Hydraulic slotting in a gas drainage borehole is an effective method of enhancing gas drainage perfor- mance. However, it frequently occurs that a large amount of slotting products (mainly the coal slurry and gas) i...Hydraulic slotting in a gas drainage borehole is an effective method of enhancing gas drainage perfor- mance. However, it frequently occurs that a large amount of slotting products (mainly the coal slurry and gas) intensely spurt out of the borehole during the slotting, which adversely affects the slotting efficiency. Despite extensive previous investigations on the mechanism and prevention-device design of the spurt during ordinary borehole drilling, a very few studies has focused on the spurt in the s Ottlng pro ] " _ cess. The slotting spurt is mainly caused by two reasons: the coal and gas outburst in the borehole and the borehole deslagging blockage. This paper focuses on the second reason, and investigates the hydraulic deslagging flow patterns in the annular space between the drill pipe and borehole wall Results show that there are six deslagging flow patterns when the drill pipe is still: pure slurry flow, pure gas flow, bubble flow, intermittent flow, layering flow and annular flow. When the drill pipe rotates, each of those six flow patterns changes due to the Taylor vortex effect. Outcomes of this study could help to better understand the slotting-spurt mechanism and provide guidance on the anti-spurt strategies through eliminating the borehole deslagging blockage.展开更多
Measured to control serious coal-gas outburst in coal seam were analyzed by theory and experimented in test site.A new technique to distress the coal-bed and drain methane,called hydraulic slotting,was described in de...Measured to control serious coal-gas outburst in coal seam were analyzed by theory and experimented in test site.A new technique to distress the coal-bed and drain methane,called hydraulic slotting,was described in detail,and the mechanism of hydrau- lic slotting was put forward and analyzed.The characteristic parameter of hydraulic slotting was given in Jiaozuo mining area and the characteristic of validity,adaptability and secu- rity was evaluated.The results show that the stress surrounding the strata and the gas in coal seam is released efficiently and thoroughly while new techniques are taken,as slot- ting at heading face by high pressure large diameter jet.The resistance to coal and gas outbursts is increased dramatically once the area of slotting is increased to a certain size. In the process of driving 2 000 m tunnel by hydraulic slotting excavation,coal and gas outburst never occurre.The technique could be used to prevent and control potential coal-gas outburst in the proceeding of tunnel driving,and the speed tunneling could be as high as more than 2 times.展开更多
t Research and development of safe and effective control technology of hard roof is an inevitable trend at present. Directional hydraulic fracturing technology is expected to become a safe and effective way to control...t Research and development of safe and effective control technology of hard roof is an inevitable trend at present. Directional hydraulic fracturing technology is expected to become a safe and effective way to control and manage hard roof. In order to make hard roof fracture in a directional way, a hydraulic fracture field test has been conducted in the third panel district of Tashan Coal Mine in Datong. First, two hydraulic fracturing drilling holes and four observing drilling holes were arranged in the roof, followed by a wedge-shaped ring slot in each hydraulic fracturing drilling hole. The hydraulic fracturing holes were then sealed and, hydraulic fracturing was conducted. The results show that the hard roof is fractured directionally by the hydraulic fracturing function of the two fracturing drilling holes; the sudden drop, or the overall downward trend of hydraulic pressure from hydraulic monitoring is the proof that the rock in the hard roof has been fractured. The required hydraulic pressure to fracture the hard roof in Tashan coal mine, consisting of carboniferous sandstone layer, is 50.09 MPa, and the fracturing radius of a single drilling hole is not less than 10.5 m. The wedge-shaped ring slot made in the bottom of the hydraulic fracturing drilling hole plays a guiding role for crack propagation. After the hydraulic fracturing drill hole is cracked, the propagation of the resulting hydraulic crack, affected mainly by the regional stress field, will turn to other directions.展开更多
Hydraulic fracturing(HF)technology can safely and efficiently increase the permeability of coal seam,which is conducive to CBM exploration and prevent coal and gas outburst.However,conventional HF fractures tend to ex...Hydraulic fracturing(HF)technology can safely and efficiently increase the permeability of coal seam,which is conducive to CBM exploration and prevent coal and gas outburst.However,conventional HF fractures tend to expand in the direction of maximum principal stress,which may be inconsistent with the direction of fracturing required by the project.Therefore,the increased direction of coal seam permeability is different from that expected.To solve these problems,PFC2D software simulation is used to study directional hydraulic fracturing(DHF),that is the combination of slotting and hydraulic fracturing.The effects of different slotting angles(θ),different horizontal stress difference coefficients(K)and different injection pressures on DHF fracture propagation are analyzed.The results show that the DHF method can overcome the dominant effect of initial in-situ stress on the propagation direction of hydraulic fractures and control the propagation of fractures along and perpendicular to the slotting direction when θ,K and liquid injection pressure are small.When the DHF fracture is connected with manual slotting,the pressure will shake violently,and the fracturing curve presents a multi-peak type.The increase and decrease of particle pressure around the fracturing hole reflect the process of pressure accumulation and fracture propagation at the fracture tip respectively.Compared with conventional HF,DHF can not only shorten the fracturing time but also make the fracture network more complex,which is more conducive to gas flow.Under the action of in-situ stress,the stress between slots will increase to exceed the maximum horizontal principal stress.Moreover,with the change in fracturing time,the local stress of the model will also change.Hydraulic fractures are always expanding to the area with large local stress.The research results could provide certain help for DHF theoretical research and engineering application.展开更多
文摘Hydraulic slotting in a gas drainage borehole is an effective method of enhancing gas drainage perfor- mance. However, it frequently occurs that a large amount of slotting products (mainly the coal slurry and gas) intensely spurt out of the borehole during the slotting, which adversely affects the slotting efficiency. Despite extensive previous investigations on the mechanism and prevention-device design of the spurt during ordinary borehole drilling, a very few studies has focused on the spurt in the s Ottlng pro ] " _ cess. The slotting spurt is mainly caused by two reasons: the coal and gas outburst in the borehole and the borehole deslagging blockage. This paper focuses on the second reason, and investigates the hydraulic deslagging flow patterns in the annular space between the drill pipe and borehole wall Results show that there are six deslagging flow patterns when the drill pipe is still: pure slurry flow, pure gas flow, bubble flow, intermittent flow, layering flow and annular flow. When the drill pipe rotates, each of those six flow patterns changes due to the Taylor vortex effect. Outcomes of this study could help to better understand the slotting-spurt mechanism and provide guidance on the anti-spurt strategies through eliminating the borehole deslagging blockage.
基金National Nature Science Foundation of China(50534070)International Science and Technology Cooperation and Communion Key Project of Ministry Science and Technology of China(2005DFA61030)+1 种基金Natural Science Foundation of Henan Province(200510460014)Coal Mine Gas and Fire Prevention and Control Key Laboratory Foundation of Henan Province(HKLGF200708)
文摘Measured to control serious coal-gas outburst in coal seam were analyzed by theory and experimented in test site.A new technique to distress the coal-bed and drain methane,called hydraulic slotting,was described in detail,and the mechanism of hydrau- lic slotting was put forward and analyzed.The characteristic parameter of hydraulic slotting was given in Jiaozuo mining area and the characteristic of validity,adaptability and secu- rity was evaluated.The results show that the stress surrounding the strata and the gas in coal seam is released efficiently and thoroughly while new techniques are taken,as slot- ting at heading face by high pressure large diameter jet.The resistance to coal and gas outbursts is increased dramatically once the area of slotting is increased to a certain size. In the process of driving 2 000 m tunnel by hydraulic slotting excavation,coal and gas outburst never occurre.The technique could be used to prevent and control potential coal-gas outburst in the proceeding of tunnel driving,and the speed tunneling could be as high as more than 2 times.
基金Supported by the National Natural Science Foundation of China (51274194, 51004104) the Program for New Century Excellent Talents in University (NCET- 12-0958)
文摘t Research and development of safe and effective control technology of hard roof is an inevitable trend at present. Directional hydraulic fracturing technology is expected to become a safe and effective way to control and manage hard roof. In order to make hard roof fracture in a directional way, a hydraulic fracture field test has been conducted in the third panel district of Tashan Coal Mine in Datong. First, two hydraulic fracturing drilling holes and four observing drilling holes were arranged in the roof, followed by a wedge-shaped ring slot in each hydraulic fracturing drilling hole. The hydraulic fracturing holes were then sealed and, hydraulic fracturing was conducted. The results show that the hard roof is fractured directionally by the hydraulic fracturing function of the two fracturing drilling holes; the sudden drop, or the overall downward trend of hydraulic pressure from hydraulic monitoring is the proof that the rock in the hard roof has been fractured. The required hydraulic pressure to fracture the hard roof in Tashan coal mine, consisting of carboniferous sandstone layer, is 50.09 MPa, and the fracturing radius of a single drilling hole is not less than 10.5 m. The wedge-shaped ring slot made in the bottom of the hydraulic fracturing drilling hole plays a guiding role for crack propagation. After the hydraulic fracturing drill hole is cracked, the propagation of the resulting hydraulic crack, affected mainly by the regional stress field, will turn to other directions.
基金supported by National Natural Science Foundation of China(52130409,52004291,51874314)the Fundamental Research Funds for the Central Universities(2022YJSAQ03,2022XJAQ02).
文摘Hydraulic fracturing(HF)technology can safely and efficiently increase the permeability of coal seam,which is conducive to CBM exploration and prevent coal and gas outburst.However,conventional HF fractures tend to expand in the direction of maximum principal stress,which may be inconsistent with the direction of fracturing required by the project.Therefore,the increased direction of coal seam permeability is different from that expected.To solve these problems,PFC2D software simulation is used to study directional hydraulic fracturing(DHF),that is the combination of slotting and hydraulic fracturing.The effects of different slotting angles(θ),different horizontal stress difference coefficients(K)and different injection pressures on DHF fracture propagation are analyzed.The results show that the DHF method can overcome the dominant effect of initial in-situ stress on the propagation direction of hydraulic fractures and control the propagation of fractures along and perpendicular to the slotting direction when θ,K and liquid injection pressure are small.When the DHF fracture is connected with manual slotting,the pressure will shake violently,and the fracturing curve presents a multi-peak type.The increase and decrease of particle pressure around the fracturing hole reflect the process of pressure accumulation and fracture propagation at the fracture tip respectively.Compared with conventional HF,DHF can not only shorten the fracturing time but also make the fracture network more complex,which is more conducive to gas flow.Under the action of in-situ stress,the stress between slots will increase to exceed the maximum horizontal principal stress.Moreover,with the change in fracturing time,the local stress of the model will also change.Hydraulic fractures are always expanding to the area with large local stress.The research results could provide certain help for DHF theoretical research and engineering application.