Two design axioms and axiomatic approach were discussed. As an example of application, design process of a new style single prop was illustrated in term of axi- oms.
The method of reliability analysis of mineral reserve estimation, mining construction, mining technological system and surface mine investment in mine design is discussed in this paper. On the basis of this method, th...The method of reliability analysis of mineral reserve estimation, mining construction, mining technological system and surface mine investment in mine design is discussed in this paper. On the basis of this method, the questions, such as "whether the planned production and predicted economic effectiveness could be obtained", can be answered, and corresponding measures can be taken.展开更多
This paper is about the application of ANN (artificial neural networks) theory in evaluation of mine design schemes and a quantified evaluation method based on a three\|layer neural network is given. It studies the st...This paper is about the application of ANN (artificial neural networks) theory in evaluation of mine design schemes and a quantified evaluation method based on a three\|layer neural network is given. It studies the structure of the three\|layer neural network, its learning process, its operating algorithm to realize the evaluation of mine design schemes in a computer and a practical example is also involved in it.展开更多
The three-dimensional (3D) deformation effect of the slope engineering underthe step-by-step excavation for the Antaibao surface mine was analyzed using the FLAG^3Dtechnique. An optimal excavated scheme with a relativ...The three-dimensional (3D) deformation effect of the slope engineering underthe step-by-step excavation for the Antaibao surface mine was analyzed using the FLAG^3Dtechnique. An optimal excavated scheme with a relatively steeper slope angle of 47^(。) instead of 30^(。) was successfully implemented at the west wall in the geological section73200 of the mine area, where the 3D effect of the nonlinear large deformation of theslope was taken into account. Based on the above research conclusion, put forward thecountermeasures of shortening mining length, excavating by different regions, timely footbackfilling to protect the excavated slope, and monitoring and feedback adjustment bystudying the nonlinear effect. The results show that these countermeasures are effective incontrolling maximum deformation and increasing the stability of the slope.展开更多
In order to ensure overall optimization of the underground metal mine production scale, multidisciplinary design optimization model of production scale which covers the subsystem objective function of income of produc...In order to ensure overall optimization of the underground metal mine production scale, multidisciplinary design optimization model of production scale which covers the subsystem objective function of income of production, safety and environmental impact in the underground metal mine was established by using multidisciplinary design optimization method. The coupling effects from various disciplines were fully considered, and adaptive mutative scale chaos immunization optimization algorithm was adopted to solve multidisciplinary design optimization model of underground metal mine production scale. Practical results show that multidisciplinary design optimization on production scale of an underground lead and zinc mine reflect the actual operating conditions more realistically, the production scale is about 1.25 Mt/a (Lead and zinc metal content of 160 000 t/a), the economic life is approximately 14 a, corresponding coefficient of production profits can be increased to 15.13%, safety factor can be increased to 5.4% and environmental impact coefficient can be reduced by 9.52%.展开更多
The classical physics theory respectively obeys the three famous conservation laws referred to as charge conjugation, parity and time reverse, and the open pit block model is equal to a Newtonian mechanics system. Con...The classical physics theory respectively obeys the three famous conservation laws referred to as charge conjugation, parity and time reverse, and the open pit block model is equal to a Newtonian mechanics system. Consequently, there would exist some correspondent symmetry principles and conservation laws within the 3D fixed block model of the deposit and the theory for the optimum design of the open pit mine. Reversing a series of relevant fundamental concepts, several conservation laws, which the theory for the optimum design of open pit mines should obey, as block weight conjugation, block model parity and combined symmetry of the both, were expounded. From the symmetry principle, the theoretic significance for a series of the current optimum techniques was discussed and explained, and a kind of conjugate heuristics which can check the error of itself was presented and demonstrated. Thus it is shown that the symmetry principle lays the foundations and opens up the prospects for the further research with mine design and scheduling problem.展开更多
Traffic management in underground mines,especially on production ramps,is a difficult problem to optimize and control.Most operations use one of a few common policies;e.g.,the so-called ‘‘lock-out" and‘‘loade...Traffic management in underground mines,especially on production ramps,is a difficult problem to optimize and control.Most operations use one of a few common policies;e.g.,the so-called ‘‘lock-out" and‘‘loaded-vehicle-priority" policies.The work presented in this paper uses discrete-event simulation to study the efficiency of multiple policies.Based on simulation results,an improvement to the common lock-out policy is proposed.This new policy utilizes the rules of the lock-out policy but integrates an option that allows a group of vehicles to be given temporary priority in a certain direction of travel.Quantitative results are provided and,based on these,a systematic technique for ramp design that aims to optimize the efficiency of underground mine ramp traffic flow is described.展开更多
This paper gives and verifies a mathematical model with only one argument which determines the movement parameters of any point in a plane four-bar linkage on the basis of the analysis of mining machinery linkages. C ...This paper gives and verifies a mathematical model with only one argument which determines the movement parameters of any point in a plane four-bar linkage on the basis of the analysis of mining machinery linkages. C A A (computer aided analysis) based on the mathemetical model can be used to make not only the quick and accurate analysis and design of mining machinery linkages but also the movement analysis and optimization design of any other plane four-bar linkage.展开更多
Pump chambers, normally used as dominant structures in mining engineering to insure the safety and production of un-derground coal mines, become generally deformed under conditions of deep mining. Given the geology an...Pump chambers, normally used as dominant structures in mining engineering to insure the safety and production of un-derground coal mines, become generally deformed under conditions of deep mining. Given the geology and engineering condition of Qishan Coal Mine in Xuzhou, the failure characteristics of pump chambers at the –1000 m level show that the main cause can be attributed to the spatial effect induced by intersectional chambers, where one pump is constructed per well. We developed an opti-mized design of the pump room, in which the pump wells in the traditional design are integrated into one compounding well. We suggest that the new design can limit the spatial effect of intersectional chambers during construction given our relevant numerical simulation. The new design is able to simplify the structure of the pump chamber and reduce the amount of excavation required. Based on a bolt-mesh-anchor with a rigid gap coupling supporting technology, the stability of pump chamber can be improved greatly.展开更多
A factorial experimental design method was used to examine the “Cu2+” removal from acid mine drainage wastewater by ion exchange technique. Ion Exchange technique is preferred because of reduced sludge generation co...A factorial experimental design method was used to examine the “Cu2+” removal from acid mine drainage wastewater by ion exchange technique. Ion Exchange technique is preferred because of reduced sludge generation compared to conventional treatment techniques and better decontamination efficiency from highly diluted solutions. Factorial design of experiments is employed to study the effect of four factors pH (3, 5, and 6), flow rate (5, 10, 15 L/hr), resin bed height (20, 40 and 60 cm) and initial concentration of the metal (100, 150 and 200 mgl-1) at three levels. The efficiency of metal removal was determined after 100 min of treatment. Main effects and interaction effects of the four factors were analyzed using statistical techniques. A regression model was recommended and it was found to fit the experimental data very well. The results were analyzed statistically using the Student’s t-test, analysis of variance, F-test and lack of fit to define most important process variables affecting the percentage “Cu2+” removal. In this study , pH was thus found to be the most important variable.展开更多
Mine rescue capsule is a typical emergency equipment in a coal mine.It provides a safe and confined space for miners when mining disasters occurred.The length of the passenger survival cell is suitable to be adjusted ...Mine rescue capsule is a typical emergency equipment in a coal mine.It provides a safe and confined space for miners when mining disasters occurred.The length of the passenger survival cell is suitable to be adjusted with several predefined modular cells according to various numbers of passengers.Aiming at the shortage of guidance rules for the modular combination design of mine rescue capsule,the configuration situations of survival cells are experimented with static and impact load analysis in ANSYS Workbench.The length range of a single cell,the combination schemes of miner survival section,and the effectiveness proof of assembled rescue capsules were solved sequentially by simulated load analysis on constructed structural models.The modular combination rules of the survival section are developed for variant passenger number ranging from 8 to 20.It also provides a reference for the optimal selection of rescue capsules with the same capacity.The proposed modular rules are effective for the rapid configuration design for mine rescue capsule driven by the number of passengers.展开更多
In abandoned mine sites, i.e., mine sites where mining operations have ended, wide spread contaminations are often evident, but the potential sources and pathways of contamination especially through the subsurface, ar...In abandoned mine sites, i.e., mine sites where mining operations have ended, wide spread contaminations are often evident, but the potential sources and pathways of contamination especially through the subsurface, are difficult to identify due to inadequate and sparse geochemical measurements available. Therefore, it is essential to design and implement a planned monitoring net-work to obtain essential information required for establishing the potential contamination source locations, i.e., waste dumps, tailing dams, pits and possible pathways through the subsurface, and to design a remediation strategy for rehabilitation. This study presents an illustrative application of modeling the flow and transport processes and monitoring network design in a study area hydrogeologically resembling an abandoned mine site in Queensland, Australia. In this preliminary study, the contaminant transport process modeled does not incorporate the reactive geochemistry of the contaminants. The transport process is modeled considering a generic conservative contaminant for the illustrative purpose of showing the potential application of an optimal monitoring design methodology. This study aims to design optimal monitoring network to: 1) minimize the contaminant solute mass estimation error;2) locate the plume boundary;3) select the monitoring locations with (potentially) high concentrations. A linked simulation optimization based methodology is utilized for optimal monitoring network design. The methodology is applied utilizing a recently developed software package CARE-GWMND, developed at James Cook University for optimal monitoring network design. Given the complexity of the groundwater systems and the sparsity of pollutant concentration observation data from the field, this software is capable of simulating the groundwater flow and solute transport with spatial interpolation of data from a sparse set of available data, and it utilizes the optimization algorithm to determine optimum locations for implementing monitoring wells.展开更多
文摘Two design axioms and axiomatic approach were discussed. As an example of application, design process of a new style single prop was illustrated in term of axi- oms.
基金This project is supported by the doctorate fund of State Education Commission
文摘The method of reliability analysis of mineral reserve estimation, mining construction, mining technological system and surface mine investment in mine design is discussed in this paper. On the basis of this method, the questions, such as "whether the planned production and predicted economic effectiveness could be obtained", can be answered, and corresponding measures can be taken.
文摘This paper is about the application of ANN (artificial neural networks) theory in evaluation of mine design schemes and a quantified evaluation method based on a three\|layer neural network is given. It studies the structure of the three\|layer neural network, its learning process, its operating algorithm to realize the evaluation of mine design schemes in a computer and a practical example is also involved in it.
基金Supported by the National Natural Science Foundation of China(10572008)the Natural Science Foundation of Beijing(3063019)Doctor Foundation of Yanshan University(B245)
文摘The three-dimensional (3D) deformation effect of the slope engineering underthe step-by-step excavation for the Antaibao surface mine was analyzed using the FLAG^3Dtechnique. An optimal excavated scheme with a relatively steeper slope angle of 47^(。) instead of 30^(。) was successfully implemented at the west wall in the geological section73200 of the mine area, where the 3D effect of the nonlinear large deformation of theslope was taken into account. Based on the above research conclusion, put forward thecountermeasures of shortening mining length, excavating by different regions, timely footbackfilling to protect the excavated slope, and monitoring and feedback adjustment bystudying the nonlinear effect. The results show that these countermeasures are effective incontrolling maximum deformation and increasing the stability of the slope.
基金Project(2012BAK09B02-05) supported by the National "Twelfth Five-year" Science & Technology Support Plan of China
文摘In order to ensure overall optimization of the underground metal mine production scale, multidisciplinary design optimization model of production scale which covers the subsystem objective function of income of production, safety and environmental impact in the underground metal mine was established by using multidisciplinary design optimization method. The coupling effects from various disciplines were fully considered, and adaptive mutative scale chaos immunization optimization algorithm was adopted to solve multidisciplinary design optimization model of underground metal mine production scale. Practical results show that multidisciplinary design optimization on production scale of an underground lead and zinc mine reflect the actual operating conditions more realistically, the production scale is about 1.25 Mt/a (Lead and zinc metal content of 160 000 t/a), the economic life is approximately 14 a, corresponding coefficient of production profits can be increased to 15.13%, safety factor can be increased to 5.4% and environmental impact coefficient can be reduced by 9.52%.
文摘The classical physics theory respectively obeys the three famous conservation laws referred to as charge conjugation, parity and time reverse, and the open pit block model is equal to a Newtonian mechanics system. Consequently, there would exist some correspondent symmetry principles and conservation laws within the 3D fixed block model of the deposit and the theory for the optimum design of the open pit mine. Reversing a series of relevant fundamental concepts, several conservation laws, which the theory for the optimum design of open pit mines should obey, as block weight conjugation, block model parity and combined symmetry of the both, were expounded. From the symmetry principle, the theoretic significance for a series of the current optimum techniques was discussed and explained, and a kind of conjugate heuristics which can check the error of itself was presented and demonstrated. Thus it is shown that the symmetry principle lays the foundations and opens up the prospects for the further research with mine design and scheduling problem.
基金funded by the Natural Science and Engineering Research Council of Canada (NSERC) under project CRDPJ 44SBO4-12funding provided by Barrick Gold Corporation and Peck Tech Consulting Ltd
文摘Traffic management in underground mines,especially on production ramps,is a difficult problem to optimize and control.Most operations use one of a few common policies;e.g.,the so-called ‘‘lock-out" and‘‘loaded-vehicle-priority" policies.The work presented in this paper uses discrete-event simulation to study the efficiency of multiple policies.Based on simulation results,an improvement to the common lock-out policy is proposed.This new policy utilizes the rules of the lock-out policy but integrates an option that allows a group of vehicles to be given temporary priority in a certain direction of travel.Quantitative results are provided and,based on these,a systematic technique for ramp design that aims to optimize the efficiency of underground mine ramp traffic flow is described.
文摘This paper gives and verifies a mathematical model with only one argument which determines the movement parameters of any point in a plane four-bar linkage on the basis of the analysis of mining machinery linkages. C A A (computer aided analysis) based on the mathemetical model can be used to make not only the quick and accurate analysis and design of mining machinery linkages but also the movement analysis and optimization design of any other plane four-bar linkage.
基金supported by the Major Project of the National Basic Research Program of China (No2006CB202200)the Program for New Century Excellent Talents in Uni-versity (NoNCET07-0800)the Special Fund for Basic Research and Operating Expenses of the China University of Mining & Technology, Beijing and the Academician workstation in enterprise of Jiangsu Province (No.BM2009563)
文摘Pump chambers, normally used as dominant structures in mining engineering to insure the safety and production of un-derground coal mines, become generally deformed under conditions of deep mining. Given the geology and engineering condition of Qishan Coal Mine in Xuzhou, the failure characteristics of pump chambers at the –1000 m level show that the main cause can be attributed to the spatial effect induced by intersectional chambers, where one pump is constructed per well. We developed an opti-mized design of the pump room, in which the pump wells in the traditional design are integrated into one compounding well. We suggest that the new design can limit the spatial effect of intersectional chambers during construction given our relevant numerical simulation. The new design is able to simplify the structure of the pump chamber and reduce the amount of excavation required. Based on a bolt-mesh-anchor with a rigid gap coupling supporting technology, the stability of pump chamber can be improved greatly.
文摘A factorial experimental design method was used to examine the “Cu2+” removal from acid mine drainage wastewater by ion exchange technique. Ion Exchange technique is preferred because of reduced sludge generation compared to conventional treatment techniques and better decontamination efficiency from highly diluted solutions. Factorial design of experiments is employed to study the effect of four factors pH (3, 5, and 6), flow rate (5, 10, 15 L/hr), resin bed height (20, 40 and 60 cm) and initial concentration of the metal (100, 150 and 200 mgl-1) at three levels. The efficiency of metal removal was determined after 100 min of treatment. Main effects and interaction effects of the four factors were analyzed using statistical techniques. A regression model was recommended and it was found to fit the experimental data very well. The results were analyzed statistically using the Student’s t-test, analysis of variance, F-test and lack of fit to define most important process variables affecting the percentage “Cu2+” removal. In this study , pH was thus found to be the most important variable.
基金National Natural Science Foundation of China(No.51475459)Fundamental Research Funds for the Central Universities of China(No.2017XKQY040)Priority Academic Program Development of Jiangsu Higher Education Institutions of China(No.PAPD)
文摘Mine rescue capsule is a typical emergency equipment in a coal mine.It provides a safe and confined space for miners when mining disasters occurred.The length of the passenger survival cell is suitable to be adjusted with several predefined modular cells according to various numbers of passengers.Aiming at the shortage of guidance rules for the modular combination design of mine rescue capsule,the configuration situations of survival cells are experimented with static and impact load analysis in ANSYS Workbench.The length range of a single cell,the combination schemes of miner survival section,and the effectiveness proof of assembled rescue capsules were solved sequentially by simulated load analysis on constructed structural models.The modular combination rules of the survival section are developed for variant passenger number ranging from 8 to 20.It also provides a reference for the optimal selection of rescue capsules with the same capacity.The proposed modular rules are effective for the rapid configuration design for mine rescue capsule driven by the number of passengers.
文摘In abandoned mine sites, i.e., mine sites where mining operations have ended, wide spread contaminations are often evident, but the potential sources and pathways of contamination especially through the subsurface, are difficult to identify due to inadequate and sparse geochemical measurements available. Therefore, it is essential to design and implement a planned monitoring net-work to obtain essential information required for establishing the potential contamination source locations, i.e., waste dumps, tailing dams, pits and possible pathways through the subsurface, and to design a remediation strategy for rehabilitation. This study presents an illustrative application of modeling the flow and transport processes and monitoring network design in a study area hydrogeologically resembling an abandoned mine site in Queensland, Australia. In this preliminary study, the contaminant transport process modeled does not incorporate the reactive geochemistry of the contaminants. The transport process is modeled considering a generic conservative contaminant for the illustrative purpose of showing the potential application of an optimal monitoring design methodology. This study aims to design optimal monitoring network to: 1) minimize the contaminant solute mass estimation error;2) locate the plume boundary;3) select the monitoring locations with (potentially) high concentrations. A linked simulation optimization based methodology is utilized for optimal monitoring network design. The methodology is applied utilizing a recently developed software package CARE-GWMND, developed at James Cook University for optimal monitoring network design. Given the complexity of the groundwater systems and the sparsity of pollutant concentration observation data from the field, this software is capable of simulating the groundwater flow and solute transport with spatial interpolation of data from a sparse set of available data, and it utilizes the optimization algorithm to determine optimum locations for implementing monitoring wells.