Recently, the critical chain study has become a hot issue in the project management research field. The construction of the critical chain with multi-resource constraints is a new research subject. According to the sy...Recently, the critical chain study has become a hot issue in the project management research field. The construction of the critical chain with multi-resource constraints is a new research subject. According to the system analysis theory and project portfolio theory, this paper discusses the creation of project portfolios based on the similarity principle and gives the definition of priority in multi-resource allocation based on quantitative analysis. A model with multi-resource constraints, which can be applied to the critical chain construction of the A-bid section in the South-to-North Water Diversion Project, was proposed. Contrast analysis with the comprehensive treatment construction method and aggressive treatment construction method was carried out. This paper also makes suggestions for further research directions and subjects, which will be useful in improving the theories in relevant research fields.展开更多
The six-generation(6G)wireless network is expected to satisfy the requirements of ubiquitous connectivity and intelligent endogenous.Terrestrialsatellite networks(TSN)enable seamless coverage for terrestrial users in ...The six-generation(6G)wireless network is expected to satisfy the requirements of ubiquitous connectivity and intelligent endogenous.Terrestrialsatellite networks(TSN)enable seamless coverage for terrestrial users in a wide area,making it very promising in 6G.As data traffic in TSNs surges,the integrated management for caching,computing,and communication(3C)has attracted much research attention.In this paper,we investigate the multi-resource management in the uplink and downlink transmission of TSN,respectively.In particularly,we aim to guarantee both throughput fairness and data security in the uplink transmission of TSN.Considering the intermittent communication of the satellite,we introduce two kinds of relays,i.e.,terrestrial relays(TRs)and aerial relays(ARs)to improve the system throughput performance in the downlink transmission of TSN.Finally,we study a specific case of TSN with the uplink and downlink transmission,and the corresponding simulation results validate the effectiveness of our proposed schemes.展开更多
This paper addresses multi-resource fair allocation: a fundamental research topic in cloud computing. To improve resource utilization under well-studied fairness constraints, we propose a new allocation mechanism call...This paper addresses multi-resource fair allocation: a fundamental research topic in cloud computing. To improve resource utilization under well-studied fairness constraints, we propose a new allocation mechanism called Dominant Resource with Bottlenecked Fairness(DRBF), which generalizes Bottleneck-aware Allocation(BAA) to the settings of Dominant Resource Fairness(DRF). We classify users into different queues by their dominant resources. The goals are to ensure that users in the same queue receive allocations in proportion to their fair shares while users in different queues receive allocations that maximize resource utilization subject to well-studied fairness properties such as those in DRF. Under DRBF, no user 1) is worse off sharing resources than dividing resources equally among all users; 2) prefers the allocation of another user; 3) can improve their own allocation without reducing other users' allocations; and(4) can benefit by misreporting their resource demands. Experiments demonstrate that the proposed allocation policy performs better in terms of high resource utilization than does DRF.展开更多
In the framework of vigorous promotion of low-carbon power system growth as well as economic globalization,multi-resource penetration in active distribution networks has been advancing fiercely.In particular,distribut...In the framework of vigorous promotion of low-carbon power system growth as well as economic globalization,multi-resource penetration in active distribution networks has been advancing fiercely.In particular,distributed generation(DG)based on renewable energy is critical for active distribution network operation enhancement.To comprehensively analyze the accessing impact of DG in distribution networks from various parts,this paper establishes an optimal DG location and sizing planning model based on active power losses,voltage profile,pollution emissions,and the economics of DG costs as well as meteorological conditions.Subsequently,multiobjective particle swarm optimization(MOPSO)is applied to obtain the optimal Pareto front.Besides,for the sake of avoiding the influence of the subjective setting of the weight coefficient,the decisionmethod based on amodified ideal point is applied to execute a Pareto front decision.Finally,simulation tests based on IEEE33 and IEEE69 nodes are designed.The experimental results show thatMOPSO can achieve wider and more uniformPareto front distribution.In the IEEE33 node test system,power loss,and voltage deviation decreased by 52.23%,and 38.89%,respectively,while taking the economy into account.In the IEEE69 test system,the three indexes decreased by 19.67%,and 58.96%,respectively.展开更多
This paper investigates a new resource-allocation problem involving multi-resource operations,where completing an operation requires simultaneous use of multiple(renewable)resources,probably of different types.The goa...This paper investigates a new resource-allocation problem involving multi-resource operations,where completing an operation requires simultaneous use of multiple(renewable)resources,probably of different types.The goal of the study is to provide a solution method that minimizes the makespan.The authors formulate the problem into a novel mixed-integer linear program(MILP)model.To efficiently solve practical-sized instances,an exact Benders decomposition algorithm is developed.This algorithm divides the original problem into a master problem of allocating resources and a subproblem of calculating the makespan,and both are linked via Benders cuts.The convergence is sped up by improving the mathematical model and embedding the variable neighborhood search algorithm.Compared with CPLEX,a commonly used MILP solver,the computational results demonstrate that the proposed algorithm provides tighter upper and lower bounds in most instances.In particular,compared with CPLEX,the proposed method can on average improve the upper and lower bounds by 4.76%and 4.39%,respectively,in solving practical-sized instances.展开更多
Confronted with the requirement of higher efficiency and higher quality of distribution network fault rush-repair, the subject addressed in this paper is the optimal resource dispatching issue of the distribution netw...Confronted with the requirement of higher efficiency and higher quality of distribution network fault rush-repair, the subject addressed in this paper is the optimal resource dispatching issue of the distribution network rush-repair when single resource center cannot meet the emergent resource demands. A multi-resource and multi-center dispatching model is established with the objective of “the shortest repair start-time” and “the least number of the repair centers”. The optimal and worst solutions of each objective are both obtained, and a “proximity degree method” is used to calculate the optimal resource dispatching plan. The feasibility of the proposed algorithm is illustrated by an example of a distribution network fault. The proposed method provides a practical technique for efficiency improvement of fault rush-repair work of distribution network, and thus mostly abbreviates power recovery time and improves the management level of the distribution network.展开更多
Every summer, there is a surge of climbers seeking to make use of the precious window of good weather to summit Mount Qomolangma, the highest mountain in the world. With the number of climbers rising every year, overc...Every summer, there is a surge of climbers seeking to make use of the precious window of good weather to summit Mount Qomolangma, the highest mountain in the world. With the number of climbers rising every year, overcrowding on the top of the world has given rise to the incredible phenomen on of 'traffic jams"―ong queues of climbers from different countries and regions awaiting their turn to reach the top and then descend. The long wait in below freezing temperatures in the rarified atmosphere is tuming increasingly perilous with some climbers meeting their death due to altitude sickness, excessive oxygen depletion and exhaustion.展开更多
基金supported by the National Science and Technology Plan (Major Project of the Eleventh Five-Year Plan,Grant No. 2006BAB04A13)the Philosophy and Social Science Fund of the Education Department of Jiangsu Province (Grant No.07SJD630006)+2 种基金the Third Key Discipline (Techno-Economics and Management) of the 211 Projectthe Key Discipline of Jiangsu Province (Engineering and Project Management)the Office of the South-to-North Water Diversion Project Construction Committee under the State Council
文摘Recently, the critical chain study has become a hot issue in the project management research field. The construction of the critical chain with multi-resource constraints is a new research subject. According to the system analysis theory and project portfolio theory, this paper discusses the creation of project portfolios based on the similarity principle and gives the definition of priority in multi-resource allocation based on quantitative analysis. A model with multi-resource constraints, which can be applied to the critical chain construction of the A-bid section in the South-to-North Water Diversion Project, was proposed. Contrast analysis with the comprehensive treatment construction method and aggressive treatment construction method was carried out. This paper also makes suggestions for further research directions and subjects, which will be useful in improving the theories in relevant research fields.
基金the National Natural Science Foundation of China under Grant 61701054the Fundamental Research Funds for the Central University under Grants 2020CDJQY-A001 and 2021CDJQY-013。
文摘The six-generation(6G)wireless network is expected to satisfy the requirements of ubiquitous connectivity and intelligent endogenous.Terrestrialsatellite networks(TSN)enable seamless coverage for terrestrial users in a wide area,making it very promising in 6G.As data traffic in TSNs surges,the integrated management for caching,computing,and communication(3C)has attracted much research attention.In this paper,we investigate the multi-resource management in the uplink and downlink transmission of TSN,respectively.In particularly,we aim to guarantee both throughput fairness and data security in the uplink transmission of TSN.Considering the intermittent communication of the satellite,we introduce two kinds of relays,i.e.,terrestrial relays(TRs)and aerial relays(ARs)to improve the system throughput performance in the downlink transmission of TSN.Finally,we study a specific case of TSN with the uplink and downlink transmission,and the corresponding simulation results validate the effectiveness of our proposed schemes.
基金financial support of the Oversea Study Program of the Guangzhou Elite Project(GEP)supported by the National Natural Science Foundation of China under Grant 61471173Guangdong Science Technology Project(no:2017A010101027)
文摘This paper addresses multi-resource fair allocation: a fundamental research topic in cloud computing. To improve resource utilization under well-studied fairness constraints, we propose a new allocation mechanism called Dominant Resource with Bottlenecked Fairness(DRBF), which generalizes Bottleneck-aware Allocation(BAA) to the settings of Dominant Resource Fairness(DRF). We classify users into different queues by their dominant resources. The goals are to ensure that users in the same queue receive allocations in proportion to their fair shares while users in different queues receive allocations that maximize resource utilization subject to well-studied fairness properties such as those in DRF. Under DRBF, no user 1) is worse off sharing resources than dividing resources equally among all users; 2) prefers the allocation of another user; 3) can improve their own allocation without reducing other users' allocations; and(4) can benefit by misreporting their resource demands. Experiments demonstrate that the proposed allocation policy performs better in terms of high resource utilization than does DRF.
基金The authors gratefully acknowledge the support of the Enhancement Strategy of Multi-Type Energy Integration of Active Distribution Network(YNKJXM20220113).
文摘In the framework of vigorous promotion of low-carbon power system growth as well as economic globalization,multi-resource penetration in active distribution networks has been advancing fiercely.In particular,distributed generation(DG)based on renewable energy is critical for active distribution network operation enhancement.To comprehensively analyze the accessing impact of DG in distribution networks from various parts,this paper establishes an optimal DG location and sizing planning model based on active power losses,voltage profile,pollution emissions,and the economics of DG costs as well as meteorological conditions.Subsequently,multiobjective particle swarm optimization(MOPSO)is applied to obtain the optimal Pareto front.Besides,for the sake of avoiding the influence of the subjective setting of the weight coefficient,the decisionmethod based on amodified ideal point is applied to execute a Pareto front decision.Finally,simulation tests based on IEEE33 and IEEE69 nodes are designed.The experimental results show thatMOPSO can achieve wider and more uniformPareto front distribution.In the IEEE33 node test system,power loss,and voltage deviation decreased by 52.23%,and 38.89%,respectively,while taking the economy into account.In the IEEE69 test system,the three indexes decreased by 19.67%,and 58.96%,respectively.
基金supported by the National Natural Science Foundation of China under Grant Nos.71871159,71701049,and 71901069National Social Science Foundation of China under Grant No.22BGL272+1 种基金Humanities and Social Science Foundation of the Chinese Ministry of Education under Grant No.21YJA630096Natural Science Foundation of Fujian Province,China under Grant Nos.2020J05040 and 2022J01075。
文摘This paper investigates a new resource-allocation problem involving multi-resource operations,where completing an operation requires simultaneous use of multiple(renewable)resources,probably of different types.The goal of the study is to provide a solution method that minimizes the makespan.The authors formulate the problem into a novel mixed-integer linear program(MILP)model.To efficiently solve practical-sized instances,an exact Benders decomposition algorithm is developed.This algorithm divides the original problem into a master problem of allocating resources and a subproblem of calculating the makespan,and both are linked via Benders cuts.The convergence is sped up by improving the mathematical model and embedding the variable neighborhood search algorithm.Compared with CPLEX,a commonly used MILP solver,the computational results demonstrate that the proposed algorithm provides tighter upper and lower bounds in most instances.In particular,compared with CPLEX,the proposed method can on average improve the upper and lower bounds by 4.76%and 4.39%,respectively,in solving practical-sized instances.
文摘Confronted with the requirement of higher efficiency and higher quality of distribution network fault rush-repair, the subject addressed in this paper is the optimal resource dispatching issue of the distribution network rush-repair when single resource center cannot meet the emergent resource demands. A multi-resource and multi-center dispatching model is established with the objective of “the shortest repair start-time” and “the least number of the repair centers”. The optimal and worst solutions of each objective are both obtained, and a “proximity degree method” is used to calculate the optimal resource dispatching plan. The feasibility of the proposed algorithm is illustrated by an example of a distribution network fault. The proposed method provides a practical technique for efficiency improvement of fault rush-repair work of distribution network, and thus mostly abbreviates power recovery time and improves the management level of the distribution network.
文摘Every summer, there is a surge of climbers seeking to make use of the precious window of good weather to summit Mount Qomolangma, the highest mountain in the world. With the number of climbers rising every year, overcrowding on the top of the world has given rise to the incredible phenomen on of 'traffic jams"―ong queues of climbers from different countries and regions awaiting their turn to reach the top and then descend. The long wait in below freezing temperatures in the rarified atmosphere is tuming increasingly perilous with some climbers meeting their death due to altitude sickness, excessive oxygen depletion and exhaustion.