It is important to determine the insulation thickness in the design of the buried hot oil pipelines.The economic thickness of the insulation layer not only meets the needs of the project but also maximizes the investm...It is important to determine the insulation thickness in the design of the buried hot oil pipelines.The economic thickness of the insulation layer not only meets the needs of the project but also maximizes the investment and environmental benefits.However,as a significant evaluation,the environmental factors haven’t been considered in the previous study.Considering this factor,the mathematical model of economic insulation thickness of the buried hot oil pipelines is built in this paper,which is solved by the golden section method while considering the costs of investment,operation,environment,the time value of money.The environmental cost is determined according to the pollutant discharge calculated through relating heat loss of the pipelines to the air emission while building the model.The results primarily showed that the most saving fuel is natural gas,followed by LPG,fuel oil,and coal.The fuel consumption for identical insulation thickness is in the order:coal,fuel oil,LPG,and natural gas.When taking the environmental costs into account,the thicker the economic insulation layer is,the higher cost it will be.Meanwhile,the more pollutant discharge,the thicker the economic insulation layer will be.展开更多
It has been proved that the thermally insulated ocean pipeline has advantages over the conventional pipe-in-pipe pipeline. The risk of using the thermally insulated pipeline is that the exterior layers covering the st...It has been proved that the thermally insulated ocean pipeline has advantages over the conventional pipe-in-pipe pipeline. The risk of using the thermally insulated pipeline is that the exterior layers covering the steel pipe may be. pulled off if the shear stress on the interface induced by the pullout fore from the tensioner is greater than the binding fore between two neighboring layers during installation. This paper develops a procedure to calculate the shear stress on the interface. The binding force between two neighboring layers can be determined with full scale model tests. The safety of the thermally insulated pipe under installation can then be checked by comparison of the interface shear stress with the binding force.展开更多
Transportation of petroleum products through pipeline presents considerable risks including wax formation and deposition as a result of heat loss of fluids, which is harmful to the flow due to the reduced inner diamet...Transportation of petroleum products through pipeline presents considerable risks including wax formation and deposition as a result of heat loss of fluids, which is harmful to the flow due to the reduced inner diameter or totally blocked pipelines in extreme cases. The production interruption due to blocked pipelines can cause colossal financial loss. Therefore, in order to diminish those adverse effects, it is critical that pipeline design for flow assurance should be considered. Flow assurance is a relatively new field in oil and gas industry, it means that the flow of hydrocarbon stream from one point to another must be ensured successfully and economically. Although flow assurance is extremely diverse, encompassing many discrete and specialized subjects and bridging across the full gamut of engineering disciplines, our work concentrated principally on the study of wax deposit in the pipelines. The main purpose of this paper is to focus on the aspect of material in pipeline design and the selection of thermal insulation coatings. Furthermore, operating parameters such as pressure, temperature and flowrate will be examined to achieve optimum results. For the case study in this paper, the pipeline connecting Ca NguVang Oilfield’s Wellhead Platform (WHP) to the Central Processing Platform of Bach Ho Oilfield (CPP-3) in Vietnam will be studied. Hence, this work covers several aspects, namely the theoretical study, the modeling using Excel as well as using specialized software OLGA, and finally the application for a real case in the petroleum industry in Vietnam.展开更多
基金funded by the National Natural Science Foundation of China(NO.51704236)the Graduate Innovation and Practice Ability Development Program of Xi’an Shiyou University(NO.YCS19113037).
文摘It is important to determine the insulation thickness in the design of the buried hot oil pipelines.The economic thickness of the insulation layer not only meets the needs of the project but also maximizes the investment and environmental benefits.However,as a significant evaluation,the environmental factors haven’t been considered in the previous study.Considering this factor,the mathematical model of economic insulation thickness of the buried hot oil pipelines is built in this paper,which is solved by the golden section method while considering the costs of investment,operation,environment,the time value of money.The environmental cost is determined according to the pollutant discharge calculated through relating heat loss of the pipelines to the air emission while building the model.The results primarily showed that the most saving fuel is natural gas,followed by LPG,fuel oil,and coal.The fuel consumption for identical insulation thickness is in the order:coal,fuel oil,LPG,and natural gas.When taking the environmental costs into account,the thicker the economic insulation layer is,the higher cost it will be.Meanwhile,the more pollutant discharge,the thicker the economic insulation layer will be.
文摘It has been proved that the thermally insulated ocean pipeline has advantages over the conventional pipe-in-pipe pipeline. The risk of using the thermally insulated pipeline is that the exterior layers covering the steel pipe may be. pulled off if the shear stress on the interface induced by the pullout fore from the tensioner is greater than the binding fore between two neighboring layers during installation. This paper develops a procedure to calculate the shear stress on the interface. The binding force between two neighboring layers can be determined with full scale model tests. The safety of the thermally insulated pipe under installation can then be checked by comparison of the interface shear stress with the binding force.
文摘Transportation of petroleum products through pipeline presents considerable risks including wax formation and deposition as a result of heat loss of fluids, which is harmful to the flow due to the reduced inner diameter or totally blocked pipelines in extreme cases. The production interruption due to blocked pipelines can cause colossal financial loss. Therefore, in order to diminish those adverse effects, it is critical that pipeline design for flow assurance should be considered. Flow assurance is a relatively new field in oil and gas industry, it means that the flow of hydrocarbon stream from one point to another must be ensured successfully and economically. Although flow assurance is extremely diverse, encompassing many discrete and specialized subjects and bridging across the full gamut of engineering disciplines, our work concentrated principally on the study of wax deposit in the pipelines. The main purpose of this paper is to focus on the aspect of material in pipeline design and the selection of thermal insulation coatings. Furthermore, operating parameters such as pressure, temperature and flowrate will be examined to achieve optimum results. For the case study in this paper, the pipeline connecting Ca NguVang Oilfield’s Wellhead Platform (WHP) to the Central Processing Platform of Bach Ho Oilfield (CPP-3) in Vietnam will be studied. Hence, this work covers several aspects, namely the theoretical study, the modeling using Excel as well as using specialized software OLGA, and finally the application for a real case in the petroleum industry in Vietnam.