Fully mechanized cave mining with large mining height is a new mining method, due to its large mining thickness and lower roadway excavation, the technology has been widely used in China's thick seam mining. In order...Fully mechanized cave mining with large mining height is a new mining method, due to its large mining thickness and lower roadway excavation, the technology has been widely used in China's thick seam mining. In order to improve the top-coal recovery ratio of fully mechanized cave mining with large mining height, a study was conducted on optimizing the caving process, based on the mechanized caving face 1302N in Longgu Coal Mine. This was achieved by improving the PFC numerical calculation methods, and establishing a more accurate model system. On this basis, the recovery ratio of the top coal in different drawing intervals and technologies was investigated in order to achieve a reasonable caving process. The top-coal tracking system was used for practical surveying of the recovery ratio of top coal.展开更多
Being a safe and highly-efficient mining method, fully mechanized mining with sublevel caving (FMMSC) was extensively employed in Chinese coal mines with thick seam. In order to make drawing top-coal furthest to par...Being a safe and highly-efficient mining method, fully mechanized mining with sublevel caving (FMMSC) was extensively employed in Chinese coal mines with thick seam. In order to make drawing top-coal furthest to parallel work with shearer cutting coal, decrease failure ratio of rear scraper conveyor and increase safe production capacity of equipments, based on production technology, set up the mating model of safe production capacity of equipments for the system of drawing top-coal and shearer cutting coal in coal face with sublevel caving. It is mean capability of drawing top-coal adapted to the capability of shearer cutting coal in a working circle in the coal face that was deduced. The type selection of equipment of rear scraper conveyor can be tackled with this mating model. The model was applied in FMMSC in Yangcun Coal Mine, Yima Coal Group of China. With the mating light-equipments, the coal output in coal face attained 1.05 Mt in 2004. It gained better technical-economic benefit.展开更多
Comprehensive mechanized top-coal caving mining is one of the efficient mining methods in coal mines.However,the goaf formed by comprehensive mechanized top-coal caving mining is high,and the goaf roof collapse will c...Comprehensive mechanized top-coal caving mining is one of the efficient mining methods in coal mines.However,the goaf formed by comprehensive mechanized top-coal caving mining is high,and the goaf roof collapse will cause strong dynamic pressure disturbance,especially the collapse of thick hard roof.Strong dynamic pressure disturbance has an influence on the stability of the roadway,which can lead to large deformation.In order to solve the above problem,a comprehensive pressure releasing and constant resistance energy absorbing control method is proposed.Comprehensive pressure releasing can change the roadway roof structure and cut off the stress transfer between goaf and roadway,which can improve the stress environment of the roadway.The constant resistance energy absorbing(CREA)anchor cable can absorb the energy of surrounding rock deformation and resist the impact load of gangue collapse,so as to ensure the stability of roadway disturbed by strong dynamic pressure.A three-dimensional geomechanics model test is carried out,based on the roadway disturbed by strong dynamic pressure of the extra-large coal mine in western China,to verify the control effect of the new control method.The stress and displacement evolution laws of the roadway with traditional control method and new control method are analyzed.The pressure releasing and energy absorbing control mechanism of the new control method is clarified.The geomechanics model test results show that the new control method can increase the range of low stress zone by 150%and reduce the average stress and the displacement by 34.7%and 67.8%respectively,compared with the traditional control method.The filed application results show that the new control method can reduce the roadway surrounding rock displacement by 67.4%compared with the traditional control method.It shows that the new control method can effectively control the displacement of the roadway disturbed by strong dynamic pressure and ensure that the roadway meets the safety requirements.On this basis,the engineering suggestions for large deformation control of this kind of roadway are put forward.The new control method can provide a control idea for the roadway disturbed by strong dynamic pressure.展开更多
文摘Fully mechanized cave mining with large mining height is a new mining method, due to its large mining thickness and lower roadway excavation, the technology has been widely used in China's thick seam mining. In order to improve the top-coal recovery ratio of fully mechanized cave mining with large mining height, a study was conducted on optimizing the caving process, based on the mechanized caving face 1302N in Longgu Coal Mine. This was achieved by improving the PFC numerical calculation methods, and establishing a more accurate model system. On this basis, the recovery ratio of the top coal in different drawing intervals and technologies was investigated in order to achieve a reasonable caving process. The top-coal tracking system was used for practical surveying of the recovery ratio of top coal.
文摘Being a safe and highly-efficient mining method, fully mechanized mining with sublevel caving (FMMSC) was extensively employed in Chinese coal mines with thick seam. In order to make drawing top-coal furthest to parallel work with shearer cutting coal, decrease failure ratio of rear scraper conveyor and increase safe production capacity of equipments, based on production technology, set up the mating model of safe production capacity of equipments for the system of drawing top-coal and shearer cutting coal in coal face with sublevel caving. It is mean capability of drawing top-coal adapted to the capability of shearer cutting coal in a working circle in the coal face that was deduced. The type selection of equipment of rear scraper conveyor can be tackled with this mating model. The model was applied in FMMSC in Yangcun Coal Mine, Yima Coal Group of China. With the mating light-equipments, the coal output in coal face attained 1.05 Mt in 2004. It gained better technical-economic benefit.
基金supported by the National Natural Science Foundation of China (Grant Nos.52074164,42077267,42277174 and 42177130)the Fundamental Research Funds for the Central Universities,China (Grant No.2022JCCXSB03).
文摘Comprehensive mechanized top-coal caving mining is one of the efficient mining methods in coal mines.However,the goaf formed by comprehensive mechanized top-coal caving mining is high,and the goaf roof collapse will cause strong dynamic pressure disturbance,especially the collapse of thick hard roof.Strong dynamic pressure disturbance has an influence on the stability of the roadway,which can lead to large deformation.In order to solve the above problem,a comprehensive pressure releasing and constant resistance energy absorbing control method is proposed.Comprehensive pressure releasing can change the roadway roof structure and cut off the stress transfer between goaf and roadway,which can improve the stress environment of the roadway.The constant resistance energy absorbing(CREA)anchor cable can absorb the energy of surrounding rock deformation and resist the impact load of gangue collapse,so as to ensure the stability of roadway disturbed by strong dynamic pressure.A three-dimensional geomechanics model test is carried out,based on the roadway disturbed by strong dynamic pressure of the extra-large coal mine in western China,to verify the control effect of the new control method.The stress and displacement evolution laws of the roadway with traditional control method and new control method are analyzed.The pressure releasing and energy absorbing control mechanism of the new control method is clarified.The geomechanics model test results show that the new control method can increase the range of low stress zone by 150%and reduce the average stress and the displacement by 34.7%and 67.8%respectively,compared with the traditional control method.The filed application results show that the new control method can reduce the roadway surrounding rock displacement by 67.4%compared with the traditional control method.It shows that the new control method can effectively control the displacement of the roadway disturbed by strong dynamic pressure and ensure that the roadway meets the safety requirements.On this basis,the engineering suggestions for large deformation control of this kind of roadway are put forward.The new control method can provide a control idea for the roadway disturbed by strong dynamic pressure.