期刊文献+
共找到5,341篇文章
< 1 2 250 >
每页显示 20 50 100
Aqueous Geochemistry and Limnology of the Sleeper Pit Lake, Nevada, USA: Evidence for Long-Term Subaqueous Solute Generation in Mine Pit Lakes
1
作者 Connor P. Newman Tyler Cluff +1 位作者 Thomas Gray Geoff Beale 《Journal of Geoscience and Environment Protection》 2019年第3期64-81,共18页
Predictive geochemical and limnologic modeling of pit lakes is an important aspect of modern mine-site permitting. One of the key assumptions of many predictive pit-lake models is that open-pit high walls and in-pit b... Predictive geochemical and limnologic modeling of pit lakes is an important aspect of modern mine-site permitting. One of the key assumptions of many predictive pit-lake models is that open-pit high walls and in-pit backfill become geochemically unreactive once submerged by the filling pit lake. Existing pit lakes provide useful data to test this assumption. The Sleeper pit lake (northwestern Nevada, USA) is approaching hydrologic equilibrium and contains good-quality water that generally meets regulatory requirements for pit lakes. Despite the overall stable geochemical composition, seasonal trends in the hypolimnion indicate the generation of dissolved metals associated with the ore deposit (e.g., Mn and Zn) and cyclical variations in pH. This study applies mass balance, analysis of subaqueous pyrite oxidation, and trends in solute concentrations to evaluate the potential causes of long-term solute generation in the hypolimnion of the Sleeper pit lake. Three separate conceptual models (subaqueous pyrite oxidation;redox reactions;and diffusion of solutes from a permanently stratified bottom layer) were tested against the high-quality dataset available for the pit lake. Evaluation of the monitoring dataset for the pit lake indicates that the Sleeper pit lake has variable limnologic behavior, wherein the lake is consistently stratified (meromictic) in some years, while it undergoes full mixing (holomixis) in other time periods. Comparison of the data with the three conceptual models illustrates that none of these models can be completely implicated as causing the seasonal geochemical variations in the bottom of the pit lake, but that a combination of the processes is likely partially responsible. Additional data collection including sediment cores and in-situ pore-water analysis would aid in understanding geochemical processes occurring over time. 展开更多
关键词 mine pit LAKES LIMNOLOGY Subaqueous Sulfide Oxidation Redox Reactions MEROMIXIS
下载PDF
SICOMINES铜钴矿含尾砂高大边坡稳定性分析及治理思路 被引量:1
2
作者 李恩旺 鲁明星 《矿业工程》 CAS 2024年第3期22-27,共6页
刚果(金)SICOMINES铜钴矿M坑北部上部局部边坡处于不稳定状态,可能存在滑坡风险。本文采用二维极限平衡分析方法,对北部含尾砂高大边坡稳定性进行了边坡稳定性计算和分析,提出了整体边坡角不应大于31°的优化建议,并为后续边坡治理... 刚果(金)SICOMINES铜钴矿M坑北部上部局部边坡处于不稳定状态,可能存在滑坡风险。本文采用二维极限平衡分析方法,对北部含尾砂高大边坡稳定性进行了边坡稳定性计算和分析,提出了整体边坡角不应大于31°的优化建议,并为后续边坡治理提供了参考。 展开更多
关键词 露天采矿 边坡安全 边坡治理 地下水 尾砂
下载PDF
基于Rhino和3Dmine的露天煤矿边坡三维数值模型构建 被引量:1
3
作者 杜昌华 宋景辉 +2 位作者 张传伟 刘籽钰 吴建圻 《露天采矿技术》 CAS 2024年第1期43-46,共4页
针对露天煤矿边坡人工地表起伏突出和自然地层相对平滑的几何特点,以Rhino和3Dmine软件为过渡平台,以Nurbs和DTM曲面差值处理方法分别对露天煤矿地表和地层进行处理,最终在Rhino中完成露天煤矿边坡三维数值模型网格的划分及输出,实现兼... 针对露天煤矿边坡人工地表起伏突出和自然地层相对平滑的几何特点,以Rhino和3Dmine软件为过渡平台,以Nurbs和DTM曲面差值处理方法分别对露天煤矿地表和地层进行处理,最终在Rhino中完成露天煤矿边坡三维数值模型网格的划分及输出,实现兼顾人工地表特征和自然地层特征的露天煤矿边坡三维数值模型的全程可视化构建。工程案例分析结果表明:此方法所构建的数值模型可充分体现露天煤矿三维边坡的几何特点。 展开更多
关键词 RHINO 3Dmine 露天煤矿边坡 三数值模型 数值分析
下载PDF
Study on the Application of Real-Time Drone Monitoring in Ordos Open-Pit Coal Mine
4
作者 Junyi Wu Weizheng Wang Xuesong Ni 《Open Journal of Applied Sciences》 CAS 2023年第4期483-495,共13页
In the process of intelligent mine construction in open-pit mine, in order to improve the safety monitoring ability of mine transportation system, solve the problems of large human interference and blind Angle detecti... In the process of intelligent mine construction in open-pit mine, in order to improve the safety monitoring ability of mine transportation system, solve the problems of large human interference and blind Angle detection by existing conventional monitoring methods, this paper establishes an open-pit mine monitoring data set, and proposes a real-time intelligent monitoring model based on UAV. The reasoning component with strong computing power and low power consumption is selected, and the lightweight object detection model is selected for the experiment. A quantitative standard of dynamic energy consumption detection by evaluation algorithm is proposed. Through experimental comparison, it is found that YOLOv4-tiny has the highest comprehensive grade in detection accuracy, speed, energy consumption and other aspects, which is suitable for application in the above model. 展开更多
关键词 Open-pit mine Safety Monitoring UAV Object Detection
下载PDF
基于MineSched的卡车燃油消耗预测模型构建及应用
5
作者 曾冰勇 刘玉龙 闫国斌 《金属矿山》 CAS 北大核心 2024年第10期166-175,共10页
纳米比亚某露天矿年度采矿生产燃油消耗成本高达数亿元,卡车燃油消耗占总油耗约50%,是整个采矿生产燃油消耗成本的主要组成部分。然而,该矿山因缺乏合适的燃油消耗预测模型,无法准确预测因优化生产和排土次序带来的经济效益,且油耗阶段... 纳米比亚某露天矿年度采矿生产燃油消耗成本高达数亿元,卡车燃油消耗占总油耗约50%,是整个采矿生产燃油消耗成本的主要组成部分。然而,该矿山因缺乏合适的燃油消耗预测模型,无法准确预测因优化生产和排土次序带来的经济效益,且油耗阶段性预算与实际消耗偏差较大,无法满足矿山生产精细化管理要求。为解决该矿山卡车燃油消耗预测难题,以优化采矿生产和指导卡车运输管理,降低卡车燃油消耗,实现降本增效,通过MineSched排产软件,结合相应的年度排产计划方案,并利用Haulage模块功能模拟卡车实际运输路线,以相应采坑、排土场地表作为约束条件,精准匹配实际开采位置和排土范围,从而获得不同道路坡度下运输物料的运输功。再结合设备厂家所提供的卡车发动机小时油耗计算表、矿山实测卡车在不同运输状态下的平均速度,以及卡车重载、空载等信息,将发动机小时油耗转换为卡车的吨公里油耗,以此构建出高精度的卡车燃油消耗预测模型。根据模型预测结果与历年实际油耗数据进行对比迭代,修正燃油消耗预测模型。利用该模型进行了抽样预测历史油耗、计算优化排土区域及次序经济效益、滚动预测卡车油耗、开展卡车油耗差异化原因分析等。结果表明:模型预测的燃油消耗与实际油耗的平均偏差控制在4%以内,模型精度高;通过优化排土场分区、排土次序和运输路径,计算出矿山全生命周期内可节约柴油消耗量约3832万L,节约燃油成本约3亿元;基于模型建立了卡车的年、季、月燃油消耗预算体系,据此分析卡车阶段性油耗差异化原因,滚动优化和降低生产油耗,可为矿山采矿生产精细化管理提供支持。 展开更多
关键词 露天矿 mineSched 燃油消耗 运输功 运输卡车
下载PDF
基于MineSight软件的米拉多铜矿露天采矿设计及其二次开发
6
作者 田坤 《世界有色金属》 2024年第1期28-30,共3页
露天采场作业面位置、矿石品位和公司管理层制订的生产任务等会直接影响生产计划的编制。本文介绍了米拉多铜矿应用矿业软件MineSight开展三维采矿设计的流程,以及应用Python编程语言,基于露天采场台阶参数关系,二次开发了采矿设计辅助... 露天采场作业面位置、矿石品位和公司管理层制订的生产任务等会直接影响生产计划的编制。本文介绍了米拉多铜矿应用矿业软件MineSight开展三维采矿设计的流程,以及应用Python编程语言,基于露天采场台阶参数关系,二次开发了采矿设计辅助工具。该工具可通过在界面直接输入不同的台阶高度和台阶坡面角,即可计算得到工作帮坡角和台阶宽度,进而将其应用于采矿设计。该软件提高了采矿设计的效率,为动态编制和优化短期生产计划提供了可靠的采场设计方案。 展开更多
关键词 露天采矿设计 mineSight PYTHON 二次开发
下载PDF
关于3Dmine矿业软件在露天矿山短中期采剥规划中的应用实践
7
作者 黄成成 钱旭林 《世界有色金属》 2024年第8期29-32,共4页
在露天矿山开采过程中,往往因无法准确估算计划采剥区域的废石量、矿石量、废石资源量,同时难以直观的看出短中期计划采剥区域在开挖后会形成一个怎样的空间形态以及计划采剥区域范围内矿石量和围岩量,而导致在做短中期采剥计划过程中... 在露天矿山开采过程中,往往因无法准确估算计划采剥区域的废石量、矿石量、废石资源量,同时难以直观的看出短中期计划采剥区域在开挖后会形成一个怎样的空间形态以及计划采剥区域范围内矿石量和围岩量,而导致在做短中期采剥计划过程中无法进行合理的设备配置以及难以直观看到在短中期计划区域竣工后对整个采区下一步采剥规划的影响,主要包括:下一步采剥规划过程中的运输道路预布置、穿爆作业面布置、平台防排水沟道规划、动力管线布置等。本文主要介绍基于在露天矿山已应用3Dmine矿业软件完成对整个采剥区域的地质建模(主要包括采区的围岩、矿体、矿石品位、矿体号、经济类型、矿石种类)及每月计划结束后已完成地形图更新的基础上,应用3Dmine矿业软件对计划采剥区域块进行模拟设计,可解决上述问题。 展开更多
关键词 3Dmine 露天矿山 短中期计划 模型建立 计划区域报量
下载PDF
Optimization of transport passage with dragline system in thick overburden open pit mine 被引量:3
8
作者 Zhang Weishi Cai Qingxiang Chen Shuzhao 《International Journal of Mining Science and Technology》 SCIE EI 2013年第6期901-906,共6页
According to the characteristics of opencast coal resources and dragline technology system application in China,the structure and shifting step of transport passage are optimized in this paper.Typical coal transport p... According to the characteristics of opencast coal resources and dragline technology system application in China,the structure and shifting step of transport passage are optimized in this paper.Typical coal transport passage is analyzed in aspects such as the internal dump occupation,dragline operation efficiency,coal transport distance,upper stripping distance and shifting quantities.The middle passage should be given priority in thick overburden open pit mine because the dragline system is only responsible for part stripping task.According to characteristics of middle passage,the transport passage is divided into parallel climbing,vertical climbing and horizontal transport.In addition,the transport passage structure optimization model and shifting distance optimization model are established in this paper.The case study in Heidaigou open pit mine shows that,the parallel climbing height is accounted for about 60%of the total height,and reasonable shifting distances of the first mining area and the second mining area are 240 and 320 m.Sensitivity analysis shows that,the total passage height has important influence on the shifting step,so it is with the stripping height and passage construction cost to the passage structure. 展开更多
关键词 Open pit mine DRAGLINE Transport passage Middle passage Internal dump
下载PDF
Cut slope reinforcement technique in open-pit mines 被引量:3
9
作者 YongtaoGao JianboSun +1 位作者 ShunchuanWu AibingJin 《Journal of University of Science and Technology Beijing》 CSCD 2004年第4期289-292,共4页
The design and practice in supporting the cut slope of an open-pit mine wereintroduced, in which the high pressure grouting method was used in reinforcing the weak formation inthe slopes. Based on a detailed geologica... The design and practice in supporting the cut slope of an open-pit mine wereintroduced, in which the high pressure grouting method was used in reinforcing the weak formation inthe slopes. Based on a detailed geological survey of the slope, a theoretical analysis was carriedout, and the design parameters were proposed, where the Tresca or Mohr-Coulomb yield criteria wasemployed. A patent technology, named 'Technology of high pressure and multiple grouting in differentlevels within a single hole', was employed in the construction. Anchor bars were also installed asgrouting proceeds. This method combines anchoring and grouting comprehensively and was foundsuccessful in practice. 展开更多
关键词 mining engineering open-pit slope weak formation SUPPORTING high pressuregrouting
下载PDF
Optimization model of truck flow at open-pit mines and standards for feasibility test 被引量:2
10
作者 YingZhang YongZhao QiweiLu WenliXu 《Journal of University of Science and Technology Beijing》 CSCD 2004年第5期389-393,共5页
In order to increase production efficiency at open-pit mines, on the basis oflinear programming, a practical mathematical model for optimizing truck flow was developed, whichimproved the traditional fixed manual sched... In order to increase production efficiency at open-pit mines, on the basis oflinear programming, a practical mathematical model for optimizing truck flow was developed, whichimproved the traditional fixed manual schedule method. The model has advantages from linearprogramming and objective programming, makes most handling points working at full capacity and keepsan optimized ratio between trucks and excavators. For ensuring feasibility of the model inpractical production, four standards for feasibility test were proposed. The model satisfied all thestandards. The application in a large scale open-pit iron mine indicated that the model reduced thenumber of required trucks by 10 percent compared with the fixed manual schedule method. 展开更多
关键词 open-pit mine truck flow linear programming mathematical model FEASIBILITY
下载PDF
Thermal recovery process of a backfilled open-pit in permafrost area at the Gulian strip coal mine in Northeast China 被引量:1
11
作者 GAO Shu-hui HE Rui-xia +3 位作者 JIN Hui-jun HUANG Ya-dong ZHANG Jian-ming LUO Dong-liang 《Journal of Mountain Science》 SCIE CSCD 2017年第11期2212-2229,共18页
Timely and proper backfilling of open-pits in strip coal-mines has been an effective measurement for the recovery of the hydrothermal regimes and ecological environment in permafrost regions. In this study, numerical ... Timely and proper backfilling of open-pits in strip coal-mines has been an effective measurement for the recovery of the hydrothermal regimes and ecological environment in permafrost regions. In this study, numerical simulations and statistical regressions were applied for analyzing the recovery processes of the backfill and its major influencing factors for the thermal equilibrium in recently backfilled open pits at the Gulian strip coalmine in Mo'he, Northeast China. Results show that the thermal recovery time of backfilled areas is positively correlated to the backfill depth(BD) of the soils, the backfilled soil temperature(BST), and the mean annual ground surface temperature(MAGST); meanwhile, climate warming can impact on thermal regimes of the backfill area. The impact of climate warming on ground temperature of the backfill will show up significantly in about 50 years afterbackfilling(BD at 10.0 and 20.0 m, BST at 20.0°C) under the climate warming scenario(CWS) of 0.025°C·year ^(-1). Grey-relation analyses show that the sensitivity of the backfill recovery time declines in the order of the BD, BST and MAGST. On the basis of the abovementioned studies, the layer-by-layer backfilling in cold seasons is advised for more effective and more rapid recovery of thermal regimes of the backfilled open-pits in cold regions. 展开更多
关键词 Coal-mine open-pit BACKFILL Numericalsimulation THERMAL recovery process SENSITIVITYANALYSIS Gulian STRIP coal mine
下载PDF
A new framework for evaluation of rock fragmentation in open pit mines 被引量:4
12
作者 Mohammad Babaeian Mohammad Ataei +2 位作者 Farhang Sereshki Farzad Sotoudeh Sadjad Mohammadi 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2019年第2期325-336,共12页
The main purpose of blasting in open pit mines is to produce the feed for crushing stage with the optimum dimensions from in situ rocks. The size distribution of muck pile indicates the efficiency of blasting pattern ... The main purpose of blasting in open pit mines is to produce the feed for crushing stage with the optimum dimensions from in situ rocks. The size distribution of muck pile indicates the efficiency of blasting pattern to reach the required optimum sizes. Nevertheless, there is no mature model to predict fragmentation distribution to date that can be used in various open pit mines. Therefore, a new framework to evaluate and predict fragmentation distribution is presented based on the image analysis approach. For this purpose, the data collected from Jajarm bauxite mine in Iran were used as the sources in this study. The image analysis process was performed by Split-Desktop software to find out fragmentation distribution, uniformity index and average size of the fragmented rocks. Then, two different approaches including the multivariate regression method and the decision-making trial and evaluation laboratory(DEMATEL) technique were incorporated to develop new models of the uniformity index and the average size to improve the Rosin-Rammler function. The performances of the proposed models were evaluated in four blasting operation sites. The results obtained indicate that the regression model possesses a better performance in prediction of the uniformity index and the average size and subsequently the fragmentation distribution in comparison with DEMATEL and conventional Rosin-Rammler models. 展开更多
关键词 Rock FRAGMENTATION Image analysis Open pit mine Split-desktop software package Decision-making TRIAL and EVALUATION laboratory(DEMATEL)technique
下载PDF
Stability analysis of the sliding process of the west slope in Buzhaoba Open-Pit Mine 被引量:1
13
作者 Ning Fang Ji Changsheng Garmondyu E.Crusoe Jr. 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2016年第5期869-875,共7页
To study the stability of the west slope in Buzhaoba Open-Pit Mine and determine the aging stability coefficient during slide mass development, the deformation band of the west slope and the slide mass structure of th... To study the stability of the west slope in Buzhaoba Open-Pit Mine and determine the aging stability coefficient during slide mass development, the deformation band of the west slope and the slide mass structure of the 34,600 profile are obtained on the basis of hydrology, geology, and monitoring data.The residual thrust method is utilized to calculate the stability coefficients, which are 1.225 and 1.00 under sound and transfixion conditions, respectively. According to the rock damage and fragmentation and the principle of mechanical parameter degradation, the mechanical models of the slide mass development of the hard and soft rock slopes are established. An integrated model for calculating the slope stability coefficient is built considering water, vibration, and other external factors that pertain to the structural plane damage mechanism and the generating mechanism of the sliding mass. The change curve of the stability coefficient in the slide mass development is obtained from the relevant analyses,and afterwards, the stability control measures are proposed. The analysis results indicate that in the cracking stage of the hard rock, the slope stability coefficient decreases linearly with the increase in the length Lbof the hard rock crack zone. The linear slope is positively correlated to rock cohesion c. In the transfixion stage of the soft rock, the decrease speed of the stability coefficient is positively correlated to the residual strength of the soft rock. When the slope is stable, the stability coefficient is in a quadratic-linear relationship with the decreased height Dh of the side slope and in a linear relationship with anchoring force P. 展开更多
关键词 Open-pit mine Side slope Sliding process Aging stability Crack zone
下载PDF
Reliability Assessment of an Open Pit Slope on Bong Iron Ore Mine 被引量:1
14
作者 Moses Garheyen Shannon 《Journal of Geoscience and Environment Protection》 2021年第3期31-43,共13页
Slope stability on Bong mine is crucial for securing a balance in the gross national product of Liberia. The mine is being operated using conventional open pit methods with slope angles optimally designed to maximize ... Slope stability on Bong mine is crucial for securing a balance in the gross national product of Liberia. The mine is being operated using conventional open pit methods with slope angles optimally designed to maximize ore stripping quantity. However, a working slope has displayed signs of uncertainty. The overall inclination of the slope is 56<span style="white-space:nowrap;">&deg;</span>, and the proposed maximal excavation is 315.42 m, but current depth in ore is approximately 50%. Based on the study of slope geological characteristics, the physical and mechanical parameters of rock mass and the geometrical calculation of stoping, the study is tailored on the mechanism of inspecting stress-strain behavior in response to seasonal variation of rock moisturization as a more suitable means of stope slope stability analysis in this case. This study took full account of local rainfall and other meteorological conditions. Slope stability is investigated via stereographic projections and stability assessment using the Shear Strength Reduction (SSR) method based on FLAC (Fast Lagrangian Analysis of Continua) numerical modeling technique in three dimensions to predict the stress-strain behavior of the open-pit slope and evaluate its stability state. Global stability has been analyzed under natural and saturated conditions and it is found that the slope is critically stable and needs proper attention. 展开更多
关键词 Open-pit mine Slope Stability Factor of Safety Strength Reduction Method
下载PDF
Optimization of Dump Bench Configuration to Improve Waste Dump Capacity of Narynsukhait Open Pit Coal Mine 被引量:1
15
作者 Tsedendorj Amarsaikhan Hideki Shimada +2 位作者 Sugeng Wahyudi Takashi Sasaoka Akihiro Hamanaka 《International Journal of Geosciences》 2018年第6期379-396,共18页
In next two years, the current waste dump of Narynsukhait coal mine is predicted insufficient to accommodate the overburden as limited of the waste dump capacity. Thus, redesigning waste dump is paramount to increase ... In next two years, the current waste dump of Narynsukhait coal mine is predicted insufficient to accommodate the overburden as limited of the waste dump capacity. Thus, redesigning waste dump is paramount to increase capacity of the dump in future. This paper describes current condition of waste dump of Narynsukhait coal mine and then discusses the optimization of waste dump geometry by analyzing the effect of different waste dump’s bench configuration on slope performance. Optimization of the geometry is carried out by investigating and comparing the performance of geometrical combinations of bench height, bench angles and number of safety berm by means of numerical modeling. The model shows that increasing height of bench is able to induce shear stress in the bench and may initiate bench instable. However, the shear stress can be limited by having safety berm and/or reducing bench angle to satisfy the stability criteria. 展开更多
关键词 WASTE DUMP BENCH Stability BENCH CONFIGURATION Open pit Coal mine
下载PDF
Charging for the waste dumping of open-pit metal mines 被引量:1
16
作者 Yunbing Hou Zhaoxiang Zhang Haifeng Duan Liming Xue 《Journal of University of Science and Technology Beijing》 CSCD 2006年第6期481-485,共5页
Based on the externality theory and the environmental value theory, the hypothesis of charging for waste dumping of open-pit metal mines was put forth. The charging methods were designed according to the characteristi... Based on the externality theory and the environmental value theory, the hypothesis of charging for waste dumping of open-pit metal mines was put forth. The charging methods were designed according to the characteristics of waste dumping of openpit metal mines, including charging based on the dumping amount of the total waste, multi-charging factors, exceeding standard punishment charging, and so on. The main charging parameter is based on the dumping area rather than the total amount of waste dumping. The charging model of waste dumping of open-pit mines was formulated, and the charging rate was divided into two parts, i.e., the standard charging rate and the differential charging rate. The standard charging rate was derived using the equilibrium dynamic model, whereas the differential one was obtained by establishing the fuzzy synthesized evaluation model. 展开更多
关键词 open-pit metal mine waste dumping charging pattern basic charging rate differential charging rate
下载PDF
NPV risk simulation of an open pit gold mine project under the O'Hara cost model by using Gas 被引量:1
17
作者 Franco-Sepulveda Giovanni Campuzano Carlos Pineda Cindy 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2017年第3期557-565,共9页
This paper analyzes an open pit gold mine project based on the O'Hara cost model. Hypothetical data is proposed based on different authors that have studied open pit gold projects, and variations are proposed acco... This paper analyzes an open pit gold mine project based on the O'Hara cost model. Hypothetical data is proposed based on different authors that have studied open pit gold projects, and variations are proposed according to the probability distributions associated to key variables affecting the NPV, like production level, ore grade, price of ore, and others, so as to see what if, in a gold open pit mine project of 3000 metric tons per day of ore. Two case scenarios were analyzed to simulate the NPV, one where there is low certainty data available, and the other where the information available is of high certainty. Results based on genetic algorithm metaheuristic simulations, which combine basically Montecarlo simulations provided by the Palisade Risk software, the O'Hara cost model, net smelter return and financial analysis tools offered by Excel are reported, in order to determine to which variables of the project is more sensitive the NPV. 展开更多
关键词 Genetic algorithms(GAs) O’Hara cost model Montecarlo simulation Open pit gold mine NPV risk analysis
下载PDF
Symmetry and conservation laws for optimum design of open pit mines
18
作者 石忠民 《中国有色金属学会会刊:英文版》 CSCD 2000年第1期119-122,共4页
The classical physics theory respectively obeys the three famous conservation laws referred to as charge conjugation, parity and time reverse, and the open pit block model is equal to a Newtonian mechanics system. Con... The classical physics theory respectively obeys the three famous conservation laws referred to as charge conjugation, parity and time reverse, and the open pit block model is equal to a Newtonian mechanics system. Consequently, there would exist some correspondent symmetry principles and conservation laws within the 3D fixed block model of the deposit and the theory for the optimum design of the open pit mine. Reversing a series of relevant fundamental concepts, several conservation laws, which the theory for the optimum design of open pit mines should obey, as block weight conjugation, block model parity and combined symmetry of the both, were expounded. From the symmetry principle, the theoretic significance for a series of the current optimum techniques was discussed and explained, and a kind of conjugate heuristics which can check the error of itself was presented and demonstrated. Thus it is shown that the symmetry principle lays the foundations and opens up the prospects for the further research with mine design and scheduling problem. 展开更多
关键词 open pit mine OPTIMUM design BLOCK model SYMMETRY CONSERVATION
下载PDF
Study on Influencing Factors and Planning Model of Mining Quantity about Mineral Resources in Open Pit
19
作者 KE Lihua CHEN Jie 《矿物学报》 CAS CSCD 北大核心 2013年第S1期41-41,共1页
According to the particularity of the open pit, the main influencing factors of mining quantity about mineral resources have been summarized systematically in life cycle and the structured hierarchical relation of its... According to the particularity of the open pit, the main influencing factors of mining quantity about mineral resources have been summarized systematically in life cycle and the structured hierarchical relation of its influencing factors has been constructed. In the light of the production process of open pit, the functional relationships between investment, mining cost and mining quantity have been defined based on the process of mining and loading so that the relation of the life cycle cost and mining quantity can be set up. And what’s more, in order to obtain the maximum economic profit of mining enterprises in life cycle, the planning model of mining quantity has been established based on the life cycle cost. The rational distribution of mining quantity will have been found on the condition of obtaining optimal solution about the planning model so as to determine scientifically the production scale of mining enterprises from the point of view of the sustainable development. 展开更多
关键词 OPEN pit MINING quantity LIFE-CYCLE COST PLANNING model
下载PDF
Influence of the Haizhou Open Pit Coal Mine on the atmospheric flow over Fuxin, China
20
作者 CHENHe YANGZhi-feng WANGXuan 《Journal of Environmental Sciences》 SCIE EI CAS CSCD 2004年第6期978-980,共3页
The influence of the Haizhou Open Pit Mine on the atmospheric flow in nearby Fuxin City in China was analyzed with the aid of the steady-state Navier-Stokes equations. The finite element method was used to obtain nume... The influence of the Haizhou Open Pit Mine on the atmospheric flow in nearby Fuxin City in China was analyzed with the aid of the steady-state Navier-Stokes equations. The finite element method was used to obtain numerical solutions to these equations. The results showed that the Haizhou Open Pit Coal Mine contributes to the turbulent flow in the Fuxin City and its surroundings. However, when compared with the climatic effects, the open pit mine has a relatively small impact on the atmospheric flow over Fuxin. 展开更多
关键词 numerical simulation TURBULENCE finite element method open pit coal mine
下载PDF
上一页 1 2 250 下一页 到第
使用帮助 返回顶部