To recover coal resources that have been damaged by traditional mining methods and ensure stability of the lower roadway in a small pit goaf,the goaf area must be filled and reinforced.In this research,the 1202 workin...To recover coal resources that have been damaged by traditional mining methods and ensure stability of the lower roadway in a small pit goaf,the goaf area must be filled and reinforced.In this research,the 1202 working face of the Hanzui mine is considered as an example for classifying the roof of the mining tunnel under the small kiln destruction zone,the effect of the goaf on the roadway is determined based on the radio tunnel penetration method,a mechanical model to determine the roof filling control mechanism was established,and the duct foaming system and roof filling process were designed.The results show that the scope and degree of influence of the goaf on the mining lane are large,but safe tunneling can be ensured through the use of a steel shed and advanced grouting techniques.When the roof conditions are not similar,materials with different filling heights and filling strengths can be used to control the roof filling of the roadway.By combining field experience and laboratory tests,it was determined that a high-foaming material with a water-cement ratio of 1:0.6,a suitable high-foaming additive,and a water volume ratio of 1:30 is cost-efficient for filling and meets the filling strength requirements.Finally,the reliability of the proposed technology was verified by field experiments,which provide a reference for filling operations in similar mines.展开更多
Several model are built to search optimum mining rate by rising optimum control theory Sor various purpose, A numerical method is extracted to assist both planer and decision maker of mining in their planing or schedu...Several model are built to search optimum mining rate by rising optimum control theory Sor various purpose, A numerical method is extracted to assist both planer and decision maker of mining in their planing or scheduling work.展开更多
Under deep and complex geological conditions,severe deformation occurs at intersection points of Y-type roadways with large cross sections during engineering projects in coal mines,especially at junction arches.Based ...Under deep and complex geological conditions,severe deformation occurs at intersection points of Y-type roadways with large cross sections during engineering projects in coal mines,especially at junction arches.Based on in-situ investigations and theoretical studies,we have summarized typical forms of destruction and identified high stress and unrestricted support at both sides of junction arch as its main causes.In this study,we also presented double-directional control bolt support technology for a large Y-type span intersection,applied to deep intersection engineering in the Jiahe Coal Mine,which has proved effective.展开更多
The studies of prediction and control of rockburst are presented during deep excavation in a gold mine in China. Firstly,the stress-relief method is used to obtain a vast amount of data about initial geostress. Second...The studies of prediction and control of rockburst are presented during deep excavation in a gold mine in China. Firstly,the stress-relief method is used to obtain a vast amount of data about initial geostress. Secondly,3D FEM analyses of large scale are performed to find out the law of geostress distribution at various excavation levels of the mining area. At the same time,as an equally important measure,six typical kinds of rock blocks are sampled for the experimental study of rockburst tendency. According to the synthesized results of the theoretical and testing results,the methods of brittleness coefficient,brittle index and stress,and so on,are adopted. Finally,the evaluation on the possibility of rockbursts is given that may take place at the deep mining area and some effective measures are put forward to prevent and control the rockburst.展开更多
基金the National Key Basic Research Program of China (No. 2015CB251600)the National Natural Science Foundation of China (Nos. 51474206 and 51774268)the Jiangsu Basic Research Program (No. BK20150051)
文摘To recover coal resources that have been damaged by traditional mining methods and ensure stability of the lower roadway in a small pit goaf,the goaf area must be filled and reinforced.In this research,the 1202 working face of the Hanzui mine is considered as an example for classifying the roof of the mining tunnel under the small kiln destruction zone,the effect of the goaf on the roadway is determined based on the radio tunnel penetration method,a mechanical model to determine the roof filling control mechanism was established,and the duct foaming system and roof filling process were designed.The results show that the scope and degree of influence of the goaf on the mining lane are large,but safe tunneling can be ensured through the use of a steel shed and advanced grouting techniques.When the roof conditions are not similar,materials with different filling heights and filling strengths can be used to control the roof filling of the roadway.By combining field experience and laboratory tests,it was determined that a high-foaming material with a water-cement ratio of 1:0.6,a suitable high-foaming additive,and a water volume ratio of 1:30 is cost-efficient for filling and meets the filling strength requirements.Finally,the reliability of the proposed technology was verified by field experiments,which provide a reference for filling operations in similar mines.
文摘Several model are built to search optimum mining rate by rising optimum control theory Sor various purpose, A numerical method is extracted to assist both planer and decision maker of mining in their planing or scheduling work.
基金supported by the National Basic Research Program of China (No.2006CB202200)the Major Program of the National Natural Science Foundation of China (No.50490270)the Innovative Team Development Project of the Ministry of Education of China (No.IRT0656)
文摘Under deep and complex geological conditions,severe deformation occurs at intersection points of Y-type roadways with large cross sections during engineering projects in coal mines,especially at junction arches.Based on in-situ investigations and theoretical studies,we have summarized typical forms of destruction and identified high stress and unrestricted support at both sides of junction arch as its main causes.In this study,we also presented double-directional control bolt support technology for a large Y-type span intersection,applied to deep intersection engineering in the Jiahe Coal Mine,which has proved effective.
基金Natural Science Foundation of China under Grant No.59979026.
文摘The studies of prediction and control of rockburst are presented during deep excavation in a gold mine in China. Firstly,the stress-relief method is used to obtain a vast amount of data about initial geostress. Secondly,3D FEM analyses of large scale are performed to find out the law of geostress distribution at various excavation levels of the mining area. At the same time,as an equally important measure,six typical kinds of rock blocks are sampled for the experimental study of rockburst tendency. According to the synthesized results of the theoretical and testing results,the methods of brittleness coefficient,brittle index and stress,and so on,are adopted. Finally,the evaluation on the possibility of rockbursts is given that may take place at the deep mining area and some effective measures are put forward to prevent and control the rockburst.