The adaptive H_∞ control problem of multi-machine power system in the case of disturbances and uncertain parameters is discussed,based on a Hamiltonian model.Considered the effect of time delay during control and tra...The adaptive H_∞ control problem of multi-machine power system in the case of disturbances and uncertain parameters is discussed,based on a Hamiltonian model.Considered the effect of time delay during control and transmission,a Hamilton model with control time delay is established.Lyapunov-Krasovskii function is selected,and a controller which makes the system asymptotically stable is got.The controller not only achieves the stability control for nonlinear systems with time delay,but also has the ability to suppress the external disturbances and adaptive ability to system parameter perturbation.The simulation results show the effect of the controller.展开更多
为了演示和验证稳定器设计的就地相位补偿法在多机电力系统中的应用,介绍在多机电力系统中,就地补偿设计稳定器的2个应用实例。第1个实例是在多机电力系统中就地补偿设计电力系统稳定器(power system stabilizer,PSS),阻尼电力系统局...为了演示和验证稳定器设计的就地相位补偿法在多机电力系统中的应用,介绍在多机电力系统中,就地补偿设计稳定器的2个应用实例。第1个实例是在多机电力系统中就地补偿设计电力系统稳定器(power system stabilizer,PSS),阻尼电力系统局部模振荡。第2个实例是就地补偿设计附加在静态同步补偿器(static synchronous compensator,STATCOM)上的稳定器,抑制多机电力系统中的区域模振荡,并给出在一个16机电力系统中的应用计算和仿真结果。展开更多
With the occurrence of burst interference,bit error rate( BER) stability of the wireless communication system( WCS) always degrades significantly. To cope with it,a stability control algorithm is proposed,utilizing th...With the occurrence of burst interference,bit error rate( BER) stability of the wireless communication system( WCS) always degrades significantly. To cope with it,a stability control algorithm is proposed,utilizing the stability theory of switched systems,which is specifically applicable for multi-parameter adaptive WCS with spectrum sensing ability,and it is capable of stabilizing BER within a reasonable range. Firstly,WCS is modeled as a switched system. Then,based on the multi-Lyapunov function,controlling rules are presented to enable the switched system to satisfy stable condition asymptotically. Finally,analysis and numerical simulation results demonstrate that the switched WCS with the proposed controlling rules is superior to conventional power-controlled WCS with or without state feedback control in terms of stability performance.展开更多
An advanced nonlinear robust control scheme is proposed for multi-machine power systems equipped with thyristor-controlled series compensation (TCSC). First, a decentralized nonlinear robust control approach based on ...An advanced nonlinear robust control scheme is proposed for multi-machine power systems equipped with thyristor-controlled series compensation (TCSC). First, a decentralized nonlinear robust control approach based on the feedback linearization and H∞ theory is introduced to eliminate the nonlinearities and interconnections of the studied system, and to attenuate the exogenous disturbances that enter die system. Then, a system model is built up, which has considered all the generators’ and TCSC’s dynamics, and the effects of uncertainties such as disturbances. Next, a decentralized nonlinear robust coordinated control law is developed based on this model. Simulation results on a six-machine power system show that the transient stability of the power system is obviously improved and die power transfer capacity of long distance transmission lines is enhanced regardless of fault locations and system operation points. In addition, the control law has engineering practicality since all the variables in the expression of he control strategy can be measured locally.展开更多
In the conventional technique,in the evaluation of the severity index,clustering and loading suffer from more iteration leading to more com-putational delay.Hence this research article identifies,a novel progression f...In the conventional technique,in the evaluation of the severity index,clustering and loading suffer from more iteration leading to more com-putational delay.Hence this research article identifies,a novel progression for fast predicting the severity of the line and clustering by incorporating machine learning aspects.The polynomial load modelling or ZIP(constant impedances(Z),Constant Current(I)and Constant active power(P))is developed in the IEEE-14 and Indian 118 bus systems considered for analysis of power system security.The process of finding the severity of the line using a Hybrid Line Stability Ranking Index(HLSRI)is used for assisting the concepts of machine learning with J48 algorithm,infers the superior affected lines by adopting the IEEE standards in concern to be compensated in maintaining the power system stability.The simulation is performed in the WEKA environment and deals with the supervisor learning in order based on severity to ensure the safety of power system.The Unified Power Flow Controller(UPFC),facts devices for the purpose of compensating the losses by maintaining the voltage characteristics.The finite element analysis findings are compared with the existing procedures and numerical equations for authentications.展开更多
The parameters of power system slowly change with time due to environmental effects or may change rapidly due to faults. It is preferable that the control technique in this system possesses robustness for various faul...The parameters of power system slowly change with time due to environmental effects or may change rapidly due to faults. It is preferable that the control technique in this system possesses robustness for various fault conditions and disturbances. The used flexible alternating current transmission system (FACTS) in this paper is an advanced super-conducting magnetic energy storage (ASMES). Many control techniques that use ASMES to improve power system stability have been proposed. While fuzzy controller has proven its value in some applications, the researches applying fuzzy controller with ASMES have been actively reported. However, it is sometimes very difficult to specify the rule base for some plants, when the parameters change. To solve this problem, a fuzzy model reference learning controller (FMRLC) is proposed in this paper, which investigates multi-input multi-output FMRLC for time-variant nonlinear system. This control method provides the motivation for adaptive fuzzy control, where the focus is on the automatic online synthesis and tuning of fuzzy controller parameters (i.e., using online data to continually learn the fuzzy controller that will ensure that the performance objectives are met). Simulation results show that the proposed robust controller is able to work with nonlinear and nonstationary power system (i.e., single machine-infinite bus (SMIB) system), under various fault conditions and disturbances.展开更多
This paper presents the design of a robust fixed-order H<sub>∞</sub> controller to damp out the inter-area oscillations and to enhance the stability of the power system. The proposed H<sub>...This paper presents the design of a robust fixed-order H<sub>∞</sub> controller to damp out the inter-area oscillations and to enhance the stability of the power system. The proposed H<sub>∞</sub> approach is based on shaping the open-loop transfer function in the Nyquist diagram through minimizing the quadratic error between the actual and the desired open loop transfer functions in the frequency domain under linear constraints that guarantee robustness and stability. The proposed approach is robust with respect to multi-model uncertainty closed-loop sensitivity functions in the Nyquist diagram through the constraints on their infinity norm. The H<sub>∞</sub> constraints are linearized with the help of a desired open-loop transfer function. The controller is designed using the convex optimization techniques in which the difference between the open-loop transfer function and the desired one is minimized. The two-area four-machine test system is selected to evaluate the performance of the designed controller under different load conditions as well as different levels of wind penetrations.展开更多
Suppression of the dynamic oscillations of tie-line power exchanges and frequency in the affected interconnected power systems due to loading-condition changes has been assigned as a prominent duty of automatic genera...Suppression of the dynamic oscillations of tie-line power exchanges and frequency in the affected interconnected power systems due to loading-condition changes has been assigned as a prominent duty of automatic generation control(AGC). To alleviate the system oscillation resulting from such load changes, implementation of flexible AC transmission systems(FACTSs) can be considered as one of the practical and effective solutions. In this paper, a thyristor-controlled series compensator(TCSC), which is one series type of the FACTS family, is used to augment the overall dynamic performance of a multi-area multi-source interconnected power system. To this end, we have used a hierarchical adaptive neuro-fuzzy inference system controller-TCSC(HANFISC-TCSC) to abate the two important issues in multi-area interconnected power systems, i.e., low-frequency oscillations and tie-line power exchange deviations. For this purpose, a multi-objective optimization technique is inevitable. Multi-objective particle swarm optimization(MOPSO) has been chosen for this optimization problem, owing to its high performance in untangling non-linear objectives. The efficiency of the suggested HANFISC-TCSC has been precisely evaluated and compared with that of the conventional MOPSO-TCSC in two different multi-area interconnected power systems, i.e., two-area hydro-thermal-diesel and three-area hydro-thermal power systems. The simulation results obtained from both power systems have transparently certified the high performance of HANFISC-TCSC compared to the conventional MOPSO-TCSC.展开更多
集中送出的新能源场站大多位于电网末端,随着其有功出力的增加,易出现静态电压失稳。该文将传统的阻抗模指标的应用对象由负荷推广至新能源场站,丰富了该指标在静态电压稳定评估方面的适用性场景,包括含无功补偿的新能源系统、新能源集...集中送出的新能源场站大多位于电网末端,随着其有功出力的增加,易出现静态电压失稳。该文将传统的阻抗模指标的应用对象由负荷推广至新能源场站,丰富了该指标在静态电压稳定评估方面的适用性场景,包括含无功补偿的新能源系统、新能源集群馈入系统、以及新能源多机多馈入系统。具体地,首先,分析新能源单馈入系统的临界静态电压稳定条件,并据此给出用于评估新能源场站静态电压稳定性的阻抗模裕度指标及稳定判据;其次,通过将无功补偿设备并入系统阻抗,分析无功补偿对于指标的影响;再次,证明在新能源的集群馈入系统中,公共耦合点(point of common coupling,PCC)的电压失稳将发生在单个新能源场站之前,并据此确定PCC点作为指标的计算节点;之后,为考虑多机多馈入系统中不同新能源场站间的影响,在指标的计算过程中,保留待评估的关键新能源场站,将其他新能源场站等值为阻抗,并入节点阻抗矩阵中,实现方法在多机多馈入系统中的扩展应用。最后,基于PSD-BPA中建立的单机单馈入系统、多机多馈入系统、以及某省实际大电网算例验证指标的有效性。展开更多
基金Supported by National Natural Science Foundation of China (60674039, 60704004) and Innovation Fund for Outstanding Scholar of Henan Province (084200510009 )
基金Sponsored by the Natural Science Foundation of Hebei Province,China(Grant No.F2016203006)
文摘The adaptive H_∞ control problem of multi-machine power system in the case of disturbances and uncertain parameters is discussed,based on a Hamiltonian model.Considered the effect of time delay during control and transmission,a Hamilton model with control time delay is established.Lyapunov-Krasovskii function is selected,and a controller which makes the system asymptotically stable is got.The controller not only achieves the stability control for nonlinear systems with time delay,but also has the ability to suppress the external disturbances and adaptive ability to system parameter perturbation.The simulation results show the effect of the controller.
文摘为了演示和验证稳定器设计的就地相位补偿法在多机电力系统中的应用,介绍在多机电力系统中,就地补偿设计稳定器的2个应用实例。第1个实例是在多机电力系统中就地补偿设计电力系统稳定器(power system stabilizer,PSS),阻尼电力系统局部模振荡。第2个实例是就地补偿设计附加在静态同步补偿器(static synchronous compensator,STATCOM)上的稳定器,抑制多机电力系统中的区域模振荡,并给出在一个16机电力系统中的应用计算和仿真结果。
基金Supported by the National Natural Science Foundation of China(No.61572254,61301103)
文摘With the occurrence of burst interference,bit error rate( BER) stability of the wireless communication system( WCS) always degrades significantly. To cope with it,a stability control algorithm is proposed,utilizing the stability theory of switched systems,which is specifically applicable for multi-parameter adaptive WCS with spectrum sensing ability,and it is capable of stabilizing BER within a reasonable range. Firstly,WCS is modeled as a switched system. Then,based on the multi-Lyapunov function,controlling rules are presented to enable the switched system to satisfy stable condition asymptotically. Finally,analysis and numerical simulation results demonstrate that the switched WCS with the proposed controlling rules is superior to conventional power-controlled WCS with or without state feedback control in terms of stability performance.
基金This work was supported by Chinese National Natural Science Foundation(No.50377018)Chinese National Key Basic Research Fund(No.G1998020309)by New Energy and Industrial Technology Development Organization of Japan.
文摘An advanced nonlinear robust control scheme is proposed for multi-machine power systems equipped with thyristor-controlled series compensation (TCSC). First, a decentralized nonlinear robust control approach based on the feedback linearization and H∞ theory is introduced to eliminate the nonlinearities and interconnections of the studied system, and to attenuate the exogenous disturbances that enter die system. Then, a system model is built up, which has considered all the generators’ and TCSC’s dynamics, and the effects of uncertainties such as disturbances. Next, a decentralized nonlinear robust coordinated control law is developed based on this model. Simulation results on a six-machine power system show that the transient stability of the power system is obviously improved and die power transfer capacity of long distance transmission lines is enhanced regardless of fault locations and system operation points. In addition, the control law has engineering practicality since all the variables in the expression of he control strategy can be measured locally.
文摘In the conventional technique,in the evaluation of the severity index,clustering and loading suffer from more iteration leading to more com-putational delay.Hence this research article identifies,a novel progression for fast predicting the severity of the line and clustering by incorporating machine learning aspects.The polynomial load modelling or ZIP(constant impedances(Z),Constant Current(I)and Constant active power(P))is developed in the IEEE-14 and Indian 118 bus systems considered for analysis of power system security.The process of finding the severity of the line using a Hybrid Line Stability Ranking Index(HLSRI)is used for assisting the concepts of machine learning with J48 algorithm,infers the superior affected lines by adopting the IEEE standards in concern to be compensated in maintaining the power system stability.The simulation is performed in the WEKA environment and deals with the supervisor learning in order based on severity to ensure the safety of power system.The Unified Power Flow Controller(UPFC),facts devices for the purpose of compensating the losses by maintaining the voltage characteristics.The finite element analysis findings are compared with the existing procedures and numerical equations for authentications.
文摘The parameters of power system slowly change with time due to environmental effects or may change rapidly due to faults. It is preferable that the control technique in this system possesses robustness for various fault conditions and disturbances. The used flexible alternating current transmission system (FACTS) in this paper is an advanced super-conducting magnetic energy storage (ASMES). Many control techniques that use ASMES to improve power system stability have been proposed. While fuzzy controller has proven its value in some applications, the researches applying fuzzy controller with ASMES have been actively reported. However, it is sometimes very difficult to specify the rule base for some plants, when the parameters change. To solve this problem, a fuzzy model reference learning controller (FMRLC) is proposed in this paper, which investigates multi-input multi-output FMRLC for time-variant nonlinear system. This control method provides the motivation for adaptive fuzzy control, where the focus is on the automatic online synthesis and tuning of fuzzy controller parameters (i.e., using online data to continually learn the fuzzy controller that will ensure that the performance objectives are met). Simulation results show that the proposed robust controller is able to work with nonlinear and nonstationary power system (i.e., single machine-infinite bus (SMIB) system), under various fault conditions and disturbances.
文摘This paper presents the design of a robust fixed-order H<sub>∞</sub> controller to damp out the inter-area oscillations and to enhance the stability of the power system. The proposed H<sub>∞</sub> approach is based on shaping the open-loop transfer function in the Nyquist diagram through minimizing the quadratic error between the actual and the desired open loop transfer functions in the frequency domain under linear constraints that guarantee robustness and stability. The proposed approach is robust with respect to multi-model uncertainty closed-loop sensitivity functions in the Nyquist diagram through the constraints on their infinity norm. The H<sub>∞</sub> constraints are linearized with the help of a desired open-loop transfer function. The controller is designed using the convex optimization techniques in which the difference between the open-loop transfer function and the desired one is minimized. The two-area four-machine test system is selected to evaluate the performance of the designed controller under different load conditions as well as different levels of wind penetrations.
文摘Suppression of the dynamic oscillations of tie-line power exchanges and frequency in the affected interconnected power systems due to loading-condition changes has been assigned as a prominent duty of automatic generation control(AGC). To alleviate the system oscillation resulting from such load changes, implementation of flexible AC transmission systems(FACTSs) can be considered as one of the practical and effective solutions. In this paper, a thyristor-controlled series compensator(TCSC), which is one series type of the FACTS family, is used to augment the overall dynamic performance of a multi-area multi-source interconnected power system. To this end, we have used a hierarchical adaptive neuro-fuzzy inference system controller-TCSC(HANFISC-TCSC) to abate the two important issues in multi-area interconnected power systems, i.e., low-frequency oscillations and tie-line power exchange deviations. For this purpose, a multi-objective optimization technique is inevitable. Multi-objective particle swarm optimization(MOPSO) has been chosen for this optimization problem, owing to its high performance in untangling non-linear objectives. The efficiency of the suggested HANFISC-TCSC has been precisely evaluated and compared with that of the conventional MOPSO-TCSC in two different multi-area interconnected power systems, i.e., two-area hydro-thermal-diesel and three-area hydro-thermal power systems. The simulation results obtained from both power systems have transparently certified the high performance of HANFISC-TCSC compared to the conventional MOPSO-TCSC.
文摘集中送出的新能源场站大多位于电网末端,随着其有功出力的增加,易出现静态电压失稳。该文将传统的阻抗模指标的应用对象由负荷推广至新能源场站,丰富了该指标在静态电压稳定评估方面的适用性场景,包括含无功补偿的新能源系统、新能源集群馈入系统、以及新能源多机多馈入系统。具体地,首先,分析新能源单馈入系统的临界静态电压稳定条件,并据此给出用于评估新能源场站静态电压稳定性的阻抗模裕度指标及稳定判据;其次,通过将无功补偿设备并入系统阻抗,分析无功补偿对于指标的影响;再次,证明在新能源的集群馈入系统中,公共耦合点(point of common coupling,PCC)的电压失稳将发生在单个新能源场站之前,并据此确定PCC点作为指标的计算节点;之后,为考虑多机多馈入系统中不同新能源场站间的影响,在指标的计算过程中,保留待评估的关键新能源场站,将其他新能源场站等值为阻抗,并入节点阻抗矩阵中,实现方法在多机多馈入系统中的扩展应用。最后,基于PSD-BPA中建立的单机单馈入系统、多机多馈入系统、以及某省实际大电网算例验证指标的有效性。