期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
Planning to Plan-Integrating Control Flow
1
作者 Alexander Nareyek 《Tsinghua Science and Technology》 SCIE EI CAS 2003年第1期1-7,共7页
In many planning situations, computation itself becomes a resource to be planned and scheduled. We model such computational resources as conventional resources which are used by control-flow actions, e.g., to direc... In many planning situations, computation itself becomes a resource to be planned and scheduled. We model such computational resources as conventional resources which are used by control-flow actions, e.g., to direct the planning process. Control-flow actions and conventional actions are planned/scheduled in an integrated way and can interact with each other. Control-flow actions are then executed by the planning engine itself. The approach is illustrated by examples, e.g., for hierarchical planning, in which tasks that are temporally still far away impose only rough constraints on the current schedule, and control-flow tasks ensure that these tasks are refined as they approach the current time. Using the same mechanism, anytime algorithms can change appropriate search methods or parameters over time, and problems like scheduling critical time-outs for garbage collection can be made part of the planning itself. 展开更多
关键词 meta-planning resource-bounded reasoning online planning integrated planning sensing and execution integrated planning and scheduling hierarchical planning anytime algorithms local search metaheuristics
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部