repair according to their repair priority.展开更多
This work describes the retro-analysis of design of rehabilitation of existing bridge over the river Cubiculo on BR-101 in Santa Catarina, Brazil, aiming to evaluate the intervention processes. In this way, it was ver...This work describes the retro-analysis of design of rehabilitation of existing bridge over the river Cubiculo on BR-101 in Santa Catarina, Brazil, aiming to evaluate the intervention processes. In this way, it was verified that the project adopted for strengthening of the structure was not adequate to support the evolution of the maximum load over time and the overload due to widening, and it was also verified that the changes in the load factor do not comply with the update of the Brazilian Technical Standards ABNT: NBR-7188 [1]. The retro-analysis of the bridge rehabilitation project has demonstrated fundamental importance to avoid possible design failings, accidents, and reworks. Affirming that it is essential to comply with Standards and Technical Manuals on the elaboration of the rehabilitation project of structures and in choosing the type of intervention to the existing structure.展开更多
As an important part of steel bridge deck,the engineering quality and service condition of steel bridge deck pavement(SBDP)directly affects the capacity and operational efficiency of the bridge.This paper reviews the ...As an important part of steel bridge deck,the engineering quality and service condition of steel bridge deck pavement(SBDP)directly affects the capacity and operational efficiency of the bridge.This paper reviews the history of the development of SBDP in China over the past 20 years from the exploration stage,rapid development stage and prosperity stage.The development and application of SBDP at different stages are discussed in terms of materials,structure,design,performance evaluation,maintenance and rehabilitation,respectively.The advantages and disadvantages of different pavement materials and structures,and the application of different research methods are summarized.The review shows that the improvement of pavement materials and structures and the development of new materials should be further studied on the multi-scale to enhance the durability of pavement materials,so as to extend the service life of pavements.The design method of SBDP related to the synergistic effect of vehicle,pavement and bridge should be established,and the design concept and method standard of rigid base pavement structure should be improved and formulate a complete design standard.In addition,multi-disease intelligent identification system and equipment should be studied to track the entire course of disease development in real time.And it is necessary to develop appropriate algorithms to select and classify the complex data of disease and maintenance history.展开更多
The International Society for Maintenance and Rehabilitation of Transport Infrastructures (iSMARTi), the National University of Singapore and the Pavement Engineering Society (Singapore) jointly organized the 8th ...The International Society for Maintenance and Rehabilitation of Transport Infrastructures (iSMARTi), the National University of Singapore and the Pavement Engineering Society (Singapore) jointly organized the 8th International Conference on Maintenance and Rehabilitation of Pavements (MAIREPAV- 8) in Singapore on 27-291uly 2016. The conference covered all aspects of maintenance and rehabilitation of road and airport pavements. Over 200 participants from 32 countries participated in this conference, which featured more than 120 technical presentations and two forums.展开更多
This paper studies the deterioration of bridge substructures utilizing the Long-Term Bridge Performance(LTBP)Program InfoBridge^(TM)and develops a survival model using Cox proportional hazards regression.The survival ...This paper studies the deterioration of bridge substructures utilizing the Long-Term Bridge Performance(LTBP)Program InfoBridge^(TM)and develops a survival model using Cox proportional hazards regression.The survival analysis is based on the National Bridge Inventory(NBI)dataset.The study calculates the survival rate of reinforced and prestressed concrete piles on bridges under marine conditions over a 29-year span(from 1992 to 2020).The state of Maryland is the primary focus of this study,with data from three neighboring regions,the District of Columbia,Virginia,and Delaware to expand the sample size.The data obtained from the National Bridge Inventory are condensed and filtered to acquire the most relevant information for model development.The Cox proportional hazards regression is applied to the condensed NBI data with six parameters:Age,ADT,ADTT,number of spans,span length,and structural length.Two survival models are generated for the bridge substructures:Reinforced and prestressed concrete piles in Maryland and reinforced and prestressed concrete piles in wet service conditions in the District of Columbia,Maryland,Delaware,and Virginia.Results from the Cox proportional hazards regression are used to construct Markov chains to demonstrate the sequence of the deterioration of bridge substructures.The Markov chains can be used as a tool to assist in the prediction and decision-making for repair,rehabilitation,and replacement of bridge piles.Based on the numerical model,the Pile Assessment Matrix Program(PAM)is developed to facilitate the assessment and maintenance of current bridge structures.The program integrates the NBI database with the inspection and research reports from various states’department of transportation,to serve as a tool for condition state simulation based on maintenance or rehabilitation strategies.展开更多
目的调查中青年维持性血液透析(maintenance hemodialysis,MHD)患者社会回归现状,并探讨其进入透析前后社会功能退化程度的影响因素。方法对2023年6月于山西医科大学第二医院接受MHD的中青年患者,采用横断面及回顾性调查方法收集资料,...目的调查中青年维持性血液透析(maintenance hemodialysis,MHD)患者社会回归现状,并探讨其进入透析前后社会功能退化程度的影响因素。方法对2023年6月于山西医科大学第二医院接受MHD的中青年患者,采用横断面及回顾性调查方法收集资料,采集生活质量简表(the kidney disease quality of life questionnaire,short-form version 1.3,KDQOL-SFtm 1.3)、社会功能缺陷筛选量表(social disability screening schedule,SDSS),以透析前后SDSS评分差值的中位数为界将患者分为社会功能退化不明显组和退化明显组。采用单因素分析、二元Logistic回归分析探讨中青年MHD患者社会功能退化的影响因素。结果本研究共纳入MHD患者112例,其中社会回归3级42例(37.50%)、4级70例(62.50%);社会回归4级患者生活质量评分高于3级患者(t=-2.554,P=0.012),而仅在肾病影响(t=2.185,P=0.031)、工作状态(t=3.203,P=0.002)、社交质量(t=2.117,P=0.037)、情感职能(t=2.700,P=0.008)、社会功能(t=2.349,P=0.021)方面有统计学差异。短透析龄(OR=3.031,95%CI:1.192~7.706,P=0.020)、有疲乏症状(OR=7.574,95%CI:1.829~31.367,P=0.005)、合并焦虑和(或)抑郁(OR=3.765,95%CI:1.120~12.658,P=0.032)、较高的社会影响量表得分(OR=1.303,95%CI:1.104~1.537,P=0.002)是中青年MHD患者社会功能退化的独立危险因素。结论中青年MHD患者社会回归及生活质量水平较高;透析龄短、伴有疲乏、有焦虑和/或抑郁状态、病耻感得分高的MHD患者社会功能减退更明显。应高度重视中青年MHD患者的心理和情绪问题。展开更多
Many transportation agencies lack sufficient funds to maintain and repair roads, which results into increased pavement maintenance cost. Pavement Management System (PMS) has demonstrated to be an essential tool for ...Many transportation agencies lack sufficient funds to maintain and repair roads, which results into increased pavement maintenance cost. Pavement Management System (PMS) has demonstrated to be an essential tool for proper management of infrastructure and proper utilization of available funds. The University of Tennessee at Chattanooga utilized Micropaver software as PMS tool to conduct a pavement management analysis of principal arterials in the City of Chattanooga. The study used the City of Chattanooga pavement database to create the current and future pavement conditions. Maintenance and repair (M&R) planning analysis was also performed in order to determine the most cost-effective treatment and suggest the optimum utilization of funds for the city. An analysis of five budget scenarios was conducted for a five-year plan using the critical pavement condition index (PCI) method (ASTM D6433). Results show that the backlog elimination budget would be the best scenario because it increases the pavement condition and eliminates the backlog of major maintenance and repairs over the five-year period. The unlimited budget seems though ideal, it does not improve pavement condition. Maintaining current condition and limited budget scenarios would increase both the backlog and the total cost of maintenance and repairs over the analysis period.展开更多
目的:分析5E理念下渐进性康复干预在糖尿病肾病(DN)血液透析患者中的应用效果。方法:选取2023年1—12月福建省泉州第一医院收治的维持性血液透析(MHD)的DN患者110例作为研究对象,按照随机数字表法分为对照组和观察组,每组55例。对照组...目的:分析5E理念下渐进性康复干预在糖尿病肾病(DN)血液透析患者中的应用效果。方法:选取2023年1—12月福建省泉州第一医院收治的维持性血液透析(MHD)的DN患者110例作为研究对象,按照随机数字表法分为对照组和观察组,每组55例。对照组给予常规治疗护理干预,观察组给予5E理念下渐进性康复干预。比较2组患者干预前与12周后空腹血糖(FPG)、餐后2 h血糖(2 h PG)、糖化血红蛋白(HbA1c)水平的差异,采用血液透析患者自我管理量表评估2组患者的自我管理能力,采用阿森斯失眠量表(AIS)比较2组患者干预前后睡眠障碍的发生情况。结果:干预后,观察组12周后血液透析患者自我管理量表评分高于对照组,空腹血糖(FPG)、餐后2 h血糖(2 h PG)及糖化血红蛋白水平(HbA1c)显著低于对照组,差异均有统计学意义(均P<0.05)。结论:5E理念下渐进性康复干预可提升DN血液透析患者自我管理能力与血糖控制效果,减少睡眠障碍的发生,值得临床推广应用。展开更多
文摘Objective:The objective of this study was to analyze the current status of barriers to exercise participation(EP)among patients on maintenance hemodialysis(MHD).Materials and Methods:A cross-sectional study was conducted on 277 outpatients undergoing MHD in 2 tertiary first-class hospitals in Beijing from February 2023 to June 2023 who were selected using convenience sampling method.The data of patients on MHD were collected using the general information questionnaire,Physical Activity Rating Scale,Exercise Benefits/Barriers Scale(EBBS),and Exercise Self-Efficacy Scale(ESES).The relationship between EP and barriers to EP was analyzed through univariate and multivariate linear regression models.Results:Patients on MHD had a low exercise volume score of 13.71±0.68 points and a medium EBBS score of 63.36±0.40 points.Multivariate logistic analysis showed that exercise volume was significantly related to the following four aspects,including low monthly household income per capita(odds ratio[OR]=86.741,95%confidence interval[CI][1.164-6.465],P=0.042),primary underlying disease of diabetic nephropathy(OR=45.993,95%CI[1.353-1.564],P=0.033),the belief that“fatigue in lower extremities hinders exercise”(OR=4.697,95%CI[1.127-19.585],P=0.034),and the belief that“physical exercise bringing optimistic and positive life attitude”(OR=0.074,95%CI[0.007-0.830],P=0.035).Conclusions:Since patients on MHD had low physical exercise volume,the health-care provider should pay more attention on the controllable factors that affect the EP of patients on MHD.Therefore,feasible and effective intervention measures can be formulated based on ESES in clinical nursing.
基金The National Key Research and Development Program of China(No.2018YFB1601202)the Natural Science Foundation of Shaanxi Province(No.2019JM-228)+1 种基金the National Natural Science Foundation of China(No.51308335)the Fundamental Research Funds for the Central Universities of Chang’an University(No.300102218401)
文摘This paper presents the theory,method,and application of performance-based pavement needs assessment at a state level,using the Pennsylvania Interstate System as an example.First,a general framework is presented for the pavement asset management and a general optimization model is established for the pavement maintenance and rehabilitation needs assessment.Also,the bundling of pavement segments for the project implementation is discussed.Using the examples of Statewide Transportation Improvement Plan and Long Range Transportation Plan for Pennsylvania Interstate System,the application of performance-based pavement needs assessment is demonstrated.It is shown that unconstrained analysis can help decision-makers investigate the real maintenance and rehabilitation needs;financially-constrained analysis can help decision-makers select projects for implementation and examine the corresponding future pavement conditions.Trade-off analysis can help decision-makers investigate the outcomes of different investment levels on pavement maintenance and rehabilitation and make the final decision on the investment level.The proposed case study provides a good example of performance-based pavement needs assessment for developing countries.
基金This work is supported by the Next Generation Transportation Systems Center(NEXTRANS),USDOT's Region 5 University Transportation CenterThe work is also affiliated with Purdue University College of Engineering's Institute for Control,Optimization,and Networks(ICON)and Center for Intelligent Infrastructure(CII)initiatives.
文摘The motivation for cost-effective management of highway pavements is evidenced not only by the massive expenditures associated with these activities at a national level but also by the consequences of poor pavement condition on road users.This paper presents a state-of-the-art review of multi-objective optimization(MOO)problems that have been formulated and solution techniques that have been used in selecting and scheduling highway pavement rehabilitation and maintenance activities.First,the paper presents a taxonomy and hierarchy for these activities,the role of funding sources,and levels of jurisdiction.The paper then describes how three different decision mechanisms have been used in past research and practice for project selection and scheduling(historical practices,expert opinion,and explicit mathematical optimization)and identifies the pros and cons of each mechanism.The paper then focuses on the optimization mechanism and presents the types of optimization problems,formulations,and objectives that have been used in the literature.Next,the paper examines various solution algorithms and discusses issues related to their implementation.Finally,the paper identifies some barriers to implementing multi-objective optimization in selecting and scheduling highway pavement rehabilitation and maintenance activities,and makes recommendations to overcome some of these barriers.
文摘Systematic approach to the maintenance of rural road network is a very important issue from the viewpoint of public costs. Most countries developed custom PMS (pavement management systems) based on deterministic or probabilistic approach. The main goal is to ensure safety and continuity of road traffic on road network with low intensity and lower technical requirements. Article presents PMS used for Slovakia rural road network based on road construction diagnostics, traffic volume, climate factors and evaluation of maintenance works economics effectives by using of software tools like HDM-4 developed by World Bank. Local road administrators of rural road networks often lack the software equipment, most PMS, however effective, are often cumbersome, demanding in regard to energy, know-how and software equipment. The majority of local road administrators of rural road networks thus resort to non-effective reactive maintenance strategies. This article describes an easy to use method, based on predetermined maintenance repair and rehabilitation standards. A simple method, based on road user cost, is introduced that administrator can use to prepare a list of road section eligible for repair according to their repair priority.
文摘This work describes the retro-analysis of design of rehabilitation of existing bridge over the river Cubiculo on BR-101 in Santa Catarina, Brazil, aiming to evaluate the intervention processes. In this way, it was verified that the project adopted for strengthening of the structure was not adequate to support the evolution of the maximum load over time and the overload due to widening, and it was also verified that the changes in the load factor do not comply with the update of the Brazilian Technical Standards ABNT: NBR-7188 [1]. The retro-analysis of the bridge rehabilitation project has demonstrated fundamental importance to avoid possible design failings, accidents, and reworks. Affirming that it is essential to comply with Standards and Technical Manuals on the elaboration of the rehabilitation project of structures and in choosing the type of intervention to the existing structure.
基金The authors appreciate the financial support from the National Natural Science Foundation of China(No.51878167)Qing Lan Project of Jiangsu Province。
文摘As an important part of steel bridge deck,the engineering quality and service condition of steel bridge deck pavement(SBDP)directly affects the capacity and operational efficiency of the bridge.This paper reviews the history of the development of SBDP in China over the past 20 years from the exploration stage,rapid development stage and prosperity stage.The development and application of SBDP at different stages are discussed in terms of materials,structure,design,performance evaluation,maintenance and rehabilitation,respectively.The advantages and disadvantages of different pavement materials and structures,and the application of different research methods are summarized.The review shows that the improvement of pavement materials and structures and the development of new materials should be further studied on the multi-scale to enhance the durability of pavement materials,so as to extend the service life of pavements.The design method of SBDP related to the synergistic effect of vehicle,pavement and bridge should be established,and the design concept and method standard of rigid base pavement structure should be improved and formulate a complete design standard.In addition,multi-disease intelligent identification system and equipment should be studied to track the entire course of disease development in real time.And it is necessary to develop appropriate algorithms to select and classify the complex data of disease and maintenance history.
文摘The International Society for Maintenance and Rehabilitation of Transport Infrastructures (iSMARTi), the National University of Singapore and the Pavement Engineering Society (Singapore) jointly organized the 8th International Conference on Maintenance and Rehabilitation of Pavements (MAIREPAV- 8) in Singapore on 27-291uly 2016. The conference covered all aspects of maintenance and rehabilitation of road and airport pavements. Over 200 participants from 32 countries participated in this conference, which featured more than 120 technical presentations and two forums.
基金This research receives funding from the Maryland Department of Transportation State Highway Administration.
文摘This paper studies the deterioration of bridge substructures utilizing the Long-Term Bridge Performance(LTBP)Program InfoBridge^(TM)and develops a survival model using Cox proportional hazards regression.The survival analysis is based on the National Bridge Inventory(NBI)dataset.The study calculates the survival rate of reinforced and prestressed concrete piles on bridges under marine conditions over a 29-year span(from 1992 to 2020).The state of Maryland is the primary focus of this study,with data from three neighboring regions,the District of Columbia,Virginia,and Delaware to expand the sample size.The data obtained from the National Bridge Inventory are condensed and filtered to acquire the most relevant information for model development.The Cox proportional hazards regression is applied to the condensed NBI data with six parameters:Age,ADT,ADTT,number of spans,span length,and structural length.Two survival models are generated for the bridge substructures:Reinforced and prestressed concrete piles in Maryland and reinforced and prestressed concrete piles in wet service conditions in the District of Columbia,Maryland,Delaware,and Virginia.Results from the Cox proportional hazards regression are used to construct Markov chains to demonstrate the sequence of the deterioration of bridge substructures.The Markov chains can be used as a tool to assist in the prediction and decision-making for repair,rehabilitation,and replacement of bridge piles.Based on the numerical model,the Pile Assessment Matrix Program(PAM)is developed to facilitate the assessment and maintenance of current bridge structures.The program integrates the NBI database with the inspection and research reports from various states’department of transportation,to serve as a tool for condition state simulation based on maintenance or rehabilitation strategies.
文摘目的调查中青年维持性血液透析(maintenance hemodialysis,MHD)患者社会回归现状,并探讨其进入透析前后社会功能退化程度的影响因素。方法对2023年6月于山西医科大学第二医院接受MHD的中青年患者,采用横断面及回顾性调查方法收集资料,采集生活质量简表(the kidney disease quality of life questionnaire,short-form version 1.3,KDQOL-SFtm 1.3)、社会功能缺陷筛选量表(social disability screening schedule,SDSS),以透析前后SDSS评分差值的中位数为界将患者分为社会功能退化不明显组和退化明显组。采用单因素分析、二元Logistic回归分析探讨中青年MHD患者社会功能退化的影响因素。结果本研究共纳入MHD患者112例,其中社会回归3级42例(37.50%)、4级70例(62.50%);社会回归4级患者生活质量评分高于3级患者(t=-2.554,P=0.012),而仅在肾病影响(t=2.185,P=0.031)、工作状态(t=3.203,P=0.002)、社交质量(t=2.117,P=0.037)、情感职能(t=2.700,P=0.008)、社会功能(t=2.349,P=0.021)方面有统计学差异。短透析龄(OR=3.031,95%CI:1.192~7.706,P=0.020)、有疲乏症状(OR=7.574,95%CI:1.829~31.367,P=0.005)、合并焦虑和(或)抑郁(OR=3.765,95%CI:1.120~12.658,P=0.032)、较高的社会影响量表得分(OR=1.303,95%CI:1.104~1.537,P=0.002)是中青年MHD患者社会功能退化的独立危险因素。结论中青年MHD患者社会回归及生活质量水平较高;透析龄短、伴有疲乏、有焦虑和/或抑郁状态、病耻感得分高的MHD患者社会功能减退更明显。应高度重视中青年MHD患者的心理和情绪问题。
文摘Many transportation agencies lack sufficient funds to maintain and repair roads, which results into increased pavement maintenance cost. Pavement Management System (PMS) has demonstrated to be an essential tool for proper management of infrastructure and proper utilization of available funds. The University of Tennessee at Chattanooga utilized Micropaver software as PMS tool to conduct a pavement management analysis of principal arterials in the City of Chattanooga. The study used the City of Chattanooga pavement database to create the current and future pavement conditions. Maintenance and repair (M&R) planning analysis was also performed in order to determine the most cost-effective treatment and suggest the optimum utilization of funds for the city. An analysis of five budget scenarios was conducted for a five-year plan using the critical pavement condition index (PCI) method (ASTM D6433). Results show that the backlog elimination budget would be the best scenario because it increases the pavement condition and eliminates the backlog of major maintenance and repairs over the five-year period. The unlimited budget seems though ideal, it does not improve pavement condition. Maintaining current condition and limited budget scenarios would increase both the backlog and the total cost of maintenance and repairs over the analysis period.
文摘目的:分析5E理念下渐进性康复干预在糖尿病肾病(DN)血液透析患者中的应用效果。方法:选取2023年1—12月福建省泉州第一医院收治的维持性血液透析(MHD)的DN患者110例作为研究对象,按照随机数字表法分为对照组和观察组,每组55例。对照组给予常规治疗护理干预,观察组给予5E理念下渐进性康复干预。比较2组患者干预前与12周后空腹血糖(FPG)、餐后2 h血糖(2 h PG)、糖化血红蛋白(HbA1c)水平的差异,采用血液透析患者自我管理量表评估2组患者的自我管理能力,采用阿森斯失眠量表(AIS)比较2组患者干预前后睡眠障碍的发生情况。结果:干预后,观察组12周后血液透析患者自我管理量表评分高于对照组,空腹血糖(FPG)、餐后2 h血糖(2 h PG)及糖化血红蛋白水平(HbA1c)显著低于对照组,差异均有统计学意义(均P<0.05)。结论:5E理念下渐进性康复干预可提升DN血液透析患者自我管理能力与血糖控制效果,减少睡眠障碍的发生,值得临床推广应用。