Active splitting control utilizes real-time decision and system-level splitting to prevent cascading blackouts and to maintain power supply under severe disturbances. Splitting strategy searching(SSS) is one of the mo...Active splitting control utilizes real-time decision and system-level splitting to prevent cascading blackouts and to maintain power supply under severe disturbances. Splitting strategy searching(SSS) is one of the most crucial issues in active splitting control for deciding‘‘where to split’’. SSS determines the splitting surface in real time to properly divide the asynchronous generators into isolated islands with an optimal control effect. In this paper, an SSS approach that focuses on island stability is presented. The proposed SSS approach is designed to ensure a rational stability margin and regulation ability on each island during and after the transient process of system splitting. This method includes the active/reactive power flow feasibility constraints and voltage/angle stability constraints in the steady state as well as the frequencyresponse capability constraints in the transient process. By considering the island stability constraints in the SSS, the proposed approach can avoid the splitting strategies with poor stability performance. Therefore, the major advantage of the proposed approach is that it can ensure better island static and transient stability during and after the splitting control. In addition, the entire model is formulated as a mixed-integer second-order cone programming(MISOCP)model. Thus, it can be rapidly solved by using commercial optimization solvers. Numerical simulations of a realistic provincial power system in central China demonstrate thevalidity of the proposed approach and the necessity of considering the island stability issues.展开更多
In the existing multi-period robust optimization methods for the optimal power flow in radial distribution systems,the capability of distributed generators(DGs)to regulate the reactive power,the operation costs of the...In the existing multi-period robust optimization methods for the optimal power flow in radial distribution systems,the capability of distributed generators(DGs)to regulate the reactive power,the operation costs of the regulation equipment,and the current of the shunt capacitor of the cables are not considered.In this paper,a multi-period two-stage robust scheduling strategy that aims to minimize the total cost of the power supply is developed.This strategy considers the time-ofuse price,the capability of the DGs to regulate the active and reactive power,the action costs of the regulation equipment,and the current of the shunt capacitors of the cables in a radial distribution system.Furthermore,the numbers of variables and constraints in the first-stage model remain constant during the iteration to enhance the computation efficiency.To solve the second-stage model,only the model of each period needs to be solved.Then,their objective values are accumulated,revealing that the computation rate using the proposed method is much higher than that of existing methods.The effectiveness of the proposed method is validated by actual 4-bus,IEEE 33-bus,and PG 69-bus distribution systems.展开更多
The increasing integration of photovoltaic generators(PVGs) and the uneven economic development in different regions may cause the unbalanced spatial-temporal distribution of load demands in an urban distribution netw...The increasing integration of photovoltaic generators(PVGs) and the uneven economic development in different regions may cause the unbalanced spatial-temporal distribution of load demands in an urban distribution network(UDN). This may lead to undesired consequences, including PVG curtailment, load shedding, and equipment inefficiency, etc. Global dynamic reconfiguration provides a promising method to solve those challenges. However, the power flow transfer capabilities for different kinds of switches are diverse, and the willingness of distribution system operators(DSOs) to select them is also different. In this paper, we formulate a multi-objective dynamic reconfiguration optimization model suitable for multi-level switching modes to minimize the operation cost, load imbalance, and the PVG curtailment. The multi-level switching includes feeder-level switching, transformer-level switching, and substation-level switching. A novel load balancing index is devised to quantify the global load balancing degree at different levels. Then, a stochastic programming model based on selected scenarios is established to address the uncertainties of PVGs and loads. Afterward, the fuzzy c-means(FCMs) clustering is applied to divide the time periods of reconfiguration. Furthermore, the modified binary particle swarm optimization(BPSO)and Cplex solver are combined to solve the proposed mixed-integer second-order cone programming(MISOCP) model. Numerical results based on the 148-node and 297-node systems are obtained to validate the effectiveness of the proposed method.展开更多
The penetration of renewable generation will affect the energy utilization efficiency,economic benefit and reliability of the active distribution network(ADN).This paper proposes a time-sequence production simulation(...The penetration of renewable generation will affect the energy utilization efficiency,economic benefit and reliability of the active distribution network(ADN).This paper proposes a time-sequence production simulation(TSPS)method for re-newable generation capacity and reliability assessments in ADN considering two operational status:the normal status and the fault status.During normal operation,an optimal dispatch model is proposed to promote the renewable consumption and increase the economic benefit.When a failure occurs,the renewable generators are partitioned into islands for resilient power supply and reliability improvement.A novel dynamic island partition model is presented based on mixed integer second-order cone programming(MISOCP).The effectiveness of the proposed TSPS method is demonstrated in a standard network integrated with historical data of load and renewable generations.展开更多
文摘Active splitting control utilizes real-time decision and system-level splitting to prevent cascading blackouts and to maintain power supply under severe disturbances. Splitting strategy searching(SSS) is one of the most crucial issues in active splitting control for deciding‘‘where to split’’. SSS determines the splitting surface in real time to properly divide the asynchronous generators into isolated islands with an optimal control effect. In this paper, an SSS approach that focuses on island stability is presented. The proposed SSS approach is designed to ensure a rational stability margin and regulation ability on each island during and after the transient process of system splitting. This method includes the active/reactive power flow feasibility constraints and voltage/angle stability constraints in the steady state as well as the frequencyresponse capability constraints in the transient process. By considering the island stability constraints in the SSS, the proposed approach can avoid the splitting strategies with poor stability performance. Therefore, the major advantage of the proposed approach is that it can ensure better island static and transient stability during and after the splitting control. In addition, the entire model is formulated as a mixed-integer second-order cone programming(MISOCP)model. Thus, it can be rapidly solved by using commercial optimization solvers. Numerical simulations of a realistic provincial power system in central China demonstrate thevalidity of the proposed approach and the necessity of considering the island stability issues.
基金supported in part by the Fundamental Research Funds for the Central Universities of China(No.PA2021GDSK0083)in part by the State Key Program of National Natural Science of China(No.51637004)in part by the National Key Research and Development Plan“Important Scientific Instruments and Equipment Development”(No.2016YFF0102200)。
文摘In the existing multi-period robust optimization methods for the optimal power flow in radial distribution systems,the capability of distributed generators(DGs)to regulate the reactive power,the operation costs of the regulation equipment,and the current of the shunt capacitor of the cables are not considered.In this paper,a multi-period two-stage robust scheduling strategy that aims to minimize the total cost of the power supply is developed.This strategy considers the time-ofuse price,the capability of the DGs to regulate the active and reactive power,the action costs of the regulation equipment,and the current of the shunt capacitors of the cables in a radial distribution system.Furthermore,the numbers of variables and constraints in the first-stage model remain constant during the iteration to enhance the computation efficiency.To solve the second-stage model,only the model of each period needs to be solved.Then,their objective values are accumulated,revealing that the computation rate using the proposed method is much higher than that of existing methods.The effectiveness of the proposed method is validated by actual 4-bus,IEEE 33-bus,and PG 69-bus distribution systems.
基金supported by the National Key R&D Program of China (No.2019YFE0123600)National Natural Science Foundation of China (No.52077146)Young Elite Scientists Sponsorship Program by CSEE (No.CESS-YESS-2019027)。
文摘The increasing integration of photovoltaic generators(PVGs) and the uneven economic development in different regions may cause the unbalanced spatial-temporal distribution of load demands in an urban distribution network(UDN). This may lead to undesired consequences, including PVG curtailment, load shedding, and equipment inefficiency, etc. Global dynamic reconfiguration provides a promising method to solve those challenges. However, the power flow transfer capabilities for different kinds of switches are diverse, and the willingness of distribution system operators(DSOs) to select them is also different. In this paper, we formulate a multi-objective dynamic reconfiguration optimization model suitable for multi-level switching modes to minimize the operation cost, load imbalance, and the PVG curtailment. The multi-level switching includes feeder-level switching, transformer-level switching, and substation-level switching. A novel load balancing index is devised to quantify the global load balancing degree at different levels. Then, a stochastic programming model based on selected scenarios is established to address the uncertainties of PVGs and loads. Afterward, the fuzzy c-means(FCMs) clustering is applied to divide the time periods of reconfiguration. Furthermore, the modified binary particle swarm optimization(BPSO)and Cplex solver are combined to solve the proposed mixed-integer second-order cone programming(MISOCP) model. Numerical results based on the 148-node and 297-node systems are obtained to validate the effectiveness of the proposed method.
基金This work was supported in part by the National Key Research and Development Program of China(Grant No.2016YFB0900100)the National Natural Science Foundation of China(Grant No.51807051)the Natural Science Foundation of Jiangsu Province(Grant No.BK20180507).
文摘The penetration of renewable generation will affect the energy utilization efficiency,economic benefit and reliability of the active distribution network(ADN).This paper proposes a time-sequence production simulation(TSPS)method for re-newable generation capacity and reliability assessments in ADN considering two operational status:the normal status and the fault status.During normal operation,an optimal dispatch model is proposed to promote the renewable consumption and increase the economic benefit.When a failure occurs,the renewable generators are partitioned into islands for resilient power supply and reliability improvement.A novel dynamic island partition model is presented based on mixed integer second-order cone programming(MISOCP).The effectiveness of the proposed TSPS method is demonstrated in a standard network integrated with historical data of load and renewable generations.