The scheduling of construction equipment is a means to realize network planning.With the large-scale and low-cost requirements of engineering construction,the cooperation among members of the engineering supply chain ...The scheduling of construction equipment is a means to realize network planning.With the large-scale and low-cost requirements of engineering construction,the cooperation among members of the engineering supply chain has become very important,and effective coordination of project plans at all levels to optimize the resource management and scheduling of a project is helpful to reduce project duration and cost.In this paper,under the milestone constraint conditions,the scheduling problems of multiple construction devices in the same sequence of operation were described and hypothesized mathematically,and the scheduling models of multiple equipment were established.The Palmer algorithm,CDS algorithm and Gupta algorithm were respectively used to solve the optimal scheduling of construction equipment to achieve the optimization of the construction period.The optimization scheduling of a single construction device and multiple construction devices was solved by using sequencing theory under milestone constraint,and these methods can obtain reasonable results,which has important guiding significance for the scheduling of construction equipment.展开更多
A neighborhood search algorithm was proposed to simultaneously schedule the waste removal quantity and the equipment fleet profile over the mine life for open pit mines.An initial search domain was first defined and a...A neighborhood search algorithm was proposed to simultaneously schedule the waste removal quantity and the equipment fleet profile over the mine life for open pit mines.An initial search domain was first defined and a good schedule was obtained as the current best schedule by searching in this domain.Then,progressively narrower neighborhood search domains were constructed around the current best schedule to search for better schedules.The objective is to minimize the present value of waste removal costs over the mine life.The resulting schedule from this algorithm provides a complete fleet profile for each year over the mine life:the selected equipment models,the number of equipment units of each model,the age of each unit,as well as the quantity of waste removed.A numerical example of application was provided to demonstrate the feasibility and merits of the algorithm.展开更多
Cloud computing plays a significant role in Information Technology(IT)industry to deliver scalable resources as a service.One of the most important factor to increase the performance of the cloud server is maximizing t...Cloud computing plays a significant role in Information Technology(IT)industry to deliver scalable resources as a service.One of the most important factor to increase the performance of the cloud server is maximizing the resource utilization in task scheduling.The main advantage of this scheduling is to max-imize the performance and minimize the time loss.Various researchers examined numerous scheduling methods to achieve Quality of Service(QoS)and to reduce execution time.However,it had disadvantages in terms of low throughput and high response time.Hence,this study aimed to schedule the task efficiently and to eliminate the faults in scheduling the tasks to the Virtual Machines(VMs).For this purpose,the research proposed novel Particle Swarm Optimization-Bandwidth Aware divisible Task(PSO-BATS)scheduling with Multi-Layered Regression Host Employment(MLRHE)to sort out the issues of task scheduling and ease the scheduling operation by load balancing.The proposed efficient sche-duling provides benefits to both cloud users and servers.The performance evalua-tion is undertaken with respect to cost,Performance Improvement Rate(PIR)and makespan which revealed the efficiency of the proposed method.Additionally,comparative analysis is undertaken which confirmed the performance of the intro-duced system than conventional system for scheduling tasks with highflexibility.展开更多
Open pit mining operations utilize large scale and expensive equipment. For the mines implementing shovel and truck operation system, trucks constitute a large portion of these equipment and are used for hauling the m...Open pit mining operations utilize large scale and expensive equipment. For the mines implementing shovel and truck operation system, trucks constitute a large portion of these equipment and are used for hauling the mined materials. In order to have sustainable and viable operation, these equipment need to be utilized efficiently with minimum operating cost. Maintenance cost is a significant proportion of the overall operating costs. The maintenance cost of a truck changes non-linearly depending on the type, age and truck types. A new approach based on stochastic integer programming (SIP) techniques is used for annually scheduling a fixed fleet of mining trucks in a given operation, over the life of mine (multi-year time horizon) to minimize maintenance cost. The maintenance cost data in mining usually has uncertainty caused from the variability of the operational conditions at mines. To estimate the cost, usually historic data from different operations for new mines, and/or the historic data at the operating mines are used. However, maintenance cost varies depending on road conditions, age of equipment and many other local conditions at an operation. Traditional models aim to estimate the maintenance cost as a deterministic single value and financial evaluations are based on the estimated value. However, it does not provide a confidence on the estimate. The proposed model in this study assumes the truck maintenance cost is a stochastic parameter due to the significant level of uncertainty in the data and schedules the available fleet to meet the annual production targets. The scheduling has been performed by applying both the proposed stochastic and deterministic approaches. The approach provides a distribution for the maintenance cost of the optimized equipment schedule minimizing the cost.展开更多
文摘The scheduling of construction equipment is a means to realize network planning.With the large-scale and low-cost requirements of engineering construction,the cooperation among members of the engineering supply chain has become very important,and effective coordination of project plans at all levels to optimize the resource management and scheduling of a project is helpful to reduce project duration and cost.In this paper,under the milestone constraint conditions,the scheduling problems of multiple construction devices in the same sequence of operation were described and hypothesized mathematically,and the scheduling models of multiple equipment were established.The Palmer algorithm,CDS algorithm and Gupta algorithm were respectively used to solve the optimal scheduling of construction equipment to achieve the optimization of the construction period.The optimization scheduling of a single construction device and multiple construction devices was solved by using sequencing theory under milestone constraint,and these methods can obtain reasonable results,which has important guiding significance for the scheduling of construction equipment.
基金Projects(51474049,51674062)supported by the National Natural Science Foundation of ChinaProject(51604061)supported by the National Science Foundation for Young Scientists of China+3 种基金Projects(201202075,2014020040)supported by the Liaoning Natural Science Founds,ChinaProject(LZ2014020)supported by the Liaoning Province’s Key Laboratory Construction,ChinaProject(20130042110012)supported by the Specialized Research Fund for the Doctoral Program of Higher Education of ChinaProject(F14-231-1-07)supported by the Shenyang Technical Plan Project,China
文摘A neighborhood search algorithm was proposed to simultaneously schedule the waste removal quantity and the equipment fleet profile over the mine life for open pit mines.An initial search domain was first defined and a good schedule was obtained as the current best schedule by searching in this domain.Then,progressively narrower neighborhood search domains were constructed around the current best schedule to search for better schedules.The objective is to minimize the present value of waste removal costs over the mine life.The resulting schedule from this algorithm provides a complete fleet profile for each year over the mine life:the selected equipment models,the number of equipment units of each model,the age of each unit,as well as the quantity of waste removed.A numerical example of application was provided to demonstrate the feasibility and merits of the algorithm.
文摘Cloud computing plays a significant role in Information Technology(IT)industry to deliver scalable resources as a service.One of the most important factor to increase the performance of the cloud server is maximizing the resource utilization in task scheduling.The main advantage of this scheduling is to max-imize the performance and minimize the time loss.Various researchers examined numerous scheduling methods to achieve Quality of Service(QoS)and to reduce execution time.However,it had disadvantages in terms of low throughput and high response time.Hence,this study aimed to schedule the task efficiently and to eliminate the faults in scheduling the tasks to the Virtual Machines(VMs).For this purpose,the research proposed novel Particle Swarm Optimization-Bandwidth Aware divisible Task(PSO-BATS)scheduling with Multi-Layered Regression Host Employment(MLRHE)to sort out the issues of task scheduling and ease the scheduling operation by load balancing.The proposed efficient sche-duling provides benefits to both cloud users and servers.The performance evalua-tion is undertaken with respect to cost,Performance Improvement Rate(PIR)and makespan which revealed the efficiency of the proposed method.Additionally,comparative analysis is undertaken which confirmed the performance of the intro-duced system than conventional system for scheduling tasks with highflexibility.
文摘Open pit mining operations utilize large scale and expensive equipment. For the mines implementing shovel and truck operation system, trucks constitute a large portion of these equipment and are used for hauling the mined materials. In order to have sustainable and viable operation, these equipment need to be utilized efficiently with minimum operating cost. Maintenance cost is a significant proportion of the overall operating costs. The maintenance cost of a truck changes non-linearly depending on the type, age and truck types. A new approach based on stochastic integer programming (SIP) techniques is used for annually scheduling a fixed fleet of mining trucks in a given operation, over the life of mine (multi-year time horizon) to minimize maintenance cost. The maintenance cost data in mining usually has uncertainty caused from the variability of the operational conditions at mines. To estimate the cost, usually historic data from different operations for new mines, and/or the historic data at the operating mines are used. However, maintenance cost varies depending on road conditions, age of equipment and many other local conditions at an operation. Traditional models aim to estimate the maintenance cost as a deterministic single value and financial evaluations are based on the estimated value. However, it does not provide a confidence on the estimate. The proposed model in this study assumes the truck maintenance cost is a stochastic parameter due to the significant level of uncertainty in the data and schedules the available fleet to meet the annual production targets. The scheduling has been performed by applying both the proposed stochastic and deterministic approaches. The approach provides a distribution for the maintenance cost of the optimized equipment schedule minimizing the cost.