期刊文献+
共找到970篇文章
< 1 2 49 >
每页显示 20 50 100
Seepage Mitigation in Hydropower Dams by Optimization in Roller Compacted Concrete Interlayer (Monoliths) Joint Bonding Technology
1
作者 Junjie Jin Qingguo Zhou +1 位作者 Yuanguang Liu Shuncai Ning 《Open Journal of Civil Engineering》 2022年第1期139-151,共13页
Roller Compacted Concrete (RCC) has gained favorable recognition in hydropower and water resource dam construction. With optimization in construction technology and materials used for RCC Dams, cost is no longer a maj... Roller Compacted Concrete (RCC) has gained favorable recognition in hydropower and water resource dam construction. With optimization in construction technology and materials used for RCC Dams, cost is no longer a major disadvantage as compared to environmental impact, that is, wildlife habitat disruption. In as much as it has become optimal for investment in hydropower dam construction, the scourge for dam failure is still eminent, which is as a result of excessive seepage compromising the integrity of the mechanical properties of the dam. The aim of the paper is to highlight successful application methods in joint bonding to avoid excessive seepage and reduce the autogenous healing to a few years of operation. In view of optimization, this paper presents a comprehensive study on the influences of interlayer joints bonding quality from RCC mix performances and how it consolidates the RCC layers to withstand the shear strength along the interface, especially on the high dams. The case study is the RCC dam at the 750 MW Kafue Gorge Lower Hydropower Station. The scope of the study reviews the joint type judged by Modified Maturity Factor (MMF) with joint surface long time exposed in regions with dry and high temperature, technical measures of layer bonding quality control under condition of long time joint surface exposure, effects of joints shear strength and impermeability of the RCC layers when under the conditions of plastic and elasticity. The subtle observations made during the dam construction phases were with respect to the optimal use of materials in relation to RCC mix designs and the basis for equipment calibration for monitoring important data that can be referenced during analysis of shear forces acting on the RCC dam over time. 展开更多
关键词 SEEPAGE Roller Compacted concrete (RCC) Mix RCC Joint Exposure Time Modified Maturity Factor (MMF) Dry and High Temperature Area RCC Joint Bonding quality Control measures IMPERMEABILITY Shear Forces
下载PDF
Rapid intelligent evaluation method and technology for determining engineering rock mass quality 被引量:6
2
作者 Faquan Wu Jie Wu +13 位作者 Han Bao Zhongxi Bai Lei Qiao Fang Zhang Bo Li Fuan Si Lei Yu Shenggong Guan Peng Sha Deheng Kong Zhenzhong Dai Kun Chen Yun Tian Changqing Liu 《Rock Mechanics Bulletin》 2023年第2期1-19,共19页
The evaluation of engineering rock mass quality is fundamental work for the engineering activities of rock mass.The increasing scale of rock mass engineering necessitates higher intelligence,timeliness,and accuracy in... The evaluation of engineering rock mass quality is fundamental work for the engineering activities of rock mass.The increasing scale of rock mass engineering necessitates higher intelligence,timeliness,and accuracy in engineering rock mass quality evaluation.As the core aspects of engineering rock mass quality evaluation,the structural characteristics,mechanical characteristics,and quality classification of rock mass have been innovated in recent years.The non-contact measurement technology for rock mass structure and rapid interpretation of rock mass structure information enables the intelligent extraction and analysis of rock mass structure parameters.The modular backpack laboratory system of rock mechanics provides an effective means to acquire rock mechanical parameters on-site conveniently.The theory of statistical mechanics of rock mass(SMRM)integrates various factors such as the rock mass properties,geological environment,and engineering disturbance,providing a theoretical basis for accurately evaluating the weakening and anisotropy of rock mass.The cloud computing platform established based on SMRM can provide technical support for the rapid calculation of rock mass parameters and instant evaluation of the rock mass quality.The development of intelligent evaluation method and technology is altering the conventional technical state of qualitative and semi-quantitative evaluation of engineering rock mass quality,supporting the realization of rock mass engineering construction with intellectualization and informatization. 展开更多
关键词 Engineering rock mass Non-contact measurement Backpack laboratory Cloud computing Rapid intelligent evaluation for rock mass quality
原文传递
Consideration of Viscoelasticity in Time Step FEM-Based Restraint Analyses of Hardening Concrete
3
作者 Dirk Schlicke Nguyen Viet Tue 《Journal of Modern Physics》 2013年第10期9-14,共6页
Concrete structures may suffer considerable restraint stresses during their hardening period. This is caused by several deformation impacts, especially temperature field changings due to hydration heat and volume chan... Concrete structures may suffer considerable restraint stresses during their hardening period. This is caused by several deformation impacts, especially temperature field changings due to hydration heat and volume changes due to autogenous shrinkage. Mainly affected are massive concrete members, but also the application of new concrete types or the erection of outstanding constructions requires further investigations in this context. 3D-FEM analyses of hydration heat induced temperature development in combination with the well known shrinkage give sufficient results for the deformation impact. The according elastic restraint stresses can be determined with consideration of the concrete’s rising elastic modulus and the restraint degree of the system. But due to duration of the heat flow process, the height of restraint stresses is strongly dependent from the viscoelasticity of the concrete. The viscoelastic effects consist of many components constituted by changing material properties influencing themselves. In practice, different simplified approaches are available for considering this in calculations. Their implementation in time step analyses is not generally admitted and requires expertise. In contrast, present research develops material models needing specific input parameters for every use case. This contribution focuses on a practicable approach considering the superposition of the viscoelastic behaviour of every stress increment in time step FEM analysis. The differentiation between the pure viscoelastic material behaviour (as it is given in the codes for idealistic conditions like creep or relaxation) and the according viscoelastic system response (addicted to the systems variable restraint degree) allows the transfer of this model into practice. As one application example of this approach, the compatibility check and the FEM-based recalculation of the monitoring program of a massive power plant slab will be presented. 展开更多
关键词 VISCOELASTICITY HARDENING mass concrete FEM RESTRAINT Analysis Time DEPENDANT Material Properties HYDRATION Heat Evolution of Stiffness Quantification of RESTRAINT Stresses In-Situ Measurements Recalculation of Measurement Data
下载PDF
炎热气候下大体积混凝土施工全过程控温技术 被引量:3
4
作者 刘军 夏子川 +3 位作者 章玉容 吴承杰 傅志华 姚水丰 《浙江工业大学学报》 CAS 北大核心 2024年第4期437-442,共6页
控制温差、防止贯穿裂缝的出现是大体积混凝土施工的重点和难点。依托杭州西站TOD项目,首先基于试验结果优选出满足C50强度等级的大体积混凝土最佳配合比,从源头上协助解决炎热季节高强度大体积混凝土内部温升过快问题;然后基于有限元... 控制温差、防止贯穿裂缝的出现是大体积混凝土施工的重点和难点。依托杭州西站TOD项目,首先基于试验结果优选出满足C50强度等级的大体积混凝土最佳配合比,从源头上协助解决炎热季节高强度大体积混凝土内部温升过快问题;然后基于有限元模拟和现场实测相结合的手段,开展温度场模拟和实测,确定布设水管冷却系统及通水冷却方案的合理性和有效性,实现对混凝土内部温升的有效控制。研究成果为杭州西站TOD项目C50大体积混凝土底板混凝土的成功浇筑奠定了坚实的理论基础,并为类似的大体积混凝土工程施工提供参考。 展开更多
关键词 大体积混凝土 配合比优选 温度场模拟 温度测试 主动控温
下载PDF
基于不确定度评估研究ID-LC-MS/MS法检测鸡蛋中氟虫腈砜残留量的关键控制点
5
作者 张巧艳 方维焕 +3 位作者 郑蔚然 王夏君 刘超纲 王强 《浙江农业学报》 CSCD 北大核心 2024年第3期643-650,共8页
为了控制检测结果准确性,以鸡蛋粉中氟虫腈砜残留分析标准物质[GBW(E)100779]为测试样,采用“自下而上”法对基于多功能净化柱(PAC柱)净化的同位素稀释液相色谱串联质谱(ID-LC-MS/MS)法进行测量不确定度评估。“鱼骨图”分析表明,不确... 为了控制检测结果准确性,以鸡蛋粉中氟虫腈砜残留分析标准物质[GBW(E)100779]为测试样,采用“自下而上”法对基于多功能净化柱(PAC柱)净化的同位素稀释液相色谱串联质谱(ID-LC-MS/MS)法进行测量不确定度评估。“鱼骨图”分析表明,不确定度分量主要来源有样品称样量、内标溶液添加体积、标准工作溶液浓度及其移取体积。内标溶液添加体积引入的不确定度最大,对检测结果不确定度的贡献率为68.59%;万分之一天平称量引入的不确定度可忽略不计。同位素内标的添加过程是ID-LC-MS/MS法检测的关键控制点,参考基准的合理选择和目标物的完全提取是准确测量的前提。进一步用LC-MS/MS法对参考物质、稀释剂和内标溶液的适用性进行了评估,并基于国家有证标准物质[GBW(E)100779]对提取方法进行了优化。研究结果有利于提升鸡蛋食品安全的检测质量和质控水平,为精准检测质控方案的设计提供新思路。 展开更多
关键词 测量不确定度 鸡蛋 氟虫腈砜 同位素稀释液相色谱串联质谱法(ID-LC-MS/MS) 质量控制 标准物质
下载PDF
地铁车站大体积混凝土裂缝产生原因及解决措施分析 被引量:3
6
作者 任利国 张海波 曾子羽 《广东建材》 2024年第1期127-130,共4页
地铁建设近年来流行于各大中城市,地铁车站建设工程大体积混凝土施工比较普遍,在混凝土凝固过程中由于其体积收缩以及各种压力的作用,会造成大量的墙体裂缝;大面积的裂缝会导致建筑渗漏,给地铁车站带来了很大威胁。本文从荷载、位移、... 地铁建设近年来流行于各大中城市,地铁车站建设工程大体积混凝土施工比较普遍,在混凝土凝固过程中由于其体积收缩以及各种压力的作用,会造成大量的墙体裂缝;大面积的裂缝会导致建筑渗漏,给地铁车站带来了很大威胁。本文从荷载、位移、温度三个方面分析了地铁车站大体积混凝土结构的开裂成因;根据裂缝的大小、深度、成因等几个角度对裂缝进行了划分;从设计、材料、施工三个角度,对如何防止混凝土开裂进行了探讨。本文研究成果对保障地铁车站大体积混凝土施工质量有一定的参考意义。 展开更多
关键词 地铁车站施工 大体积混凝土 墙体裂缝 产生原因 预防措施
下载PDF
Geotechnical investigations and remediation design for failure of tunnel portal section: a case study in northern Turkey 被引量:7
7
作者 Ayberk KAYA Kadir KARAMAN Fikri BULUT 《Journal of Mountain Science》 SCIE CSCD 2017年第6期1140-1160,共21页
Mass movements are very common problems in the eastern Black Sea region of Turkey due to its climate conditions, geological, and geomorphological characteristics. High slope angle, weathering, dense rainfalls, and ant... Mass movements are very common problems in the eastern Black Sea region of Turkey due to its climate conditions, geological, and geomorphological characteristics. High slope angle, weathering, dense rainfalls, and anthropogenic impacts are generally reported as the most important triggering factors in the region. Following the portal slope excavations in the entrance section of Cankurtaran tunnel, located in the region, where the highly weathered andesitic tuff crops out, a circular toe failure occurred. The main target of the present study is to investigate the causes and occurrence mechanism of this failure and to determine the feasible remedial measures against it using finite element method(FEM) in four stages. These stages are slope stability analyses for pre-and postexcavation cases, and remediation design assessments for slope and tunnel. The results of the FEM-SSR analyses indicated that the insufficient initial support design and weathering of the andesitic tuffs are the main factors that caused the portal failure. After installing a rock retaining wall with jet grout columns and reinforced slope benching applications, the factor of safety increased from 0.83 to 2.80. In addition toslope stability evaluation, the Rock Mass Rating(RMR), Rock Mass Quality(Q) and New Austrian Tunneling Method(NATM) systems were also utilized as empirical methods to characterize the tunnel ground and to determine the tunnel support design. The performance of the suggested empirical support design, induced stress distributions and deformations were analyzed by means of numerical modelling. Finally, it was concluded that the recommended stabilization technique was essential for the dynamic long-term stability and prevents the effects of failure. Additionally, the FEM method gives useful and reasonably reliable results in evaluating the stability of cut slopes and tunnels excavated both in continuous and discontinuous rock masses. 展开更多
关键词 Portal failure Stability analysis Finite element method Tunnel support design Remedial measures Rock mass Rating(RMR) Rock mass quality(Q) New Austrian Tunneling Method(NATM)
下载PDF
建筑工程中筏板基础大体积混凝土温度裂缝计算及施工技术 被引量:5
8
作者 李帅 《科技创新与应用》 2024年第5期156-159,共4页
该文以某高层建筑为例,探究筏板基础大体积混凝土温度裂缝的计算方法及混凝土施工技术。分别计算各龄期混凝土的收缩变形值、弹性模量、温度应力等参数,然后求解抗裂安全系数。计算结果显示,大体积混凝土各龄期的抗裂安全系数均大于1.0... 该文以某高层建筑为例,探究筏板基础大体积混凝土温度裂缝的计算方法及混凝土施工技术。分别计算各龄期混凝土的收缩变形值、弹性模量、温度应力等参数,然后求解抗裂安全系数。计算结果显示,大体积混凝土各龄期的抗裂安全系数均大于1.0,满足抗裂要求。在大体积混凝土施工中,重点加强物料质量检验与配合比设计,以及混凝土浇筑、养护等环节的施工管理,把握施工技术要点,才能提高筏板基础的施工质量。在混凝土养护结束后进行温度测控,结果表明大体积混凝土内外温差较小,不存在温度裂缝的风险。 展开更多
关键词 筏板基础 大体积混凝土 温度裂缝 配合比 温度测控
下载PDF
大体积混凝土施工技术及质量控制要点 被引量:1
9
作者 周国忠 《石油化工技术与经济》 CAS 2024年第1期35-39,共5页
大体积混凝土结构在施工和使用过程中受物理、化学和力学等因素作用,会出现各种变形,进而产生裂缝,影响观感及质量,严重时会影响混凝土的耐久性。文章以T-104罐本质安全环保隐患治理项目30000 m^(3)储罐基础为例,通过对大体积混凝土施... 大体积混凝土结构在施工和使用过程中受物理、化学和力学等因素作用,会出现各种变形,进而产生裂缝,影响观感及质量,严重时会影响混凝土的耐久性。文章以T-104罐本质安全环保隐患治理项目30000 m^(3)储罐基础为例,通过对大体积混凝土施工过程中混凝土原材料选用、配合比控制、浇筑顺序、养护、降温等一系列施工过程的管控,提高了混凝土结构抗裂、防渗漏等性能,保证了混凝土结构的稳定性和耐久性。 展开更多
关键词 大体积混凝土 施工技术 质量控制
下载PDF
桥梁大体积混凝土智能温控系统研究与应用
10
作者 陈道想 安瑞楠 +2 位作者 林鹏 张铮 卢冠楠 《桥梁建设》 EI CSCD 北大核心 2024年第4期77-85,共9页
为提高大型桥梁墩、台等大体积混凝土结构在浇筑施工阶段的温控防裂水平,基于智能闭环控制理念,提出一种以气温年较差和日较差为大体积混凝土温控气候分区主要指标的智能温控方法;以该方法为基础,构建智能温控系统(包括一体集成式桥梁... 为提高大型桥梁墩、台等大体积混凝土结构在浇筑施工阶段的温控防裂水平,基于智能闭环控制理念,提出一种以气温年较差和日较差为大体积混凝土温控气候分区主要指标的智能温控方法;以该方法为基础,构建智能温控系统(包括一体集成式桥梁智能温控装备和多端远程智能温控平台),完成桥梁大体积混凝土温度场的感知、分析、控制与反馈闭环。将该智能温控系统应用于内蒙古西拉沐沦河特大桥桥墩大体积混凝土施工,并提出个性化智能通水冷却措施,通过监测温度、裂缝等验证其应用效果。监测结果表明:大桥20个C50混凝土浇筑仓的混凝土浇筑块最高温度符合率为100%,内表温差符合率为90%,施工期浇筑块表面未出现温度裂缝,混凝土结构浇筑施工阶段质量较好,该智能温控系统及智能通水冷却措施能有效实现对大体积混凝土浇筑施工阶段的温控防裂。 展开更多
关键词 桥梁工程 大体积混凝土 气候分区 智能温控方法 智能温控系统 温控策略 施工质量
下载PDF
燃气电站基础大体积混凝土施工技术 被引量:1
11
作者 刘晔 《工程建设与设计》 2024年第4期150-152,共3页
以某燃气电站工程为例,重点研究大体积混凝土施工技术,确定混凝土的原材料及配合比,阐述施工准备工作内容,重点研究大体积混凝土施工技术的应用要点,包含温度计算、混凝土浇筑、振捣、测温、养护等,并根据质量最佳化的原则提出施工控制... 以某燃气电站工程为例,重点研究大体积混凝土施工技术,确定混凝土的原材料及配合比,阐述施工准备工作内容,重点研究大体积混凝土施工技术的应用要点,包含温度计算、混凝土浇筑、振捣、测温、养护等,并根据质量最佳化的原则提出施工控制措施。按照计划有条不紊地施工,充分保证燃气电站基础大体积混凝土施工质量。 展开更多
关键词 燃气电站 大体积混凝土 配合比 施工工艺 控制措施
下载PDF
针对双目摄像技术的岩体结构面非接触调查评述 被引量:1
12
作者 刘兴全 《科技创新与应用》 2024年第6期192-196,共5页
为准确评估岩体质量的优劣,以及了解其在稳定性方面的差异,进行岩体质量分级工作是必要的,其中最关键的部分是调查岩体的结构面。现阶段,对于岩体质量分级中的岩体结构面的调查方法主要有现场接触法、钻孔测量以及非接触扫描测量3类方... 为准确评估岩体质量的优劣,以及了解其在稳定性方面的差异,进行岩体质量分级工作是必要的,其中最关键的部分是调查岩体的结构面。现阶段,对于岩体质量分级中的岩体结构面的调查方法主要有现场接触法、钻孔测量以及非接触扫描测量3类方法。随着科技发展,基于双目摄像技术的岩体结构面非接触调查法在识别准确率上有质的提升,同时大大节省人力物力成本。该文结合基于双目摄像技术的岩体结构面非接触调查法的基本原理、采集过程及数据处理过程对这项技术进行详细介绍,同时通过应用实例对该技术的实用性进行评述。该技术符合现场实际条件,能够快速评价岩体质量,为矿山企业提供重要依据来选择工程结构参数,并有效指导生产。 展开更多
关键词 结构面 调查 非接触法 双目测量技术 岩体质量分级
下载PDF
给排水厂站薄壁混凝土结构质量通病及对策研究
13
作者 夏杰 王泉 《城市道桥与防洪》 2024年第6期230-234,共5页
近年来,上海市水务重大工程建设体量大、工期紧,部分厂站薄壁混凝土存在局部渗漏、蜂窝麻面、色差明显等质量问题。为更好地贯彻落实水务工程高质量发展要求,通过对在建典型给排水厂站工程进行深入调研,从人、机、料、法、环五要素对构... 近年来,上海市水务重大工程建设体量大、工期紧,部分厂站薄壁混凝土存在局部渗漏、蜂窝麻面、色差明显等质量问题。为更好地贯彻落实水务工程高质量发展要求,通过对在建典型给排水厂站工程进行深入调研,从人、机、料、法、环五要素对构筑物池体薄壁混凝土质量问题产生的原因进行深入剖析,总结薄壁混凝土结构常见的质量问题,提出现场质量技术措施和管理对策。 展开更多
关键词 给排水厂站 薄壁混凝土 质量通病 对策研究
下载PDF
预制清水混凝土外观质量控制措施 被引量:1
14
作者 王珊珊 于阔 《四川建材》 2024年第1期118-121,共4页
结合已完成预制清水混凝土工程,针对清水混凝土的外观质量缺陷产生原因,从预制清水混凝土工程的模板、钢筋、混凝土、养护、成品保护5个方面的影响因素进行研究分析,形成系统的预制构件外观质量控制措施,最后论述在项目实施中所达到的效... 结合已完成预制清水混凝土工程,针对清水混凝土的外观质量缺陷产生原因,从预制清水混凝土工程的模板、钢筋、混凝土、养护、成品保护5个方面的影响因素进行研究分析,形成系统的预制构件外观质量控制措施,最后论述在项目实施中所达到的效果,有效避免外观质量缺陷的发生,保证了清水混凝土构件高品质的外观质量。 展开更多
关键词 预制清水混凝土 外观质量缺陷 影响因素 控制措施
下载PDF
临淮关淮河大桥承台大体积混凝土温度控制与数值分析 被引量:1
15
作者 蒿一旭 李大华 《黑龙江工业学院学报(综合版)》 2024年第2期142-148,共7页
裂缝控制是桥梁承台施工中的关键技术,其质量直接关系到整个桥梁的安全运行。然而,在承台浇筑过程中,由于混凝土体积大、温度变化大等因素,容易导致混凝土承台产生温度裂缝,影响承台的使用寿命和安全性。本文以临淮关淮河大桥施工项目... 裂缝控制是桥梁承台施工中的关键技术,其质量直接关系到整个桥梁的安全运行。然而,在承台浇筑过程中,由于混凝土体积大、温度变化大等因素,容易导致混凝土承台产生温度裂缝,影响承台的使用寿命和安全性。本文以临淮关淮河大桥施工项目为背景,通过MIDAS/FEA建立大体积混凝土承台有限元模型进行混凝土温度场的模拟分析,将仿真计算结果与实测温度进行对比验证模型的合理性,通过布置冷却水管、蓄热法养护等措施可明显降低外部环境温度的直接影响,将大体积混凝土承台浇筑阶段最大温度差控制在合理范围,减少混凝土承台温度裂缝的产生。 展开更多
关键词 大体积混凝土 水化热 温度裂缝 管冷 保温措施
下载PDF
大体积混凝土施工技术在土木建筑工程中的应用研究 被引量:1
16
作者 赵明海 《工程技术研究》 2024年第7期83-85,共3页
为提高土木建筑工程中大体积混凝土的施工质量,文章首先介绍了大体积混凝土施工技术在土木建筑工程中应用的重要性,然后针对大体积混凝土施工技术在土木建筑工程中应用提出了逐层浇筑与施工缝处理、温度控制与裂缝防治、振捣与密实度处... 为提高土木建筑工程中大体积混凝土的施工质量,文章首先介绍了大体积混凝土施工技术在土木建筑工程中应用的重要性,然后针对大体积混凝土施工技术在土木建筑工程中应用提出了逐层浇筑与施工缝处理、温度控制与裂缝防治、振捣与密实度处理,以及构件支护与养护等应用策略,提升了大体积混凝土施工的效率和质量。 展开更多
关键词 大体积混凝土 土木建筑工程 施工质量 逐层浇筑
下载PDF
桥墩承台大体积混凝土温度场监测与有限元分析
17
作者 曹青 《铁道建筑》 北大核心 2024年第9期86-91,共6页
为控制大体积混凝土浇筑后里表温差过大及温度裂缝的不利影响,通过对无冷却水管试验墩和有冷却水管承台的大体积混凝土温度场进行监测,研究在有无冷却水管降温措施下大体积混凝土内部温度场的分布及变化规律,并建立有限元模型分析有限... 为控制大体积混凝土浇筑后里表温差过大及温度裂缝的不利影响,通过对无冷却水管试验墩和有冷却水管承台的大体积混凝土温度场进行监测,研究在有无冷却水管降温措施下大体积混凝土内部温度场的分布及变化规律,并建立有限元模型分析有限元模拟结果与实测数据之间的差异。结果表明:大体积混凝土浇筑后,混凝土升温速率大于降温速率;布设冷却水管降温措施可以明显降低大体积混凝土中心温度;升降温阶段,混凝土内部和表面温度升降温速率基本相同,且从内到外温度变化呈递减趋势,但无线性关系;有限元模拟结果与实测数据吻合较好。 展开更多
关键词 大体积混凝土 桥墩承台 现场监测 水化热分析 温度场 降温措施
下载PDF
建设工程大体积混凝土施工质量控制
18
作者 张金志 《工程质量》 2024年第9期34-38,共5页
大体积混凝土广泛应用于大坝、桥梁、房屋建筑和市政基础设施等工程中。长期以来,温度控制和预防开裂是大体积混凝土施工质量控制的关键性工作。论文基于国内外对于大体积混凝土的认识,深入分析了大体积混凝土结构开裂原因,提出并总结... 大体积混凝土广泛应用于大坝、桥梁、房屋建筑和市政基础设施等工程中。长期以来,温度控制和预防开裂是大体积混凝土施工质量控制的关键性工作。论文基于国内外对于大体积混凝土的认识,深入分析了大体积混凝土结构开裂原因,提出并总结了大体积混凝土施工质量的控制措施。 展开更多
关键词 建设工程 大体积混凝土 质量控制
下载PDF
温度监测在大体积混凝土施工过程的应用
19
作者 黄文旭 《广东建材》 2024年第8期84-87,共4页
混凝土会因自身水化热及干燥收缩等因素而发生变形,这将使大体积混凝土出现变形不一致以及整体收缩过大等问题,进而在内外约束的作用下产生较大应力,如不及时对大体积混凝土内外表面温度预警及采取措施,混凝土将产生内部裂缝,严重时会... 混凝土会因自身水化热及干燥收缩等因素而发生变形,这将使大体积混凝土出现变形不一致以及整体收缩过大等问题,进而在内外约束的作用下产生较大应力,如不及时对大体积混凝土内外表面温度预警及采取措施,混凝土将产生内部裂缝,严重时会出现贯穿裂缝,最终影响结构安全。本文以某工程项目为例,对温度监测在大体积混凝土施工过程的应用进行研究,对监测数据进行整理并加以分析,采用大体积温度监测的试验方法能够准确监测出建筑结构中大体积混凝土的里表温差,出现异常时能预警并采取措施,确保了大体积混凝土浇筑顺利进行,避免出现有害裂缝。 展开更多
关键词 大体积混凝土 裂缝产生原因 裂缝控制措施 温度监测
下载PDF
线性地下工程大体积混凝土抗裂技术措施研究
20
作者 王鑫 《工程质量》 2024年第S01期95-98,共4页
国内线性地下工程混凝土结构出现的渗漏水质量通病比较普遍,它直接影响到结构的安全性和耐久性。针对地下工程大体积混凝土开裂机理,分析混凝土开裂主要原因,研究降低温度应力与收缩应力、应力释放与应力约束,通过抗裂设计优化、混凝土... 国内线性地下工程混凝土结构出现的渗漏水质量通病比较普遍,它直接影响到结构的安全性和耐久性。针对地下工程大体积混凝土开裂机理,分析混凝土开裂主要原因,研究降低温度应力与收缩应力、应力释放与应力约束,通过抗裂设计优化、混凝土抗裂配合比优化、施工养护等技术措施,达到综合技术最优。 展开更多
关键词 大体积混凝土 抗裂 温度应力 收缩应力 技术措施
下载PDF
上一页 1 2 49 下一页 到第
使用帮助 返回顶部