The modernization of water conservancy project management is a complicated engineering system involving a management system, a management method, management personnel, the exertion of social, economic, and ecological ...The modernization of water conservancy project management is a complicated engineering system involving a management system, a management method, management personnel, the exertion of social, economic, and ecological effects, and so on. However, indices for evaluating the modernization of water conservancy project management are usually unobtainable in practical applications. Conducting appropriate extension of the classical rough set theory and then applying it to an incomplete information system are the key to the application of the rough set theory Based on analysis of some extended rough set models in incomplete information systems, a rough set model based on the θ-improved limited tolerance relation is put forward. At the same time, upper approximation and lower approximation are defined under this improved relation. According to the evaluation index system and management practices, the threshold for θ is defined. An example study indicates the practicability and maneuverability of the model.展开更多
In this paper, we conduct research on the present situation and improvement strategy of the water conservancy project construction quality management based on quality efficiency equilibrium theory. Water conservancy e...In this paper, we conduct research on the present situation and improvement strategy of the water conservancy project construction quality management based on quality efficiency equilibrium theory. Water conservancy engineering construction enterprises should refer to oneself circumstance, and the characteristics of the water conservancy project, determine the quality objectives of specific quality assurance plan and the related measures, clear implementation content, methods and effects. Strictly control the factors influencing the water conservancy engineering quality of many aspects, in the process of the water conservancy project construction, to establish a meet the requirements of the technical process and quality standards, operation procedures. Establish the strict appraisal system, continuous improvement and improve the level of construction technique and technology. Establish strict quality assurance system and quality responsibility system, each division, subdivisional work will comprehensively implement in place management to ensure the engineering quality.展开更多
基金supported by the Fundamental Research Funds for the Central Universities(Grant No.2013B102008)the Open Fund of the Yellow River Committee(Grant No.2011535012)
文摘The modernization of water conservancy project management is a complicated engineering system involving a management system, a management method, management personnel, the exertion of social, economic, and ecological effects, and so on. However, indices for evaluating the modernization of water conservancy project management are usually unobtainable in practical applications. Conducting appropriate extension of the classical rough set theory and then applying it to an incomplete information system are the key to the application of the rough set theory Based on analysis of some extended rough set models in incomplete information systems, a rough set model based on the θ-improved limited tolerance relation is put forward. At the same time, upper approximation and lower approximation are defined under this improved relation. According to the evaluation index system and management practices, the threshold for θ is defined. An example study indicates the practicability and maneuverability of the model.
文摘In this paper, we conduct research on the present situation and improvement strategy of the water conservancy project construction quality management based on quality efficiency equilibrium theory. Water conservancy engineering construction enterprises should refer to oneself circumstance, and the characteristics of the water conservancy project, determine the quality objectives of specific quality assurance plan and the related measures, clear implementation content, methods and effects. Strictly control the factors influencing the water conservancy engineering quality of many aspects, in the process of the water conservancy project construction, to establish a meet the requirements of the technical process and quality standards, operation procedures. Establish the strict appraisal system, continuous improvement and improve the level of construction technique and technology. Establish strict quality assurance system and quality responsibility system, each division, subdivisional work will comprehensively implement in place management to ensure the engineering quality.