Evaluation and prediction of earth pressure balance shield performance in complex rock strata:A case study in Dalian,China 被引量:1
1
作者 Xiang Shen Dajun Yuan +2 位作者 Xing-Tao Lin Xiangsheng Chen Yuansheng Peng 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2023年第6期1491-1505,共15页
This research explores the potential for the evaluation and prediction of earth pressure balance shield performance based on a gray system model.The research focuses on a shield tunnel excavated for Metro Line 2 in Da... This research explores the potential for the evaluation and prediction of earth pressure balance shield performance based on a gray system model.The research focuses on a shield tunnel excavated for Metro Line 2 in Dalian,China.Due to the large error between the initial geological exploration data and real strata,the project construction is extremely difficult.In view of the current situation regarding the project,a quantitative method for evaluating the tunneling efficiency was proposed using cutterhead rotation(R),advance speed(S),total thrust(F)and torque(T).A total of 80 datasets with three input parameters and one output variable(F or T)were collected from this project,and a prediction framework based gray system model was established.Based on the prediction model,five prediction schemes were set up.Through error analysis,the optimal prediction scheme was obtained from the five schemes.The parametric investigation performed indicates that the relationships between F and the three input variables in the gray system model harmonize with the theoretical explanation.The case shows that the shield tunneling performance and efficiency are improved by the tunneling parameter prediction model based on the gray system model. 展开更多
关键词 Evaluation of earth pressure balance shield PERFORMANCE Gray system model Metro construction Rock strata Field data prediction
下载PDF
Discrete element simulation of mechanical characteristic of conditioned sands in earth pressure balance shield tunneling 被引量:10
2
作者 武力 屈福政 《Journal of Central South University》 SCIE EI CAS 2009年第6期1028-1033,共6页
The discrete element method (DEM) was used to simulate the flow characteristic and strength characteristic of the conditioned sands in the earth pressure balance (EPB) tunneling. In the laboratory the conditioned sand... The discrete element method (DEM) was used to simulate the flow characteristic and strength characteristic of the conditioned sands in the earth pressure balance (EPB) tunneling. In the laboratory the conditioned sands were reproduced and the slump test and the direct shear test of the conditioned sands were implemented. A DEM equivalent model that can simulate the macro mechanical characteristic of the conditioned sands was proposed,and the corresponding numerical models of the slump test and the shear test were established. By selecting proper DEM model parameters,the errors of the slump values between the simulation results and the test results are in the range of 10.3%-14.3%,and the error of the curves between the shear displacement and the shear stress calculated with the DEM simulation is 4.68%-16.5% compared with that of the laboratory direct shear test. This illustrates that the proposed DEM equivalent model can approximately simulate the mechanical characteristics of the conditioned sands,which provides the basis for further simulation of the interaction between the conditioned soil and the chamber pressure system of the EPB machine. 展开更多
关键词 有限元模拟 土压平衡盾构 离散单元法 机械特性 隧道 实验室条件 空调
下载PDF
Optimal arrangement for pressure measurement points in working chamber of earth pressure balance shield 被引量:4
3
作者 刘畅 屈福政 +1 位作者 李守巨 孟庆琳 《Journal of Central South University》 SCIE EI CAS 2012年第7期1883-1891,共9页
In order to exactly provide scientific basis for pressure dynamic balance control of working chamber of earth pressure balance shield (EPBS),study on optimal arrangement of pressure measurement points in working chamb... In order to exactly provide scientific basis for pressure dynamic balance control of working chamber of earth pressure balance shield (EPBS),study on optimal arrangement of pressure measurement points in working chamber was conducted. Based on mathematical description of optimal arrangement for pressure measurement points,fuzzy clustering analysis and discriminant analysis were used to divide pressure regions of nodes on bulkhead. Finally,the selection method of optimal measurement points was proposed,and by selecting d6.28 m EPBS as study object,the case study was conducted. By contrast,based on optimal arrangement scheme of pressure measurement points,through adopting weighted algorithm,the absolute error mean of equivalent pressure of working chamber is the smallest. In addition,pressure curve of optimal arrangement points presents parabola,and it can show the state of pressure distribution on bulkhead truly. It is concluded that the optimal arrangement method of pressure measurement points in working chamber is effective and feasible,and the method can provide basis for realizing high precision pressure control of EPBS. 展开更多
关键词 土压平衡盾构 压力动态 测量点 优化布置 优化配置 模糊聚类分析 平衡控制 数学描述
下载PDF
基于泥水平衡盾构掘进参数的PSO-BP神经网络掘进地层识别模型研究
4
作者 陈志鼎 李小龙 +2 位作者 李广聪 万山涛 董亿 《水电能源科学》 北大核心 2024年第2期67-71,共5页
为解决泥水平衡盾构机在掘进时无法准确地实时识别掘进地层的问题,以珠三角水资源配置工程为例,研究泥水平衡盾构机的盾构推力、掘进速度、刀盘转速、刀盘扭矩在不同地层下的变化规律,提出基于掘进参数的PSO-BP神经网络掘进地层识别方法... 为解决泥水平衡盾构机在掘进时无法准确地实时识别掘进地层的问题,以珠三角水资源配置工程为例,研究泥水平衡盾构机的盾构推力、掘进速度、刀盘转速、刀盘扭矩在不同地层下的变化规律,提出基于掘进参数的PSO-BP神经网络掘进地层识别方法,建立盾构推力、掘进速度、刀盘转速、刀盘扭矩4种掘进参数为输入集,地层编码为输出集的地层识别模型。工程数据的验证结果表明,该模型在珠三角水资源配置工程数据集上的掘进地层的识别准确率达99.07%,PSO-BP神经网络算法的识别准确率明显高于BP、RF、RBF、CNN等机械学习算法。 展开更多
关键词 泥水平衡盾构机 掘进参数 地层识别 PSO-BP神经网络
下载PDF
土压平衡盾构施工引起地面变形研究的评述
5
作者 姚元 陈梦成 +3 位作者 何彬彬 许开成 侯宇 冯玉林 《城市轨道交通研究》 北大核心 2024年第1期73-79,共7页
[目的]土压平衡盾构施工过程中会不可避免地产生土体扰动,引起地层变形,进而对周围建筑环境产生不利影响,开展土压平衡盾构施工引起地层变形的研究具有重要意义。[方法]通过整合各类相关文献,以施工各环节的联系为中心进行研究。阐明了... [目的]土压平衡盾构施工过程中会不可避免地产生土体扰动,引起地层变形,进而对周围建筑环境产生不利影响,开展土压平衡盾构施工引起地层变形的研究具有重要意义。[方法]通过整合各类相关文献,以施工各环节的联系为中心进行研究。阐明了土压平衡盾构施工工作机理,从隧道几何因素、土层地质条件和盾构掘进参数三方面研究地面变形诱因。论述了土压平衡盾构施工引起地面变形的预测方法,并分析了各方法的适用性与优缺点。以变形诱因和变形预测为基础,列举了土压平衡盾构施工致地面变形的控制措施。指出了土压平衡盾构施工研究中存在的不足,并对土压平衡盾构施工未来发展方向进行了展望。[结果及结论]土压平衡盾构施工引起地面变形的诱因为隧道几何因素、土层地质条件和盾构掘进参数。土压平衡盾构施工引起地面变形的预测方法有经验公式法、理论解析法、有限单元与有限差分的数值模拟法,模型试验法、人工智能法。基于对地面变形的监测,不断调整施工中的盾构参数,是目前控制土压平衡盾构地面变形的有效方法。 展开更多
关键词 土压平衡盾构施工 地面变形 研究进展
下载PDF
滇中引水隧洞砾质土地层盾构渣土饼化控制技术
6
作者 龚振宇 肖钢 +3 位作者 雷波 令凡琳 王树英 朱汉标 《铁道标准设计》 北大核心 2024年第4期145-152,共8页
砾质土地层盾构掘进时,容易发生盾构刀盘结泥饼现象,须对渣土改良参数进行合理优化,以降低结泥饼风险。依托滇中引水龙泉倒虹吸盾构隧洞工程,首先分析砾质土地层盾构结泥饼风险以及分散型泡沫剂发泡性能,然后结合坍落度试验和界限含水... 砾质土地层盾构掘进时,容易发生盾构刀盘结泥饼现象,须对渣土改良参数进行合理优化,以降低结泥饼风险。依托滇中引水龙泉倒虹吸盾构隧洞工程,首先分析砾质土地层盾构结泥饼风险以及分散型泡沫剂发泡性能,然后结合坍落度试验和界限含水率试验探究分散型泡沫改良渣土的塑流性特征,提出砾质土地层盾构渣土饼化风险控制技术,并通过现场跟踪试验对饼化控制技术进行验证。研究结果表明:(1)分散型泡沫剂发泡倍率随着浓度增加而增长,随发泡压力增加呈先增后减趋势,在发泡压力为0.3 MPa时获得最佳发泡倍率;(2)分散型泡沫剂能有效改善砾质土渣土塑流性,降低砾质土渣土液塑限,进而降低渣土饼化风险;(3)提出砾质土渣土改良参数建议值并应用于实际工程,应用后盾构总推力、扭矩明显降低且离散程度减小,盾构推进速度明显提升,验证了砾质土地层盾构渣土饼化控制技术的合理性。 展开更多
关键词 土压平衡盾构 砾质土 饼化 坍落度试验 液塑限 掘进参数
下载PDF
富水砂层土压平衡盾构渣土改良技术研究
7
作者 吴志雄 曹亚洲 +2 位作者 胡黎明 张玄 肖颖 《地下空间与工程学报》 CSCD 北大核心 2024年第1期210-218,共9页
富水砂层土体具有流塑性差、渗透性强的特点,土压平衡盾构施工时易造成排土困难和喷涌事故。针对西安地铁10号线穿越富水砂层的土压平衡盾构工程,采用膨润土泥浆和泡沫剂改良盾构渣土,提出了改良渣土流塑性的评价方法,基于其流塑性和渗... 富水砂层土体具有流塑性差、渗透性强的特点,土压平衡盾构施工时易造成排土困难和喷涌事故。针对西安地铁10号线穿越富水砂层的土压平衡盾构工程,采用膨润土泥浆和泡沫剂改良盾构渣土,提出了改良渣土流塑性的评价方法,基于其流塑性和渗透性确定最佳改良方案,为工程提供借鉴和参考。结果表明:(1)当改良渣土塌落后无开裂或坍塌、塌落形状为梨形、塌落度为180~210 mm、塌落渣土与地面接触角θ为0°~90°时,流塑性合适,此时改良渣土的渗透系数于90 min内稳定在10-5cm/s,满足工程要求;(2)最佳改良方案为:渣土、膨润土、水三者质量比保持在200∶1∶40~200∶1.5∶44之间,泡沫剂溶液体积比浓度为2%,泡沫注入比为6%。 展开更多
关键词 富水砂层 土压平衡盾构 渣土改良 流塑性 渗透性
下载PDF
Experimental study on workability and permeability of sandy soils conditioned with thickened foam
8
作者 Zhiyao Feng Shuying Wang +2 位作者 Tongming Qu Xiangcou Zheng Fanlin Ling 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2024年第2期532-544,共13页
Water spewing and muck plugging often occur during earth pressure balance(EPB)shield machines tunnelling in water-rich sandy strata,even though the conventional foam has been employed to condition sandy soils.In this ... Water spewing and muck plugging often occur during earth pressure balance(EPB)shield machines tunnelling in water-rich sandy strata,even though the conventional foam has been employed to condition sandy soils.In this study,a novel thickened foaming agent suitable for EPB shield tunnelling in water-rich sandy strata is developed.In contrast to conventional foam-conditioned sands,the thickened foam-conditioned sand has a low permeability due to the consistent filling of soil pores with the thickened foam,and the initial permeability coefficient decreases by approximately two orders of magnitude.It also exhibits a suitable workability,which is attributed to the enhanced capability of the thickened foam to condition sandy soils.In addition,the effect of concentration on the stability of the foam is explained by the Gibbs-Marangoni effect,and conditioning mechanisms for the thickened foam on sands are discussed from the evolution of foam bubbles. 展开更多
关键词 Earth pressure balance(EPB)shield Thickened foam Foam-conditioned sand PERMEABILITY WORKABILITY
下载PDF
青岛地铁土压平衡盾构碎石土改良方法研究
9
作者 冀海峰 刘卫景 +4 位作者 赵国梁 牛宇哲 肖凤春 江玉生 杨星 《岩土工程技术》 2024年第1期7-13,共7页
盾构在碎石土地层掘进时经常面临着地层渗透性强、刀盘扭矩大、刀具磨损严重等诸多困难。为解决上述施工难题,以青岛地铁4号线典型的碎石土地层为研究对象,首先通过颗粒筛分、LCPC试验和渗透性试验评价了碎石土的基本特性,结合传统的砂... 盾构在碎石土地层掘进时经常面临着地层渗透性强、刀盘扭矩大、刀具磨损严重等诸多困难。为解决上述施工难题,以青岛地铁4号线典型的碎石土地层为研究对象,首先通过颗粒筛分、LCPC试验和渗透性试验评价了碎石土的基本特性,结合传统的砂土和黏性土改良方案设计了5组碎石土改良配比方案,对不同配比方案进行坍落度试验、渗透性试验和直剪试验,分析了不同改良指标碎石土的流塑性、渗透性及抗剪力学特性,根据实际工程中盾构刀盘扭矩的变化情况验证了泡沫与聚合物组合改良的最佳方案。研究表明:7%浓度泡沫与5%浓度聚合物配比的改良剂能够有效降低碎石土的渗透系数,同时起到降低刀盘扭矩的作用。 展开更多
关键词 地铁 土压平衡盾构 碎石土 坍落度 渗透性 直剪试验
下载PDF
软土地层盾构掘进参数分析及掘进速度预测
10
作者 裴浩东 叶社保 +1 位作者 杨平 吴永哲 《郑州大学学报(工学版)》 北大核心 2024年第1期107-113,共7页
依托佛山地铁3号线逢沙站—创意园站区间隧道工程,通过现场实测数据,详细分析了土压平衡盾构穿越软土地层时盾构掘进参数内在变化规律,并建立了掘进速度预测模型。首先,对盾构掘进参数进行数理统计分析,对各掘进参数的分布进行正态性检... 依托佛山地铁3号线逢沙站—创意园站区间隧道工程,通过现场实测数据,详细分析了土压平衡盾构穿越软土地层时盾构掘进参数内在变化规律,并建立了掘进速度预测模型。首先,对盾构掘进参数进行数理统计分析,对各掘进参数的分布进行正态性检验;其次,进行Pearson相关性分析,找出线性相关性较强参数间变化规律;再次,利用基于互信息的特征选择算法,筛选与掘进速度非线性相关性较高的参数变量;最后,分别建立随机森林回归预测模型和基于遗传算法优化BP神经网络预测模型,对掘进速度进行预测。研究结果表明:在软弱地层盾构隧道工程中,通常采用较低的刀盘转速、刀盘扭矩及较高的掘进速度、贯入度、盾构总推力、土仓压力;掘进速度等参数均通过了采用K-S检验法的正态性检验;掘进速度与贯入度存在极强相关性关系;基于遗传算法优化BP神经网络预测模型的预测精度略优于随机森林回归预测模型,随机森林回归预测模型在测试集中的平均绝对误差、均方根误差、拟合优度分别为4.055、5.038、0.871,而基于遗传算法优化BP神经网络预测模型分别为0.822、1.244、0.991。 展开更多
关键词 土压平衡盾构 掘进参数 正态性检验 互信息 随机森林 遗传算法 BP神经网络
下载PDF
大直径土压平衡盾构隧道下穿既有高速公路施工影响分析
11
作者 蒋红 《安徽水利水电职业技术学院学报》 2024年第1期47-51,共5页
通过对大直径土压平衡盾构隧道下穿既有高速公路的施工影响进行分析,研究了当前阶段高速公路变形沉降控制标准和采用不同加固措施情况下既有高速公路施工影响变化。研究结果表明,在未加固工况中路基变形的最大值为28.6mm,加固工况中路... 通过对大直径土压平衡盾构隧道下穿既有高速公路的施工影响进行分析,研究了当前阶段高速公路变形沉降控制标准和采用不同加固措施情况下既有高速公路施工影响变化。研究结果表明,在未加固工况中路基变形的最大值为28.6mm,加固工况中路基的沉降变形最大值为17.3mm。对比分析表明,洞内的注浆加固对于地表的沉降变形控制效果是极为显著的,所以在盾构隧道开挖过程中对于盾构隧道洞内进行注浆加固十分必要。 展开更多
关键词 土压平衡盾构 近接施工 沉降分析
下载PDF
地铁盾构洞内盾尾刷更换技术研究 被引量:1
12
作者 李红岩 《工程建设与设计》 2024年第3期181-183,共3页
土压平衡盾构穿越承压水、透水地层时,盾尾刷会出现严重磨损,止水效果变差,对盾构隧道的掘进质量、安全等造成严重影响。因此,盾尾刷的快速更换对施工安全和工程质量至关重要。徐州地铁6号线一期工程市紫区间右线掘进过程中,通过洞内更... 土压平衡盾构穿越承压水、透水地层时,盾尾刷会出现严重磨损,止水效果变差,对盾构隧道的掘进质量、安全等造成严重影响。因此,盾尾刷的快速更换对施工安全和工程质量至关重要。徐州地铁6号线一期工程市紫区间右线掘进过程中,通过洞内更换盾尾刷技术进行研究,提出土压平衡盾构机掘进期间进行安全、高效的洞内盾尾刷更换技术措施。结果表明,洞内快速更换盾尾刷安全快速可行。 展开更多
关键词 土压平衡 洞内盾尾刷更换 止水环
下载PDF
EPB盾构刀盘泥饼成因分析及评价模型构建
13
作者 丁小彬 杨辉泰 施钰 《华南理工大学学报(自然科学版)》 EI CAS CSCD 北大核心 2024年第5期71-83,共13页
目前土压平衡(EPB)盾构机刀盘结泥饼的研究大都聚焦在单一因素上,缺少整体的、量化的评价标准,难以满足工程上对刀盘结泥饼的预测需求。针对以上问题,文中从地质条件、盾构选型、施工因素3个层面出发,系统总结了导致土压平衡盾构机刀盘... 目前土压平衡(EPB)盾构机刀盘结泥饼的研究大都聚焦在单一因素上,缺少整体的、量化的评价标准,难以满足工程上对刀盘结泥饼的预测需求。针对以上问题,文中从地质条件、盾构选型、施工因素3个层面出发,系统总结了导致土压平衡盾构机刀盘泥饼形成的23个主要因素;将土压平衡盾构机在掘进过程中的刀盘结泥饼风险划分为4个等级:高风险、中风险、低风险和无风险。同时提出了结泥饼的风险因子量化标准,并结合层次分析法构建了土压平衡盾构的刀盘结泥饼风险评价模型;基于广州地铁14号线马创区间右线115-165环盾构隧道工程的掘进数据,计算出盾构机掘进过程中不同环的刀盘结泥饼风险程度,验证了刀盘结泥饼风险评价模型的预测性能。研究结果表明:结泥饼风险评价模型的23个影响因子中,以塑性指数、刀盘扭矩、液性指数、总推力的影响权重最大,启动扭矩的影响权重最小;结泥饼风险评价模型表现出了良好的预测性能,计算得到的结泥饼风险变化曲线与现场施工情况基本吻合;盾构掘进参数的变化能很好地反映掘进过程中泥饼的形成,其中总推力对泥饼产生最敏感,刀盘扭矩、土仓压力、推进速度和螺旋机转速的敏感度依次降低。研究成果可适用于类似工程中的土压平衡盾构机刀盘结泥饼的评价分析。 展开更多
关键词 土压平衡盾构 泥饼 量化分析 评价模型
下载PDF
高水压盾构滚刀用橡胶套管的自适应平衡特性研究
14
作者 李英发 陈彦涛 +5 位作者 姜海峰 张耀鑫 曾婧 李焕旭 王彪 张国鹏 《隧道建设(中英文)》 CSCD 北大核心 2024年第4期705-711,共7页
为保持滚刀浮动密封的有效性,滚刀内外压力差需要控制在0.3 MPa内,而工作环境水压可以达到1.4 MPa,因此需要设计自适应压力平衡结构降低滚刀内外压差。常规的活塞式平衡阀经常由于高压环境下的岩渣堵塞或者O型圈动密封快速磨损导致滚刀... 为保持滚刀浮动密封的有效性,滚刀内外压力差需要控制在0.3 MPa内,而工作环境水压可以达到1.4 MPa,因此需要设计自适应压力平衡结构降低滚刀内外压差。常规的活塞式平衡阀经常由于高压环境下的岩渣堵塞或者O型圈动密封快速磨损导致滚刀浮动密封失效。因此针对高水压环境下滚刀内外压力自动可靠平衡问题,设计了自适应平衡橡胶套管:通过气囊变形响应外界压力变化,实现滚刀内介质对于外界压力变化的动态跟随功能。首先,采用理论分析的方法研究橡胶套管自适应平衡机制,并基于仿真与理论分析相结合的方式给出自适应平衡橡胶套管性能评估方法;其次,通过套管参数的敏感性分析给出优选的结构参数、试制等径式橡胶套管,并进行压力跟随试验,发现输入压力为0~0.6 MPa时,内外压差为0.12 MPa;最后,将试制橡胶套管应用在盾构滚刀项目中,滚刀运行状况良好。 展开更多
关键词 高水压 自适应平衡橡胶套管 密封 盾构滚刀
下载PDF
基于1D/3D耦合仿真的某大功率重型货车冷却系统性能研究
15
作者 程浩杰 马彦达 +4 位作者 徐亚坤 吴延巽 董丽萍 于振华 张艺伦 《汽车工程》 EI CSCD 北大核心 2024年第6期1125-1135,共11页
随着经济的快速发展,人们对商用车的功率需求越来越高,大功率意味着更高的散热负荷,这对发动机冷却系统的匹配及系统的空间布置提出了更高的挑战。针对装配600马力发动机的某重型商用车,采用1D/3D耦合仿真的手段建立整车热流场模型与发... 随着经济的快速发展,人们对商用车的功率需求越来越高,大功率意味着更高的散热负荷,这对发动机冷却系统的匹配及系统的空间布置提出了更高的挑战。针对装配600马力发动机的某重型商用车,采用1D/3D耦合仿真的手段建立整车热流场模型与发动机冷却系统一维模型,研究了护风罩、导流板对散热器进风流量与进风平均温度的影响;并根据发动机热平衡试验数据,完成了冷却系统的匹配计算,同时进行了整车热平衡试验验证。结果表明:与单层护风罩相比,C型护风罩所引起的湍动能较小,因而可以提供更大的风量;当水泵速比由2.2降至为1.8时,转矩点和功率点出水温度分别为99.2和96.2℃,可满足冷却的需求,同时也降低了水泵的能耗,此外整车环境舱试验也验证了仿真模型的准确性,在大转矩工况下C型护风罩可以有效降低冷却系统的水温。 展开更多
关键词 发动机热平衡 C型护风罩 冷却系统 导流板 水泵能耗
下载PDF
大直径土压盾构机下穿超浅覆土河道施工关键技术
16
作者 闫桂梅 《科学技术创新》 2024年第10期114-117,共4页
采用土压平衡盾构机下穿既有河道是近年来土压盾构机技术研究探索的重要方向,本文通过借助宁芜铁路改造工程盾构段的工程实际,详细阐述了大直径土压平衡盾构机在下穿极浅覆土河道时遇到的技术难题,并给出了适应性的河道加固解决方案和... 采用土压平衡盾构机下穿既有河道是近年来土压盾构机技术研究探索的重要方向,本文通过借助宁芜铁路改造工程盾构段的工程实际,详细阐述了大直径土压平衡盾构机在下穿极浅覆土河道时遇到的技术难题,并给出了适应性的河道加固解决方案和针对性措施。研究表明:针对河道进行分批次分步围堰加固,是保证盾构安全高效穿越河道的关键技术措施;大直径土压盾构在下穿河道时有针对性地及时调整掘进参数是超浅覆土施工的必要措施,相关处理措施可为该类工程提供参考借鉴。 展开更多
关键词 大直径盾构 土压平衡盾构 超浅覆土 下穿河道
下载PDF
泥水平衡盾构泥浆处理计量与计价研究
17
作者 邹红枚 《铁路工程技术与经济》 2024年第3期52-56,共5页
随着国家环保政策的调整,环保、绿色、低碳理念不断融入工程建设实践。本文从泥水平衡盾构的泥浆组成、处理技术及工艺,现行铁路、城市轨道交通、市政工程的泥浆计量与计价差异进行分析,结合目前建设管理情况,提出泥水平衡盾构泥浆处理... 随着国家环保政策的调整,环保、绿色、低碳理念不断融入工程建设实践。本文从泥水平衡盾构的泥浆组成、处理技术及工艺,现行铁路、城市轨道交通、市政工程的泥浆计量与计价差异进行分析,结合目前建设管理情况,提出泥水平衡盾构泥浆处理计量与计价方法的建议,为后续项目实施提供参考借鉴。 展开更多
关键词 泥水平衡 盾构 泥浆处理 计量与计价
下载PDF
超大直径土压平衡盾构穿越高水压砂性地层土体改良技术研究
18
作者 陆罡 《建筑施工》 2024年第6期888-890,914,共4页
超大直径土压平衡盾构全断面穿越砂性地层时,会面临盾构推力及扭矩增大、土仓压力及螺旋机压力不稳、螺旋机喷涌导致开挖面失稳等风险,需要对开挖面土体进行改良。选取泡沫剂作为土体改良材料,通过试验揭示了泡沫剂不同发泡浓度、发泡... 超大直径土压平衡盾构全断面穿越砂性地层时,会面临盾构推力及扭矩增大、土仓压力及螺旋机压力不稳、螺旋机喷涌导致开挖面失稳等风险,需要对开挖面土体进行改良。选取泡沫剂作为土体改良材料,通过试验揭示了泡沫剂不同发泡浓度、发泡率与泡沫寿命的关系,并且测定了改良后土体的物理及力学特性,建立了基于发泡材料的改良土体控制方法,形成了高风险开挖面土体改良技术,有效降低了高水压砂性地层盾构穿越施工风险,为同类型施工提供了技术参考。 展开更多
关键词 土压平衡盾构 土体改良 泡沫土体 高水压 砂性地层
下载PDF
砂卵石地层泥水盾构废浆二次利用技术研究
19
作者 邹坤秘 《交通节能与环保》 2024年第1期232-236,共5页
为解决泥水平衡盾构施工期间产生的大量废弃浆液难处理和盾构同步注浆高成本的问题,提出将泥水平衡盾构产生的废弃泥浆再利用于配制同步注浆浆液。本研究依托主要穿越地层为砂卵石地层的成蒲铁路紫瑞隧道工程项目,研究浆灰比(废弃泥浆... 为解决泥水平衡盾构施工期间产生的大量废弃浆液难处理和盾构同步注浆高成本的问题,提出将泥水平衡盾构产生的废弃泥浆再利用于配制同步注浆浆液。本研究依托主要穿越地层为砂卵石地层的成蒲铁路紫瑞隧道工程项目,研究浆灰比(废弃泥浆与水泥质量比)、浆砂比(废弃泥浆与砂质量比)对同步注浆浆液的性能影响,另外在废浆再利用配制同步注浆浆液的基础上,研究了用耐火泥替代部分水泥的可行性。研究结果表明:1)随着同步注浆浆液浆灰比的增大,同步浆液的流动度增大,凝结时间延长,立方体28d抗压强度降低;2)随着浆砂比的增大,同步浆液的流动度增大,凝结时间延长,立方体28d抗压强度也降低;3)掺入耐火泥将增强同步注浆浆液的28d抗压强度,降低同步浆液流动度,缩短同步浆液凝结时间。因此,在配制同步注浆浆液中,用耐火泥替代部分水泥具有可行性,并能带来一定经济效益。 展开更多
关键词 砂卵石地层 同步注浆浆液 泥水平衡盾构 再利用
下载PDF
大埋深复杂地层土压平衡盾构机盾尾脱困技术研究
20
作者 杨有平 《山西建筑》 2024年第16期89-91,127,共4页
盾构机盾尾包裹是施工中经常遇到的问题,往往会造成设备损坏、工期拖延、成本消耗。研究盾构机盾尾包裹成因,掌握脱困技术,以及制定切实可行的预防措施,在盾构施工中尤为重要。结合某城际轨道交通项目施工中盾尾包裹脱困实践,分析了盾... 盾构机盾尾包裹是施工中经常遇到的问题,往往会造成设备损坏、工期拖延、成本消耗。研究盾构机盾尾包裹成因,掌握脱困技术,以及制定切实可行的预防措施,在盾构施工中尤为重要。结合某城际轨道交通项目施工中盾尾包裹脱困实践,分析了盾尾包裹产生的原因,通过采取地层加固、增加盾体润滑、盾体和管片保护、增加辅助千斤顶等系列技术措施,实现了盾构机的安全脱困,为类似工程提供经验和参考。 展开更多
关键词 大埋深 复杂地层 土压平衡盾构机 盾构施工 脱困技术
下载PDF
上一页 1 2 36 下一页 到第
使用帮助 返回顶部