期刊文献+
共找到44,334篇文章
< 1 2 250 >
每页显示 20 50 100
Multi-Branch Cable Harness Layout Design Based on Genetic Algorithm with Probabilistic Roadmap Method 被引量:2
1
作者 Yingfeng Zhao Jianhua Liu +1 位作者 Jiangtao Ma Linlin Wu 《Chinese Journal of Mechanical Engineering》 SCIE EI CAS CSCD 2021年第2期68-78,共11页
Current studies on cable harness layouts have mainly focused on cable harness route planning.However,the topological structure of a cable harness is also extremely complex,and the branch structure of the cable harness... Current studies on cable harness layouts have mainly focused on cable harness route planning.However,the topological structure of a cable harness is also extremely complex,and the branch structure of the cable harness can affect the route of the cable harness layout.The topological structure design of the cable harness is a key to such a layout.In this paper,a novel multi-branch cable harness layout design method is presented,which unites the probabilistic roadmap method(PRM)and the genetic algorithm.First,the engineering constraints of the cable harness layout are presented.An obstacle-based PRM used to construct non-interference and near to the surface roadmap is then described.In addition,a new genetic algorithm is proposed,and the algorithm structure of which is redesigned.In addition,the operation probability formula related to fitness is proposed to promote the efficiency of the branch structure design of the cable harness.A prototype system of a cable harness layout design was developed based on the method described in this study,and the method is applied to two scenarios to verify that a quality cable harness layout can be efficiently obtained using the proposed method.In summary,the cable harness layout design method described in this study can be used to quickly design a reasonable topological structure of a cable harness and to search for the corresponding routes of such a harness. 展开更多
关键词 cable harness layout Probabilistic roadmap method Genetic algorithm Hybrid fuzzy control
下载PDF
Instability mechanism of mining roadway passing through fault at different angles in kilometre-deep mine and control measures of roof cutting and NPR cables 被引量:2
2
作者 SUN Xiaoming WANG Jian +6 位作者 ZHAO Wenchao MING Jiang ZHANG Yong LI Zhihu MIAO Chengyu GUO Zhibiao HE Manchao 《Journal of Mountain Science》 SCIE CSCD 2024年第1期236-251,共16页
The angle α between the fault strike and the axial direction of the roadway produces different damage characteristics. In this paper, the research methodology includes theoretical analyses, numerical simulations and ... The angle α between the fault strike and the axial direction of the roadway produces different damage characteristics. In this paper, the research methodology includes theoretical analyses, numerical simulations and field experiments in the context of the Daqiang coal mine located in Shenyang, China. The stability control countermeasure of "pre-splitting cutting roof + NPR anchor cable"(PSCR-NPR) is simultaneously proposed. According to the different deformation characteristics of the roadway, the faults are innovatively classified into three types, with α of type I being 0°-30°, α of type II being 30°-60°, and α of type III being 60°-90°. The full-cycle stress evolution paths during mining roadway traverses across different types of faults are investigated by numerical simulation. Different pinch angles α lead to high stress concentration areas at different locations in the surrounding rock. The non-uniform stress field formed in the shallow surrounding rock is an important reason for the instability of the roadway. The pre-cracked cut top shifted the high stress region to the deep rock mass and formed a low stress region in the shallow rock mass. The high prestressing NPR anchor cable transforms the non-uniform stress field of the shallow surrounding rock into a uniform stress field. PSCR-NPR is applied in the fault-through roadway of Daqiang mine. The low stress area of the surrounding rock was enlarged by 3-7 times, and the cumulative convergence was reduced by 45%-50%. It provides a reference for the stability control of the deep fault-through mining roadway. 展开更多
关键词 Kilometre-deep mine Fault Mining roadway Failure mechanism Pre-splitting cutting roof High pre-stress NPR anchor cable
下载PDF
A new deformable cable for rock support in high stress tunnel:Steel pipe shrinkable energy-absorbing cable
3
作者 Xuezhen Wu Mingzhu Zhao +5 位作者 Qing Ye Yujing Jiang Tao Deng Hanfang Zheng Gang Wang Zhenchang Guan 《International Journal of Mining Science and Technology》 SCIE EI CAS CSCD 2024年第8期1083-1093,共11页
High stress in surrounding rock will lead to serious problems,e.g.,rock burst in hard rock and large deformation in soft rock.The applied support system under high in-situ stress conditions should be able to carry hig... High stress in surrounding rock will lead to serious problems,e.g.,rock burst in hard rock and large deformation in soft rock.The applied support system under high in-situ stress conditions should be able to carry high load and also accommodate large deformation without experiencing severe damage.In this paper,a specially designed energy-absorbing component for rock bolt and cable that can solve the above problems was proposed.The energy-absorbing component can provide support resistance by plastic deformation of the metal including constraint annulus and compression pipe.For practical engineering,two forms were proposed.One was installed in the surrounding rock by reaming,and the other was installed directly outside the surrounding rock.During the dilation of the surrounding rock,the relative displacement of constraint annulus and compression pipe occurs,resulting in deformation resistance.Deformation resistance is transmitted to the rock bolt or cable,providing support resistance.The lab test and numerical simulation showed that the energy-absorbing component can perfectly achieve the large deformation effect,the deformation amount is as high as 694 mm,and the bearing capacity is stable at 367 kN.The field application tests were carried out in the mining roadway of Xinjulong coal mine,and the results showed that the new type of cable can ensure itself not to break under the condition of large deformation of the surrounding rock.The energy-absorbing component has the superiorities of performing large constant resistance and controllable deformation to effectively control the unpredictable disasters such as large deformation in soft rock and rock burst in hard rock encountered in deep strata. 展开更多
关键词 Energy-absorbing cable Numerical simulation Lab test Load capacity Ultimate displacement
下载PDF
Seismic stability of expansive soil slopes reinforced by anchor cables using a modified horizontal slice method
4
作者 Wang Long Chen Guoxing +3 位作者 Hu Wei Zhou Enquan Feng Jianxue Huang Anping 《Earthquake Engineering and Engineering Vibration》 SCIE EI CSCD 2024年第2期377-387,共11页
Earthquake-induced slope failures are common occurrences in engineering practice and pre-stressed anchor cables are an effective technique in maintaining slope stability,especially in areas that are prone to earthquak... Earthquake-induced slope failures are common occurrences in engineering practice and pre-stressed anchor cables are an effective technique in maintaining slope stability,especially in areas that are prone to earthquakes.Furthermore,the soil at typical engineering sites also exhibit unsaturated features.Explicit considerations of these factors in slope stability estimations are crucial in producing accurate results.In this study,the seismic responses of expansive soil slopes stabilized by anchor cables is studied in the realm of kinematic limit analysis.A modified horizontal slice method is proposed to semi-analytically formulate the energy balance equation.An illustrative slope is studied to demonstrate the influences of suction,seismic excitations and anchor cables on the slope stability.The results indicate that the stabilizing effect of soil suction relates strongly to the seismic excitation and presents a sine shape as the seismic wave propagates.In higher and steeper slopes,the stabilizing effect of suction is more evident.The critical slip surface tends to be much more shallow as the seismic wave approaches the peak and vice versa. 展开更多
关键词 limit analysis expansive soil slope matric suction anchor cable pseudo-dynamic analysis
下载PDF
Mechanism of high-preload support based on the NPR anchor cable in layered soft rock tunnels
5
作者 SUI Qiru HE Manchao +3 位作者 SHI Mengfan TAO Zhigang ZHAO Feifei ZHANG Xiaoyu 《Journal of Mountain Science》 SCIE CSCD 2024年第4期1403-1418,共16页
The control of large deformation problems in layered soft rock tunnels needs to solve urgently.The roof problem is particularly severe among the deformation issues in tunnels.This study first analyzes the asymmetric d... The control of large deformation problems in layered soft rock tunnels needs to solve urgently.The roof problem is particularly severe among the deformation issues in tunnels.This study first analyzes the asymmetric deformation modes in layered soft rock tunnels with large deformations.Subsequently,we construct a mechanical model under ideal conditions for controlling the roof of layered soft rock tunnels through high preload with the support of NPR anchor cables.The prominent roles of long and short NPR anchor cables in the support system are also analyzed.The results indicate the significance of high preload in controlling the roof of layered soft rock tunnels.The short NPR anchor cables effectively improve the integrity of the stratified soft rock layers,while the long NPR anchor cables effectively mobilize the self-bearing capacity of deep-stable rock layers.Finally,the high-preload support method with NPR anchor cables is validated to have a good effect on controlling large deformations in layered soft rock tunnels through field monitoring data. 展开更多
关键词 Tunnel engineering Soft rock High-preload support NPR anchor cables
下载PDF
Global Dynamic Responses and Progressive Failure of Submerged Floating Tunnel Under Cable Breakage Conditions
6
作者 ZHOU Xiang-bo QIAO Dong-sheng +3 位作者 WANG Ming TANG Guo-qiang LU Lin OU Jinping 《China Ocean Engineering》 SCIE EI CSCD 2024年第4期676-688,共13页
The Submerged Floating Tunnel(SFT)relies on a tensioned mooring system for precise positioning.The sudden breakage of a single cable can trigger an immediate alteration in the constraint conditions of the tube,inducin... The Submerged Floating Tunnel(SFT)relies on a tensioned mooring system for precise positioning.The sudden breakage of a single cable can trigger an immediate alteration in the constraint conditions of the tube,inducing a transient heave response within the structure along with a transient increase in cable tension experienced by adjacent cables.In more severe cases,this may even lead to a progressive failure culminating in the global destruction of the SFT.This study used ANSYS/AQWA to establish a numerical model of the entire length SFT for the hydrodynamic response analysis,and conducted a coupled calculation of the dynamic responses of the SFT-mooring line model based on Orca Flex to study the global dynamic responses of the SFT at the moment of cable breakage and the redistribution of cable internal forces.The most unfavorable position for SFT cable breakage was identified,the influence mechanism of cable breakage at different positions on the global dynamic response was revealed,and the progressive chain failure pattern caused by localized cable breakage are also clarified. 展开更多
关键词 submerged floating tunnel cable breakage global dynamic responses progressive failure
下载PDF
Analytical modeling and approaches of multihelix cables incorporating with interwire mutual contacts
7
作者 Zhichao ZHANG Xingzhe WANG 《Applied Mathematics and Mechanics(English Edition)》 SCIE EI CSCD 2024年第9期1633-1654,共22页
This study aims to develop an analytical model based on the curve beam theory to capture the mechanical response of a multihelix cable considering the internal contact displacements.Accordingly,a double-helix cable su... This study aims to develop an analytical model based on the curve beam theory to capture the mechanical response of a multihelix cable considering the internal contact displacements.Accordingly,a double-helix cable subjected to axial tension and torsion is analyzed,and both the line and point contacts between the neighboring wires and strands are considered via an equivalent homogenized approach.Then,the proposed theoretical model is extended to a hierarchical multihelix cable with mutual contact displacements by constructing a recursive relationship between the high-and low-level multihelix structures.The global tensile stiffness and torsional stiffness of the double-helix cable are successfully evaluated.The results are validated by a finite element(FE)model,and are found to be consistent with the findings of previous studies.It is shown that the contact deformations in multihelix cables significantly affect their equivalent mechanical stiffness,and the contact displacements are remarkably enhanced as the helix angles increase.This study provides insights into the interwire/interstrand mutual contact effects on global and local responses. 展开更多
关键词 wordshierarchical multihelix cable mutual contact effect mechanical response effective stiffness
下载PDF
Case study on the mechanics of NPR anchor cable compensation for large deformation tunnel in soft rock in the Transverse Mountain area,China
8
作者 LI Yong ZHENG Jing +3 位作者 HUO Shu-sen WANG Feng-nian HE Man-chao TAO Zhi-gang 《Journal of Central South University》 SCIE EI CAS CSCD 2024年第6期2054-2069,共16页
A study was conducted to analyze the deformation mechanism of strongly weathered quartz schist in the Daliangshan Tunnel,located in the western Transverse Mountain area.A large deformation problem was experienced duri... A study was conducted to analyze the deformation mechanism of strongly weathered quartz schist in the Daliangshan Tunnel,located in the western Transverse Mountain area.A large deformation problem was experienced during the tunnel construction.To mitigate this problem,a support system was designed incorporating negative Poisson ratio(NPR)anchor cables with negative Poisson ratio effect.Physical model experiments,field experiments,and numerical simulation experiments were conducted to investigate the compensation mechanical behavior of NPR anchor cables.The large deformations of soft rocks in the Daliangshan Tunnel are caused by a high ground stress,a high degree of joint fracture development,and a high degree of surrounding rock fragmentation.A compensation mechanics support system combining long and short NPR anchor cables was suggested to provide sufficient counter-support force(approximately 350 kN)for the surrounding rock inside the tunnel.Comparing the NPR anchor cable support system with the original support system used in the Daliangshan tunnel showed that an NPR anchor cable support system,combining cables of 6.3 m and 10.3 m in length,effectively prevented convergence of surrounding rock deformation,and the integrated settlement convergence value remained below 300 mm.This study provides an effective scientific basis for resolving large deformation problems in deeply buried soft rocks in western transverse mountain areas. 展开更多
关键词 soft rock large deformation NPR anchor cable physical model numerical simulation compensation mechanics
下载PDF
Exploring the feasibility of prestressed anchor cables as an alternative to temporary support in the excavation of super-large-span tunnel
9
作者 Shunhua Zhou Yuyin Jin +3 位作者 Zhiyao Tian Chunhua Zou Heming Zhao Zengrun Miao 《Railway Engineering Science》 EI 2024年第3期344-360,共17页
Excavating super-large-span tunnels in soft rock masses presents significant challenges.To ensure safety,the sequential excavation method is commonly adopted.It utilizes internal temporary supports to spatially partit... Excavating super-large-span tunnels in soft rock masses presents significant challenges.To ensure safety,the sequential excavation method is commonly adopted.It utilizes internal temporary supports to spatially partition the tunnel face and divide the excavation into multiple stages.However,these internal supports generally impose spatial constraints,limiting the use of large-scale excavation equipment and reducing construction efficiency.To address this constraint,this study adopts the“Shed-frame”principle to explore the feasibility of an innovative support system,which aims to replace internal supports with prestressed anchor cables and thus provide a more spacious working space with fewer internal obstructions.To evaluate its effectiveness,a field case involving the excavation of a 24-m span tunnel in soft rock is presented,and an analysis of extensive field data is conducted to study the deformation characteristics of the surrounding rock and the mechanical behavior of the support system.The results revealed that prestressed anchor cables integrated the initial support with the shed,creating an effective“shed-frame”system,which successively maintained tunnel deformation and frame stress levels within safe regulatory bounds.Moreover,the prestressed anchor cables bolstered the surrounding rock effectively and reduced the excavation-induced disturbance zone significantly.In summary,the proposed support system balances construction efficiency and safety.These field experiences may offer valuable insights into the popularization and further development of prestressed anchor cable support systems. 展开更多
关键词 Super-large-span tunnel Construction safety Sequential excavation method Shed-frame principle Prestressed anchor cables
下载PDF
Three-dimensional limit variation analysis on the ultimate pullout capacity of the anchor cables based on the Hoek-Brown failure criterion
10
作者 ZUO Shi ZHAO Lianheng HU Shihong 《Journal of Mountain Science》 SCIE CSCD 2024年第3期1036-1047,共12页
Only simplified two-dimensional model and a single failure mode are adopted to calculate the ultimate pullout capacity(UPC)of anchor cables in most previous research.This study focuses on a more comprehensive combinat... Only simplified two-dimensional model and a single failure mode are adopted to calculate the ultimate pullout capacity(UPC)of anchor cables in most previous research.This study focuses on a more comprehensive combination failure mode that consists of bond failure of an anchorage body and failure of an anchored rock mass.The three-dimensional ultimate pullout capacity of the anchor cables is calculated based on the Hoek-Brown failure criterion and variation analysis method.The numerical solution for the curvilinear function in fracture plane is obtained based on the finite difference theory,which more accurately reflects the failure state of the anchor cable,as opposed to that being assumed in advance.The results reveal that relying solely on a single failure mode for UPC calculations has limitations,as changes in parameter values not only directly impact the UPC value but also can alter the failure model and thus the calculation method. 展开更多
关键词 Anchor cable Ultimate pullout capacity(UPC) Failure model Variation analysis Hoek-Brown failure criterion
下载PDF
Research on the monitoring system for induced voltage and ground current of 27.5 kV cable sheath in railways
11
作者 Zehui Zhang Qian Huang +3 位作者 Lewen Li Dan Li Xueping Luo Xiaohong Zeng 《Railway Sciences》 2024年第5期622-635,共14页
Purpose–The purpose of this study is to address the deficiency in safety monitoring technology for 27.5 kV high-voltage cables within the railway traction power supply by analyzing the grounding methods employed in h... Purpose–The purpose of this study is to address the deficiency in safety monitoring technology for 27.5 kV high-voltage cables within the railway traction power supply by analyzing the grounding methods employed in high-speed railways and developing an effective monitoring solution.Design/methodology/approach–Through establishing a mathematical model of induced potential in the cable sheath and analyzing its influencing factors,the principle of grounding current monitoring is proposed.Furthermore,the accuracy of data collection and alarm function of the monitoring equipment were verified through laboratory simulation experiments.Finally,through practical application in the traction substation of the railway bureau on site,a large amount of data were collected to verify the stability and reliability of the monitoring system in actual environments.Findings–The experimental results show that the designed monitoring system can effectively monitor the grounding current of high-voltage cables and respond promptly to changes in cable insulation status.The system performs excellently in terms of data collection accuracy,real-time performance and reliability of alarm functions.In addition,the on-site trial results further confirm the accuracy and reliability of the monitoring system in practical applications,providing strong technical support for the safe operation of highspeed railway traction power supply systems.Originality/value–This study innovatively develops a 27.5kV high-voltage cable grounding current monitoring system,which provides a new technical means for evaluating the insulation status of cables by accurately measuring the grounding current.The design,experimental verification and application of this system in high-speed railway traction power supply systems have demonstrated significant academic value and practical significance,contributing innovative solutions to the field of railway power supply safety monitoring. 展开更多
关键词 Railway 27.5 kV high-voltage cable Online monitoring system Grounding current Induced potential
下载PDF
Analyzing the Form-Finding of a Large-Span Transversely Stiffened Suspended Cable System: A Method Considering Construction Processes
12
作者 Junyu Chen Yanfei Wang +2 位作者 Ke Chen Shiqing Huang Xiaowen Xu 《World Journal of Engineering and Technology》 2024年第2期229-244,共16页
The precise control of the shape of transversely stiffened suspended cable systems is crucial. However, existing form-finding methods primarily rely on iterative calculations that treat loads as fixed known conditions... The precise control of the shape of transversely stiffened suspended cable systems is crucial. However, existing form-finding methods primarily rely on iterative calculations that treat loads as fixed known conditions. These methods are inefficient and fail to accurately control shape results. In this study, we propose a form-finding method that analyzes the load response of models under different sag and stress levels, taking into account the construction process. To analyze the system, a structural finite element model was established in ANSYS, and geometric nonlinear analysis was conducted using the Newton-Raphson method. The form-finding analysis results demonstrate that the proposed method achieves precise control of shape, with a maximum shape error ranging from 0.33% to 0.98%. Furthermore, the relationships between loads and tension forces are influenced by the deformed shape of the structures, exhibiting significant geometric nonlinear characteristics. Meanwhile, the load response analysis reveals that the stress level of the self-equilibrium state in the transversely stiffened suspended cable system is primarily governed by strength criteria, while shape is predominantly controlled by stiffness criteria. Importantly, by simulating the initial tensioning process as an initial condition, this method solves for a counterweight that satisfies the requirements and achieves a self-equilibrium state with the desired shape. The shape of the self-equilibrium state is precisely controlled by simulating the construction process. Overall, this work presents a new method for analyzing the form-finding process of large-span transversely stiffened suspended cable system, considering the construction process which was often overlooked in previous studies. 展开更多
关键词 cable Structure Long-Span Structure Form-Finding Analysis Finite Element Simulation Transverse cable Stiffening System
下载PDF
Analysis of the Design and Application of a Novel CT Secondary Cable Line Calibrator
13
作者 Jiaxing Ren 《Journal of Electronic Research and Application》 2024年第2期7-11,共5页
With the rapid development of electrical power systems,ensuring the accuracy and reliability of power transmis-sion has become particularly crucial.The secondary cable line calibrator for current transformers(CT)plays... With the rapid development of electrical power systems,ensuring the accuracy and reliability of power transmis-sion has become particularly crucial.The secondary cable line calibrator for current transformers(CT)plays an essential role in calibrating electrical power systems.It is not only related to the safe operation of the system but also directly im-pacts the accuracy of energy metering.This study aims to design and analyze an efficient CT secondary cable line calibra-tor to explore its application effects in the power system.By thoroughly analyzing the characteristics of CT secondary ca-ble lines and the design requirements of the calibrator,this paper proposes an innovative design scheme for the calibrator.This device demonstrates significant effects in enhancing the accuracy and stability of power system calibration,providing robust technical support for the optimization and upgrade of the power system.This research not only offers a theoretical basis and practical guidance for the design and application of CT secondary cable line calibrators but also contributes new ideas and methods for the precise calibration and efficient management of the power system. 展开更多
关键词 CT secondary cable line CALIBRATOR Power system DESIGN Application
下载PDF
带来更为丰富、乡细腻且动听的听觉享受 体验Esprit Cables斯捷Celesta行星系列喇叭线、XLR平衡线信号线及电源线
14
作者 小路(图/文) 《视听前线》 2024年第8期49-51,共3页
当你的音响表现不尽如人意时,你是否曾怀疑过线材的问题?有人正是因此走上了DIY线材的道路,并成功创立了品牌,他就是法国Esprit Cables(斯捷)的创始人Richard Cesari(理查德·塞萨里)先生。年轻时,理查德是一位架子鼓鼓手,他对音乐... 当你的音响表现不尽如人意时,你是否曾怀疑过线材的问题?有人正是因此走上了DIY线材的道路,并成功创立了品牌,他就是法国Esprit Cables(斯捷)的创始人Richard Cesari(理查德·塞萨里)先生。年轻时,理查德是一位架子鼓鼓手,他对音乐的热爱到了极致,无法容忍音乐中存在任何微小的瑕疵。尽管他的音响系统和器材都相当不错,但声音的品质却总让他感到不满意。渐渐地,他将目光转向了线材,开始怀疑是不是线材影响了声音的质量。于是,他亲自动手制作线材,寻找声音的完美呈现。 展开更多
关键词 音响系统 电源线 cable 信号线 平衡线
下载PDF
Field implementation of enzyme-induced carbonate precipitation technology for reinforcing a bedding layer beneath an underground cable duct 被引量:6
15
作者 Kai Xu Ming Huang +2 位作者 Jiajie Zhen Chaoshui Xu Mingjuan Cui 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2023年第4期1011-1022,共12页
A suitable bearing capacity of foundation is critical for the safety of civil structures.Sometimes foundation reinforcement is necessary and an effective and environmentally friendly method would be the preferred choi... A suitable bearing capacity of foundation is critical for the safety of civil structures.Sometimes foundation reinforcement is necessary and an effective and environmentally friendly method would be the preferred choice.In this study,the potential application of enzyme-induced carbonate precipitation(EICP)was investigated for reinforcing a 0.6 m bedding layer on top of clay to improve the bearing capacity of the foundation underneath an underground cable duct.Laboratory experiments were conducted to determine the optimal operational parameters for the extraction of crude urease liquid and optimal grain size range of sea sands to be used to construct the bedding layer.Field tests were planned based on orthogonal experimental design to study the factors that would significantly affect the biocementation effect on site.The dynamic deformation modulus,calcium carbonate content and longterm ground stress variations were used to evaluate the bio-cementation effect and the long-term performance of the EICP-treated bedding layer.The laboratory test results showed that the optimal duration for the extraction of crude urease liquid is 1 h and the optimal usage of soybean husk powder in urease extraction solution is 100 g/L.The calcium carbonate production rate decreases significantly when the concentration of cementation solution exceeds 0.5 mol/L.The results of site trial showed that the number of EICP treatments has the most significant impact on the effectiveness of EICP treatment and the highest dynamic deformation modulus(Evd)of EICP-treated bedding layer reached 50.55 MPa.The area with better bio-cementation effect was found to take higher ground stress which validates that the EICP treatment could improve the bearing capacity of foundation by reinforcing the bedding layer.The field trial described and the analysis introduced in this paper can provide a practical basis for applying EICP technology to the reinforcement of bedding layer in poor ground conditions. 展开更多
关键词 Enzyme-induced carbonate precipitation (EICP) Plant-based urease Underground cable duct Foundation reinforcement
下载PDF
Numerical simulation of the mechanical behavior of superconducting tape in conductor on round core cable using the cohesive zone model 被引量:1
16
作者 Shengyi TANG Xubin PENG Huadong YONG 《Applied Mathematics and Mechanics(English Edition)》 SCIE EI CSCD 2023年第9期1511-1532,共22页
Cables composed of rare-earth barium copper oxide(REBCO)tapes have been extensively used in various superconducting devices.In recent years,conductor on round core(CORC)cable has drawn the attention of researchers wit... Cables composed of rare-earth barium copper oxide(REBCO)tapes have been extensively used in various superconducting devices.In recent years,conductor on round core(CORC)cable has drawn the attention of researchers with its outstanding current-carrying capacity and mechanical properties.The REBCO tapes are wound spirally on the surface of CORC cable.Under extreme loadings,the REBCO tapes with layered composite structures are vulnerable,which can lead to degradation of critical current and even quenching of superconducting devices.In this paper,we simulate the deformation of CORC cable under external loads,and analyze the damage inside the tape with the cohesive zone model(CZM).Firstly,the fabrication and cabling of CORC are simulated,and the stresses and strains generated in the tape are extracted as the initial condition of the next step.Then,the tension and bending loads are applied to CORC cable,and the damage distribution inside the tape is presented.In addition,the effects of some parameters on the damage are discussed during the bending simulations. 展开更多
关键词 high temperature superconducting(HTS)tape superconducting cable finite element simulation cohesive zone model(CZM) damage
下载PDF
New algorithm of shape-finding of suspension bridge with spatial cables
17
作者 Xiao-Kang Deng Zhuo Deng Xin Ren 《Theoretical & Applied Mechanics Letters》 CAS CSCD 2023年第1期33-40,共8页
A new algorithm is proposed to solve the problems of shape-finding of suspension bridge with spatial cables what include tedious iteration,slow convergence speed and even no convergent under some circumstances.In this... A new algorithm is proposed to solve the problems of shape-finding of suspension bridge with spatial cables what include tedious iteration,slow convergence speed and even no convergent under some circumstances.In this paper,the stress analysis of the main cable is carried out,and the relationship between the slope change and the coordinate change is found.This paper also discussed how to find the minimum slope point of symmetrical or asymmetric main cable,and the deformation compatibility equation is established and solved to obtain the shape of main cable.The algorithm in this paper can ensure the convergence of the solution for the suspension bridge with spatial cables.The calculation accuracy is high through the demonstration of the calculation examples. 展开更多
关键词 Spatial cables Suspenders Shape-finding Slope of cable Coupling Unequal height main tower
下载PDF
Numerical simulation of rockburst disaster and control strategy of constant resistance and large deformation anchor cable in Gaoloushan tunnel
18
作者 MIAO Cheng-yu JIANG Ming +6 位作者 LI Zhi-hu SUN Xiao-ming ZHANG Tong ZHANG Yong YANG Jin-kun REN Chao SONG Peng 《Journal of Mountain Science》 SCIE CSCD 2023年第6期1605-1619,共15页
The Gaoloushan Tunnel in Longnan City,Gansu Province,China,frequently experiences rockburst disasters due to high in-situ stress.Managing rockburst in deep-buried tunnels remains a challenging issue.This paper employs... The Gaoloushan Tunnel in Longnan City,Gansu Province,China,frequently experiences rockburst disasters due to high in-situ stress.Managing rockburst in deep-buried tunnels remains a challenging issue.This paper employs RFPA(Rock Failure Process Analysis)software to establish a calculation model of constant resistance and large deformation(CRLD)anchorages and analyzes the effects of different support methods and pre-stress levels on rockburst.We simulate the process of tunnel rockburst disasters and find that ordinary anchor support incurs rockburst on the right arch waist and arch top,forming a V-shaped explosion pit.CRLD anchor support has several advantages in rockburst control,such as more uniform stress distribution in the surrounding rock,a uniform distribution of plastic zones,less noticeable damage to the tunnel,and effective control of the arch top displacement.The effectiveness of the CRLD anchor support under varying pre-stress conditions shows that a higher prestress results in a smaller plastic zone of the surrounding rock and arch top displacement and a lower number of acoustic emission signals,which better explains the excavation compensation effect.Moreover,adding long anchorages in the deep surrounding rock area can better control rockburst and reduce surrounding rock deformation.Based on these findings,we propose a comprehensive control system that combines long and short anchorages and provides the optimal scheme based on calculations.Therefore,by using high-prestress CRLD anchor support and the combination of long and short anchorages at critical positions,we can enhance the integrity of the surrounding rock,effectively absorb the energy released by the surrounding rock deformation,and reduce the incidence of rockburst disasters. 展开更多
关键词 TUNNEL ROCKBURST RFPA Constant Resistance and Large Deformation anchor cable Long and short cable coupling support.
下载PDF
时间分数阶Cable方程修正格式的误差分析
19
作者 吴晓蕾 杨艳 闫玉斌 《兰州理工大学学报》 CAS 北大核心 2023年第1期158-163,共6页
考虑时间分数阶Cable方程在修正的二阶向后差分格式下的误差分析.利用连续Laplace变换、反Laplace变换方法得到方程的准确解,类似得到空间有限元半离散解;运用Lubich的修正方法引入此分数阶微分方程的修正格式,离散的Laplace变换、反Lap... 考虑时间分数阶Cable方程在修正的二阶向后差分格式下的误差分析.利用连续Laplace变换、反Laplace变换方法得到方程的准确解,类似得到空间有限元半离散解;运用Lubich的修正方法引入此分数阶微分方程的修正格式,离散的Laplace变换、反Laplace变换法得到Cable方程的时间离散解,进而讨论了时间离散下L2范数的误差估计,得到二阶收敛阶,并用数值算例验证了定理的结论.这个结论比不修正的情形下一阶收敛阶要高. 展开更多
关键词 分数阶cable方程 Riemann-Liouville分数阶导 LAPLACE变换 非光滑数据误差估计
下载PDF
Nondestructive Testing of Bridge Stay Cable Surface Defects Based on Computer Vision
20
作者 Fengyu Xu Masoud Kalantari +1 位作者 Bangjian Li Xingsong Wang 《Computers, Materials & Continua》 SCIE EI 2023年第4期2209-2226,共18页
The automatically defect detection method using vision inspectionis a promising direction. In this paper, an efficient defect detection method fordetecting surface damage to cables on a cable-stayed bridge automatical... The automatically defect detection method using vision inspectionis a promising direction. In this paper, an efficient defect detection method fordetecting surface damage to cables on a cable-stayed bridge automatically isdeveloped. A mechanism design method for the protective layer of cables of abridge based on vision inspection and diameter measurement is proposed bycombining computer vision and diameter measurement techniques. A detectionsystem for the surface damages of cables is de-signed. Images of cablesurfaces are then enhanced and subjected to threshold segmentation by utilizingthe improved local grey contrast enhancement method and the improvedmaximum correlation method. Afterwards, the data obtained through diametermeasurement are mined by employing the moving average method. Imageenhancement, threshold segmentation, and diameter measurement methodsare separately validated experimentally. The experimental test results showthat the system delivers recall ratios for type-I and II surface defects of cablesreaching 80.4% and 85.2% respectively, which accurately detects bulges oncable surfaces. 展开更多
关键词 Defect detection computer vision bridge cable image enhancement
下载PDF
上一页 1 2 250 下一页 到第
使用帮助 返回顶部