The railway mobile communication system is undergoing a smooth transition from the Global System for Mobile Communications-Railway(GSM-R)to the Railway 5G.In this paper,an empirical path loss model based on a large am...The railway mobile communication system is undergoing a smooth transition from the Global System for Mobile Communications-Railway(GSM-R)to the Railway 5G.In this paper,an empirical path loss model based on a large amount of measured data is established to predict the path loss in the Railway 5G marshalling yard scenario.According to the different characteristics of base station directional antennas,the antenna gain is verified.Then we propose the position of the breakpoint in the antenna propagation area,and based on the breakpoint segmentation,a large-scale statistical model for marshalling yards is established.展开更多
Sorting humps are the main technical means providing the breaking- and making-up of freight trains. Automation of sorting process by implementing microprocessor control systems is the main direction ofincreasing hump ...Sorting humps are the main technical means providing the breaking- and making-up of freight trains. Automation of sorting process by implementing microprocessor control systems is the main direction ofincreasing hump yard capacity, enhancement of safety in trains breaking-up, improvement of working conditions on hump yards. However, for wider introduction of such systems at the humps, it is necessary to reduce their cost. One of the main tasks of hump control systems is the determination of the optimal cars exit speeds from the retarders. Its solution is significantly complicated because of the uncertainty of cars rolling resistance coefficient, wind velocity and direction, retarder control errors. The paper is aimed at solving the problem of searching for such cars exit speeds from the retarders that provide the longest time intervals between them at the switches. Implementation of this method will make it possible to improve the quality of sorting process as a whole by improving the software of microprocessor control systems for automatic humping, rather than by increasing their technical facilities, which as a result will reduce the cost of their construction and operation. The research results, when solving the problem of searching for cars exit speeds from the retarders, allow us to move from searching for the maximum of a nonlinear non-smooth function of two variables to solution of an equation with one variable, which significantlyaccelerates and simplifies the solution to the problem.展开更多
基金supported in part by the Fundamental Research Funds for the Central Universities under Grant No.2022JBXT001in part by NS⁃FC under Grant No.62171021+1 种基金in part by the Project of China State Rail⁃way Group under Grant No.P2021G012in part by ZTE Industry⁃University⁃Institute Cooperation Funds under Grant No.I21L00220.
文摘The railway mobile communication system is undergoing a smooth transition from the Global System for Mobile Communications-Railway(GSM-R)to the Railway 5G.In this paper,an empirical path loss model based on a large amount of measured data is established to predict the path loss in the Railway 5G marshalling yard scenario.According to the different characteristics of base station directional antennas,the antenna gain is verified.Then we propose the position of the breakpoint in the antenna propagation area,and based on the breakpoint segmentation,a large-scale statistical model for marshalling yards is established.
文摘Sorting humps are the main technical means providing the breaking- and making-up of freight trains. Automation of sorting process by implementing microprocessor control systems is the main direction ofincreasing hump yard capacity, enhancement of safety in trains breaking-up, improvement of working conditions on hump yards. However, for wider introduction of such systems at the humps, it is necessary to reduce their cost. One of the main tasks of hump control systems is the determination of the optimal cars exit speeds from the retarders. Its solution is significantly complicated because of the uncertainty of cars rolling resistance coefficient, wind velocity and direction, retarder control errors. The paper is aimed at solving the problem of searching for such cars exit speeds from the retarders that provide the longest time intervals between them at the switches. Implementation of this method will make it possible to improve the quality of sorting process as a whole by improving the software of microprocessor control systems for automatic humping, rather than by increasing their technical facilities, which as a result will reduce the cost of their construction and operation. The research results, when solving the problem of searching for cars exit speeds from the retarders, allow us to move from searching for the maximum of a nonlinear non-smooth function of two variables to solution of an equation with one variable, which significantlyaccelerates and simplifies the solution to the problem.