Bolting of mining roadway for fully mechanized sublevel caving has been practised successfully in Hebi mining area.It provides a new method for roadway support and settles the problem of support difficulty radically f...Bolting of mining roadway for fully mechanized sublevel caving has been practised successfully in Hebi mining area.It provides a new method for roadway support and settles the problem of support difficulty radically for sublevel caving in Hebi mining area.Where anchor reinforcement holds an important station in roadway support.This article brings forward the arrangement project of anchor based on theoretic analysis.Compared with arranged in the middle of the entry, anchor arranged in the vertex of the entry can reduces the length of anchor,shortens the anchor installation time,and heightens the reliability of anchor installation.展开更多
To keep coal workers away from the hazardous area with frequent accidents such as the roof fall and rib spalling in an underground coalmine,we put forward the solution with robotized self-moving anchor-supporting unit...To keep coal workers away from the hazardous area with frequent accidents such as the roof fall and rib spalling in an underground coalmine,we put forward the solution with robotized self-moving anchor-supporting unit.The existing research shows that the surrounding rock of the roadway has self-stability,and the early or late support is not conducive to the safe and reliable support of the roadway,so there is a problem of support opportunity.In order to study the supporting effect and the optimal supporting time of the above solution,we established the mechanical coupling model of surrounding rock and advance support,and investigated the surrounding rock deformation and advance support pressure distribution under different reserved roof subsidence by using the numerical simulation software FLAC3D.The results show that the deformation of surrounding rock increases and finally tends to a stable level with the increase of pre settlement of roadway roof,and when the pre settlement of roof is between 8-15 mm,the vertical pressure of the top beam of advance support reaches the minimum value,about 0.58 MPa.Based on the above research,we put forward the optimum supporting time in roadway excavation,and summarized the evaluation method based on the mechanical coupling model of surrounding rock-advance support.展开更多
The run-around of Xiagou subincline bottom is a soft rock roadway, its floor has heaved over 1 m. ln this paper, by electronic microscope scanning and X-ray diffraction analy-sis, the components of the soft rock are d...The run-around of Xiagou subincline bottom is a soft rock roadway, its floor has heaved over 1 m. ln this paper, by electronic microscope scanning and X-ray diffraction analy-sis, the components of the soft rock are determined and the breaking mechanism of roadway is analyzed as well. Through finite element calculation and simulation model test, the reasonable repair support method is put forward.展开更多
文摘Bolting of mining roadway for fully mechanized sublevel caving has been practised successfully in Hebi mining area.It provides a new method for roadway support and settles the problem of support difficulty radically for sublevel caving in Hebi mining area.Where anchor reinforcement holds an important station in roadway support.This article brings forward the arrangement project of anchor based on theoretic analysis.Compared with arranged in the middle of the entry, anchor arranged in the vertex of the entry can reduces the length of anchor,shortens the anchor installation time,and heightens the reliability of anchor installation.
基金National Key Basic Research and Development Program Fund project(Grant No.2014CB046306)the Central University Funding Project for Basic Scientific Research Operations(Grant No.2009QJ16)
文摘To keep coal workers away from the hazardous area with frequent accidents such as the roof fall and rib spalling in an underground coalmine,we put forward the solution with robotized self-moving anchor-supporting unit.The existing research shows that the surrounding rock of the roadway has self-stability,and the early or late support is not conducive to the safe and reliable support of the roadway,so there is a problem of support opportunity.In order to study the supporting effect and the optimal supporting time of the above solution,we established the mechanical coupling model of surrounding rock and advance support,and investigated the surrounding rock deformation and advance support pressure distribution under different reserved roof subsidence by using the numerical simulation software FLAC3D.The results show that the deformation of surrounding rock increases and finally tends to a stable level with the increase of pre settlement of roadway roof,and when the pre settlement of roof is between 8-15 mm,the vertical pressure of the top beam of advance support reaches the minimum value,about 0.58 MPa.Based on the above research,we put forward the optimum supporting time in roadway excavation,and summarized the evaluation method based on the mechanical coupling model of surrounding rock-advance support.
文摘The run-around of Xiagou subincline bottom is a soft rock roadway, its floor has heaved over 1 m. ln this paper, by electronic microscope scanning and X-ray diffraction analy-sis, the components of the soft rock are determined and the breaking mechanism of roadway is analyzed as well. Through finite element calculation and simulation model test, the reasonable repair support method is put forward.