This paper focuses on the optimization method for multi-skilled painting personnel scheduling.The budget working time analysis is carried out considering the influence of operating area,difficulty of spraying area,mul...This paper focuses on the optimization method for multi-skilled painting personnel scheduling.The budget working time analysis is carried out considering the influence of operating area,difficulty of spraying area,multi-skilled workers,and worker’s efficiency,then a mathematical model is established to minimize the completion time. The constraints of task priority,paint preparation,pump management,and neighbor avoidance in the ship block painting production are considered. Based on this model,an improved scatter search(ISS)algorithm is designed,and the hybrid approximate dynamic programming(ADP)algorithm is used to improve search efficiency. In addition,the two solution combination methods of path-relinking and task sequence combination are used to enhance the search breadth and depth. The numerical experimental results show that ISS has a significant advantage in solving efficiency compared with the solver in small scale instances;Compared with the scatter search algorithm and genetic algorithm,ISS can stably improve the solution quality. Verified by the production example,ISS effectively shortens the total completion time of the production,which is suitable for scheduling problems in the actual painting production of the shipyard.展开更多
A memetic algorithm (MA) for a multi-mode resourceconstrained project scheduling problem (MRCPSP) is proposed. We use a new fitness function and two very effective local search procedures in the proposed MA. The f...A memetic algorithm (MA) for a multi-mode resourceconstrained project scheduling problem (MRCPSP) is proposed. We use a new fitness function and two very effective local search procedures in the proposed MA. The fitness function makes use of a mechanism called "strategic oscillation" to make the search process have a higher probability to visit solutions around a "feasible boundary". One of the local search procedures aims at improving the lower bound of project makespan to be less than a known upper bound, and another aims at improving a solution of an MRCPSP instance accepting infeasible solutions based on the new fitness function in the search process. A detailed computational experiment is set up using instances from the problem instance library PSPLIB. Computational results show that the proposed MA is very competitive with the state-of-the-art algorithms. The MA obtains improved solutions for one instance of set J30.展开更多
The resource constrained project scheduling problem (RCPSP) and a decision-making model based on multi-agent systems (MAS) and general equilibrium marketing are proposed. An algorithm leading to the resource allocatio...The resource constrained project scheduling problem (RCPSP) and a decision-making model based on multi-agent systems (MAS) and general equilibrium marketing are proposed. An algorithm leading to the resource allocation decision involved in RCPSP has also been developed. And this algorithm can be used in the multi-project scheduling field as well.Finally, an illustration is given.展开更多
The motivation for cost-effective management of highway pavements is evidenced not only by the massive expenditures associated with these activities at a national level but also by the consequences of poor pavement co...The motivation for cost-effective management of highway pavements is evidenced not only by the massive expenditures associated with these activities at a national level but also by the consequences of poor pavement condition on road users.This paper presents a state-of-the-art review of multi-objective optimization(MOO)problems that have been formulated and solution techniques that have been used in selecting and scheduling highway pavement rehabilitation and maintenance activities.First,the paper presents a taxonomy and hierarchy for these activities,the role of funding sources,and levels of jurisdiction.The paper then describes how three different decision mechanisms have been used in past research and practice for project selection and scheduling(historical practices,expert opinion,and explicit mathematical optimization)and identifies the pros and cons of each mechanism.The paper then focuses on the optimization mechanism and presents the types of optimization problems,formulations,and objectives that have been used in the literature.Next,the paper examines various solution algorithms and discusses issues related to their implementation.Finally,the paper identifies some barriers to implementing multi-objective optimization in selecting and scheduling highway pavement rehabilitation and maintenance activities,and makes recommendations to overcome some of these barriers.展开更多
Offshore engineering construction projects are large and complex,having the characteristics of multiple execution modes andmultiple resource constraints.Their complex internal scheduling processes can be regarded as r...Offshore engineering construction projects are large and complex,having the characteristics of multiple execution modes andmultiple resource constraints.Their complex internal scheduling processes can be regarded as resourceconstrained project scheduling problems(RCPSPs).To solve RCPSP problems in offshore engineering construction more rapidly,a hybrid genetic algorithmwas established.To solve the defects of genetic algorithms,which easily fall into the local optimal solution,a local search operation was added to a genetic algorithm to defend the offspring after crossover/mutation.Then,an elitist strategy and adaptive operators were adopted to protect the generated optimal solutions,reduce the computation time and avoid premature convergence.A calibrated function method was used to cater to the roulette rules,and appropriate rules for encoding,decoding and crossover/mutation were designed.Finally,a simple network was designed and validated using the case study of a real offshore project.The performance of the genetic algorithmand a simulated annealing algorithmwas compared to validate the feasibility and effectiveness of the approach.展开更多
This paper introduces a hybrid evolutionary algorithm for the resource-constrained project scheduling problem (RCPSP). Given an RCPSP instance, the algorithm identifies the problem structure and selects a suitable dec...This paper introduces a hybrid evolutionary algorithm for the resource-constrained project scheduling problem (RCPSP). Given an RCPSP instance, the algorithm identifies the problem structure and selects a suitable decoding scheme. Then a multi-pass biased sampling method followed up by a multi-local search is used to generate a diverse and good quality initial population. The population then evolves through modified order-based recombination and mutation operators to perform exploration for promising solutions within the entire region. Mutation is performed only if the current population has converged or the produced offspring by recombination operator is too similar to one of his parents. Finally the algorithm performs an intensified local search on the best solution found in the evolutionary stage. Computational experiments using standard instances indicate that the proposed algorithm works well in both computational time and solution quality.展开更多
Themulti-skill resource-constrained project scheduling problem(MS-RCPSP)is a significantmanagement science problem that extends from the resource-constrained project scheduling problem(RCPSP)and is integrated with a r...Themulti-skill resource-constrained project scheduling problem(MS-RCPSP)is a significantmanagement science problem that extends from the resource-constrained project scheduling problem(RCPSP)and is integrated with a real project and production environment.To solve MS-RCPSP,it is an efficient method to use dispatching rules combined with a parallel scheduling mechanism to generate a scheduling scheme.This paper proposes an improved gene expression programming(IGEP)approach to explore newly dispatching rules that can broadly solve MS-RCPSP.A new backward traversal decoding mechanism,and several neighborhood operators are applied in IGEP.The backward traversal decoding mechanism dramatically reduces the space complexity in the decoding process,and improves the algorithm’s performance.Several neighborhood operators improve the exploration of the potential search space.The experiment takes the intelligent multi-objective project scheduling environment(iMOPSE)benchmark dataset as the training set and testing set of IGEP.Ten newly dispatching rules are discovered and extracted by IGEP,and eight out of ten are superior to other typical dispatching rules.展开更多
In this paper, we present an extension of the classical Resource Constrained Project Scheduling Problem (RCPSP). We present a new type of resource constraints in which staff members are involved. We present a new mode...In this paper, we present an extension of the classical Resource Constrained Project Scheduling Problem (RCPSP). We present a new type of resource constraints in which staff members are involved. We present a new model where staff members can have several skills with different proficiency, i.e., a staff member is able to perform more than one kind of activity as well as the time need is complete the task assign depends on the staff individual skill. We call this model the Weighted-Multi-Skill Project Scheduling Problem (WMSPSP). In our model, an activity has specific skill requirements that must be satisfied. To solve this problem, we propose a lower bound that uses a linear programming scheme for the RCPSP.展开更多
This study utilizes a time-precedence network technique to construct two models of multi-mode resource constrained project scheduling problem with discounted cash flows (MRCPSPDCF), individually including the progre...This study utilizes a time-precedence network technique to construct two models of multi-mode resource constrained project scheduling problem with discounted cash flows (MRCPSPDCF), individually including the progress payment (PP) and the payment at an equal time interval (ETI). The objective of each model is to maximize the net present value (NPV) for all cash flows in the project, subject to the related operational constraints. The models are characterized as NP-hard. A heuristic algorithm, coupled with two upper bound solutions, is proposed to efficiently solve the models and evaluate the heuristic algorithm performance which was not performed in past studies. The results show that the performance of proposed models and heuristic algorithm is good.展开更多
To solve the resource-constrained project scheduling problem (RCPSP), a hybrid ant colony optimization (HACO) approach is presented. To improve the quality of the schedules, the HACO is incorporated with an extend...To solve the resource-constrained project scheduling problem (RCPSP), a hybrid ant colony optimization (HACO) approach is presented. To improve the quality of the schedules, the HACO is incorporated with an extended double justification in which the activity splitting is applied to predict whether the schedule could be improved. The HACO is tested on the set of large benchmark problems from the project scheduling problem library (PSPLIB). The computational result shows that the proposed algo- rithm can improve the quality of the schedules efficiently.展开更多
In this study, we simulated water flow in a water conservancy project consisting of various hydraulic structures, such as sluices, pumping stations, hydropower stations, ship locks, and culverts, and developed a multi...In this study, we simulated water flow in a water conservancy project consisting of various hydraulic structures, such as sluices, pumping stations, hydropower stations, ship locks, and culverts, and developed a multi-period and multi-variable joint optimization scheduling model for flood control, drainage, and irrigation. In this model, the number of sluice holes, pump units, and hydropower station units to be opened were used as decision variables, and different optimization objectives and constraints were considered. This model was solved with improved genetic algorithms and verified using the Huaian Water Conservancy Project as an example. The results show that the use of the joint optimization scheduling led to a 10% increase in the power generation capacity and a 15% reduction in the total energy consumption. The change in the water level was reduced by 0.25 m upstream of the Yundong Sluice, and by 50% downstream of pumping stations No. 1, No. 2, and No. 4. It is clear that the joint optimization scheduling proposed in this study can effectively improve power generation capacity of the project, minimize operating costs and energy consumption, and enable more stable operation of various hydraulic structures. The results may provide references for the management of water conservancy projects in complex river networks.展开更多
An improved differential evolution(IDE)algorithm that adopts a novel mutation strategy to speed up the convergence rate is introduced to solve the resource-constrained project scheduling problem(RCPSP)with the obj...An improved differential evolution(IDE)algorithm that adopts a novel mutation strategy to speed up the convergence rate is introduced to solve the resource-constrained project scheduling problem(RCPSP)with the objective of minimizing project duration Activities priorities for scheduling are represented by individual vectors and a senal scheme is utilized to transform the individual-represented priorities to a feasible schedule according to the precedence and resource constraints so as to be evaluated.To investigate the performance of the IDE-based approach for the RCPSP,it is compared against the meta-heuristic methods of hybrid genetic algorithm(HGA),particle swarm optimization(PSO) and several well selected heuristics.The results show that the proposed scheduling method is better than general heuristic rules and is able to obtain the same optimal result as the HGA and PSO approaches but more efficient than the two algorithms.展开更多
This paper considers a project scheduling problem with the objective of minimizing resource availability costs appealed to finish al activities before the deadline. There are finish-start type precedence relations amo...This paper considers a project scheduling problem with the objective of minimizing resource availability costs appealed to finish al activities before the deadline. There are finish-start type precedence relations among the activities which require some kinds of renewable resources. We predigest the process of sol-ving the resource availability cost problem (RACP) by using start time of each activity to code the schedule. Then, a novel heuris-tic algorithm is proposed to make the process of looking for the best solution efficiently. And then pseudo particle swarm optimiza-tion (PPSO) combined with PSO and path relinking procedure is presented to solve the RACP. Final y, comparative computational experiments are designed and the computational results show that the proposed method is very effective to solve RACP.展开更多
In order to minimize the project duration of resourceconstrained project scheduling problem( RCPSP), a gene expression programming-based scheduling rule( GEP-SR) method is proposed to automatically discover and select...In order to minimize the project duration of resourceconstrained project scheduling problem( RCPSP), a gene expression programming-based scheduling rule( GEP-SR) method is proposed to automatically discover and select the effective scheduling rules( SRs) which are constructed using the project status and attributes of the activities. SRs are represented by the chromosomes of GEP, and an improved parallel schedule generation scheme( IPSGS) is used to transform the SRs into explicit schedules. The framework of GEP-SR for RCPSP is designed,and the effectiveness of the GEP-SR approach is demonstrated by comparing with other methods on the same instances.展开更多
Both fuzzy temporal constraint and flexible resource constraint are considered in project scheduling. In order to obtain an optimal schedule, we propose a genetic algorithm integrated with concepts on fuzzy set theory...Both fuzzy temporal constraint and flexible resource constraint are considered in project scheduling. In order to obtain an optimal schedule, we propose a genetic algorithm integrated with concepts on fuzzy set theory as well as specialized coding and decoding mechanism. An example demonstrates that the proposed approach can assist the project managers to obtain the optimal schedule effectively and make the correct decision on skill training before a project begins.展开更多
Motivated by the projects constrained by space capacity and resource transporting time, a project scheduling probIem with capacity constraint was modeled. A hybrid algorithm is proposed, which uses the ideas of bi-lev...Motivated by the projects constrained by space capacity and resource transporting time, a project scheduling probIem with capacity constraint was modeled. A hybrid algorithm is proposed, which uses the ideas of bi-level scheduling and project decomposition technology, and the genetic algorithm and tabu search is combined. Topological reordering technology is used to improve the efficiency of evaluation. Simulation results show the proposed algorithm can obtain satisfied scheduling results in acceptable time.展开更多
It is of great significance to carry out effective scheduling for the carrier-based aircraft flight deck operations.In this paper,the precedence constraints and resource constraints in flight deck operations are analy...It is of great significance to carry out effective scheduling for the carrier-based aircraft flight deck operations.In this paper,the precedence constraints and resource constraints in flight deck operations are analyzed,then the model of the multi-aircraft integrated scheduling problem with transfer times(MAISPTT)is established.A dual population multi-operator genetic algorithm(DPMOGA)is proposed for solving the problem.In the algorithm,the dual population structure and random-key encoding modified by starting/ending time of operations are adopted,and multiple genetic operators are self-adaptively used to obtain better encodings.In order to conduct the mapping from encodings to feasible schedules,serial and parallel scheduling generation scheme-based decoding operators,each of which adopts different justified mechanisms in two separated populations,are introduced.The superiority of the DPMOGA is verified by simulation experiments.展开更多
Current SDN controllers suffer from a series of potential attacks. For example, malicious flow rules may lead to system disorder by introducing unexpected flow entries. In this paper, we propose Mcad-SA, an aware deci...Current SDN controllers suffer from a series of potential attacks. For example, malicious flow rules may lead to system disorder by introducing unexpected flow entries. In this paper, we propose Mcad-SA, an aware decision-making security architecture with multiple controllers, which could coordinate heterogeneous controllers internally as a "big" controller. This architecture includes an additional plane, the scheduling plane, which consists of transponder, sensor, decider and scheduler. Meanwhile it achieves the functions of communicating, supervising and scheduling between data and control plane. In this framework, we adopt the vote results from the majority of controllers to determine valid flow rules distributed to switches. Besides, an aware dynamic scheduling(ADS) mechanism is devised in scheduler to intensify security of Mcad-SA further. Combined with perception, ADS takes advantage of heterogeneity and redundancy of controllers to enable the control plane operate in a dynamic, reliable and unsteady state, which results in significant difficulty of probing systems and executing attacks. Simulation results demonstrate the proposed methods indicate better security resilience over traditional architectures as they have lower failure probability when facing attacks.展开更多
A treelike hybrid multi-cluster tool is composed of both single-arm and dual-arm cluster tools with a treelike topology. Scheduling such a tool is challenging. For a hybrid treelike multi-cluster tool whose bottleneck...A treelike hybrid multi-cluster tool is composed of both single-arm and dual-arm cluster tools with a treelike topology. Scheduling such a tool is challenging. For a hybrid treelike multi-cluster tool whose bottleneck individual tool is process-bound, this work aims at finding its optimal one-wafer cyclic schedule. It is modeled with Petri nets such that a onewafer cyclic schedule is parameterized as its robots' waiting time.Based on the model, this work proves the existence of its onewafer cyclic schedule that features with the ease of industrial implementation. Then, computationally efficient algorithms are proposed to find the minimal cycle time and optimal onewafer cyclic schedule. Multi-cluster tool examples are given to illustrate the proposed approach. The use of the found schedules enables industrial multi-cluster tools to operate with their highest productivity.展开更多
基金Sponsored by the Ministry of Industry and Information Technology of China(Grant No.MIIT[2019]359)。
文摘This paper focuses on the optimization method for multi-skilled painting personnel scheduling.The budget working time analysis is carried out considering the influence of operating area,difficulty of spraying area,multi-skilled workers,and worker’s efficiency,then a mathematical model is established to minimize the completion time. The constraints of task priority,paint preparation,pump management,and neighbor avoidance in the ship block painting production are considered. Based on this model,an improved scatter search(ISS)algorithm is designed,and the hybrid approximate dynamic programming(ADP)algorithm is used to improve search efficiency. In addition,the two solution combination methods of path-relinking and task sequence combination are used to enhance the search breadth and depth. The numerical experimental results show that ISS has a significant advantage in solving efficiency compared with the solver in small scale instances;Compared with the scatter search algorithm and genetic algorithm,ISS can stably improve the solution quality. Verified by the production example,ISS effectively shortens the total completion time of the production,which is suitable for scheduling problems in the actual painting production of the shipyard.
基金supported by the National Natural Science Foundation of China(71171038)
文摘A memetic algorithm (MA) for a multi-mode resourceconstrained project scheduling problem (MRCPSP) is proposed. We use a new fitness function and two very effective local search procedures in the proposed MA. The fitness function makes use of a mechanism called "strategic oscillation" to make the search process have a higher probability to visit solutions around a "feasible boundary". One of the local search procedures aims at improving the lower bound of project makespan to be less than a known upper bound, and another aims at improving a solution of an MRCPSP instance accepting infeasible solutions based on the new fitness function in the search process. A detailed computational experiment is set up using instances from the problem instance library PSPLIB. Computational results show that the proposed MA is very competitive with the state-of-the-art algorithms. The MA obtains improved solutions for one instance of set J30.
文摘The resource constrained project scheduling problem (RCPSP) and a decision-making model based on multi-agent systems (MAS) and general equilibrium marketing are proposed. An algorithm leading to the resource allocation decision involved in RCPSP has also been developed. And this algorithm can be used in the multi-project scheduling field as well.Finally, an illustration is given.
基金This work is supported by the Next Generation Transportation Systems Center(NEXTRANS),USDOT's Region 5 University Transportation CenterThe work is also affiliated with Purdue University College of Engineering's Institute for Control,Optimization,and Networks(ICON)and Center for Intelligent Infrastructure(CII)initiatives.
文摘The motivation for cost-effective management of highway pavements is evidenced not only by the massive expenditures associated with these activities at a national level but also by the consequences of poor pavement condition on road users.This paper presents a state-of-the-art review of multi-objective optimization(MOO)problems that have been formulated and solution techniques that have been used in selecting and scheduling highway pavement rehabilitation and maintenance activities.First,the paper presents a taxonomy and hierarchy for these activities,the role of funding sources,and levels of jurisdiction.The paper then describes how three different decision mechanisms have been used in past research and practice for project selection and scheduling(historical practices,expert opinion,and explicit mathematical optimization)and identifies the pros and cons of each mechanism.The paper then focuses on the optimization mechanism and presents the types of optimization problems,formulations,and objectives that have been used in the literature.Next,the paper examines various solution algorithms and discusses issues related to their implementation.Finally,the paper identifies some barriers to implementing multi-objective optimization in selecting and scheduling highway pavement rehabilitation and maintenance activities,and makes recommendations to overcome some of these barriers.
基金funded by the Ministry of Industry and Information Technology of the People’s Republic of China(Nos.[2018]473,[2019]331).
文摘Offshore engineering construction projects are large and complex,having the characteristics of multiple execution modes andmultiple resource constraints.Their complex internal scheduling processes can be regarded as resourceconstrained project scheduling problems(RCPSPs).To solve RCPSP problems in offshore engineering construction more rapidly,a hybrid genetic algorithmwas established.To solve the defects of genetic algorithms,which easily fall into the local optimal solution,a local search operation was added to a genetic algorithm to defend the offspring after crossover/mutation.Then,an elitist strategy and adaptive operators were adopted to protect the generated optimal solutions,reduce the computation time and avoid premature convergence.A calibrated function method was used to cater to the roulette rules,and appropriate rules for encoding,decoding and crossover/mutation were designed.Finally,a simple network was designed and validated using the case study of a real offshore project.The performance of the genetic algorithmand a simulated annealing algorithmwas compared to validate the feasibility and effectiveness of the approach.
文摘This paper introduces a hybrid evolutionary algorithm for the resource-constrained project scheduling problem (RCPSP). Given an RCPSP instance, the algorithm identifies the problem structure and selects a suitable decoding scheme. Then a multi-pass biased sampling method followed up by a multi-local search is used to generate a diverse and good quality initial population. The population then evolves through modified order-based recombination and mutation operators to perform exploration for promising solutions within the entire region. Mutation is performed only if the current population has converged or the produced offspring by recombination operator is too similar to one of his parents. Finally the algorithm performs an intensified local search on the best solution found in the evolutionary stage. Computational experiments using standard instances indicate that the proposed algorithm works well in both computational time and solution quality.
基金funded by the National Natural Science Foundation of China(Nos.51875420,51875421,52275504).
文摘Themulti-skill resource-constrained project scheduling problem(MS-RCPSP)is a significantmanagement science problem that extends from the resource-constrained project scheduling problem(RCPSP)and is integrated with a real project and production environment.To solve MS-RCPSP,it is an efficient method to use dispatching rules combined with a parallel scheduling mechanism to generate a scheduling scheme.This paper proposes an improved gene expression programming(IGEP)approach to explore newly dispatching rules that can broadly solve MS-RCPSP.A new backward traversal decoding mechanism,and several neighborhood operators are applied in IGEP.The backward traversal decoding mechanism dramatically reduces the space complexity in the decoding process,and improves the algorithm’s performance.Several neighborhood operators improve the exploration of the potential search space.The experiment takes the intelligent multi-objective project scheduling environment(iMOPSE)benchmark dataset as the training set and testing set of IGEP.Ten newly dispatching rules are discovered and extracted by IGEP,and eight out of ten are superior to other typical dispatching rules.
文摘In this paper, we present an extension of the classical Resource Constrained Project Scheduling Problem (RCPSP). We present a new type of resource constraints in which staff members are involved. We present a new model where staff members can have several skills with different proficiency, i.e., a staff member is able to perform more than one kind of activity as well as the time need is complete the task assign depends on the staff individual skill. We call this model the Weighted-Multi-Skill Project Scheduling Problem (WMSPSP). In our model, an activity has specific skill requirements that must be satisfied. To solve this problem, we propose a lower bound that uses a linear programming scheme for the RCPSP.
文摘This study utilizes a time-precedence network technique to construct two models of multi-mode resource constrained project scheduling problem with discounted cash flows (MRCPSPDCF), individually including the progress payment (PP) and the payment at an equal time interval (ETI). The objective of each model is to maximize the net present value (NPV) for all cash flows in the project, subject to the related operational constraints. The models are characterized as NP-hard. A heuristic algorithm, coupled with two upper bound solutions, is proposed to efficiently solve the models and evaluate the heuristic algorithm performance which was not performed in past studies. The results show that the performance of proposed models and heuristic algorithm is good.
基金supported by Liaoning BaiQianWan Talents Program(20071866-25)
文摘To solve the resource-constrained project scheduling problem (RCPSP), a hybrid ant colony optimization (HACO) approach is presented. To improve the quality of the schedules, the HACO is incorporated with an extended double justification in which the activity splitting is applied to predict whether the schedule could be improved. The HACO is tested on the set of large benchmark problems from the project scheduling problem library (PSPLIB). The computational result shows that the proposed algo- rithm can improve the quality of the schedules efficiently.
基金supported by the Water Conservancy Science and Technology Project of Jiangsu Province(Grant No.2012041)the Jiangsu Province Ordinary University Graduate Student Research Innovation Project(Grant No.CXZZ13_0256)
文摘In this study, we simulated water flow in a water conservancy project consisting of various hydraulic structures, such as sluices, pumping stations, hydropower stations, ship locks, and culverts, and developed a multi-period and multi-variable joint optimization scheduling model for flood control, drainage, and irrigation. In this model, the number of sluice holes, pump units, and hydropower station units to be opened were used as decision variables, and different optimization objectives and constraints were considered. This model was solved with improved genetic algorithms and verified using the Huaian Water Conservancy Project as an example. The results show that the use of the joint optimization scheduling led to a 10% increase in the power generation capacity and a 15% reduction in the total energy consumption. The change in the water level was reduced by 0.25 m upstream of the Yundong Sluice, and by 50% downstream of pumping stations No. 1, No. 2, and No. 4. It is clear that the joint optimization scheduling proposed in this study can effectively improve power generation capacity of the project, minimize operating costs and energy consumption, and enable more stable operation of various hydraulic structures. The results may provide references for the management of water conservancy projects in complex river networks.
基金supported by the National Natural Science Foundation of China(6083500460775047+4 种基金60974048)the National High Technology Research and Development Program of China(863 Program)(2007AA0422442008AA04Z214)the Natural Science Foundation of Hunan Province(09JJ9012)Scientific Research Fund of Hunan Provincial Education Department(08C337)
文摘An improved differential evolution(IDE)algorithm that adopts a novel mutation strategy to speed up the convergence rate is introduced to solve the resource-constrained project scheduling problem(RCPSP)with the objective of minimizing project duration Activities priorities for scheduling are represented by individual vectors and a senal scheme is utilized to transform the individual-represented priorities to a feasible schedule according to the precedence and resource constraints so as to be evaluated.To investigate the performance of the IDE-based approach for the RCPSP,it is compared against the meta-heuristic methods of hybrid genetic algorithm(HGA),particle swarm optimization(PSO) and several well selected heuristics.The results show that the proposed scheduling method is better than general heuristic rules and is able to obtain the same optimal result as the HGA and PSO approaches but more efficient than the two algorithms.
基金supported by the National Natural Science Foundation of China(7120116671201170)
文摘This paper considers a project scheduling problem with the objective of minimizing resource availability costs appealed to finish al activities before the deadline. There are finish-start type precedence relations among the activities which require some kinds of renewable resources. We predigest the process of sol-ving the resource availability cost problem (RACP) by using start time of each activity to code the schedule. Then, a novel heuris-tic algorithm is proposed to make the process of looking for the best solution efficiently. And then pseudo particle swarm optimiza-tion (PPSO) combined with PSO and path relinking procedure is presented to solve the RACP. Final y, comparative computational experiments are designed and the computational results show that the proposed method is very effective to solve RACP.
基金The Spring Plan of Ministry of Education,China(No.Z2012017)
文摘In order to minimize the project duration of resourceconstrained project scheduling problem( RCPSP), a gene expression programming-based scheduling rule( GEP-SR) method is proposed to automatically discover and select the effective scheduling rules( SRs) which are constructed using the project status and attributes of the activities. SRs are represented by the chromosomes of GEP, and an improved parallel schedule generation scheme( IPSGS) is used to transform the SRs into explicit schedules. The framework of GEP-SR for RCPSP is designed,and the effectiveness of the GEP-SR approach is demonstrated by comparing with other methods on the same instances.
基金Supported by the National Natural Science Foundation of China(No.71272146)
文摘Both fuzzy temporal constraint and flexible resource constraint are considered in project scheduling. In order to obtain an optimal schedule, we propose a genetic algorithm integrated with concepts on fuzzy set theory as well as specialized coding and decoding mechanism. An example demonstrates that the proposed approach can assist the project managers to obtain the optimal schedule effectively and make the correct decision on skill training before a project begins.
基金the National Basic Research Program (973 Program) (2002CB312200)
文摘Motivated by the projects constrained by space capacity and resource transporting time, a project scheduling probIem with capacity constraint was modeled. A hybrid algorithm is proposed, which uses the ideas of bi-level scheduling and project decomposition technology, and the genetic algorithm and tabu search is combined. Topological reordering technology is used to improve the efficiency of evaluation. Simulation results show the proposed algorithm can obtain satisfied scheduling results in acceptable time.
基金supported by the National Natural Science Foundation of China(61671462).
文摘It is of great significance to carry out effective scheduling for the carrier-based aircraft flight deck operations.In this paper,the precedence constraints and resource constraints in flight deck operations are analyzed,then the model of the multi-aircraft integrated scheduling problem with transfer times(MAISPTT)is established.A dual population multi-operator genetic algorithm(DPMOGA)is proposed for solving the problem.In the algorithm,the dual population structure and random-key encoding modified by starting/ending time of operations are adopted,and multiple genetic operators are self-adaptively used to obtain better encodings.In order to conduct the mapping from encodings to feasible schedules,serial and parallel scheduling generation scheme-based decoding operators,each of which adopts different justified mechanisms in two separated populations,are introduced.The superiority of the DPMOGA is verified by simulation experiments.
基金supported by the Foundation for Innovative Research Groups of the National Natural Science Foundation of China (No.61521003)the National Key R&D Program of China (No.2016YFB0800100,No.2016YFB0800101)the National Natural Science Foundation of China (No.61602509)
文摘Current SDN controllers suffer from a series of potential attacks. For example, malicious flow rules may lead to system disorder by introducing unexpected flow entries. In this paper, we propose Mcad-SA, an aware decision-making security architecture with multiple controllers, which could coordinate heterogeneous controllers internally as a "big" controller. This architecture includes an additional plane, the scheduling plane, which consists of transponder, sensor, decider and scheduler. Meanwhile it achieves the functions of communicating, supervising and scheduling between data and control plane. In this framework, we adopt the vote results from the majority of controllers to determine valid flow rules distributed to switches. Besides, an aware dynamic scheduling(ADS) mechanism is devised in scheduler to intensify security of Mcad-SA further. Combined with perception, ADS takes advantage of heterogeneity and redundancy of controllers to enable the control plane operate in a dynamic, reliable and unsteady state, which results in significant difficulty of probing systems and executing attacks. Simulation results demonstrate the proposed methods indicate better security resilience over traditional architectures as they have lower failure probability when facing attacks.
基金supported in part by Science and Technology Development Fund(FDCT)of Macao(106/2016/A3)the National Natural Science Foundation of China(U1401240)the Delta Electronics Inc and the National Research Foundation(NRF)Singapore under the Corp Lab@University Scheme
文摘A treelike hybrid multi-cluster tool is composed of both single-arm and dual-arm cluster tools with a treelike topology. Scheduling such a tool is challenging. For a hybrid treelike multi-cluster tool whose bottleneck individual tool is process-bound, this work aims at finding its optimal one-wafer cyclic schedule. It is modeled with Petri nets such that a onewafer cyclic schedule is parameterized as its robots' waiting time.Based on the model, this work proves the existence of its onewafer cyclic schedule that features with the ease of industrial implementation. Then, computationally efficient algorithms are proposed to find the minimal cycle time and optimal onewafer cyclic schedule. Multi-cluster tool examples are given to illustrate the proposed approach. The use of the found schedules enables industrial multi-cluster tools to operate with their highest productivity.