To evaluate the effects of possible ground explosion on a shallow-buried metro tunnel, this paper attempts to analyze the dynamic responses of the operating metro tunnel in soft soil, using a widely applied explicit d...To evaluate the effects of possible ground explosion on a shallow-buried metro tunnel, this paper attempts to analyze the dynamic responses of the operating metro tunnel in soft soil, using a widely applied explicit dynamic nonlinear finite element software ANSYS/LS-DYNA. The blast induced wave propagation in the soil and the tunnel, and the von Mises effective stress and acceleration of the tunnel lining were presented, and the safety of the tunnel lining was evaluated based on the failure criterion. Besides, the parametric study of the soil was also carried out. The numerical results indicate that the upper part of the tunnel lining cross-section with directions ranging from 0° to 22.5° and horizontal distances 0 to 7 m away from the explosive center are the vulnerable areas, and the metro tunnel might be safe when tunnel depth is more than 7 m and TNT charge on the ground is no more than 500 kg, and the selection of soil parameters should be paid more attentions to conduct a more precise analysis.展开更多
The 1/15 reduced-scale experiments using Froude scaling were designed to study the effect on the smoke control efficiency for subway tunnel fires with natural ventilation mode.The propane gas fires with heat release r...The 1/15 reduced-scale experiments using Froude scaling were designed to study the effect on the smoke control efficiency for subway tunnel fires with natural ventilation mode.The propane gas fires with heat release rate 11.48 kW was used,which corresponds to the heat release rate 10 MW in the full-scale tunnel.The temperature distributions under the ceiling were measured by K-type thermocouples to investigate smoke movement,and the velocity of smoke in shafts was measured by hot-wire anemometer to obtain the smoke extract amount of ventilation shafts.The results show that the smoke temperature under the ceiling varies with the longitudinal different distance from fire source.The results also show that the smoke temperature distributions and the smoke control efficiency in tunnel vary with the space between ventilation shafts and vary with the area and the height of ventilation shaft.展开更多
To choose the optimum construction method of metro tunneling, we conducted research with numerical simulation on strata consolidation subsidence by dewatering, dynamic dewatering, and non-dewatering construction metho...To choose the optimum construction method of metro tunneling, we conducted research with numerical simulation on strata consolidation subsidence by dewatering, dynamic dewatering, and non-dewatering construction method, taking the integrated effects of fluid-solid coupling and tunneling mechanics into account. We obtained the curved surfaces of ground surface subsidence and strata consolidation subsidence. The results show that the quantity of ground surface subsidence is 31 mm for the non-dewatering method, 39 mm for the dynamic dewatering method, and 105 mm for the dewatering method. Their ratio is 1:1.3:3.4; and the percentages of strata consolidation subsidence to whole ground surface subsidence of each construction method is 27% (no-dewatering), 50% (dynamic dewatering), and 79% (dewatering). It is obvious that the non-dewatering construction method is the most effective method to control the strata consolidation subsidence induced by metro tunneling in saturated soft clay strata, and it has been successfully applied to the construction of the Shenzben metro line 1.展开更多
Evaluating the adaptability of cantilever boring machine(CBM) through in-depth excavation and analysis of tunnel excavation data and rock mass parameters is the premise of mechanical design and efficient excavation in...Evaluating the adaptability of cantilever boring machine(CBM) through in-depth excavation and analysis of tunnel excavation data and rock mass parameters is the premise of mechanical design and efficient excavation in the field of underground space engineering.This paper presented a case study of tunnelling performance prediction method of CBM in sedimentary hard-rock tunnel of Karst landform type by using tunneling data and surrounding rock parameters.The uniaxial compressive strength(UCS),rock integrity factor(Kv),basic quality index([BQ]),rock quality index RQD,brazilian tensile strength(BTS) and brittleness index(BI) were introduced to construct a performance prediction database based on the hard-rock tunnel of Guiyang Metro Line 1 and Line 3,and then established the performance prediction model of cantilever boring machine.Then the deep belief network(DBN) was introduced into the performance prediction model,and the reliability of performance prediction model was verified by combining with engineering data.The study showed that the influence degree of surrounding rock parameters on the tunneling performance of the cantilever boring machine is UCS > [BQ] > BTS >RQD > Kv > BI.The performance prediction model shows that the instantaneous cutting rate(ICR) has a good correlation with the surrounding rock parameters,and the predicting model accuracy is related to the reliability of construction data.The prediction of limestone and dolomite sections of Line 3 based on the DBN performance prediction model shows that the measured ICR and predicted ICR is consistent and the built performance prediction model is reliable.The research results have theoretical reference significance for the applicability analysis and mechanical selection of cantilever boring machine for hard rock tunnel.展开更多
To understand the mechanical response pattern of the existing structure and ground due to the construction of metro tunnels underneath,the finite difference method is adopted to study the torsional deformation and str...To understand the mechanical response pattern of the existing structure and ground due to the construction of metro tunnels underneath,the finite difference method is adopted to study the torsional deformation and stress variation of the existing structure and the effect of underground carriageway structures on the surface subsidence.The curves of the maximum differential subsidence,torsion angle,and distortion of the cross-section of the existing structure show two peaks in succession during traversing of two metro tunnels beneath it.The torsion angle of the existing structure changes when the two tunnels traverse beneath it in opposite directions.The first traversing of the shield tunnel mainly induces the magnitude variation in torsional deformation of the existing structure,but the second traversing of the subsurface tunnel may cause a dynamic change in the magnitude and form of torsional deformation in the existing structure.The shielding effect can reduce the surface subsidence caused by metro tunnel excavation to a certain extent,and the development trend of subsidence becomes slower as the excavation continues.展开更多
The application of jacked box tunnelling for underground passages has grown rapidly in recent years in China.In this study,the design of an extreme shallow jacked box tunnel traversing the underlying metro tunnels was...The application of jacked box tunnelling for underground passages has grown rapidly in recent years in China.In this study,the design of an extreme shallow jacked box tunnel traversing the underlying metro tunnels was introduced.An innovative additional soil filling above the ground surface was carried out to overcome the overlying-soil-carrying effect of the extreme shallow jacked box tunnelling.The structural safety of metro tunnels during the jacking process was analyzed through in-situ monitoring.It indicated that the overlying-soil-carrying effect was successfully alleviated.The metro tunnels generally showed horizontal displacement towards the receiving shaft,uplift and horizontal stretch during the jacking process.The stop of jacking machine in front of obstacles generally contributed to the decrease of horizontal displacement,uplift and horizontal stretch of metro tunnels.The largest horizontal displacement(1.3–1.6 mm),uplift(1.5 mm)and horizontal convergence(1.6–1.8 mm)generally occurred when the reception of jacking machine was completed,and they all met the requirement of 2 mm for this project.The design and construction of this shallow jacked box tunnel project could provide references for future similar projects.展开更多
基金Supported by the National Natural Science Foundation of China (40874074, 50950110347)the National High Technology Research and Development Program (863 Program) of China (2006AA11ZAA8)Shanghai Science and Technology Development Funds (07ZR14117)
文摘To evaluate the effects of possible ground explosion on a shallow-buried metro tunnel, this paper attempts to analyze the dynamic responses of the operating metro tunnel in soft soil, using a widely applied explicit dynamic nonlinear finite element software ANSYS/LS-DYNA. The blast induced wave propagation in the soil and the tunnel, and the von Mises effective stress and acceleration of the tunnel lining were presented, and the safety of the tunnel lining was evaluated based on the failure criterion. Besides, the parametric study of the soil was also carried out. The numerical results indicate that the upper part of the tunnel lining cross-section with directions ranging from 0° to 22.5° and horizontal distances 0 to 7 m away from the explosive center are the vulnerable areas, and the metro tunnel might be safe when tunnel depth is more than 7 m and TNT charge on the ground is no more than 500 kg, and the selection of soil parameters should be paid more attentions to conduct a more precise analysis.
文摘The 1/15 reduced-scale experiments using Froude scaling were designed to study the effect on the smoke control efficiency for subway tunnel fires with natural ventilation mode.The propane gas fires with heat release rate 11.48 kW was used,which corresponds to the heat release rate 10 MW in the full-scale tunnel.The temperature distributions under the ceiling were measured by K-type thermocouples to investigate smoke movement,and the velocity of smoke in shafts was measured by hot-wire anemometer to obtain the smoke extract amount of ventilation shafts.The results show that the smoke temperature under the ceiling varies with the longitudinal different distance from fire source.The results also show that the smoke temperature distributions and the smoke control efficiency in tunnel vary with the space between ventilation shafts and vary with the area and the height of ventilation shaft.
文摘To choose the optimum construction method of metro tunneling, we conducted research with numerical simulation on strata consolidation subsidence by dewatering, dynamic dewatering, and non-dewatering construction method, taking the integrated effects of fluid-solid coupling and tunneling mechanics into account. We obtained the curved surfaces of ground surface subsidence and strata consolidation subsidence. The results show that the quantity of ground surface subsidence is 31 mm for the non-dewatering method, 39 mm for the dynamic dewatering method, and 105 mm for the dewatering method. Their ratio is 1:1.3:3.4; and the percentages of strata consolidation subsidence to whole ground surface subsidence of each construction method is 27% (no-dewatering), 50% (dynamic dewatering), and 79% (dewatering). It is obvious that the non-dewatering construction method is the most effective method to control the strata consolidation subsidence induced by metro tunneling in saturated soft clay strata, and it has been successfully applied to the construction of the Shenzben metro line 1.
基金National Natural Science Foundation of China (Grant No.52178393)the Science and Technology Innovation Team of Shaanxi Innovation Capability Support Plan (Grant No.2020TD005)Science and Technology Innovation Project of China Railway Construction Bridge Engineering Bureau Group Co.,Ltd.(Grant No.DQJ-2020-B07)。
文摘Evaluating the adaptability of cantilever boring machine(CBM) through in-depth excavation and analysis of tunnel excavation data and rock mass parameters is the premise of mechanical design and efficient excavation in the field of underground space engineering.This paper presented a case study of tunnelling performance prediction method of CBM in sedimentary hard-rock tunnel of Karst landform type by using tunneling data and surrounding rock parameters.The uniaxial compressive strength(UCS),rock integrity factor(Kv),basic quality index([BQ]),rock quality index RQD,brazilian tensile strength(BTS) and brittleness index(BI) were introduced to construct a performance prediction database based on the hard-rock tunnel of Guiyang Metro Line 1 and Line 3,and then established the performance prediction model of cantilever boring machine.Then the deep belief network(DBN) was introduced into the performance prediction model,and the reliability of performance prediction model was verified by combining with engineering data.The study showed that the influence degree of surrounding rock parameters on the tunneling performance of the cantilever boring machine is UCS > [BQ] > BTS >RQD > Kv > BI.The performance prediction model shows that the instantaneous cutting rate(ICR) has a good correlation with the surrounding rock parameters,and the predicting model accuracy is related to the reliability of construction data.The prediction of limestone and dolomite sections of Line 3 based on the DBN performance prediction model shows that the measured ICR and predicted ICR is consistent and the built performance prediction model is reliable.The research results have theoretical reference significance for the applicability analysis and mechanical selection of cantilever boring machine for hard rock tunnel.
基金National Natural Science Foundation of China,Grant/Award Numbers:51878060,52078046。
文摘To understand the mechanical response pattern of the existing structure and ground due to the construction of metro tunnels underneath,the finite difference method is adopted to study the torsional deformation and stress variation of the existing structure and the effect of underground carriageway structures on the surface subsidence.The curves of the maximum differential subsidence,torsion angle,and distortion of the cross-section of the existing structure show two peaks in succession during traversing of two metro tunnels beneath it.The torsion angle of the existing structure changes when the two tunnels traverse beneath it in opposite directions.The first traversing of the shield tunnel mainly induces the magnitude variation in torsional deformation of the existing structure,but the second traversing of the subsurface tunnel may cause a dynamic change in the magnitude and form of torsional deformation in the existing structure.The shielding effect can reduce the surface subsidence caused by metro tunnel excavation to a certain extent,and the development trend of subsidence becomes slower as the excavation continues.
基金supported by the Construction Research Project of Zhejiang Province,China(Grant Nos.2021K167 and 2021K103)Science and Technology Innovation Project of Zhejiang Province,China(Grant No.2019R52035)Research Funding of Dongtong Geotechnical Technology Co.,Ltd.,China.
文摘The application of jacked box tunnelling for underground passages has grown rapidly in recent years in China.In this study,the design of an extreme shallow jacked box tunnel traversing the underlying metro tunnels was introduced.An innovative additional soil filling above the ground surface was carried out to overcome the overlying-soil-carrying effect of the extreme shallow jacked box tunnelling.The structural safety of metro tunnels during the jacking process was analyzed through in-situ monitoring.It indicated that the overlying-soil-carrying effect was successfully alleviated.The metro tunnels generally showed horizontal displacement towards the receiving shaft,uplift and horizontal stretch during the jacking process.The stop of jacking machine in front of obstacles generally contributed to the decrease of horizontal displacement,uplift and horizontal stretch of metro tunnels.The largest horizontal displacement(1.3–1.6 mm),uplift(1.5 mm)and horizontal convergence(1.6–1.8 mm)generally occurred when the reception of jacking machine was completed,and they all met the requirement of 2 mm for this project.The design and construction of this shallow jacked box tunnel project could provide references for future similar projects.