期刊文献+
共找到3,220篇文章
< 1 2 161 >
每页显示 20 50 100
Optimization of support vector machine power load forecasting model based on data mining and Lyapunov exponents 被引量:7
1
作者 牛东晓 王永利 马小勇 《Journal of Central South University》 SCIE EI CAS 2010年第2期406-412,共7页
According to the chaotic and non-linear characters of power load data,the time series matrix is established with the theory of phase-space reconstruction,and then Lyapunov exponents with chaotic time series are comput... According to the chaotic and non-linear characters of power load data,the time series matrix is established with the theory of phase-space reconstruction,and then Lyapunov exponents with chaotic time series are computed to determine the time delay and the embedding dimension.Due to different features of the data,data mining algorithm is conducted to classify the data into different groups.Redundant information is eliminated by the advantage of data mining technology,and the historical loads that have highly similar features with the forecasting day are searched by the system.As a result,the training data can be decreased and the computing speed can also be improved when constructing support vector machine(SVM) model.Then,SVM algorithm is used to predict power load with parameters that get in pretreatment.In order to prove the effectiveness of the new model,the calculation with data mining SVM algorithm is compared with that of single SVM and back propagation network.It can be seen that the new DSVM algorithm effectively improves the forecast accuracy by 0.75%,1.10% and 1.73% compared with SVM for two random dimensions of 11-dimension,14-dimension and BP network,respectively.This indicates that the DSVM gains perfect improvement effect in the short-term power load forecasting. 展开更多
关键词 power load forecasting support vector machine (SVM) Lyapunov exponent data mining embedding dimension feature classification
下载PDF
Mathematical model of electric hydraulic and powered support control system at a plough mining face 被引量:2
2
作者 ZHANG Wei HAN Xiao SUN Jing-jing 《Journal of China University of Mining and Technology》 EI 2008年第1期55-58,共4页
Given the actual working of a fully mechanized plough at a mining face, we have proposed a formula for running constraints between powered supports and a coal plough under assumed geological conditions of the coal fac... Given the actual working of a fully mechanized plough at a mining face, we have proposed a formula for running constraints between powered supports and a coal plough under assumed geological conditions of the coal face and, on this basis, established an automatic control model of powered supports for the coal plough face. We introduced the working principle of the powered support control system of the plough at the mining face. We established three advanced characteristics of this control system: response speed, reliability and easy maintenance of the system. As well, we briefly introduced, the principal function of primary and subordinate controllers and the realization of the communication system by a Single Bus. Ten controllers were constructed and tested in our laboratorium. The results show that the control model is practical and meets actual conditions. It provides a theoretical basis for designing a comouter control system for a oowered support system of a plough at a mining face. 展开更多
关键词 plough mining face powered supports CONSTRAINTS automatic control model
下载PDF
Long-term economic sensitivity analysis of light duty underground mining vehicles by power source
3
作者 Schatz Richard S. Nieto Antonio Lvov Serguei N. 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2017年第3期567-571,共5页
LHD's are expensive vehicles; therefore, it is important to accurately define the financial consequences associated with the investment of purchasing the mining equipment. This study concentrates on longterm incre... LHD's are expensive vehicles; therefore, it is important to accurately define the financial consequences associated with the investment of purchasing the mining equipment. This study concentrates on longterm incremental and sensitivity analysis to determine whether it is feasible to incorporate current battery technology into these machines. When revenue was taken into account, decreasing the amount of haulage in battery operated equipment by 5% or 200 kg per h amounts to a $4.0 × 10~4 loss of profit per year. On average it was found that using battery operated equipment generated $9.5 × 10~4 more in income annually, reducing the payback period from seven to two years to pay back the additional $1.0 × 10~5 investment of buying battery powered equipment over cheaper diesel equipment. Due to the estimated 5% increase in capital, it was observed that electric vehicles must possess a lifetime that is a minimum of one year longer than that of diesel equipment. 展开更多
关键词 Sensitivity analysis Underground mining vehicles Battery power Battery mining equipment Economic evaluation
下载PDF
Research and Application of Distributed Data Mining Method for Improving Rural Power Grid Enterprises in Production and Operation Status Evaluation
4
作者 Gao Xiu-yun Xiang Wen Fang Jun-long 《Journal of Northeast Agricultural University(English Edition)》 CAS 2019年第2期87-96,共10页
With the reform of rural network enterprise system,the speed of transfer property rights in rural power enterprises is accelerated.The evaluation of the operation and development status of rural power enterprises is d... With the reform of rural network enterprise system,the speed of transfer property rights in rural power enterprises is accelerated.The evaluation of the operation and development status of rural power enterprises is directly related to the future development and investment direction of rural power enterprises.At present,the evaluation of the production and operation of rural network enterprises and the development status of power network only relies on the experience of the evaluation personnel,sets the reference index,and forms the evaluation results through artificial scoring.Due to the strong subjective consciousness of the evaluation results,the practical guiding significance is weak.Therefore,distributed data mining method in rural power enterprises status evaluation was proposed which had been applied in many fields,such as food science,economy or chemical industry.The distributed mathematical model was established by using principal component analysis(PCA)and regression analysis.By screening various technical indicators and determining their relevance,the reference value of evaluation results was improved.Combined with statistical program for social sciences(SPSS)data analysis software,the operation status of rural network enterprises was evaluated,and the rationality,effectiveness and economy of the evaluation was verified through comparison with current evaluation results and calculation examples of actual grid operation data. 展开更多
关键词 RURAL power grid PRODUCTION and management distributed data mining STATISTICAL program for SOCIAL sciences(SPSS19)
下载PDF
Field test of high-power microwave-assisted mechanical excavation for deep hard iron ore 被引量:1
5
作者 Feng Lin Xia-Ting Feng +5 位作者 Shiping Li Xiao Hai Jiuyu Zhang Xiangxin Su Tianyang Tong Jianchun Song 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2024年第6期1922-1935,共14页
Microwave-assisted mechanical excavation has great application prospects in mines and tunnels,but there are few field experiments on microwave-assisted rock breaking.This paper takes the Sishanling iron mine as the re... Microwave-assisted mechanical excavation has great application prospects in mines and tunnels,but there are few field experiments on microwave-assisted rock breaking.This paper takes the Sishanling iron mine as the research object and adopts the self-developed high-power microwave-induced fracturing test system for hard rock to conduct field experiments of microwave-induced fracturing of iron ore.The heating and reflection evolution characteristics of ore under different microwave parameters(antenna type,power,and working distance)were studied,and the optimal microwave parameters were obtained.Subsequently,the ore was irradiated with the optimal microwave parameters,and the cracking effect of the ore under the action of the high-power open microwave was analyzed.The results show that the reflection coefficient(standing wave ratio)can be rapidly(<5 s)and automatically adjusted below the preset threshold value(1.6)as microwave irradiation is performed.When using a right-angle horn antenna with a working distance of 5 cm,the effect of automatic reflection adjustment reaches the best among other antenna types and working distances.When the working distance is the same,the average temperature of the irradiation surface and the area of the high-temperature area under the action of the two antennas(right-angled and equal-angled horn antenna)are basically the same and decrease with the increase of working distance.The optimal microwave parameters are:a right-angle horn antenna with a working distance of 5 cm.Subsequently,in further experiments,the optimal parameters were used to irradiate for 20 s and 40 s at a microwave power of 60 kW,respectively.The surface damage extended 38 cm×30 cm and 53 cm×30 cm,respectively,and the damage extended to a depth of about 50 cm.The drilling speed was increased by 56.2%and 66.5%,respectively,compared to the case when microwaves were not used. 展开更多
关键词 Microwave parameters High power Field experiment Mechanical mining
下载PDF
Operating Analysis and Data Mining System for Power Grid Dispatching
6
作者 Haiming Zhou Dunnan Liu +2 位作者 Dan Li Guanghui Shao Qun Li 《Energy and Power Engineering》 2013年第4期616-620,共5页
The dispatching center of power-grid companies is also the data center of the power grid where gathers great amount of operating information. The valuable information contained in these data means a lot for power grid... The dispatching center of power-grid companies is also the data center of the power grid where gathers great amount of operating information. The valuable information contained in these data means a lot for power grid operating management, but at present there is no special method for the management of operating data resource. This paper introduces the operating analysis and data mining system for power grid dispatching. The technique of data warehousing online analytical processing has been used to manage and analysis the great capacity of data. This analysis system is based on the real-time data of the power grid to dig out the potential rule of the power grid operating. This system also provides a research platform for the dispatchers, help to improve the JIT (Just in Time) management of power system. 展开更多
关键词 power GRID DISPATCH INDEX System DATA mining
下载PDF
Sustainable Development around Small Scale Mining Areas by the Development of Micro Hydro Power: Application Cases in Cameroon
7
作者 Fanyep Nana Antoine Gubong Takam Charles Bertrand +1 位作者 Kengne Signe Elie Bertrand Claudio J. C. Blanco 《Journal of Power and Energy Engineering》 2020年第3期36-48,共13页
Of all the precious metals buried in the Cameroonian subsoil, gold is certainly the longest exploited. It has longtime been the subject of artisanal exploitation. In 2014, the monthly national production was estimated... Of all the precious metals buried in the Cameroonian subsoil, gold is certainly the longest exploited. It has longtime been the subject of artisanal exploitation. In 2014, the monthly national production was estimated at around 170 kg. In these mining areas, people still live in a screaming precariousness of which one of the main causes is often the lack of electricity, because of the distance of these localities to the national electricity network. Cameroon has a great hydroelectric potential, but the access rate to electricity is still very low in isolate or rural areas of this country. The objective of this work is to show that it is possible to efficiently exploit gold in isolated areas and contribute to the sustainable development of these localities through the development of micro hydro power (MHP). The mining community of Tikondi in the East Region of Cameroon is the practical case study for an illustration. The results of this study show that the development of the MHP project can be developed with installed power of 87 kW, where the Banki-Michell turbine is recommended according to the Sulzer-Escher Wyss diagram. The investment cost evaluated at 79,832,775 FCFA (1 Euro = 656 FCFA). It is a profitable project with a maximum payback period of 8 years. This project can be easily funded by gold mining activity. That Tikondi’s MHP can make this village becoming attractive for others activities, improving the quality of education of children (there is not any school and lots of them do not go to school), the building of health centers and the quality of life in that locality and therefore contribute to their sustainable development too. 展开更多
关键词 MICRO HYDRO power mining Areas SUSTAINABLE Development
下载PDF
Data—mining massive real—time data in a power plant:challenges,problems and solutions
8
作者 陈坚红 任浩仁 《Journal of Zhejiang University Science》 CSCD 2002年第5期538-542,共5页
Nowadays, the scale of data normally stored in a database collected by Data Acquisition System (DAS) or Distributed Control System (DCS) in a power plant is becoming larger and larger. However there are abundant valua... Nowadays, the scale of data normally stored in a database collected by Data Acquisition System (DAS) or Distributed Control System (DCS) in a power plant is becoming larger and larger. However there are abundant valuable knowledge hidden behind them. It will be beyond people's capacity to analyze and understand these data stored in such a scale database. Fortunately data mining techniques are arising at the historic moment. In this paper, we explain the basic concept and general knowledge of data mining; analyze the characteristics and research method of data mining; give some typical applications of data mining system based on power plant real time database on intranet. 展开更多
关键词 Data mining power plant Database Real time INTRANET
下载PDF
DSS Scheme for Operation Optimization Problem on Power Plants 被引量:1
9
作者 江浩 徐治皋 《Journal of Southeast University(English Edition)》 EI CAS 2002年第3期212-215,共4页
Based on the target analysis of the operation optimization for power plants, a novel system scheme called operation optimization decision support system (OODSS) is brought forward. According to the structure and desig... Based on the target analysis of the operation optimization for power plants, a novel system scheme called operation optimization decision support system (OODSS) is brought forward. According to the structure and design thinking of decision support system (DSS), the overall structure of the OODSS is studied, and the scheme of the sub systems in the OODSS such as the user interface system, the problem processing system, the database system, the model base system, the expert system (ES) and the data mining sy... 展开更多
关键词 power plant operation optimization DSS database system model base system data mining expert system
下载PDF
基于PDMiner大数据挖掘平台的电力系统安全评估及故障诊断系统 被引量:11
10
作者 常成 《电力与能源》 2016年第1期7-11,共5页
电力系统中的数据复杂多样,电力大数据的挖掘处理是电力公司面临的难题之一。阐述了电力大数据发展现状,将电力云概念引入到电力系统大数据分析之中,提出了基于云计算理论的大数据挖掘平台PDMiner,介绍了其整体架构和原理,针对电力大数... 电力系统中的数据复杂多样,电力大数据的挖掘处理是电力公司面临的难题之一。阐述了电力大数据发展现状,将电力云概念引入到电力系统大数据分析之中,提出了基于云计算理论的大数据挖掘平台PDMiner,介绍了其整体架构和原理,针对电力大数据的平台架构和关键技术,开发了一套基于PDMiner平台的电力系统安全评估与故障诊断系统,该系统配置在SCADA/EMS的数据管理子系统上,提高了数据处理的效率,并且能准确提取到故障类型、风险区域等数据背后的准确信息。 展开更多
关键词 电力系统大数据 数据挖掘 PDMiner平台 安全评估 故障诊断
下载PDF
3Dmine在南非某金矿资源量估算中的应用 被引量:1
11
作者 曹锦元 张志军 《世界有色金属》 2023年第3期154-156,共3页
以南非某金矿①号主矿体为例,本文介绍了3Dmine软件在资源量估算中的全过程应用。该过程包括原始数据的整理,统计分析样品,建立主矿体和构造模型,建立矿块模型并进行赋值,进行矿体资源量估值等步骤。本文侧重利用距离幂次反比法对建立... 以南非某金矿①号主矿体为例,本文介绍了3Dmine软件在资源量估算中的全过程应用。该过程包括原始数据的整理,统计分析样品,建立主矿体和构造模型,建立矿块模型并进行赋值,进行矿体资源量估值等步骤。本文侧重利用距离幂次反比法对建立的矿块模型进行品位估值,生成金品位分布模型,并完成估值参数合理性验证。这些步骤提供了科学依据,为下一步地质勘探工作和数字化矿山建设提供了支持。 展开更多
关键词 金矿 矿体模型 距离幂次反比法 资源量估算 3Dmine 南非
下载PDF
Influence of canopy ratio of powered roof support on longwall working stability——A case study 被引量:1
12
作者 Sylwester Rajwa Tomasz Janoszek Stanis?aw Prusek 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2019年第4期591-598,共8页
The case study describes longwall coal seam A in a hard coal mine,where longwall coal face stability loss and periodic roof fall occurrences had been registered.The authors have attempted to explain the situation base... The case study describes longwall coal seam A in a hard coal mine,where longwall coal face stability loss and periodic roof fall occurrences had been registered.The authors have attempted to explain the situation based on in-situ measurements and observations of the longwall working as well as numerical simulation.The calculations included several parameters,such as powered roof support geometry in the form of the canopy ratio,which is a factor that influences load distribution along the canopy.Numerical simulations were realized based on a rock mass model representing realistic mining and geological conditions at a depth of 600 m below surface for coal seam A.Numerical model assumptions are described,while the obtained results were compared with the in-situ measurements.The conclusions drawn from this work can complement engineering knowledge utilized at the stage of powered roof support construction and selection in order to improve both personnel safety and longwall working stability,and to achieve better extraction. 展开更多
关键词 COAL mining Modelling powered ROOF supports LONGWALL workings Safety STABILITY
下载PDF
Heat calculation and numerical simulation in steam mining of permafrost gas hydrate 被引量:1
13
作者 LI Bing SUN Youhong +1 位作者 GUO Wei LI Kuan 《Global Geology》 2012年第2期135-139,共5页
Steam mining method was injecting hot steam into the borehole to heat the hydrate strata at the same time of depressurization mining,which could promote further decomposition and expand mining areas of gas hydrate. St... Steam mining method was injecting hot steam into the borehole to heat the hydrate strata at the same time of depressurization mining,which could promote further decomposition and expand mining areas of gas hydrate. Steam heat calculation would provide the basis for the design of heating device and the choice of the field test parameters. There were piping heat loss in the process of mining. The heat transfer of steam flowing in the pipe was steady,so the heat loss could be obtained easily by formula calculation. The power of stratum heating should be determined by numerical simulation for the process of heating was dynamic and the equations were usually nonlinear. The selected mining conditions were 500-millimeter mining radius,10 centigrade mining temperature and 180 centigrade steam temperature. Heat loss and best heating power,obtained by formula calculation and numerical simulation,were 21. 35 W/m and 20 kW. 展开更多
关键词 gas hydrates steam mining heat loss numerical simulation best power
下载PDF
A practical approach to improve alarm system performance: Application to power plant
14
作者 Jay Sompura Amit Joshi +1 位作者 Babji Srinivasan Rajagopalan Srinivasan 《Chinese Journal of Chemical Engineering》 SCIE EI CAS CSCD 2019年第5期1094-1102,共9页
Process safety in chemical industries is considered to be one of the important goals towards sustainable development. This is due to the fact that, major accidents still occur and continue to exert significant reputat... Process safety in chemical industries is considered to be one of the important goals towards sustainable development. This is due to the fact that, major accidents still occur and continue to exert significant reputational and financial impacts on process industries. Alarm systems constitute an indispensable component of automation as they draw the attention of process operators to any abnormal conditi on in the plant. Therefore, if deployed properly, alarm systems can play a critical role in helping plant operators ensure process safety and profitability. How-ever, in practice, many process plants suffer from poor alarm system configuration which leads to nuisance alarms and alarm floods that compromise safety. A vast amount of research has primarily focused on developing sophisticated alarm management algorithms to address specific issues. In this article, we provide a simple, practical, systematic approach that can be applied by plant engineers (i.e., non-experts) to improve industrial alarm system performance. The proposed approach is demonstrated using an industrial power plant case study. 展开更多
关键词 CHATTERING ALARM CORRESPONDENCE analysis Density based clustering DUPLICATE ALARMS Combined-cycle power plant Association RULE mining
下载PDF
Security Risk Assessment of Cyber Physical Power System Based on Rough Set and Gene Expression Programming 被引量:3
15
作者 Song Deng Dong Yue +1 位作者 Xiong Fu Aihua Zhou 《IEEE/CAA Journal of Automatica Sinica》 SCIE EI 2015年第4期431-439,共9页
Risk assessment is essential for the safe and reliable operation of cyber physical power system. Traditional security risk assessment methods do not take integration of cyber system and physical system of power grid i... Risk assessment is essential for the safe and reliable operation of cyber physical power system. Traditional security risk assessment methods do not take integration of cyber system and physical system of power grid into account. In order to solve this problem, security risk assessment algorithm of cyber physical power system based on rough set and gene expression programming is proposed. Firstly, fast attribution reduction based on binary search algorithm is presented. Secondly, security risk assessment function for cyber physical power system is mined based on gene expression programming. Lastly, security risk levels of cyber physical power system are predicted and analyzed by the above function model. Experimental results show that security risk assessment function model based on the proposed algorithm has high efficiency of function mining, accuracy of security risk level prediction and strong practicality. © 2014 Chinese Association of Automation. 展开更多
关键词 Algorithms Electric power system security Gene expression GENES Rough set theory
下载PDF
Diesel generator exhaust heat recovery fully-coupled with intake air heating for off-grid mining operations:An experimental,numerical,and analytical evaluation
16
作者 Durjoy Baidya Marco Antonio Rodrigues de Brito +1 位作者 Agus PSasmito Seyed Ali Ghoreishi-Madiseh 《International Journal of Mining Science and Technology》 SCIE EI CAS CSCD 2022年第1期155-169,共15页
The customarily discarded exhaust from the fossil fuel-based power plants of the off-grid mines holds the thermal potential to fulfill the heating requirement of the underground operation.This present research fills i... The customarily discarded exhaust from the fossil fuel-based power plants of the off-grid mines holds the thermal potential to fulfill the heating requirement of the underground operation.This present research fills in an important research gap by investigating the coupling effect between a diesel exhaust heat recovery and an intake air heating system employed in a remote mine.An integrative approach comprising analytical,numerical,and experimental assessment has been adapted.The novel analytical model developed here establishes the reliability of the proposed mine heating system by providing comparative analysis between a coupled and a decoupled system.The effect of working fluid variation has been examined by the numerical analysis and the possible improvement has been identified.Experimental investigations present a demonstration of the successful lab-scale implementation of the concept and validate the numerical and analytical models developed.Successful deployment of the fully coupled mine heating system proposed here will assist the mining industry on its journey towards energy-efficient,and sustainable mining practices through nearly 70%reduction in fossil fuel consumption for heating intentions. 展开更多
关键词 Remote mines Waste heat utilization Diesel exhaust Combined heat and power generation Clean energy in mining Coupled heating system
下载PDF
Text Mining Analysis of Efficiency of the Continuously Implemented Gathering Type Action Plan for Male Elderly People Obtained
17
作者 Motoya Yamada Ruriko Kidachi +4 位作者 Tetsuko Takaoka Yosuke Kamata Chiyoko Kimura Mayumi Shimizu Kazutaka Kikuchi 《Open Journal of Nursing》 2022年第1期25-41,共17页
<strong>Aim: </strong>To clarify transformation of the participants’ consciousness for rebuilding the community and its factors from the discussion contents by actions for male elderly people in Town A in... <strong>Aim: </strong>To clarify transformation of the participants’ consciousness for rebuilding the community and its factors from the discussion contents by actions for male elderly people in Town A in Fukushima prefecture. <strong>Design: </strong>This study was an action research. <strong>Method: </strong>The author verbalized discussion contents of the action conducted in 2018-2019 and analyzed them for each year by the text mining method. <strong>Results: </strong>The word appearance frequency was high in the order of “Person” and “Town A” in both years. One large word network was formed in 2018 and its topic was about what the participants feel in their life in Town A. Two large word networks were formed in 2019 and their topic was about the community participation including difficulty in motivating others such as how people who do not participate can feel like joining it. 展开更多
关键词 Action Research Male Elderly People Community Reconstitution Text mining Method Nuclear power Plant Accident
下载PDF
Inner Mongolia plans to set up 10 GW centralized wind and photovoltaic power projects
18
《China Rare Earth Information》 2021年第3期3-3,共1页
It is reported that the Energy Bureau of Inner Mongolia Autonomous Region plans to construct10 GW centralized wind power and photovoltaic power projects this year.According to the"Notice from Energy Bureau of Inn... It is reported that the Energy Bureau of Inner Mongolia Autonomous Region plans to construct10 GW centralized wind power and photovoltaic power projects this year.According to the"Notice from Energy Bureau of Inner Mongolia Autonomous Region on the development and construction of wind power and photovoltaic power in 2021",Inner Mongolia of China will construct a number of centralized and grid-connected projects of wind power and photovoltaic power basing on abundant wind and solar energy resources in this area.The projects will focus on the areas of desert,coal mining subsidence,open coal mining dump and along the border. 展开更多
关键词 power mining PHOTOVOLTAIC
下载PDF
煤电化基地大宗固废“三化”协同利用基础与技术 被引量:1
19
作者 杨科 何淑欣 +6 位作者 何祥 初茉 周伟 袁宁 陈登红 龚鹏 张元春 《煤炭科学技术》 EI CAS CSCD 北大核心 2024年第4期69-82,共14页
我国14个大型煤炭基地及89个大宗固体废弃物综合利用示范基地建设,标志着矿区大宗固废利用已被纳入全国战略发展布局。长期以来煤炭资源高强度的开发与利用,造成矿区浅埋煤层资源临近枯竭,煤电化基地大规模固废堆积及地表沉陷,已成为制... 我国14个大型煤炭基地及89个大宗固体废弃物综合利用示范基地建设,标志着矿区大宗固废利用已被纳入全国战略发展布局。长期以来煤炭资源高强度的开发与利用,造成矿区浅埋煤层资源临近枯竭,煤电化基地大规模固废堆积及地表沉陷,已成为制约矿区绿色低碳、高质量发展的难题。大宗煤基固废协同利用与绿色充填是解放“三下一上”压煤,延长矿井服务年限,实现固废无害化、资源化、规模化“三化”利用的有效途径。基于产煤大省山西省、“华东能源粮仓”安徽两淮基地及宁东能源化工基地的煤基固废种类和产量,详细阐述了以煤矸石、粉煤灰、炉底渣、气化渣和脱硫石膏等为主要材料的煤基固废通过重金属吸附解吸和络合钝化技术实现无害化处置,列举煤基固废分类应用于低热值煤基固废发电、制备建筑材料如水泥、砖瓦等资源化利用途径,对比分析煤基固废采煤沉陷区复垦回填及井下充填规模化利用途径,突出煤基固废井下充填的优越性。基于煤电化基地深部煤炭资源,提出绿色充填开采理论与关键技术,包括深部煤矸石源头减量与采选充协同技术、充填材料高效制备与深部井下输送技术及煤基固废充填材料深部多场耦合机理,探究多源煤基固废从源头、过程到终端的深部充填开采全过程的技术原理与方法,以解决矿区深部井下充填的技术难题。根据宁东基地任家庄煤矿、山西省霍尔辛赫煤矿及淮北矿区地质条件和充填目的,分别提出超前钻孔注充低位充填方案、关键层非典型特征条件下多离层梯级注浆方案和煤基固废协同利用关键技术,综合矿山固废处置与利用、深部煤炭资源开发利用、地表沉陷控制、生态环境保护等优势,形成煤电化基地大宗固废协同利用与绿色开采模式,为煤炭开采高质量化和环境低损伤化提供参考。 展开更多
关键词 煤电化基地 煤基固废 协同利用 深部开采 源头减量 采选充一体化
下载PDF
矿井无线电波防爆安全发射功率研究 被引量:4
20
作者 孙继平 彭铭 《工矿自动化》 CSCD 北大核心 2024年第3期1-5,共5页
5G,5.5G,WiFi6,WiFi7,UWB,ZigBee等矿井移动通信系统及人员和车辆定位系统等发射的大功率无线电波有点燃瓦斯和煤尘的风险。因此,需要合理设置防爆无线电设备发射的无线电波防爆安全功率阈值,限制防爆无线电设备发射的无线电波功率。欧... 5G,5.5G,WiFi6,WiFi7,UWB,ZigBee等矿井移动通信系统及人员和车辆定位系统等发射的大功率无线电波有点燃瓦斯和煤尘的风险。因此,需要合理设置防爆无线电设备发射的无线电波防爆安全功率阈值,限制防爆无线电设备发射的无线电波功率。欧洲标准CLC/TR 50427:2004《Assessment of inadvertent ignition of flammable atmospheres by radio-frequency radiation-Guide》规定了爆炸性气体环境中无线电波防爆安全接收点火功率阈值,但缺少无线电波防爆安全发射功率阈值的内容。国家标准GB/T 3836.1—2021《爆炸性环境第1部分:设备通用要求》和国际标准IEC 60079-0:2017《Explosive atmospheres-Part 0:Equipment-General requirements》虽然有无线电波防爆安全发射功率阈值的相关规定,但错误地将欧洲标准CLC/TR 50427:2004中的无线电波防爆安全接收点火功率阈值修改为无线电波防爆安全发射功率阈值,大大降低了爆炸性环境中无线电设备所能允许的最大发射功率。由于煤矿井下没有能作为接收天线的起重机这类细长结构物体,且现有矿井无线通信及定位系统工作频率均远大于30 MHz,所以,无线电波防爆安全接收点火功率阈值应为8 W,而不是国家标准GB/T 3836.1—2021和国际标准IEC 60079-0:2017规定的无线电波防爆安全发射功率阈值6 W。在发射天线发射的无线电波能量全部被等效天线吸收的最不利于无线电防爆的传输和耦合情况下,无线电设备工作频率为等效天线谐振频率时,接收点火功率达到最大,为等效天线接收的总功率的一半,即发射功率的一半。在实际工程中,无线传输效率和耦合效率均不会为1,因此,无线电波防爆安全发射功率阈值应是无线电波防爆安全接收点火功率阈值2倍以上。煤矿井下无线电波防爆安全接收点火功率阈值为8 W,因此,煤矿井下无线电波防爆安全发射功率阈值应大于16 W。 展开更多
关键词 矿井无线电波 防爆安全 接收点火功率 发射功率
下载PDF
上一页 1 2 161 下一页 到第
使用帮助 返回顶部