期刊文献+
共找到1,142篇文章
< 1 2 58 >
每页显示 20 50 100
Land Cover Changes and Drivers in the Water Source Area of the Middle Route of the South-to-North Water Diversion Project in China from 2000 to 2015 被引量:3
1
作者 GAO Wenwen ZENG Yuan +2 位作者 ZHAO Dan WU Bingfang REN Zhiyuan 《Chinese Geographical Science》 SCIE CSCD 2020年第1期115-126,共12页
The Middle Route of the South-to-North Water Diversion Project(MR-SNWDP)in China,with construction beginning in 2003,diverts water from Danjiangkou Reservoir to North China for residential,agriculture and industrial u... The Middle Route of the South-to-North Water Diversion Project(MR-SNWDP)in China,with construction beginning in 2003,diverts water from Danjiangkou Reservoir to North China for residential,agriculture and industrial use.The water source area of the MR-SNWDP is the region that is most sensitive to and most affected by the construction of this water diversion project.In this study,we used Landsat Thematic Mapper(TM)and HJ-1 A/B images from 2000 to 2015 by an object-based approach with a hierarchical classification method for mapping land cover in the water source area.The changes in land cover were illuminated by transfer matrixes,single dynamic degree,slope zones and fractional vegetation cover(FVC).The results indicated that the area of cropland decreased by 31%and was replaced mainly by shrub over the past 15 years,whereas forest and settlements showed continuous increases of 29.2% and 77.7%,respectively.The changes in cropland were obvious in all slope zones and decreased most remarkably(–43.8%)in the slope zone above 25°.Compared to the FVC of forest and shrub,significant improvement was exhibited in the FVC of grassland,with a growth rate of 16.6%.We concluded that local policies,including economic development,water conservation and immigration resulting from the construction of the MR-SNWDP,were the main drivers of land cover changes;notably,they stimulated the substantial and rapid expansion of settlements,doubled the wetlands and drove the transformation from cropland to settlements in immigration areas. 展开更多
关键词 remote sensing land cover change object-based classification middle Route of the south-to-north water Diversion project(MR-SNWDP) China
下载PDF
Price Analysis of Water Supply for South-to-North Water Transfer Project
2
作者 QIU Zhong enProfessor, Design Institute, Changjiang Water Resources Commission, Wuhan 430010, China Tan Chang liSenior Engineer, Design Institute, Changjiang Water Resources Commission, Wuhan 430010, China ZHU Qin Engineer, Design Institute, Chan 《人民长江》 北大核心 2001年第S1期29-32,共4页
The factors influencing the water supply price of a hydraulic project include natural conditions and economic policies. This paper thoroughly demonstrates the water price of South-to-North Water Transfer Project from ... The factors influencing the water supply price of a hydraulic project include natural conditions and economic policies. This paper thoroughly demonstrates the water price of South-to-North Water Transfer Project from the viewpoint of economic policies. It is considered that if the project is assigned as a profitable one and built depending on commercial loan from bank completely or mostly, the water price will be too high to be undertaken by users,and if the project places the public good at first while considering the economic benefit, its investment mainly relies on the state (national or local governments) appropriation and self-raised funds and a little from the bank loan on favorable terms, the price determined according to the principle of satisfying the cost and reasonable profit will be relatively lower and can be undertaken by the users in the North China where water shortage is serious. The problem of higher water price of agricultural irrigation to the north of the Yellow River can be tackled by taking measures such as "compensating agriculture by industry" according to foreign practical experiences and relevant suggestions. 展开更多
关键词 PRICE of water supply water PRICE estimation FUND RAISING schemes water TRANSFER cost middle-Route project of south-to-north water TRANSFER
下载PDF
Geological conditions and key rock mechanics issues in the Western Route of South-to-North Water Transfer Project 被引量:2
3
作者 XuechaoWang 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE 2011年第3期234-243,共10页
In terms of special geological conditions of the Western Route of South-to-North Water Transfer Project, the classification method for surrounding rocks is discussed by combining with the construction method of tunnel... In terms of special geological conditions of the Western Route of South-to-North Water Transfer Project, the classification method for surrounding rocks is discussed by combining with the construction method of tunnel boring machine (TBM). The classification standard of surrounding rocks is put forward on the basis of physical simulations and engineering practices. Damage, deformation and evolution of surrounding rocks induced by TBM excavation are discussed. Meanwhile, the long-term deformation mechanisms and stability of surrounding rocks are also studied. On this basis, a three-dimensional constitutive model for interbedded sandstone slate and a fiat shell-joint element-foundation system for calculating internal forces of segment lining are established. The deformation features of surrounding rocks of deep and steep interbedded sandstone slate and their influences on internal forces of segment lining are presented. Finally, the design methods of segment lining constructed in deep and steep flysch are proposed. 展开更多
关键词 the Western Route of south-to-north water Transfer project rock mechanics issues classification of surrounding rocks stability of surrounding rocks excavation-induced damage lining design
下载PDF
Eco-environmental benefit assessment of China's South-North Water Transfer Scheme——the middle route project
4
作者 DUANGuang-ming ZHAOJing-zhu LIUGuo-hua KEBing XIAOHan WUGang DENGHong-bing 《Journal of Environmental Sciences》 SCIE EI CAS CSCD 2004年第2期308-315,共8页
This paper assess the eco-environmental benefits that may come from the middle route project of China's South-North Water Transfer Scheme(SNWT) with principles and methods of eco-economics and planning reports of ... This paper assess the eco-environmental benefits that may come from the middle route project of China's South-North Water Transfer Scheme(SNWT) with principles and methods of eco-economics and planning reports of SNWT's middle route project. Some benefits were calculated in monetary units. To make sure that the results can be comparable with normal monetary indices, concrete assessment objects and the parameters are prudently selected according to the major characteristics of the project and its water import region. Primary assessment revealed that in different project construction stages, the benefit could be more than 13 07 billion RMB Yuan in 2010 and 19 79 billion RMB Yuan in 2030, respectively. The monetary value tends to increase with social-economic development. To realize these potential benefits, however, calls for more endeavors. 展开更多
关键词 China's south-north water Transfer Scheme(SNWT) the middle route project of south-north water Transfer(MRPSNWT) assessment ecosystem services monetary indices
下载PDF
Computing payment for ecosystem services in watersheds: An analysis of the Middle Route Project of South-to-North Water Diversion in China 被引量:12
5
作者 Zhengju Dong Yan Yan +5 位作者 Jing Duan Xiao Fu Qingrong Zhou Xiang Huang Xiangen Zhu Jingzhu Zhao 《Journal of Environmental Sciences》 SCIE EI CAS CSCD 2011年第12期2005-2012,共8页
Payment for ecosystem services (PES) has attracted considerable attention as an economic incentive for promoting natural resource management recently. As emphasis has been placed on using the incentive-based mechani... Payment for ecosystem services (PES) has attracted considerable attention as an economic incentive for promoting natural resource management recently. As emphasis has been placed on using the incentive-based mechanism by the central government, rapid progress on PES research and practice has been achieved. However PES still faces many difficulties. A key issue is the lack of a fully-fledged theory and method to clearly define the design scope, accounting and feasibility of PES criteria. An improved watershed criteria model was developed in light of research on PES practices in China, investigations on the water source area for the Middle Route Project of South-to-North Water Diversion and ecosystem services outflows theory. The basic principle of assessment is the direct and opportunity cost for ecological conservation and environmental protection in the water source area deduct nationally-financed PES and internal effect. Then the scope and the criteria methods were determined, and internal effect was put forward to define benefits brought from water source area. Finally, Shiyan City, which is the main water source area for the Project of Water Diversion, was analyzed by this model and its payment was calculated. The results showed that: (1) during 2003–2050, the total direct cost and opportunity cost would reach up to 262.70 billion and 256.33 billion Chinese Yuan (CNY, 2000 constant prices), i.e., 50.61% and 49.38% of total cost, respectively; (2) Shiyan City would gain 0.23, 0.06 and 0.03 CNY/m3 in 2014–2020, 2021–2030, and 2031–2050, respectively. 展开更多
关键词 waterSHED payment for ecosystem services ecosystem services cost-benefit analysis middle Route project of south-to- north water Diversion
原文传递
Simulation of Transport Channel in China's Middle Route South-to-North Water Transfer Project 被引量:3
6
作者 方神光 魏加华 +1 位作者 吴保生 尚毅梓 《Tsinghua Science and Technology》 SCIE EI CAS 2009年第3期367-377,共11页
The unsteady flow in the Middle Route South-to-North Water Transfer Channel was simulated numerically using an implicit solution procedure for the Saint Venant equations. An equivalent roughness was used to simulate t... The unsteady flow in the Middle Route South-to-North Water Transfer Channel was simulated numerically using an implicit solution procedure for the Saint Venant equations. An equivalent roughness was used to simulate the effect of many transfer structures on the water levels in the main channel. Various gate operating and control methods were analyzed to study the response to disturbances produced by varying the flow rates through the Tianjin outlet. The results show that when the inflow at the head changes in the same way as the sum of the flow rates through all the outlets, the transition time and the fluctuation of the water levels using the timed gate operation method are less than when using the simultaneous gate operation method, but the variations of the gate openings and flow rates through each control gate are much larger. The flow disturbances produced by the Tianjin outlet can be rectified within several channel sections and the transition time can be greatly shortened by allowing the water levels immediately upstream of the control gates to vary within proscribed ranges, rather than being held constant. 展开更多
关键词 middle Route south-to-north water Transfer project unsteady flow open channel control system SIMULATION
原文传递
局部降温对输水渠道水华抑制的影响分析
7
作者 张雅卓 宋芷萱 +2 位作者 姚烨 闫琳琳 徐楚涵 《水资源与水工程学报》 CSCD 北大核心 2024年第2期130-138,148,共10页
南水北调中线工程自通水以来,发挥着巨大的社会和经济效益,已成为京津地区的主力水源。中线工程输水的水质理化指标相对稳定,但局部渠段存在藻类异常增殖现象,有水华爆发的风险。针对出现的藻类异常增殖问题,在通冷风这一改变局部气象... 南水北调中线工程自通水以来,发挥着巨大的社会和经济效益,已成为京津地区的主力水源。中线工程输水的水质理化指标相对稳定,但局部渠段存在藻类异常增殖现象,有水华爆发的风险。针对出现的藻类异常增殖问题,在通冷风这一改变局部气象条件的工程措施基础上,建立了澎河—沙河渡槽段平面二维水动力和水质模型,研究了通风位置、通风温度和通风时长等因素对输水渠道水温和藻类的影响。研究表明:水温和叶绿素a浓度均与通风位置、通风温度和通风时长有关,通风温度越低、通风时长越长,平均水温和叶绿素a浓度下降幅度越大,平均水温最高可下降约2℃,叶绿素a浓度最大可降低约54.5%,且仅上游和全渠段通风均可有效降低水温和抑制藻类生长,仅下游通风对水温和藻类的影响较小。因此,采取局部降温的方式可以起到一定的降低叶绿素a浓度的作用,综合考虑藻类抑制效果和工程成本,在水华易爆发渠段的上游通冷风是行之有效的工程措施。 展开更多
关键词 输水渠道水华 局部降温 通冷风 叶绿素A 水温 数值模拟 南水北调中线工程
下载PDF
南水北调中线水源区植被指数时空变化分析
8
作者 白景锋 张海军 白云帆 《湖北农业科学》 2024年第2期205-210,共6页
通过单线性回归(SLOPE)和地理加权回归(GWR)法,用植被指数(NDVI)研究南水北调中线水源区的植被分布变化趋势及机制,为保障水量和水质提供理论支撑。结果表明,2000—2019年水源区NDVI和入库流量呈现同步增长,植被逐渐变好,2007年以前NDV... 通过单线性回归(SLOPE)和地理加权回归(GWR)法,用植被指数(NDVI)研究南水北调中线水源区的植被分布变化趋势及机制,为保障水量和水质提供理论支撑。结果表明,2000—2019年水源区NDVI和入库流量呈现同步增长,植被逐渐变好,2007年以前NDVI增长幅度大,2008—2011年处于波动阶段,2012年以后增长幅度减小;NDVI变化最明显的是研究区东北部、西部和丹江口库区周边,这些区域地势相对低平、人口集中,中山和高山区NDVI变化不大;高程、坡度、人口数和城镇化是影响水源区NDVI分布的主要因素,降水、气温和产业比重是次要因素;各因素影响的强度和方向在空间上有异质性,自然地理因素对NDVI影响的最显著范围为高程1090 m以下、年均降水量980 mm以上的区域,人文地理因素影响的显著范围区是人口密度大、城镇化率高的地区。 展开更多
关键词 南水北调中线水源区 NDVI 时空变化
下载PDF
基于水网视角的水资源与关联要素适配性评价
9
作者 刘欢 甘永德 +2 位作者 杨钦 张丰搏 李青青 《水资源保护》 EI CAS CSCD 北大核心 2024年第5期62-68,103,共8页
为研究水资源与关联要素的空间错配问题,基于水网视角,根据适配理论和水资源多维属性理论,提出了包含资源层、社会层、经济层和生态层的水资源与关联要素适配性评价方法,并应用于南水北调中线一期工程影响区。结果表明:该方法可较为合... 为研究水资源与关联要素的空间错配问题,基于水网视角,根据适配理论和水资源多维属性理论,提出了包含资源层、社会层、经济层和生态层的水资源与关联要素适配性评价方法,并应用于南水北调中线一期工程影响区。结果表明:该方法可较为合理、系统地揭示水资源与关联要素的适配特征;2016—2020年南水北调中线一期工程影响区水资源与关联要素空间分布相对合理,整体基尼系数为0.388,资源层和社会层水资源与关联要素空间适配性较好,基尼系数分别为0.283和0.284,而经济层和生态层水资源与关联要素错配问题严重,基尼系数为0.501和0.486;南水北调中线一期工程通水后,水资源与关联要素的空间适配性在资源层、社会层、经济层有不同程度改善,在生态层变化不大。 展开更多
关键词 水网 水资源关联要素 适配性 南水北调中线工程
下载PDF
南水北调中线工程水源区环境规制对经济高质量发展的影响 被引量:1
10
作者 黄进 王伟 +1 位作者 田野 郭晓燚 《水资源保护》 EI CAS CSCD 北大核心 2024年第4期148-156,共9页
为研究南水北调中线工程水源区环境规制通过水资源利用对区域发展质效的影响,基于2005—2022年南水北调中线工程水源区12个城市的面板数据,构建基准回归模型、中介效应模型和门槛效应模型,实证分析了环境规制、水资源利用效率和经济高... 为研究南水北调中线工程水源区环境规制通过水资源利用对区域发展质效的影响,基于2005—2022年南水北调中线工程水源区12个城市的面板数据,构建基准回归模型、中介效应模型和门槛效应模型,实证分析了环境规制、水资源利用效率和经济高质量发展之间的关系。结果表明:环境规制对经济高质量发展具有正向促进效应,该促进效应在不同区域间存在异质性,环境规制的促进作用在用水量小的地区更加显著,而在用水量大的地区,丰富的水资源限制了环境规制对经济高质量发展的促进作用;在环境规制影响区域,水资源利用效率在经济高质量发展过程中发挥出显著的中介作用,水资源利用效率中介效应占环境规制总促进效应的比例为13.5%;水资源利用效率在环境规制对经济高质量发展影响中具有门槛效应,当水资源利用效率超过4.3后,环境规制对经济高质量发展的促进效应显著增强。 展开更多
关键词 环境规制 经济高质量发展 水资源利用效率 中介效应 门槛效应 南水北调中线工程
下载PDF
南水北调中线京石段闸门间歇关闭水力响应特性
11
作者 雷毓灵 崔巍 +3 位作者 王磊 丁志楠 穆祥鹏 陈文学 《南水北调与水利科技(中英文)》 CAS CSCD 北大核心 2024年第3期427-435,共9页
为减小闸门关闭引发的水位壅高,以南水北调中线工程京石段磁河闸至沙河北闸之间的渠池为研究对象,构建一维明渠非恒定渐变流仿真模型,比较分次间歇关闸与一次连续关闸,以及不同闸门间歇方案对闸前壅水峰值、水力振荡稳定时间的影响。研... 为减小闸门关闭引发的水位壅高,以南水北调中线工程京石段磁河闸至沙河北闸之间的渠池为研究对象,构建一维明渠非恒定渐变流仿真模型,比较分次间歇关闸与一次连续关闸,以及不同闸门间歇方案对闸前壅水峰值、水力振荡稳定时间的影响。研究表明:分次间歇关闸可带来更低的闸前壅水水位和更短的水力振荡稳定时间;设置1次间歇相较于多次间歇可减小闸前壅水峰值,将间歇开始时刻设置在上游降水波即将传播至闸前的时刻、设置间歇时长略小于关闸总时间的1/2均可有效降低闸前壅水峰值,缩短稳定时间。闸门分次间歇关闭水力响应特性与水波运动规律紧密关联,合理设置间歇有助于在应急调控阶段减少事故造成的影响。 展开更多
关键词 明渠水力学 南水北调中线工程 闸门分次间歇关闭 水力振荡 应急调度
下载PDF
水上光伏覆盖对明渠水质的影响规律研究
12
作者 闫琳琳 练继建 +1 位作者 姚烨 宋芷萱 《太阳能学报》 EI CAS CSCD 北大核心 2024年第7期548-557,共10页
水上光伏带来的太阳短波辐照度变化对缓解输水明渠藻类增殖问题的效果亟需评估。以南水北调中线干渠为例,建立干渠安阳河节制闸至坟庄河节制闸渠段的水动力和水质模型,分析比较明渠水面悬浮式覆盖水上光伏带来的太阳短波辐照度变化和水... 水上光伏带来的太阳短波辐照度变化对缓解输水明渠藻类增殖问题的效果亟需评估。以南水北调中线干渠为例,建立干渠安阳河节制闸至坟庄河节制闸渠段的水动力和水质模型,分析比较明渠水面悬浮式覆盖水上光伏带来的太阳短波辐照度变化和水上光伏不同覆盖位置对渠道水温和水质的影响规律。研究表明:在开展水上光伏项目时,渠道接收的太阳短波辐照度降低会使得水温、藻生物量和溶解氧含量下降,营养盐含量有所上升。太阳短波辐照度降低50%后,藻生物量开始逐渐降低。在覆盖率和透射率一定的情况下,不同覆盖位置情景下对藻生物量的削减峰值区别较小。当太阳短波辐照度由高到低逐渐变化时,流速变化对藻生物量的影响幅度呈先升高后下降趋势。 展开更多
关键词 光伏 水质 太阳短波辐照度 南水北调中线工程 流速
下载PDF
高雷诺数下倒虹吸闸墩绕流水力特性
13
作者 贺蔚 周红星 +3 位作者 秦杭晓 曾庆林 张健 徐辉 《水电能源科学》 北大核心 2024年第4期155-159,共5页
为研究倒虹吸出口闸墩绕流特性,以南水北调某典型倒虹吸为例,基于Flow3D软件建立倒虹吸模型,根据现场原型实测水位、流速进行模型验证;利用该模型模拟了雷诺数6.17×10^(6)~9.38×10^(6)范围下闸墩绕流特性。结果表明,高雷诺数... 为研究倒虹吸出口闸墩绕流特性,以南水北调某典型倒虹吸为例,基于Flow3D软件建立倒虹吸模型,根据现场原型实测水位、流速进行模型验证;利用该模型模拟了雷诺数6.17×10^(6)~9.38×10^(6)范围下闸墩绕流特性。结果表明,高雷诺数条件下,随着雷诺数的增加,闸墩绕流造成的液面波动幅度增加,中墩液面波动显著大于边墩;闸墩后的尾涡量持续增加,雷诺数对斯特劳哈尔数影响不大;边侧闸墩受力的非对称性明显,边墩闸室间特征流速偏流比存在先增大再减小的变化规律,偏流效应造成的离心距不断增加。本研究可针对性改善输水工程水流流态。 展开更多
关键词 南水北调中线工程 卡门涡街 闸墩绕流 偏流效应 倒虹吸
下载PDF
南水北调中线沉藻池布置方案优化
14
作者 吴永妍 李书友 +2 位作者 郭辉 刘少华 黄明海 《南水北调与水利科技(中英文)》 CAS CSCD 北大核心 2024年第4期798-809,共12页
南水北调中线总干渠联通工程处拟新建沉藻池,实现总干渠藻类等混合物集中沉降和处理。通过现场试验研究总干渠水体藻类等混合物沉降特性,并采用二维水动力数值仿真分析沉藻池在设计工况条件下的水流特性,提出导流墩的优化布置思路。结... 南水北调中线总干渠联通工程处拟新建沉藻池,实现总干渠藻类等混合物集中沉降和处理。通过现场试验研究总干渠水体藻类等混合物沉降特性,并采用二维水动力数值仿真分析沉藻池在设计工况条件下的水流特性,提出导流墩的优化布置思路。结果表明:在水深基本一致条件下,随着断面平均流速的增加,有效沉降距离增加,有效沉降率有所降低;在沉藻池初始设计方案下,藻类等混合物可在沉藻池内进行沉降,但沉藻池利用效率不足;布置纵向导流墩后,可有效改善沉藻池内水流平顺性和水体交换能力;在设计工况下,沉藻池内回流区水域面积占比从57%降低至7%,池内水流平均流速从约0.10 m/s降低至约0.07 m/s,平均水龄从约18 h降低至约6 h。研究成果可为中线沉藻池工程布置提供基本技术支撑。 展开更多
关键词 南水北调中线 沉藻池 工程布置 导流墩 沉降距离
下载PDF
南水北调中线工程水源区和受水区的降水时空变化特征及丰枯遭遇
15
作者 陈茜茜 屈艳萍 +1 位作者 吕娟 张学君 《水土保持通报》 CSCD 北大核心 2024年第1期136-146,共11页
[目的]基于1950—2022年时间序列ERA5再分析降水数据,探究南水北调中线工程水源区和受水区降水量时空变化特征,旨在保障跨流域调水的可行性和持续性,为南水北调中线工程水资源调度和运行管理提供科学参考。[方法]采用Mann-Kendall检验... [目的]基于1950—2022年时间序列ERA5再分析降水数据,探究南水北调中线工程水源区和受水区降水量时空变化特征,旨在保障跨流域调水的可行性和持续性,为南水北调中线工程水资源调度和运行管理提供科学参考。[方法]采用Mann-Kendall检验、小波分析、云模型以及Copula函数等方法,分析水源区和受水区降水变化趋势以及丰枯遭遇特征。[结果]①1950—2022年南水北调工程水源区和受水区分别按照年降水量34.75和39.35mm/(10a)幅度减少,水源区年降水量存在43a的主周期,受水区年降水量存在55a的主周期。②云模型隶属云图夏季降水量分布不均且离散程度较高,而冬季分布均匀且较集中。③调水不利的组合汛期和非汛期遭遇频率分别为23.15%和25.92%。[结论]水源区和受水区年降水量均呈现明显减少趋势,水源区丰枯交替变化显著;南北丰枯异步概率大于丰枯同步,同枯频率不高,有利于调水工程的安全性和可靠性。研究结果可为制定南水北调中线工程相关政策和技术指导提供理论依据,有助于工程的规划和管理,提高水资源利用效率和可持续性。 展开更多
关键词 南水北调中线工程 MANN-KENDALL检验 小波分析 云模型 丰枯遭遇
下载PDF
南水北调中线工程输水建筑物整流累积效应研究
16
作者 陈晓楠 白一墨 +4 位作者 胡羽蝶 曾诚 夏悦玥 尹雨然 王玲玲 《水利水电科技进展》 CSCD 北大核心 2024年第2期61-65,98,共6页
为分析输水建筑物整流对南水北调中线工程输水能力的影响,以陶岔渠首闸至十二里河渡槽渠段为例,建立一二维耦合水动力模型,其中渠道段采用一维模型,4个输水建筑物段(刁河渡槽、湍河渡槽、严陵河渡槽和淇河倒虹吸)采用二维模型,利用多年... 为分析输水建筑物整流对南水北调中线工程输水能力的影响,以陶岔渠首闸至十二里河渡槽渠段为例,建立一二维耦合水动力模型,其中渠道段采用一维模型,4个输水建筑物段(刁河渡槽、湍河渡槽、严陵河渡槽和淇河倒虹吸)采用二维模型,利用多年实测数据对耦合模型进行率定。分别对无整流方案和15种整流方案进行模拟计算,分析不同整流方案对上下游的影响,进而确定水头损失最小的整流方案。结果表明:单体整流影响范围为建筑物上下游3~5 km,多个建筑物整流的累积效果小于单个建筑物整流效果的线性叠加;对渠段中间2个输水建筑物(湍河渡槽、严陵河渡槽)进行整流的效果优于对上下游2个输水建筑物(刁河渡槽、淇河倒虹吸)进行整流的效果。 展开更多
关键词 输水建筑物 整流 累积效应 数值模拟 一二维耦合模型 南水北调中线工程
下载PDF
新形势下南水北调中线工程智慧调度的研究框架思考
17
作者 吴永妍 陈晓楠 +3 位作者 陈根发 段文刚 黄会勇 冯志勇 《中国水利》 2024年第4期67-72,21,共7页
南水北调中线工程智慧调度是新形势下实现精确精准调水、支撑工程高质量发展的重要途径。系统分析了南水北调中线工程通水以来的运行条件变化,提出了新形势下中线工程智慧调度需解决的关键科学技术问题,并提出了未来重点研究内容:要在... 南水北调中线工程智慧调度是新形势下实现精确精准调水、支撑工程高质量发展的重要途径。系统分析了南水北调中线工程通水以来的运行条件变化,提出了新形势下中线工程智慧调度需解决的关键科学技术问题,并提出了未来重点研究内容:要在研究复杂调水系统多水源多用户水资源均衡调配方法基础上,研发中线工程多场景输水智慧调控技术、事故智能预警与精细控制技术体系、决策支持平台,形成中线工程调度的科学决策管理模式,为国家水网重大工程智慧调度管理提供科学应用范式。 展开更多
关键词 南水北调中线工程 智慧调度 输水调控 多水源均衡
下载PDF
基于标准化温度指数的南水北调中线工程沿线地区冷暖冬评估
18
作者 陈晓楠 李天毅 +1 位作者 郭新蕾 李景刚 《南水北调与水利科技(中英文)》 CAS CSCD 北大核心 2024年第4期810-820,共11页
选择南水北调中线工程沿线邯郸、正定、涿州为代表地区,利用1979-2021年冬季逐日气温数据,分析各代表区气温序列统计频率分布与理论概率分布的拟合情况,提出标准化温度指数(standardized temperature index,STI),并据此建立新的冬季冷... 选择南水北调中线工程沿线邯郸、正定、涿州为代表地区,利用1979-2021年冬季逐日气温数据,分析各代表区气温序列统计频率分布与理论概率分布的拟合情况,提出标准化温度指数(standardized temperature index,STI),并据此建立新的冬季冷暖量化评估模型。结果表明:STI方法与国标法的冬季冷暖评估结果基本一致,但在各代表区强冷冬和强暖冬划定上,STI评估得出的年份数量均少于国标法;各代表区以1月份气温计算得出的冷暖等级阈值对应的气温值均明显低于按整个冬季3个月计算结果。工程所在纬度越高,冬季冷暖等级阈值对应的气温值越低;根据STI评估结果,邯郸、正定、涿州发生强冷冬概率分别为7.14%、9.52%和4.76%,发生弱冷冬及以上的概率分别为38.09%、40.48%和38.09%,发生平冬的概率分别为21.43%、28.57%和21.43%,发生弱暖冬及以上的概率分别为40.48%、30.95%和40.48%,发生强暖冬的概率分别为4.76%、7.14%和2.38%。研究成果与基于正态分布的国标法相比,考虑了气温序列的偏态性概率分布特征,对相对冷暖的判别更科学,有推广应用价值。 展开更多
关键词 南水北调中线 标准化温度指数 冰期输水 冬季冷暖评估
下载PDF
南水北调中线总干渠水情数据智能清洗
19
作者 陈晓楠 顾起豪 +2 位作者 张召 靳燕国 顾沁扬 《南水北调与水利科技(中英文)》 CAS CSCD 北大核心 2024年第3期436-444,共9页
南水北调中线总干渠水位、流量等实时水情数据受外界扰动、测量系统误差等因素影响而产生的病态水情数据将造成调度模型计算失真,甚至导致计算失败。为此,针对上下游流量数据空间上的逻辑错误和水位数据时间序列的跳变,分别建立基于粒... 南水北调中线总干渠水位、流量等实时水情数据受外界扰动、测量系统误差等因素影响而产生的病态水情数据将造成调度模型计算失真,甚至导致计算失败。为此,针对上下游流量数据空间上的逻辑错误和水位数据时间序列的跳变,分别建立基于粒子群优化的水量平衡模型和指数加权滑动平均模型,对病态水情数据在空间、时间上实施横向、纵向清洗处理。以穿黄节制闸至漳河节制闸间的渠段为典型研究区间,利用模型自动识别流量倒挂点,并对该渠段涉及的12座节制闸、26处分水点的流量数据进行统一修正,实现了上下游逻辑上的合理性。同时,选取研究渠段内的闫河节制闸为代表,在48 h内运行基本稳定状态下,对每2 h的闸前水位数据序列进行分析,自动识别出跳变数据并进行合理修正。结果表明:建立的模型可自动识别病态水情数据并进行智能清洗,处理后的数据能够较好地满足输水调度分析决策的需要,因此该模型具有推广应用的价值。 展开更多
关键词 南水北调中线 数据清洗 输水调度 粒子群优化算法 指数加权滑动平均模型
下载PDF
南水北调中线工程受水区年度水量分配方法研究 被引量:1
20
作者 马立亚 惠宇 +2 位作者 马彪 孙宁宁 顾甜甜 《人民长江》 北大核心 2024年第5期107-111,共5页
南水北调中线一期工程已正式通水运行近10 a,随着受水区各省(直辖市)配套设施不断建成,水量消纳能力逐步提高,在水源区供水有限的情况下,受水区之间竞争性用水问题日益突出。基于南水北调中线工程设计成果,提出一种基于受水区各省(直辖... 南水北调中线一期工程已正式通水运行近10 a,随着受水区各省(直辖市)配套设施不断建成,水量消纳能力逐步提高,在水源区供水有限的情况下,受水区之间竞争性用水问题日益突出。基于南水北调中线工程设计成果,提出一种基于受水区各省(直辖市)设计多年平均分配比例的南水北调中线工程年度水量分配方法。该方法将可调水量按各省(直辖市)设计多年平均分配比例进行分配,所得结果为各省(直辖市)的年度可调水量初始分配值,进而取该值与该省(直辖市)用水计划建议的较小值作为其年度分配水量;最后以南水北调中线工程可调水量80亿m^(3)为例开展计算。结果表明:根据受水区4省(直辖市)用水计划建议分析水量分配面临情况,提出北京市、天津市、河北省、河南省分配的水量分别为10.4亿,8.56亿,28亿,30亿m^(3)。该方法可为南水北调中线工程年度水量调度计划编制提供参考,为保障工程效益的发挥提供支撑。 展开更多
关键词 水量分配 可调水量 年度调度计划 受水区 南水北调中线工程
下载PDF
上一页 1 2 58 下一页 到第
使用帮助 返回顶部