Reservoir safety, testing-string safety, and flow control are key factors that should be considered in deep-water unconsolidated sandstone gas well testing work system. Combined with the feature of testing reservoir, ...Reservoir safety, testing-string safety, and flow control are key factors that should be considered in deep-water unconsolidated sandstone gas well testing work system. Combined with the feature of testing reservoir, pipe string type and sea area, the required minimum testing flow rate during cleaning up process, as well as minimum test flow rate without hydrate generation, pipe string erosion critical production, the maximum testing flow rate without destroying sand formation and the minimum output of meeting the demand of development was analyzed;based on the above critical test flow rates, testing working system is designed. Field application showed that the designed work system effectively provided good guidance for field test operations;no sand production or hydrate generation happened during the test process;the test parameter evaluated the reservoir accurately;the safe and efficient test operation was achieved.展开更多
To provide electrical power for the Research System of Superconducting Magnets(RSSMs)including the background field superconducting magnet and the tested superconducting objects,the high power phase-controlled convert...To provide electrical power for the Research System of Superconducting Magnets(RSSMs)including the background field superconducting magnet and the tested superconducting objects,the high power phase-controlled converter will be used to develop the power supply system.However, because of its inner nonlinear feature, the current harmonics and the reactive power are injected into the AC power supply system. To improve the quality of the power supply system for RSSMs, an improved synchronous control strategy is suggested for the superconducting magnet power supply system, which comprises four series-connected six-pulse converters fed by a phase-shifting transformer, respectively. According to the proposed control strategy, the basic unit is two 12-pulse converters and the control method will be changed in terms of loadfluctuations which are represented by the per unit value of converter output voltage. As a result,harmonic is greatly reduced but the power factor is also high.展开更多
The new Austrian tunneling method (NATM) is widely applied in design and construction of underground engineering projects. When the type and distribution of unfavorable geological bodies (UGBs) associated with the...The new Austrian tunneling method (NATM) is widely applied in design and construction of underground engineering projects. When the type and distribution of unfavorable geological bodies (UGBs) associated with their influences on geoengineering are complicated or unfortunately are overlooked, we should pay more attentions to internal features of rocks grades IV and V (even in local but mostly controlling zones). With increasing attentions to the characteristics, mechanism and influences of engineering construction-triggered geohazards, it is crucial to fully understand the disturbance of these geohazards on project construction. A reasonable determination method in construction procedure, i.e. the shape of working face, the type of engineering support and the choice of feasible procedure, should be considered in order to mitigate the construction-triggered geohazards. Due to their high sensitivity to groundwater and in-situ stress, various UGBs exhibit hysteretic nature and failure modes. To give a complete understanding on the internal causes, the emphasis on advanced comprehensive geological forecasting and overall reinforcement treatment is therefore of more practical significance. Compre- hensive evaluation of influential factors, identification of UGB, and measures of discontinuity dynamic controlling comprises the geoengineering condition evaluation and dynamic controlling method. In a case of a cut slope, the variations of UGBs and the impacts of key environmental factors are presented, where more severe construction-triggered geohazards emerged in construction stage than those predicted in design and field investigation stages. As a result, the weight ratios of different influential factors with respect to field investigation, design and construction are obtained.展开更多
文摘Reservoir safety, testing-string safety, and flow control are key factors that should be considered in deep-water unconsolidated sandstone gas well testing work system. Combined with the feature of testing reservoir, pipe string type and sea area, the required minimum testing flow rate during cleaning up process, as well as minimum test flow rate without hydrate generation, pipe string erosion critical production, the maximum testing flow rate without destroying sand formation and the minimum output of meeting the demand of development was analyzed;based on the above critical test flow rates, testing working system is designed. Field application showed that the designed work system effectively provided good guidance for field test operations;no sand production or hydrate generation happened during the test process;the test parameter evaluated the reservoir accurately;the safe and efficient test operation was achieved.
基金supported by National Natural Science Foundation of China (No. 51877001)
文摘To provide electrical power for the Research System of Superconducting Magnets(RSSMs)including the background field superconducting magnet and the tested superconducting objects,the high power phase-controlled converter will be used to develop the power supply system.However, because of its inner nonlinear feature, the current harmonics and the reactive power are injected into the AC power supply system. To improve the quality of the power supply system for RSSMs, an improved synchronous control strategy is suggested for the superconducting magnet power supply system, which comprises four series-connected six-pulse converters fed by a phase-shifting transformer, respectively. According to the proposed control strategy, the basic unit is two 12-pulse converters and the control method will be changed in terms of loadfluctuations which are represented by the per unit value of converter output voltage. As a result,harmonic is greatly reduced but the power factor is also high.
基金support by the National Natural Science Foundation of China (No. 41372324)support from the Chinese Special Funds for Major State Basic Research Project under Grant No. 2010CB732001
文摘The new Austrian tunneling method (NATM) is widely applied in design and construction of underground engineering projects. When the type and distribution of unfavorable geological bodies (UGBs) associated with their influences on geoengineering are complicated or unfortunately are overlooked, we should pay more attentions to internal features of rocks grades IV and V (even in local but mostly controlling zones). With increasing attentions to the characteristics, mechanism and influences of engineering construction-triggered geohazards, it is crucial to fully understand the disturbance of these geohazards on project construction. A reasonable determination method in construction procedure, i.e. the shape of working face, the type of engineering support and the choice of feasible procedure, should be considered in order to mitigate the construction-triggered geohazards. Due to their high sensitivity to groundwater and in-situ stress, various UGBs exhibit hysteretic nature and failure modes. To give a complete understanding on the internal causes, the emphasis on advanced comprehensive geological forecasting and overall reinforcement treatment is therefore of more practical significance. Compre- hensive evaluation of influential factors, identification of UGB, and measures of discontinuity dynamic controlling comprises the geoengineering condition evaluation and dynamic controlling method. In a case of a cut slope, the variations of UGBs and the impacts of key environmental factors are presented, where more severe construction-triggered geohazards emerged in construction stage than those predicted in design and field investigation stages. As a result, the weight ratios of different influential factors with respect to field investigation, design and construction are obtained.