Presents the detailed algorithm established for determination of workspace for a 3-DOF coordinate measuring machine using parallel link mechanism by constructing the inverse kinematic model first and then reviewing th...Presents the detailed algorithm established for determination of workspace for a 3-DOF coordinate measuring machine using parallel link mechanism by constructing the inverse kinematic model first and then reviewing the physical and kinematical constraints from the structural characteristics of the parallel link mechanism, and discusses the actual geometries of workspace and the factors having effect on workspace through computer simulation thereby providing necessary theoretical basis for the research and development of coordinate measuring machines using parallel link mechanism.展开更多
A joint industry project on a full scale measurement of Fenjin FPSO,headed by Shanghai Jiao Tong University and sponsored by CNOOC,was initiated in October 2007 and has been going on for more than 25 months.The purpos...A joint industry project on a full scale measurement of Fenjin FPSO,headed by Shanghai Jiao Tong University and sponsored by CNOOC,was initiated in October 2007 and has been going on for more than 25 months.The purpose of the project is to measure and collect the motions in six-degrees of freedom of an FPSO,and to collect the environmental loads at the offshore oil-field.A motion data measuring system is designed and installed on the FPSO.Another environmental data measuring system is installed on a fixed jacket platform nearby.A large quantity of valuable first-hand data is obtained.With the data collected,motion characteristics of the FPSO in a long-term period are concluded.A short-term analysis for the FPSO in one of the typhoons is also completed.The mean periods of wave-frequency motions are calculated by the spectrum analysis.The tension loads of the mooring system,which is of great concern,are calculated by the decoupled technique.展开更多
按照ISO标准"Guide to the Expression of Uncertainty in Measurement"和国家计量技术规范JJF1059-1999"测量不确定度评定与表示"的规定,推导了热电偶测温系统不确定度评定的一般方法.以一个典型热电偶测温系统为...按照ISO标准"Guide to the Expression of Uncertainty in Measurement"和国家计量技术规范JJF1059-1999"测量不确定度评定与表示"的规定,推导了热电偶测温系统不确定度评定的一般方法.以一个典型热电偶测温系统为实例,给出不确定度计算的具体步骤,分析了各主要不确定度分量的影响,并提出了减少不确定度的相关措施,为优化热电偶测温系统的测量提供了指导.展开更多
文摘Presents the detailed algorithm established for determination of workspace for a 3-DOF coordinate measuring machine using parallel link mechanism by constructing the inverse kinematic model first and then reviewing the physical and kinematical constraints from the structural characteristics of the parallel link mechanism, and discusses the actual geometries of workspace and the factors having effect on workspace through computer simulation thereby providing necessary theoretical basis for the research and development of coordinate measuring machines using parallel link mechanism.
基金supported by the National Scientific and Technology Major Project (Grant No.2008ZX05026-006)
文摘A joint industry project on a full scale measurement of Fenjin FPSO,headed by Shanghai Jiao Tong University and sponsored by CNOOC,was initiated in October 2007 and has been going on for more than 25 months.The purpose of the project is to measure and collect the motions in six-degrees of freedom of an FPSO,and to collect the environmental loads at the offshore oil-field.A motion data measuring system is designed and installed on the FPSO.Another environmental data measuring system is installed on a fixed jacket platform nearby.A large quantity of valuable first-hand data is obtained.With the data collected,motion characteristics of the FPSO in a long-term period are concluded.A short-term analysis for the FPSO in one of the typhoons is also completed.The mean periods of wave-frequency motions are calculated by the spectrum analysis.The tension loads of the mooring system,which is of great concern,are calculated by the decoupled technique.
文摘按照ISO标准"Guide to the Expression of Uncertainty in Measurement"和国家计量技术规范JJF1059-1999"测量不确定度评定与表示"的规定,推导了热电偶测温系统不确定度评定的一般方法.以一个典型热电偶测温系统为实例,给出不确定度计算的具体步骤,分析了各主要不确定度分量的影响,并提出了减少不确定度的相关措施,为优化热电偶测温系统的测量提供了指导.